CN205036098U CN201520590603.1U CN201520590603U CN205036098U CN 205036098 U CN205036098 U CN 205036098U CN 201520590603 U CN201520590603 U CN 201520590603U CN 205036098 U CN205036098 U CN 205036098U
Authority
CN
China
Prior art keywords
escape way
building construction
steel
guardrail
fence
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520590603.1U
Other languages
Chinese (zh)
Inventor
黄明国
黄前
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CN201520590603.1U priority Critical patent/CN205036098U/en
Application granted granted Critical
Publication of CN205036098U publication Critical patent/CN205036098U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model provides an interim escape way of high building construction. Rail and road surface including ceiling, both sides constitute frame rack structure, its characterized in that: the rail be multimode pin -connected panel structure, wherein each module is the rectangle of equal specification, adopts many steel pipes to be formed by connecting, adopt to connect between the steel pipe and the concatenation of overlap joint spare, for detachable construction, the ceiling be multilayer structure, the upper strata is the frame construction of steel pipe, one deck refractory material has laid in the lower floor, the road surface passageway that adopts the steel grid to lay a workman person colleague, also laid refractory material on the steel grid. The utility model discloses simple structure, simple to operate can be applicable to different job sites to can reuse, and good fire behavior has.

Description

The interim escape way of building construction
Technical field
The utility model relates to technical field of building construction, is specifically related to the interim escape way of a kind of building construction.
Background technology
Along with the development of building trade, safety is the guarantee of enterprise's life, and increasing industry and civilian construction all need to arrange at main building Stall the escape way passed in and out for constructor at present.Setting up of escape way is an important step of job site security protection, and run through the overall process of whole construction, escape way is the life passage of job site, is the key measure guaranteed safe production.
The escape way of job site, typically refers to " the head protector canopy " set up at building entrance scaffold, safety net and hard plank, and object is that the article that drop in order to avoid top are hurted sb.'s feelings.This escape way also can be arranged lifting region frequently sometimes.
Adopt the escape way built in this way, its most of parts such as reinforcing bar, palm, safety net etc. are single use, and after having constructed, these parts can not be reused again, cause the waste of material; In addition this escape way does not possess fire-proof function, and its parts mostly are inflammable articles, once breaking out of fire, also will become hidden danger, and affect personnel escape.
Therefore, need to design a kind of escape way for job site newly.
Summary of the invention
Technical problem to be solved in the utility model is the deficiency for above-mentioned existence, there is provided a kind of structure simple, easy for installation, different job sites can be applicable to, and can reusing, and the interim escape way of the building construction with good fireproof performance.
The utility model solves the technical scheme that its technical problem adopts:
The interim escape way of building construction, include ceiling, the fence of both sides and road surface, form tower structure, it is characterized in that: described fence is multi-module assembled structure, wherein each module is the rectangle of equivalent specifications, adopt many fastener for connection to form, adopting joint and bridge piece splicing between steel pipe, is demountable structure; Described ceiling is sandwich construction, and upper strata is the frame construction of steel pipe, and lower floor is equipped with one deck refractory material; Described road surface adopts steel grid to be equipped with the passage of a workman person colleague, and steel grid is also equipped with refractory material.
In such scheme, described steel pipe is square tube, and joint and bridge piece are also rectangular elements, is conducive to overlap joint firmly stable.
In such scheme, each module distance ground level of described fence is lower than 1.5 meters, and forming bottom is hollow, top be steel work shape.
In such scheme, inside described fence, be also provided with a row highly lower than the guardrail of 1.5 meters, guardrail blocks the hollow part of fence completely.
In such scheme, to be that many vertical reinforcing bars are equidistant be welded for the top of described guardrail, and the bottom of guardrail is monoblock steel plate, steel plate is provided with multiple hexagonal holes.
In such scheme, described guardrail arranged outside has multiple hook, hook hangs with multiple escape apparatus and breathing mask, escapes for when urgent fire.
Operating principle of the present utility model: make traditional Fence structure into modular construction, each module all adopts square steel pipe to form, dismounting and recycling can be realized, and fire prevention measure is set up on ceiling and ground, the bottom of fence is become hard guard bar structure, also increases fire prevention measure simultaneously.
The beneficial effect that the utility model produces is:
The utility model structure is simple, easy for installation, can be applicable to different job sites, and can reuse, and have good fireproof performance.
Accompanying drawing explanation
Fig. 1 is the Fence structure front view of the utility model embodiment;
Fig. 2 is the ceiling structure top view of the utility model embodiment;
Fig. 3 is the road surface top view of the utility model embodiment;
Fig. 4 is the guard bar structure front view of the utility model embodiment;
In figure: 1 ceiling, 2 fences, 3 road surfaces, 4 steel grids, 5 guardrails.
Detailed description of the invention
Below in conjunction with detailed description of the invention, the utility model is further described:
The interim escape way of building construction as shown in Figures 1 to 4, include ceiling 1, the fence 2 of both sides and road surface 3, form tower structure, described fence 2 is multi-module assembled structure, and wherein each module is the rectangle of equivalent specifications, many fastener for connection are adopted to form, adopt joint and bridge piece splicing between steel pipe, be demountable structure, described steel pipe is square tube, joint and bridge piece are also rectangular elements, are conducive to overlap joint firmly stable; Described ceiling 1 is sandwich construction, and upper strata is the frame construction of steel pipe, and lower floor is equipped with one deck refractory material; Described road surface 3 adopts steel grid 4 to be equipped with the passage of a workman person colleague, and steel grid 4 is also equipped with refractory material.
In the present embodiment, each module distance ground level of described fence 2 is lower than 1.5 meters, and forming bottom is hollow, top be steel work shape.Inside described fence 2, be also provided with a row highly lower than the guardrail 5 of 1.5 meters, guardrail 5 blocks the hollow part of fence completely.
In the present embodiment, to be that many vertical reinforcing bars are equidistant be welded for the top of described guardrail 5, and the bottom of guardrail 5 is monoblock steel plate, steel plate is provided with multiple hexagonal holes.Described guardrail 5 arranged outside has multiple hook, hook hangs with multiple escape apparatus and breathing mask, escapes for when urgent fire.
More than illustrate and be only Application Example of the present utility model, certainly can not limit the interest field of the utility model with this, therefore according to the equivalence change that the utility model claim is done, still belong to protection domain of the present utility model.

Claims (6)

1. the interim escape way of building construction, include ceiling, the fence of both sides and road surface, form tower structure, it is characterized in that: described fence is multi-module assembled structure, wherein each module is the rectangle of equivalent specifications, adopt many fastener for connection to form, adopting joint and bridge piece splicing between steel pipe, is demountable structure; Described ceiling is sandwich construction, and upper strata is the frame construction of steel pipe, and lower floor is equipped with one deck refractory material; Described road surface adopts steel grid to be equipped with the passage of a workman person colleague, and steel grid is also equipped with refractory material.
2. the interim escape way of building construction as claimed in claim 1, it is characterized in that, described steel pipe is square tube, and joint and bridge piece are also rectangular elements, is conducive to overlap joint firmly stable.
3. the interim escape way of building construction as claimed in claim 1, is characterized in that, each module distance ground level of described fence is lower than 1.5 meters, and forming bottom is hollow, top be steel work shape.
4. the interim escape way of building construction as claimed in claim 1, is characterized in that, inside described fence, be also provided with a row highly lower than the guardrail of 1.5 meters, guardrail blocks the hollow part of fence completely.
5. the interim escape way of building construction as claimed in claim 4, is characterized in that, to be that many vertical reinforcing bars are equidistant be welded for the top of described guardrail, and the bottom of guardrail is monoblock steel plate, steel plate is provided with multiple hexagonal holes.
6. the interim escape way of the building construction as described in claim 4 or 5, is characterized in that, described guardrail arranged outside has multiple hook, hook hangs with multiple escape apparatus and breathing mask, escapes for when urgent fire.
CN201520590603.1U 2015-08-07 2015-08-07 Interim escape way of high building construction Expired - Fee Related CN205036098U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520590603.1U CN205036098U (en) 2015-08-07 2015-08-07 Interim escape way of high building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520590603.1U CN205036098U (en) 2015-08-07 2015-08-07 Interim escape way of high building construction

Publications (1)

Publication Number Publication Date
CN205036098U true CN205036098U (en) 2016-02-17

Family

ID=55295007

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520590603.1U Expired - Fee Related CN205036098U (en) 2015-08-07 2015-08-07 Interim escape way of high building construction

Country Status (1)

Country Link
CN (1) CN205036098U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109577690A (en) * 2018-12-19 2019-04-05 金刚幕墙集团有限公司 A kind of assembled channel system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109577690A (en) * 2018-12-19 2019-04-05 金刚幕墙集团有限公司 A kind of assembled channel system
CN109577690B (en) * 2018-12-19 2024-03-01 金刚幕墙集团有限公司 Assembled channel system

Similar Documents

Publication Publication Date Title
CN101876209B (en) Supertall building core tube construction safety fire protection system and device
CN206722368U (en) One kind is used to protect frame system outside the working regularization of assembled architecture
CN203755711U (en) Light tool type hole pile protection device
CN205036098U (en) Interim escape way of high building construction
CN204752026U (en) Tower crane escape way
CN205838325U (en) Fabricated construction superimposed sheet string hangs construction special hanger
CN205025124U (en) Standardized limit of facing can be dismantled and is prevented guardrail bar
CN111236603B (en) Comprehensive construction method for steel plate mesh overhanging scaffold
CN204126290U (en) Elevator shaft horizontal protective device
CN204081430U (en) A kind of overhanging type discharging platform works in coordination with scaffold unitary construction
CN206722377U (en) A kind of external scaffolding drawknot node structure
CN206942111U (en) Build high spatial large span lighting roof, ceiling construction rope net scaffold
CN201826545U (en) Safety fire protection system device for core tube construction of super high-rise building
CN206418861U (en) A kind of switch base for facing skirt shield and multiduty skirt of facing are protected
CN203569905U (en) Novel safety protection structure for decoration
CN204850515U (en) Steel construction faces limit protector
CN204510855U (en) A kind of folding guardrail
CN205713187U (en) Horizontal entrance to a cave protection architecture
CN203008400U (en) Enhanced-type fine mesh safe vertical net
CN207420069U (en) A kind of guard rail being used in turn
CN207538492U (en) A kind of combination tool formula faces side hole protector
CN205348726U (en) Steel frame - steel sheet shear wall structure system construction tool formula operation platform
CN204703544U (en) A kind of safe and practical high rise elevator well construction guard system
CN202627477U (en) Safety barrier for construction scaffold
CN206693741U (en) Guardrail is protected in a kind of detachable artificial digging pile aperture

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160217

CF01 Termination of patent right due to non-payment of annual fee