CN206428681U - A kind of hydroenergy storage station unit base ring temporary support structure - Google Patents

A kind of hydroenergy storage station unit base ring temporary support structure Download PDF

Info

Publication number
CN206428681U
CN206428681U CN201720108381.4U CN201720108381U CN206428681U CN 206428681 U CN206428681 U CN 206428681U CN 201720108381 U CN201720108381 U CN 201720108381U CN 206428681 U CN206428681 U CN 206428681U
Authority
CN
China
Prior art keywords
support
base ring
hydraulic turbine
steel support
room
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720108381.4U
Other languages
Chinese (zh)
Inventor
谷文涌
李鸣
郭洪振
田翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Xinyuan Co Ltd
Shandong Taishan Pumped Storage Power Station Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Xinyuan Co Ltd
Shandong Taishan Pumped Storage Power Station Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Xinyuan Co Ltd, Shandong Taishan Pumped Storage Power Station Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201720108381.4U priority Critical patent/CN206428681U/en
Application granted granted Critical
Publication of CN206428681U publication Critical patent/CN206428681U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a kind of hydroenergy storage station unit base ring temporary support structure, room and truss support mechanism are installed including the hydraulic turbine, the hydraulic turbine is installed above room as generator installation room, the hydraulic turbine is installed and is embedded with truss support mechanism inside the concrete exterior wall of outside, the hydraulic turbine installs indoor bottom and is provided with seat ring, the inside that the hydraulic turbine installs room is also connected with base ring by support device, and the support meanss include directly supporting the horizontal steel support of base ring lower surface and the bent steel support for reinforcing horizontal steel support.The utility model can effectively support base ring by the truss support mechanism of pre-plugged, it is to avoid the method that support meanss are squeezed into wall, and the protection hydraulic turbine installs outside wall body structure;Steel bracket laterally with bending is combined, can further improve a kind of independent load bearing stength of supporting body, improve security;Even it is connected by method, dismounting and recovery when being easy to the base ring to install.

Description

A kind of hydroenergy storage station unit base ring temporary support structure
Technical field
The utility model belongs to power station unit base ring temporary support structure engineering device technique field, and in particular to one kind is drawn water storage Can power station unit base ring temporary support structure.
Background technology
, it is necessary to which each flange face and seam of seat ring in first machine is cheated enter during hydroenergy storage station unit installation Row machining polishing, could carry out the bolt connection between the seat ring in the base ring and machine hole of the hydraulic turbine and weldering after the completion of polishing Connect.Because the internal diameter that generator above installs room is less than the diameter of base ring, and base ring is overall structure, so existing Need grade seat ring polishing to machine and install during hydroenergy storage station unit installation and carry out generator installation after base ring again The processing of room.
Existing hydroenergy storage station unit base ring temporary support structure is more to install room as weight body using the hydraulic turbine, by Insertion supporting construction is used for temporary support base ring within the walls, and this construction is easily destroyed the hydraulic turbine and installs room side wall body structure, and When later stage lifts base ring, dismounting inconvenience, the problem of easily causing relatively low efficiency of construction and longer integral construction duration.
Utility model content
The purpose of this utility model is to provide a kind of hydroenergy storage station unit base ring temporary support structure, with solution State the problem of being proposed in background technology.
To achieve the above object, the utility model provides following technical scheme:A kind of hydroenergy storage station unit base ring faces When supporting construction, including the hydraulic turbine installs room and truss support mechanism, and the hydraulic turbine is installed above room and to install room for generator, The hydraulic turbine is installed and truss support mechanism is embedded with inside the concrete exterior wall of outside, and the hydraulic turbine installs indoor bottom Portion is provided with seat ring, and the inside that the hydraulic turbine installs room is also connected with base ring, the support meanss by support device Including directly supporting the horizontal steel support of base ring lower surface and bent steel support for reinforcing horizontal steel support.
It is preferred that, the truss support mechanism includes passing through waist between the girder support being vertically arranged, the girder support Beam reinforces connection, and the girder support two ends are fixedly connected in the middle part of waist rail by bracing piece.
It is preferred that, the lower surface of one end support connection base ring of the horizontal steel support, the other end of horizontal steel support passes through even Acting flange is fixedly installed in the side of girder support, and the bent steel support upper end is fixedly connected on the horizontal steel support below base ring One end, the other end of the bent steel support is fixedly installed in girder support by adpting flange.
It is preferred that, the bent steel support is in the quadrant arc using the adpting flange of horizontal steel support as the center of circle.
It is preferred that, the horizontal steel support upper surface is installed with the guide pad of cambered surface, and horizontal steel support connects with base ring Tactile part is provided with cushion pad.
Technique effect of the present utility model and advantage:The hydroenergy storage station unit base ring temporary support structure, by When building hydraulic turbine installation room, pre-plugged truss support mechanism, then support meanss are installed on truss support mechanism, utilize purlin Frame supporting mechanism can effectively be supported base ring by the big advantage of force intensity, it is to avoid the method that support meanss are squeezed into wall, be protected Protect the hydraulic turbine and outside wall body structure is installed;Steel bracket laterally with bending is combined, can further improve independent one The load bearing stength of supporting body is planted, security is improved;Even it is connected by method, dismounting and recovery when being easy to the base ring to install.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is overlooking the structure diagram of the present utility model;
Fig. 3 is mplifying structure schematic diagram at A in Fig. 1.
In figure:1 hydraulic turbine install room, 2 generators install room, 3 concrete exterior walls, 4 truss support mechanisms, 5 base rings, 6 Ring, 7 guide pads, 8 cushion pads, 9 horizontal steel supports, 10 bent steel supports, 11 support meanss, 12 bracing pieces, 13 girder supports, 14 waists Beam, 15 adpting flanges.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belongs to the scope of the utility model protection.
Refer to Fig. 1-2, a kind of hydroenergy storage station unit base ring temporary support structure, including the hydraulic turbine and the He of room 1 is installed Truss support mechanism 4, the hydraulic turbine installs the top of room 1 and installs room 2 for generator, and the hydraulic turbine installs the mixed of the outside of room 1 Truss support mechanism 4 is embedded with inside solidifying soil exterior wall 3, the bottom that the hydraulic turbine is installed in room 1 is provided with seat ring 6, the water The inside that turbine installs room 1 is also connected with base ring 5 by the support of support meanss 11, and the support meanss 11 include directly supporting bottom The horizontal steel support 9 of the lower surface of ring 5 and the bent steel support 10 for reinforcing horizontal steel support 9, the outside of room 1 is installed carrying out the hydraulic turbine When concrete exterior wall 3 is constructed, truss support mechanism 4 is installed in advance, and the truss support mechanism 4 includes the girder being vertically arranged Reinforced and connected by waist rail 14 between support 13, the girder support 13, the two ends of girder support 13 are solid by bracing piece 12 Surely the middle part of waist rail 14 is connected to, this structure stress is uniform, and anti-pressure ability is big, is unlikely to deform, carries out pouring mixed mud, shape afterwards Into concrete exterior wall 3, there is piece truss supporting mechanism 4 to expose in the inside middle portion of concrete exterior wall 3, in truss support mechanism 4 Girder support 13 be provided with for mounting flange 15 mounting hole, the horizontal steel support 9 one end support connection base ring 5 under Surface, the other end of horizontal steel support 9 is fixedly installed in the side of girder support 13 by adpting flange 15, when base ring 5 hangs in water Turbine is installed behind room 1, horizontal steel support 9 and bent steel support 10 is installed by flange 15, for supporting base ring 5, the bent steel Support 10 is in that the upper end of the bent steel support 10 is fixed with quadrant arc of the adpting flange 15 of horizontal steel support 9 for the center of circle One end of the horizontal steel support 9 of the lower section of base ring 5 is connected to, the other end of the bent steel support 10 is fixedly mounted by adpting flange 15 In girder support 13.
Referring to Fig. 3, being supported for the ease of the positioning of base ring 5, the horizontal upper surface of steel support 9 is installed with cambered surface Guide pad 7, when the outer ledge of base ring 5 enters the cambered surface side of guide pad 7, continues to decline base ring 5, base ring 5 is slided along cambered surface Enter and support site, the part that the horizontal steel support 9 is in contact with base ring 5 is provided with cushion pad 8, cushion pad is used to buffer under base ring 5 Impulsive force during drop, it is to avoid base ring 5 is impacted and deformed, effectively protection base ring 5.
Finally it should be noted that:Preferred embodiment of the present utility model is the foregoing is only, this is not limited to Utility model, although the utility model is described in detail with reference to the foregoing embodiments, for those skilled in the art For, it can still modify to the technical scheme described in foregoing embodiments, or to which part technical characteristic Equivalent substitution is carried out, all within spirit of the present utility model and principle, any modification, equivalent substitution and improvements made etc., It should be included within protection domain of the present utility model.

Claims (5)

1. a kind of hydroenergy storage station unit base ring temporary support structure, including the hydraulic turbine install room(1)With truss support mechanism (4), it is characterised in that:The hydraulic turbine installs room(1)Top is that generator installs room(2), the hydraulic turbine installation room(1)Outside The concrete exterior wall of side(3)Inside is embedded with truss support mechanism(4), the hydraulic turbine installation room(1)Interior bottom is provided with Seat ring(6), the hydraulic turbine installation room(1)Inside also pass through support meanss(11)Support is connected with base ring(5), the support Device(11)Including directly supporting base ring(5)The horizontal steel support of lower surface(9)With for reinforcing horizontal steel support(9)Bent steel support (10).
2. a kind of hydroenergy storage station unit base ring temporary support structure according to claim 1, it is characterised in that:It is described Truss support mechanism(4)Including the girder support being vertically arranged(13), the girder support(13)Between pass through waist rail(14)Plus It is solidly connected, the girder support(13)Two ends pass through bracing piece(12)It is fixedly connected on waist rail(14)Middle part.
3. a kind of hydroenergy storage station unit base ring temporary support structure according to claim 1, it is characterised in that:It is described Horizontal steel support(9)One end support connection base ring(5)Lower surface, horizontal steel support(9)The other end pass through adpting flange(15) It is fixedly installed in girder support(13)Side, the bent steel support(10)Upper end is fixedly connected on base ring(5)The transverse direction of lower section Steel support(9)One end, the bent steel support(10)The other end pass through adpting flange(15)It is fixedly installed in girder support(13).
4. a kind of hydroenergy storage station unit base ring temporary support structure according to claim 3, it is characterised in that:It is described Bent steel support(10)In with horizontal steel support(9)Adpting flange(15)For the quadrant arc in the center of circle.
5. a kind of hydroenergy storage station unit base ring temporary support structure according to claim 3, it is characterised in that:It is described Horizontal steel support(9)Upper surface is installed with the guide pad of cambered surface(7), and horizontal steel support(9)With base ring(5)The part being in contact Provided with cushion pad(8).
CN201720108381.4U 2017-02-05 2017-02-05 A kind of hydroenergy storage station unit base ring temporary support structure Expired - Fee Related CN206428681U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720108381.4U CN206428681U (en) 2017-02-05 2017-02-05 A kind of hydroenergy storage station unit base ring temporary support structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720108381.4U CN206428681U (en) 2017-02-05 2017-02-05 A kind of hydroenergy storage station unit base ring temporary support structure

Publications (1)

Publication Number Publication Date
CN206428681U true CN206428681U (en) 2017-08-22

Family

ID=59592315

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720108381.4U Expired - Fee Related CN206428681U (en) 2017-02-05 2017-02-05 A kind of hydroenergy storage station unit base ring temporary support structure

Country Status (1)

Country Link
CN (1) CN206428681U (en)

Similar Documents

Publication Publication Date Title
CN107604827A (en) A kind of porous large-span freely-supported steel truss girder bridge erection method
CN207732075U (en) A kind of fixing device for communication tower antenna
CN201687227U (en) Integrated communication base station
CN204858400U (en) Slope shaft tower unscrambler
CN201506692U (en) Roofing steel structure simple lifting device and installation structure thereof
CN206428681U (en) A kind of hydroenergy storage station unit base ring temporary support structure
CN202785387U (en) Indoor cantilever crane
CN206233656U (en) Steel frame mill building structure
CN211775667U (en) Power transmission line crossing tower assembly high-altitude construction platform
CN204023319U (en) For the triangular tower of cableway of constructing
CN107634706A (en) A kind of photovoltaic plant array bracket
CN209523522U (en) A kind of tower body bracing means and tubular structure tower
CN203022409U (en) Iron tower support assembly
CN206753087U (en) A kind of lighting roof operating platform structure
CN102383613B (en) Hoisting construction method for steel roof truss of main power house of power plant and special hoisting device
CN211371492U (en) Formula antidetonation pipeline bracket sways
CN204455845U (en) A kind of large-scale assembling drilling platform
CN204825924U (en) Square steel tube concrete waist rail
CN204733123U (en) A kind of uniaxial tracking bracket
CN209669889U (en) Suspension type riding track assembled attached wall fashioned iron English truss
CN203238655U (en) Offshore wind power single pile foundation-based tidal current energy power generation foundation structure
CN206476671U (en) Attachment device of tower crane
CN204877804U (en) Fixing base and use wind power generation set of this fixing base
CN202467221U (en) Power plant main workshop steel roof truss hoisting lifting device
CN206646518U (en) A kind of foundation ditch diagonal brace

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170822

Termination date: 20190205