CN206422496U - Charged electric power apparatus device for expelling ice and snow - Google Patents
Charged electric power apparatus device for expelling ice and snow Download PDFInfo
- Publication number
- CN206422496U CN206422496U CN201720021729.6U CN201720021729U CN206422496U CN 206422496 U CN206422496 U CN 206422496U CN 201720021729 U CN201720021729 U CN 201720021729U CN 206422496 U CN206422496 U CN 206422496U
- Authority
- CN
- China
- Prior art keywords
- control unit
- control box
- ice
- wedge
- chute
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Nozzles (AREA)
Abstract
电力设备带电除冰雪装置,包括控制箱,控制箱内分别设置控制箱总电源、加热器分级控制单元、变频器控制单元和变频风机,控制箱总电源分别与加热器分级控制单元和变频器控制单元连接,变频器控制单元与变频风机连接,变频风机的出风口连接绝缘软管的一端,绝缘软管的另一端穿出控制箱并连接绝缘管的一端,绝缘管的另一端安装喷头,绝缘管内设置电加热装置,加热器分级控制单元与电加热装置连接。它能方便去除积雪,可根据情况选择投入加热器数量,根据设备和积冰情况调节变频器控制单元来控制变频风机风速,从而方便去除积冰。本实用新型安全度高,对电力设备具有极高的通用性,工具携带方便,组装便捷,对周围设备无二次污染。
The live ice and snow removal device for electric equipment includes a control box. The control box is equipped with the main power supply of the control box, the heater classification control unit, the frequency converter control unit and the frequency conversion fan. The control box main power supply is connected with the heater classification control unit and the frequency converter control Unit connection, the frequency converter control unit is connected with the frequency conversion fan, the air outlet of the frequency conversion fan is connected to one end of the insulating hose, the other end of the insulating hose passes through the control box and connects to one end of the insulating tube, the other end of the insulating tube is installed with a nozzle, and the insulation An electric heating device is arranged in the tube, and the heater classification control unit is connected with the electric heating device. It can remove snow easily, and the number of heaters can be selected according to the situation, and the frequency converter control unit can be adjusted according to the equipment and ice accumulation to control the wind speed of the frequency conversion fan, so as to facilitate the removal of ice accumulation. The utility model has high safety, high versatility for electric equipment, convenient tool carrying, convenient assembly, and no secondary pollution to surrounding equipment.
Description
技术领域technical field
本实用新型涉属于电力设备除冰技术领域,确切地说是电力设备带电除冰雪装置。The utility model relates to the technical field of deicing of electric power equipment, in particular to a live deicing and snow removal device for electric power equipment.
背景技术Background technique
随着我国经济的快速发展和人民生活水平的提高,保证电网安全运行显得越来越With the rapid development of my country's economy and the improvement of people's living standards, it is becoming more and more important to ensure the safe operation of power grids.
重要。在北方地区冬季经常发生的雨雪、冰冻天气造成的电力设备覆冰给电网带来了important. The icing of power equipment caused by rain, snow and freezing weather that often occurs in winter in the northern region has brought serious damage to the power grid.
巨大的困难,由于缺少有效的除冰手段和方式,变电设备发生覆冰后,为避免引发事Due to the lack of effective means and methods of deicing, after the substation equipment is covered with ice, in order to avoid accidents
故,主要采用人工清扫、敲打除冰的方法,这种方法除冰效果有限,工作人员劳动强度大,而且容易对电力设备等造成危害。Therefore, manual cleaning and beating deicing methods are mainly used. The deicing effect of this method is limited, the labor intensity of the staff is high, and it is easy to cause damage to electrical equipment.
实用新型内容Utility model content
为解决上述问题,本实用新型的目的是提供电力设备带电除冰雪装置装置。In order to solve the above-mentioned problems, the purpose of this utility model is to provide a device for deicing and snowing live electricity equipment.
本实用新型为实现上述目的,通过以下技术方案实现:电力设备带电除冰雪装置,包括控制箱,控制箱内分别设置控制箱总电源、加热器分级控制单元、变频器控制单元和变频风机,控制箱总电源分别与加热器分级控制单元和变频器控制单元连接,变频器控制单元与变频风机连接,变频风机的出风口连接绝缘软管的一端,绝缘软管的另一端穿出控制箱并连接绝缘管的一端,绝缘管的另一端安装喷头,绝缘管内设置电加热装置,加热器分级控制单元与电加热装置连接。In order to achieve the above object, the utility model is realized through the following technical solutions: the charged ice and snow removal device for electric equipment includes a control box, and the control box is respectively equipped with a total power supply of the control box, a heater classification control unit, a frequency converter control unit and a frequency conversion fan. The main power supply of the box is respectively connected to the heater classification control unit and the frequency converter control unit, the frequency converter control unit is connected to the frequency conversion fan, the air outlet of the frequency conversion fan is connected to one end of the insulating hose, and the other end of the insulation hose passes through the control box and is connected to One end of the insulating tube and the other end of the insulating tube are equipped with a nozzle, an electric heating device is arranged in the insulating tube, and the heater classification control unit is connected with the electric heating device.
为进一步实现本实用新型的目的,还可以采用以下技术方案:所述的喷头为圆形喷头、扁平喷头或气动毛刷。所述的绝缘管与喷头之间设置弯折的连接管。所述的绝缘管为伸缩管。所述的控制箱内分别开设固定槽、C形的容纳槽、第一滑槽和第二滑槽,C形的容纳槽分别与第一滑槽和第二滑槽相通,固定槽内设置托板,托板固定在绝缘管外壁上,托板侧壁上沿长度方向安装齿条,C形的容纳槽的一端内安装齿轮,齿轮与齿条啮合,齿轮上同轴安装传动轮,传动轮上连接传动带的一端,容纳槽内设置过渡轮,第一滑槽内设置第一楔形块,第二滑槽内设置第二楔形块,第一楔形块开设斜面的一端与第二楔形块的斜面相触,第一楔形块另一端连接拉杆,拉杆的端部伸出控制箱,拉杆上设置弹簧,弹簧两端分别第一滑槽的侧壁和第一楔形块固定连接,弹簧始终给第一楔形块推力,传动带的另一端绕过过渡轮与第二楔形块的一端连接,第二楔形块的另一端固定连接拉簧,拉簧固定在C形的容纳槽侧壁上,拉簧始终给第二楔形块拉力,第二楔形块侧部安装限位块,托板侧壁开设限位槽,限位块位于限位槽内。所述的拉杆伸出控制箱的端部上安装挡板。所述的限位块侧部设置斜面,限位槽的侧壁设置斜面,限位块的斜面与限位槽的斜面相配合。In order to further realize the purpose of the utility model, the following technical solutions can also be adopted: the spray head is a circular spray head, a flat spray head or a pneumatic brush. A bent connecting pipe is arranged between the insulating pipe and the spray head. The insulating tube is a telescopic tube. A fixed groove, a C-shaped accommodation groove, a first chute and a second chute are provided in the control box respectively, and the C-shaped accommodation groove communicates with the first chute and the second chute respectively, and a bracket is arranged in the fixed groove. The plate and the supporting plate are fixed on the outer wall of the insulating tube, the rack is installed on the side wall of the supporting plate along the length direction, the gear is installed in one end of the C-shaped receiving groove, the gear and the rack are meshed, and the transmission wheel is coaxially installed on the gear. One end of the transmission belt is connected to the top, a transition wheel is set in the accommodation groove, a first wedge block is set in the first chute, a second wedge block is set in the second chute, and one end of the first wedge block with an inclined surface is connected with the inclined surface of the second wedge block. The other end of the first wedge-shaped block is connected to the pull rod, and the end of the pull rod extends out of the control box. A spring is arranged on the pull rod. The two ends of the spring are respectively fixedly connected to the side wall of the first chute and the first wedge-shaped block. Wedge block thrust, the other end of the transmission belt bypasses the transition wheel and connects with one end of the second wedge block, and the other end of the second wedge block is fixedly connected to the extension spring, which is fixed on the side wall of the C-shaped accommodation groove, and the extension spring always gives The second wedge block pulls, the side of the second wedge block is equipped with a limit block, the side wall of the supporting plate is provided with a limit groove, and the limit block is located in the limit groove. A baffle is installed on the end of the control box where the pull rod extends out. The side of the limiting block is provided with an inclined surface, the side wall of the limiting groove is provided with an inclined surface, and the inclined surface of the limiting block matches the inclined surface of the limiting groove.
本实用新型的优点在于:本实用新型设置电加热装置,增加了由变频风机吹出的风的温度,除冰雪效率更快,可以根据需要改变加热器的数量。需要进行电力设备除雪时,打开控制箱总电源,打开变频风机,风通过绝缘管由喷头喷出,人们可以手持绝缘管,使喷头面向积雪,根据设备和积雪情况调节变频器控制单元来控制变频风机风速,从而方便去除积雪。需要进行电力设备除冰时,打开控制箱总电源,接通电加热装置,从而使变频风机吹出风的温度增高,可根据情况选择投入加热器数量,人们可以手持绝缘管,使喷头面向积冰,根据设备和积冰情况调节变频器控制单元来控制变频风机风速,从而方便去除积冰。本实用新型安全度高,对电力设备具有极高的通用性,工具携带方便,组装便捷,对周围设备无二次污染。The utility model has the advantages that: the utility model is equipped with an electric heating device, which increases the temperature of the wind blown by the frequency conversion fan, and the efficiency of removing ice and snow is faster, and the number of heaters can be changed as required. When it is necessary to remove snow from electrical equipment, turn on the main power supply of the control box, turn on the frequency conversion fan, and the wind will be sprayed out from the nozzle through the insulating tube. People can hold the insulating tube and make the nozzle face the snow, and adjust the frequency converter control unit according to the equipment and snow conditions. Control the wind speed of the frequency conversion fan, so as to facilitate the removal of snow. When it is necessary to de-ice the electrical equipment, turn on the main power supply of the control box and connect the electric heating device, so that the temperature of the air blown by the frequency conversion fan will increase, and the number of heaters can be selected according to the situation. People can hold the insulating tube and make the nozzle face the ice accumulation According to the equipment and ice accumulation, adjust the frequency converter control unit to control the wind speed of the frequency conversion fan, so as to facilitate the removal of ice accumulation. The utility model has high safety, high versatility for electric equipment, convenient tool carrying, convenient assembly, and no secondary pollution to surrounding equipment.
附图说明Description of drawings
图1是本实用新型结构示意图;图2是本实用新型结构框图;图3是本实用新型另一种结构示意图;图4是图3的Ⅰ部放大图;图5是图4的另一种状态图。Fig. 1 is a schematic structural diagram of the utility model; Fig. 2 is a structural block diagram of the utility model; Fig. 3 is another structural schematic diagram of the utility model; Fig. 4 is an enlarged view of part I of Fig. 3; Fig. 5 is another one of Fig. 4 State diagram.
具体实施方式detailed description
电力设备带电除冰雪装置,如图1所示,包括控制箱1,控制箱1内分别设置控制箱总电源、加热器分级控制单元、变频器控制单元和变频风机,控制箱总电源分别与加热器分级控制单元和变频器控制单元连接,变频器控制单元与变频风机连接,变频风机的出风口连接绝缘软管2的一端,绝缘软管2的另一端穿出控制箱1并连接绝缘管4的一端,绝缘管4的另一端安装喷头5,绝缘管4内设置电加热装置3,加热器分级控制单元与电加热装置3连接。电加热装置3为电热丝,电加热装置3安装在绝缘管4的下部,电加热装置3的设置增加了由变频风机吹出的风的温度,除冰雪效率更快,可以根据需要改变加热器的数量。需要进行电力设备除雪时,打开控制箱总电源,打开变频风机,风通过绝缘管4由喷头5喷出,人们可以手持绝缘管4,使喷头5面向积雪,根据设备和积雪情况调节变频器控制单元来控制变频风机风速,从而方便去除积雪。需要进行电力设备除冰时,打开控制箱总电源,接通电加热装置,从而使变频风机吹出风的温度增高,可根据情况选择投入加热器数量,人们可以手持绝缘管4,使喷头5面向积冰,根据设备和积冰情况调节变频器控制单元来控制变频风机风速,从而方便去除积冰。这种结构安全度高,对电力设备具有极高的通用性,工具携带方便,组装便捷,对周围设备无二次污染。The live ice and snow removal device for electric equipment, as shown in Figure 1, includes a control box 1. The control box 1 is respectively equipped with the total power supply of the control box, the heater classification control unit, the frequency converter control unit and the frequency conversion fan. The total power supply of the control box is respectively connected to the heating The classification control unit of the inverter is connected with the inverter control unit, the inverter control unit is connected with the frequency conversion fan, the air outlet of the frequency conversion fan is connected with one end of the insulating hose 2, and the other end of the insulating hose 2 passes through the control box 1 and connects with the insulation pipe 4 One end of the insulating tube 4, the other end of the insulating tube 4 is installed with a shower head 5, an electric heating device 3 is arranged in the insulating tube 4, and the heater grading control unit is connected with the electric heating device 3. The electric heating device 3 is an electric heating wire, and the electric heating device 3 is installed on the lower part of the insulating pipe 4. The setting of the electric heating device 3 increases the temperature of the wind blown by the frequency conversion fan, and the deicing and snow removal efficiency is faster, and the heater can be changed as required. quantity. When it is necessary to remove snow from electric equipment, turn on the main power supply of the control box, turn on the frequency conversion fan, and the wind will be sprayed out from the nozzle 5 through the insulation pipe 4. People can hold the insulation pipe 4 and make the nozzle 5 face the snow, and adjust the frequency conversion according to the equipment and snow accumulation conditions. The inverter control unit is used to control the wind speed of the variable frequency fan, so as to facilitate the removal of snow. When it is necessary to de-ice the electrical equipment, turn on the main power supply of the control box and connect the electric heating device, so that the temperature of the air blown by the frequency conversion fan will increase, and the number of heaters can be selected according to the situation. Ice accumulation, adjust the frequency converter control unit to control the wind speed of the frequency conversion fan according to the equipment and ice accumulation conditions, so as to facilitate the removal of ice accumulation. This structure has a high degree of safety, high versatility for power equipment, easy to carry tools, easy assembly, and no secondary pollution to surrounding equipment.
为了更有效的清除设备表面积雪,方便清除设备表面不同程度的积冰雪,所述的喷头5为圆形喷头、扁平喷头或气动毛刷。喷头5为气动毛刷时,能够方便人们手持绝缘管4,使用气动毛刷来清理覆冰及积雪。In order to remove snow on the surface of the equipment more effectively and facilitate the removal of ice and snow on the surface of the equipment in different degrees, the nozzle 5 is a circular nozzle, a flat nozzle or a pneumatic brush. When the nozzle 5 is a pneumatic brush, it is convenient for people to hold the insulating pipe 4 and use the pneumatic brush to clean up ice and snow.
所述的绝缘管4与喷头5之间设置弯折的连接管6。这种结构能够方便人们清除角度不同的积雪积冰以及设备上方的积雪积冰。A bent connecting pipe 6 is provided between the insulating pipe 4 and the spray head 5 . This structure can facilitate people to remove snow and ice accumulations at different angles and snow and ice accumulations above the equipment.
为方便根据电压等级或设备位置,调节绝缘管4以达到安全合适的长度。所述的绝缘管4为伸缩管。绝缘管4可以是电动伸缩杆,也可以是雨伞伞柄结构的机械式伸缩杆,还可以是登山杖结构的机械式伸缩杆。For convenience, the insulating tube 4 is adjusted to a safe and suitable length according to the voltage level or the location of the equipment. The insulating tube 4 is a telescopic tube. The insulating pipe 4 can be an electric telescopic rod, or a mechanical telescopic rod with an umbrella handle structure, or a mechanical telescopic rod with a trekking pole structure.
为方便一起控制箱1和绝缘管4一起携带,所述的控制箱1内分别开设固定槽7、C形的容纳槽8、第一滑槽9和第二滑槽10,C形的容纳槽8分别与第一滑槽9和第二滑槽10相通,固定槽7内设置托板11,托板11固定在绝缘管4外壁上,托板11侧壁上沿长度方向安装齿条13,C形的容纳槽8的一端内安装齿轮14,齿轮14与齿条13啮合,齿轮14上同轴安装传动轮15,传动轮15上连接传动带16的一端,容纳槽8内设置过渡轮17,第一滑槽9内设置第一楔形块18,第二滑槽10内设置第二楔形块19,第一楔形块18开设斜面的一端与第二楔形块19的斜面相触,第一楔形块18另一端连接拉杆20,拉杆20的端部伸出控制箱1,拉杆20上设置弹簧21,弹簧21两端分别第一滑槽9的侧壁和第一楔形块18固定连接,弹簧21始终给第一楔形块18推力,传动带16的另一端绕过过渡轮17与第二楔形块19的一端连接,第二楔形块19的另一端固定连接拉簧22,拉簧22固定在C形的容纳槽8侧壁上,拉簧22始终给第二楔形块19拉力,第二楔形块19侧部安装限位块23,托板11侧壁开设限位槽24,限位块23位于限位槽24内。将绝缘管4与控制箱1连接时,推动托板11使托板11进入固定槽7,进入过程中,托板11上的齿条13带动齿轮14转动,从而使传动轮15通过传动带16带动第二楔形块19移动,第二楔形块19的斜面沿着第一楔形块18的斜面移动时,第二楔形块19上的限位块23进入托板11上的限位槽24内,将托板11固定在固定槽7内,从而将绝缘管4固定在控制箱1上。拆卸托板11时,拉动拉杆20,使第二楔形块19上的限位块23脱离限位槽24,并在拉簧22的拉力作用下,第二楔形块19回复原位,传动带16通过传动轮15带动齿轮14反向转动,使托板11离开固定槽7,从而方便将绝缘管4与控制箱1分离以便使用。For the convenience of carrying the control box 1 and the insulating tube 4 together, a fixed groove 7, a C-shaped receiving groove 8, a first chute 9 and a second chute 10, and a C-shaped accommodating groove are set in the control box 1 respectively. 8 communicate with the first chute 9 and the second chute 10 respectively, the supporting plate 11 is arranged in the fixed groove 7, the supporting plate 11 is fixed on the outer wall of the insulating tube 4, and the rack 13 is installed on the side wall of the supporting plate 11 along the length direction, Gear 14 is installed in one end of C-shaped accommodation groove 8, and gear 14 is meshed with tooth bar 13, and transmission wheel 15 is coaxially installed on gear 14, and an end of drive belt 16 is connected on transmission wheel 15, and transition wheel 17 is set in accommodation groove 8, The first wedge block 18 is set in the first chute 9, the second wedge block 19 is set in the second chute 10, and one end of the first wedge block 18 offering an inclined surface contacts with the inclined surface of the second wedge block 19, the first wedge block The other end of 18 is connected to the pull rod 20, the end of the pull rod 20 extends out of the control box 1, the pull rod 20 is provided with a spring 21, and the two ends of the spring 21 are respectively fixedly connected to the side wall of the first chute 9 and the first wedge block 18, and the spring 21 is always Give the first wedge block 18 a thrust, the other end of the drive belt 16 is connected to one end of the second wedge block 19 around the transition wheel 17, and the other end of the second wedge block 19 is fixedly connected to the extension spring 22, and the extension spring 22 is fixed on the C-shaped On the side wall of the accommodation groove 8, the extension spring 22 always gives the second wedge block 19 tension, the second wedge block 19 side is equipped with a limit block 23, the side wall of the supporting plate 11 is provided with a limit groove 24, and the limit block 23 is located at the position limit In slot 24. When connecting the insulating tube 4 to the control box 1, push the supporting plate 11 so that the supporting plate 11 enters the fixed groove 7. During the entry process, the rack 13 on the supporting plate 11 drives the gear 14 to rotate, so that the transmission wheel 15 is driven by the transmission belt 16 The second wedge block 19 moves, and when the slope of the second wedge block 19 moves along the slope of the first wedge block 18, the stopper 23 on the second wedge block 19 enters in the stop groove 24 on the supporting plate 11, and the The supporting plate 11 is fixed in the fixing groove 7 , thereby fixing the insulating tube 4 on the control box 1 . When dismounting the supporting plate 11, pull the pull bar 20 to make the stopper 23 on the second wedge-shaped block 19 break away from the stopper groove 24, and under the pulling force of the extension spring 22, the second wedge-shaped block 19 returns to its original position, and the transmission belt 16 passes through The transmission wheel 15 drives the gear 14 to reversely rotate, so that the supporting plate 11 leaves the fixing groove 7, thereby facilitating the separation of the insulating tube 4 from the control box 1 for use.
所述的拉杆20伸出控制箱1的端部上安装挡板25。这种结构能够避免拉杆20完全进入第一滑槽9,并方便拉动拉杆20。The baffle plate 25 is installed on the end of the pull rod 20 protruding from the control box 1 . This structure can prevent the pull rod 20 from completely entering the first chute 9 and facilitate pulling the pull rod 20 .
所述的限位块23侧部设置斜面,限位槽24的侧壁设置斜面,限位块23的斜面与限位槽24的斜面相配合。这种结构能够在限位块23进入限位槽24时,两者的斜面相互贴合提供缓冲,避免限位块23与限位槽24产生冲撞。The side of the limiting block 23 is provided with an inclined surface, the side wall of the limiting groove 24 is provided with an inclined surface, and the inclined surface of the limiting block 23 matches the inclined surface of the limiting groove 24 . This structure can provide buffering when the limiting block 23 enters the limiting groove 24 , and the slopes of the two fit together to prevent the limiting block 23 from colliding with the limiting groove 24 .
本实用新型的技术方案并不限制于本实用新型所述的实施例的范围内。本实用新型未详尽描述的技术内容均为公知技术。The technical solution of the utility model is not limited within the scope of the embodiments described in the utility model. The technical contents not described in detail in the utility model are all known technologies.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720021729.6U CN206422496U (en) | 2017-01-10 | 2017-01-10 | Charged electric power apparatus device for expelling ice and snow |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720021729.6U CN206422496U (en) | 2017-01-10 | 2017-01-10 | Charged electric power apparatus device for expelling ice and snow |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN206422496U true CN206422496U (en) | 2017-08-18 |
Family
ID=59574769
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201720021729.6U Expired - Fee Related CN206422496U (en) | 2017-01-10 | 2017-01-10 | Charged electric power apparatus device for expelling ice and snow |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN206422496U (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107994491A (en) * | 2017-11-10 | 2018-05-04 | 国家电网公司 | Charged electric power apparatus device for expelling ice and snow |
| CN110194059A (en) * | 2019-07-29 | 2019-09-03 | 常州大连理工大学智能装备研究院 | A kind of high pressure blowing-type benchmark accessory antifreeze based on pantograph |
| CN113241648A (en) * | 2021-05-21 | 2021-08-10 | 贵州电网有限责任公司 | Transformer substation's isolator contact congeals processing apparatus |
| CN117712973A (en) * | 2024-01-08 | 2024-03-15 | 国网湖北省电力有限公司黄冈供电公司 | Be used for distribution lines to patrol line and cover ice cleaning device |
-
2017
- 2017-01-10 CN CN201720021729.6U patent/CN206422496U/en not_active Expired - Fee Related
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107994491A (en) * | 2017-11-10 | 2018-05-04 | 国家电网公司 | Charged electric power apparatus device for expelling ice and snow |
| CN110194059A (en) * | 2019-07-29 | 2019-09-03 | 常州大连理工大学智能装备研究院 | A kind of high pressure blowing-type benchmark accessory antifreeze based on pantograph |
| CN113241648A (en) * | 2021-05-21 | 2021-08-10 | 贵州电网有限责任公司 | Transformer substation's isolator contact congeals processing apparatus |
| CN117712973A (en) * | 2024-01-08 | 2024-03-15 | 国网湖北省电力有限公司黄冈供电公司 | Be used for distribution lines to patrol line and cover ice cleaning device |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102983538B (en) | Electric device snow-blowing and deicing device | |
| CN107508239B (en) | A kind of voltage wire ice removing device | |
| CN202978179U (en) | Snow-blowing deicing device for power devices | |
| CN201191746Y (en) | Electric blower machine for deicing | |
| CN111313349A (en) | A kind of automatic deicing and snow removing device for power transmission line and its control method | |
| CN111889407A (en) | High tension cable snow clearing device for power maintenance | |
| CN115000905B (en) | An intelligent power maintenance and cleaning device | |
| WO2015007138A1 (en) | Energized deicing device for overhead power transmission line | |
| CN108599077B (en) | Be used for high suitability defroster of outdoor power cable | |
| CN204144748U (en) | Power transmission and transforming equipment ice and snow removing device | |
| CN202984202U (en) | Post insulator electrified cleaning device | |
| CN101262125B (en) | Method for removing ice of power transmission line | |
| CN107994491A (en) | Charged electric power apparatus device for expelling ice and snow | |
| CN221177235U (en) | A power energy-saving power grid deicing device | |
| CN204441764U (en) | A kind of transformer station snow-blowing and deicing device | |
| CN221227489U (en) | Snow melting device for photovoltaic power station | |
| CN107196222A (en) | Movable transformer pack deicer | |
| CN218472736U (en) | Power grid deicing device | |
| CN218124271U (en) | Snow removing device for power grid line | |
| CN204118586U (en) | A kind of Simple line mechanical deicing device | |
| CN114530811B (en) | Ice and snow removing device of power transmission line | |
| CN116885656A (en) | A kind of de-icing device for high-voltage cables in distribution network | |
| CN214590487U (en) | Electrified ice-melt device of distribution network | |
| CN104014493A (en) | Special tool for cleaning accumulated snow and ice on outdoor insulator | |
| CN115646883A (en) | Automatic snow removing device for power equipment |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170818 Termination date: 20180110 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |