CN206399414U - One kind is based on GPRS power transmission line line pole tower tilt detection systems - Google Patents

One kind is based on GPRS power transmission line line pole tower tilt detection systems Download PDF

Info

Publication number
CN206399414U
CN206399414U CN201621198722.3U CN201621198722U CN206399414U CN 206399414 U CN206399414 U CN 206399414U CN 201621198722 U CN201621198722 U CN 201621198722U CN 206399414 U CN206399414 U CN 206399414U
Authority
CN
China
Prior art keywords
module
tilt detection
pole tower
power transmission
transmission line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621198722.3U
Other languages
Chinese (zh)
Inventor
丁三六
申卫华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hefei Same Information Technology Co Ltd
Original Assignee
Hefei Same Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hefei Same Information Technology Co Ltd filed Critical Hefei Same Information Technology Co Ltd
Priority to CN201621198722.3U priority Critical patent/CN206399414U/en
Application granted granted Critical
Publication of CN206399414U publication Critical patent/CN206399414U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Arrangements For Transmission Of Measured Signals (AREA)

Abstract

The utility model discloses a kind of based on GPRS power transmission line line pole tower tilt detection systems, including environment measuring subsystem, control module, locating module, power module, wireless transport module, display terminal;Wherein, environment measuring subsystem includes Temperature and Humidity module, tilt detection module;Control module is connected with Temperature and Humidity module, tilt detection module, locating module, power module, wireless communication module respectively, and wireless communication module is connected with display terminal.The utility model is detected by inclination sensor to the angle of shaft tower, can accurately detect the inclined degree of tool shaft tower;Electric energy is converted solar energy into for equipment by solar cell working power is provided, greatly save electric energy;By between display terminal and control module mutually transmission information, facilitate the information of personnel's active obtaining shaft tower, with it is simple in construction, the degree of accuracy is high the characteristics of.

Description

One kind is based on GPRS power transmission line line pole tower tilt detection systems
Technical field
The utility model belongs to electric power transmission line technical field, is related to a kind of based on GPRS power transmission line line pole towers Tilt detection system.
Background technology
Extensively, complex geologic conditions are various, and transmission line of electricity is substantially all and uses overhead transmission line again for China's geographical distribution, due to The construction of line is in the air, it is necessary to bear invading for the pernicious gases such as effect and the dust storm of the mechanical forces such as deadweight, wind-force, heavy rain and ice and snow Erosion, service condition is very severe, when transmission line of electricity is by coal mining area, weak soil matter area, hillside, desert region, riverbed During the unfavorable geology area such as area, in the presence of natural environment and external condition, pole and tower foundation can slide, tilt often, The phenomenons such as sedimentation, cracking, so as to cause the deformation of shaft tower, even shaft tower inclination, the broken string of falling tower.Shaft tower, which will be tilted, to cause shaft tower to lead The uneven stress of ground wire, causes shaft tower stress to change, and causes electrical safety distance not enough, and influence circuit is normally run, The broken string of falling tower will make supply line at a standstill, have a strong impact on the production and living of people, bring about great losses.
The initial stage developed in shaft tower tilt phenomenon, track walker is difficult to observe with the naked eye small change.At present Conventional shaft tower tilt measuring method is that transit survey method is more than 1.5 betas on horizontal, fair line road using theodolite apart from steel tower Most deviant is surveyed on high position twice, the slope of shaft tower is obtained by calculating, but to be only applicable to landform flat for this method Area, in physical features steep hills area, is limited by observation station, it is impossible to carry out shaft tower gradient measurement according to a conventional method.Using flat Face mirror mensuration tries to achieve the shaft tower slope under special topography condition, but requires that level crossing hangs down with plane where measuring center line Directly, otherwise error is larger.Therefore, in the urgent need to being carried out using intelligentized data monitoring device to inclination of transmission line tower Line monitoring and fault diagnosis, scents a hidden danger early, fixes a breakdown in time, to improve transmission line of electricity reliability of operation.
Utility model content
The purpose of this utility model is that the one kind provided is based on GPRS power transmission line line pole tower tilt detection systems, leads to Cross tilt detection module, Temperature and Humidity module to detect the angle of shaft tower and the environment of surrounding, and pass through display terminal Information is mutually transmitted between control module, the problem of staff can not repair to inclined shaft tower in time is solved.
The purpose of this utility model can be achieved through the following technical solutions:
One kind be based on GPRS power transmission line line pole tower tilt detection systems, including environment measuring subsystem, control module, Locating module, power module, wireless communication module, display terminal;
Wherein, environment measuring subsystem includes oblique detection module, tilt detection module;
The angle of inclination of the tilt detection module collection electric power line pole tower is sent to control module, the control module Alarm signal is sent through the wireless communication module to the display terminal;
Staff sends query statement through the wireless communication module to the control module by the display terminal, The control module is by the Temperature and Humidity module, tilt detection module and locating module gathered data information through described wireless Communication module is sent to the display terminal.
Further, the tilt detection module uses model SCA126T shaft tower inclination sensor, installed in transmission of electricity The top of overhead line structures.
Further, the Temperature and Humidity module uses model SHT21 Temperature Humidity Sensor.
Further, the power module uses solar cell.
Further, the wireless communication module is communicated using GPRS.
Further, the environment measuring subsystem also includes wind speed measurement module and pressure detecting module.
The beneficial effects of the utility model:Angle detection of the utility model by inclination sensor to shaft tower, Neng Gouzhun Really detection has the inclined degree of shaft tower;Electric energy is converted solar energy into for equipment by solar cell working power is provided, greatly It is big to save electric energy;By mutually transmitting information between display terminal and control module, facilitate the information of personnel's active obtaining shaft tower, have There is the characteristics of simple in construction, the degree of accuracy is high.
Brief description of the drawings
In order to illustrate more clearly of the technical scheme of the utility model embodiment, make required for being described below to embodiment Accompanying drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the present utility model, For those of ordinary skill in the art, on the premise of not paying creative work, it can also be obtained according to these accompanying drawings Other accompanying drawings.
Fig. 1 is that the utility model one kind is based on GPRS power transmission line line pole tower tilt detection system diagrams.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The all other embodiment obtained, belongs to the scope of the utility model protection.
Refer to shown in Fig. 1, one kind is based on GPRS power transmission line line pole tower tilt detection systems, including environment measuring System, control module, locating module, power module, wireless communication module, display terminal;Wherein, environment measuring subsystem includes Temperature and Humidity module, tilt detection module;Control module respectively with Temperature and Humidity module, tilt detection module, positioning mould Block, power module, wireless communication module connection, wireless communication module are connected with display terminal.
Temperature and Humidity module uses model SHT21 Temperature Humidity Sensor, for detecting around power transmission line Temperature and humidity parameter.
Tilt detection module is using model SCA126T shaft tower inclination sensor, the angle of inclination for detecting shaft tower, And send the data of detection to control module.
Control module is single-chip microcomputer, is handled for receiving temperature, humidity and angle-data, and to the data of reception.
Locating module is positioned using GPS, is positioned for the position to detection device, is easy to staff to understand The position coordinates of equipment.
Power module provides working power using 12V battery packs to control module, wherein, power module is solar-electricity Luminous energy, directly electric energy is changed into by photoelectric effect or photochemical effect by pond.
Wireless communication module communicates for GPRS, for sending data message to display terminal.
Display terminal, is smart mobile phone or computer, for showing that the Data Concurrent of detection goes out warning reminding.
Angular transducer is arranged on the top of electric power line pole tower, and angular transducer gathers inclining for electric power line pole tower in real time Rake angle, when the inclined degree of power transmission line line pole tower is more than the angle of inclination of setting, angular transducer will be gathered and transmitted electricity The angle of inclination of overhead line structures is simultaneously sent to control module, and control module is analyzed the data of reception, handled, the report of transmission Alert signal is sent to remote computer or the smart mobile phone of staff through GPRS communications, and staff is reminded in time to tilting shaft tower Repaired.
Under rugged environment, staff sends query statement by mobile phone or computer, and the query statement is logical through GPRS Letter is to control module, and control module sends humiture information, angle of inclination and the position coordinates of collection through wireless communication module To monitoring computer or mobile phone.
This detection system also includes wind speed measurement module and pressure detecting module, and wherein wind-force detection module uses wind-force Sensor, for detecting the wind-force size suffered by shaft tower;Pressure detecting module uses pressure sensor, for detecting electric power transmission The pressure size of circuit.
The utility model is detected by inclination sensor to the angle of shaft tower, can accurately detect the inclination journey of tool shaft tower Degree;Electric energy is converted solar energy into for equipment by solar cell working power is provided, greatly save electric energy;By showing eventually Information is mutually transmitted between end and control module, facilitates the information of personnel's active obtaining shaft tower, it is high with the simple in construction, degree of accuracy Feature.
Above content is only to the utility model structure example and explanation, the technology people of affiliated the art Member is made various modifications or supplement to described specific embodiment or substituted using similar mode, without departing from reality With new structure or surmount scope defined in the claims, protection domain of the present utility model all should be belonged to.

Claims (6)

1. one kind is based on GPRS power transmission line line pole tower tilt detection systems, it is characterised in that:Including environment measuring subsystem, Control module, locating module, power module, wireless communication module, display terminal;
Wherein, environment measuring subsystem includes Temperature and Humidity module, tilt detection module;
The angle of inclination of the tilt detection module collection electric power line pole tower is sent to control module, and the control module is sent Alarm signal is through the wireless communication module to the display terminal;
Staff sends query statement through the wireless communication module to the control module by the display terminal, described Control module is by the Temperature and Humidity module, tilt detection module and locating module gathered data information through the radio communication Module is sent to the display terminal.
2. it is according to claim 1 a kind of based on GPRS power transmission line line pole tower tilt detection systems, it is characterised in that: The tilt detection module uses model SCA126T shaft tower inclination sensor, installed in the top of electric power line pole tower.
3. it is according to claim 1 a kind of based on GPRS power transmission line line pole tower tilt detection systems, it is characterised in that: The Temperature and Humidity module uses model SHT21 Temperature Humidity Sensor.
4. it is according to claim 1 a kind of based on GPRS power transmission line line pole tower tilt detection systems, it is characterised in that: The power module uses solar cell.
5. it is according to claim 1 a kind of based on GPRS power transmission line line pole tower tilt detection systems, it is characterised in that: The wireless communication module is communicated using GPRS.
6. it is according to claim 1 a kind of based on GPRS power transmission line line pole tower tilt detection systems, it is characterised in that: The environment measuring subsystem also includes wind speed measurement module and pressure detecting module.
CN201621198722.3U 2016-11-07 2016-11-07 One kind is based on GPRS power transmission line line pole tower tilt detection systems Expired - Fee Related CN206399414U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621198722.3U CN206399414U (en) 2016-11-07 2016-11-07 One kind is based on GPRS power transmission line line pole tower tilt detection systems

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621198722.3U CN206399414U (en) 2016-11-07 2016-11-07 One kind is based on GPRS power transmission line line pole tower tilt detection systems

Publications (1)

Publication Number Publication Date
CN206399414U true CN206399414U (en) 2017-08-11

Family

ID=59507515

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621198722.3U Expired - Fee Related CN206399414U (en) 2016-11-07 2016-11-07 One kind is based on GPRS power transmission line line pole tower tilt detection systems

Country Status (1)

Country Link
CN (1) CN206399414U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106643651A (en) * 2016-11-07 2017-05-10 合肥同想信息技术有限公司 A GPRS-based inclination detection system for electric power transmission line supports
CN107504951A (en) * 2017-09-08 2017-12-22 安徽暖阳信息科技有限公司 The real-time monitoring system and its monitoring method of a kind of communication iron tower
CN109084836A (en) * 2018-07-24 2018-12-25 安徽康能电气有限公司 A kind of shaft tower information collecting device based on Beidou positioning

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106643651A (en) * 2016-11-07 2017-05-10 合肥同想信息技术有限公司 A GPRS-based inclination detection system for electric power transmission line supports
CN107504951A (en) * 2017-09-08 2017-12-22 安徽暖阳信息科技有限公司 The real-time monitoring system and its monitoring method of a kind of communication iron tower
CN109084836A (en) * 2018-07-24 2018-12-25 安徽康能电气有限公司 A kind of shaft tower information collecting device based on Beidou positioning

Similar Documents

Publication Publication Date Title
CN101493680B (en) Gangue stock digitalization safety monitoring system, method and device
CN101826247A (en) System for monitoring, forecasting and warning mud-rock flow
CN106646557A (en) Beidou satellite based augmentation system and short message function-based marine monitoring buoy
CN203552399U (en) Tower inclination monitoring device based on GPS and four-dimensional data mining
CN201917812U (en) Iron tower state detecting system based on wireless network technology
CN206399414U (en) One kind is based on GPRS power transmission line line pole tower tilt detection systems
CN205537535U (en) Collecting space area deformation monitoring and early warning device
CN111970382A (en) Iron tower safety monitoring and early warning system
CN101931270A (en) Method and system for protecting power transmission line
CN107025771A (en) A kind of massif disaster intelligent monitoring early warning system
CN205138471U (en) Railway roadbed subsides real -time monitoring system based on big dipper dual -frenquency is measured
CN205103980U (en) Transmission line shaft tower slope analysis alarm device
CN207182625U (en) A kind of debris flow early-warning system
CN106643651A (en) A GPRS-based inclination detection system for electric power transmission line supports
CN204807136U (en) Embedded road surface environmental aspect observation device
CN211604275U (en) Wireless transmission type landslide disaster monitoring device
CN113781746A (en) Large-scale reservoir bank landslide surge disaster early warning device and method
CN204926420U (en) Automatic monitoring devices of shaft tower mountain landslide
CN117072247A (en) 5G safety precaution inspection system based on coal mine
CN112344901A (en) Coal mining earth's surface removes deformation intelligent monitoring system based on 5G transmission
CN214149165U (en) Monitoring device for slope stability
CN203630917U (en) Multimode remote monitoring and warning system for mud-rock flow
CN203809053U (en) Novel mine water disaster monitoring and early warning system
CN105136117A (en) Beidou communication system-based electric tower inclination monitoring system
CN202938823U (en) Device for monitoring and early warning overhead transmission line tower tilt on line

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170811

Termination date: 20181107