CN206396771U - Building basement ground construction conserves discharge structure - Google Patents

Building basement ground construction conserves discharge structure Download PDF

Info

Publication number
CN206396771U
CN206396771U CN201621313957.2U CN201621313957U CN206396771U CN 206396771 U CN206396771 U CN 206396771U CN 201621313957 U CN201621313957 U CN 201621313957U CN 206396771 U CN206396771 U CN 206396771U
Authority
CN
China
Prior art keywords
drinking
water pipe
basement
water
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621313957.2U
Other languages
Chinese (zh)
Inventor
陈惠春
金群达
孙来凯
叶斌斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG ZHENGLI HIGH TECHNOLOGY CONSTRUCTION CO., LTD.
Original Assignee
Wenzhou Zhonghai Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wenzhou Zhonghai Construction Co Ltd filed Critical Wenzhou Zhonghai Construction Co Ltd
Priority to CN201621313957.2U priority Critical patent/CN206396771U/en
Application granted granted Critical
Publication of CN206396771U publication Critical patent/CN206396771U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of building basement ground construction maintenance discharge structure, including basement ground concrete layer, it is characterized in that:Microlith layer is provided below in basement ground concrete layer, microlith layer is laid on underground soil body surface, the underground soil body surface, which is excavated downwards, the gutter being distributed longitudinally or transversely, first drinking-water pipe is passed down through basement ground concrete layer depth and entered in gutter, and first drinking-water pipe is communicated with the external world.The structure can conserve stage pump drainage underground water in underground room floor.

Description

Building basement ground construction conserves discharge structure
Technology leads city
The utility model is related to a kind of building basement ground construction maintenance discharge structure.The utility model is also related to And a kind of method that discharge structure construction basement concrete layer is conserved using above-mentioned building basement ground construction.
Background technology
Rich in aqua region, underground room floor is because going deep into the soil body, and when pouring, basement ground concrete layer can be by ground The pressure of lower water, is completed, it is easy to formed under groundwater pressure in maintenance stage basement ground concrete layer ot-yet-hardened Crack, so as to influence quality.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of building basement ground construction maintenance row Water-bound, the structure can conserve stage pump drainage underground water in underground room floor.Technical problem to be solved in the utility model is also Discharge structure construction basement concrete layer is conserved including providing a kind of above-mentioned building basement ground construction of use Method
The technical scheme that the utility model is used is:Building basement ground construction conserves discharge structure, bag Basement ground concrete layer is included, microlith layer is provided below in basement ground concrete layer, and microlith layer is laid on the underground soil body Surface, the underground soil body surface, which is excavated downwards, the gutter being distributed longitudinally or transversely, and the first drinking-water pipe is passed down through ground Lower room floor concrete layer gos deep into gutter, and first drinking-water pipe is communicated with the external world.
The utility model has the following effects that:Underground water below basement ground concrete layer can converge to microlith first Layer, discharges the external world, so that hydraulic pressure upwards under hydraulic pressure or water plug effect via the gutter and drinking-water pipe of microlith layer It is released, it is not damaged to the concrete layer for conserving the stage.
Below in conjunction with the accompanying drawings and embodiment the utility model is described in further detail.
Brief description of the drawings
Fig. 1 conserves discharge structure for the building basement ground construction that the utility model the first embodiment is provided Structural representation.
Fig. 2 conserves discharge structure for the building basement ground construction that second of embodiment of the utility model is provided Structural representation.
Embodiment
Shown in reference picture 1, the building basement ground construction maintenance that the first embodiment of the utility model is provided Microlith layer 2, microlith layer 2 is provided below in discharge structure, including basement ground concrete layer 1, basement ground concrete layer 1 Underground soil body surface is laid on, the underground soil body surface, which is excavated downwards, the gutter 3 being distributed longitudinally or transversely, and first takes out Water pipe 4, which is passed down through basement ground concrete layer 1, to be goed deep into gutter 3, and first drinking-water pipe 4 is communicated with the external world, this reality Applying the mode arranged in example on underground water has two kinds, and the first is, not by equipment, directly to be formed by underground water under closed environment Pressure, underground water is discharged to the external world from the first drinking-water pipe 4;Second is that the first drinking-water pipe 4 is configured with the first water plug, First water plug is generally suction pump, and water is discharged into the external world with the first water plug.
Shown in reference picture 1, on the basis of the first above-mentioned embodiment, in order to which the underground water for utilizing pump drainage is used to conserve ground The concrete layer of lower room, first drinking-water pipe 4 is laid in basement concrete wall face 5, and first drinking-water pipe 4 is with collecting Groove 6 is turned on, and collector groove 6 is on the top in the basement concrete wall face 5, and the collector groove 6 is connected with weep pipe 7, is dripped Weeper, inner side of the weep pipe 7 just to basement concrete wall surface 5, the collector groove 6 and weep pipe 7 are intervally distributed with pipe 7 Junction be provided with valve 8 and opened and closed with control passage.When the first drinking-water pipe 4 is in basement concrete wall face 5, on ground The maintenance stage of the concrete layer of lower room concrete wall surface 5 can distribute amount of heat, and such as discharge will cause wall crazing not in time, this When the underground water constantly discharged upwards via the first drinking-water pipe 4 can take away amount of heat, it is to avoid mix in basement concrete wall face 5 Solidifying soil layer cracking, while underground water can be also converged in collector groove 6, the maintenance stage in basement concrete wall face 5 opens valve Door 8, promotes the underground water in collector groove 6 to be gradually dropped from weep pipe 7 on the inside of the concrete layer of basement concrete wall face 5, The structure can substitute artificial watering to a certain extent, and can save substantial amounts of water.Because of the water and shakiness arranged on underground water Fixed, the maintenance discharge structure of the present embodiment is applied to have the certain thickness concrete layer of basement concrete wall face 5, but uncomfortable Close the concrete layer of significant volume.
Shown in reference picture 1, the utility model is additionally provided conserves row using above-mentioned building basement ground construction The method of water-bound construction basement concrete layer, comprises the following steps:
A, before basement ground concrete layer 1 is poured, basement soil body surface is flattened;
B, soil body surface vertically and horizontally downwards excavate gutter 3;
C, the microlith layer 2 in basement soil body surface laying 200-300 millimeters thicks;
D, it is vertical lay in the first drinking-water pipe 4, the bottom insertion gutter 3 of the first drinking-water pipe 4, the first drinking-water pipe 4 it is upper End and extraneous conducting;
E, basement ground concrete layer 1 is poured, groundwater pressure penetrates into microlith layer 2 when increasing, and converges to diversion In groove 3, through the first drinking-water pipe 4, discharge is extraneous upwards, until groundwater pressure is balanced with external pressure.
Shown in reference picture 1, in above-mentioned steps D, first drinking-water pipe 4 is laid in the mould in basement concrete wall face 5 In plate, first drinking-water pipe 4 is turned on collector groove 6, and collector groove 6, which is in, to be prepared to pour the basement concrete wall face 5 On top;In the step E, basement ground concrete layer 1 is poured finish after, the collector groove 6 is connected with weep pipe 7, It is intervally distributed with weeper on weep pipe 7, inner side of the weep pipe 7 just to basement concrete wall surface, the collector groove 6 is with dripping The junction of pipe 7 is provided with valve 8 and opened and closed with control passage, when basement concrete wall surface 5 needs to carry out watering maintenance, is opened Opening the valve 8 promotes the water in collector groove 6 to flow into weep pipe 7, and is dripped to by weeper on basement concrete wall face 5.
Shown in reference picture 2, second of embodiment of the utility model and the first embodiment are essentially identical, and the present embodiment is main Suitable for mass concrete layer, it differs only in following structure with the first embodiment:Set above the basement There is transverse collector pipe 9, first drinking-water pipe 4 is connected with transverse collector pipe 9, and transverse collector pipe 9 is connected with sedimentation basin 10.Institute Basement underground is stated with sump 11, sump 11 is connected with the second upward drinking-water pipe 12, and the second drinking-water pipe 12 is configured with Second water plug 13, the second drinking-water pipe 12 is connected with the sedimentation basin 10, and the underground water in the sump 11 is taken out by second Water installations 13 are acted on to be discharged in sedimentation basin 10 through the second drinking-water pipe 12, and the top of sedimentation basin 10 carries the 3rd drinking-water pipe 14, the 3rd Draw water end of the drinking-water pipe 14 in sedimentation basin 10 is configured with screen pack, and the 3rd drinking-water pipe 14 is configured with the 3rd water plug 15, institute State the 3rd drinking-water pipe 14 to be connected with circulatory pool 16, hot channel 17 is laterally laid with the basement concrete wall face 5, radiate The two ends of pipeline 17 are connected with circulatory pool 16, and its liquid heat eliminating medium is the water in circulatory pool 16.Horizontal stroke is added in the structure To the hot channel 17 of distribution, and add sump 11 bigger water is provided to sedimentation basin 10, so as to have enough The radiating that many waters are used for hot channel 17 is circulated.

Claims (5)

1. a kind of building basement ground construction conserves discharge structure, including basement ground concrete layer, its feature It is:Microlith layer is provided below in basement ground concrete layer, and microlith layer is laid on underground soil body surface, the underground soil body table Excavating downwards has the gutter being distributed longitudinally or transversely, and the first drinking-water pipe is passed down through basement ground concrete layer depth and entered In gutter, first drinking-water pipe is communicated with the external world.
2. building basement ground construction according to claim 1 conserves discharge structure, it is characterized in that:It is described to take out Water pipe is configured with the first water plug.
3. building basement ground construction according to claim 1 or 2 conserves discharge structure, it is characterized in that:Institute State the first drinking-water pipe to be laid in basement concrete wall face, transverse collector pipe, described first are provided with above the basement Drinking-water pipe is connected with transverse collector pipe, and transverse collector pipe is connected with sedimentation basin.
4. building basement ground construction according to claim 1 or 2 conserves discharge structure, it is characterized in that:Institute State the first drinking-water pipe to be laid in basement concrete wall face, first drinking-water pipe is turned on collector groove, collector groove is in institute On the top for stating basement concrete wall face, the collector groove is connected with weep pipe, and weeper is intervally distributed with weep pipe, is dripped The inner side just to basement concrete wall surface is managed, the junction of the collector groove and weep pipe is provided with valve and opened with control passage Close.
5. building basement ground construction according to claim 3 conserves discharge structure, it is characterized in that:Describedly Lower room underground carries sump, and sump is connected with the second upward drinking-water pipe, and the second drinking-water pipe is configured with the second water plug, Second drinking-water pipe is connected with the sedimentation basin, and the underground water in the sump is acted on through the second drinking-water pipe by the second water plug It is discharged in sedimentation basin, the top of sedimentation basin carries the 3rd drinking-water pipe, and draw water end of the 3rd drinking-water pipe in sedimentation basin was configured with Filter screen, the 3rd drinking-water pipe is configured with the 3rd water plug, and the 3rd drinking-water pipe is connected with circulatory pool, the concrete of basement Hot channel is laterally laid with metope, the two ends of hot channel are connected with circulatory pool.
CN201621313957.2U 2016-12-02 2016-12-02 Building basement ground construction conserves discharge structure Active CN206396771U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621313957.2U CN206396771U (en) 2016-12-02 2016-12-02 Building basement ground construction conserves discharge structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621313957.2U CN206396771U (en) 2016-12-02 2016-12-02 Building basement ground construction conserves discharge structure

Publications (1)

Publication Number Publication Date
CN206396771U true CN206396771U (en) 2017-08-11

Family

ID=59510134

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621313957.2U Active CN206396771U (en) 2016-12-02 2016-12-02 Building basement ground construction conserves discharge structure

Country Status (1)

Country Link
CN (1) CN206396771U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106703057A (en) * 2016-12-02 2017-05-24 温州中海建设有限公司 Basement ground construction maintenance drainage structure of large building and method for constructing basement concrete layer
CN111691467A (en) * 2020-06-22 2020-09-22 福建省华策建设集团有限公司 Construction method for basement water prevention and drainage combination

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106703057A (en) * 2016-12-02 2017-05-24 温州中海建设有限公司 Basement ground construction maintenance drainage structure of large building and method for constructing basement concrete layer
CN111691467A (en) * 2020-06-22 2020-09-22 福建省华策建设集团有限公司 Construction method for basement water prevention and drainage combination
CN111691467B (en) * 2020-06-22 2022-01-11 福建省华策建设集团有限公司 Construction method for basement water prevention and drainage combination

Similar Documents

Publication Publication Date Title
CN102116033B (en) Method and device for dewatering and draining water collecting well of blind drain of deep foundation pit
CN103046565B (en) Draining method for ultra-deep batholith deep foundation pit
CN205063005U (en) Can carry out novel rainwater well that compensates to groundwater
CN206396771U (en) Building basement ground construction conserves discharge structure
CN106677158B (en) A kind of blowing-filling sludge superficial layer Quick uniform processing method and structure recently
CN103696481A (en) Rainwater regulating, storing and recycling system
CN102561307A (en) Clogging preventing method for drainage channel based on underground high-flow-capacity drainage system
CN208203348U (en) A kind of drainage pumping plant of shield tunnel
CN106703057A (en) Basement ground construction maintenance drainage structure of large building and method for constructing basement concrete layer
CN203782850U (en) Rainwater regulation, storage and reuse system
CN110670613B (en) Foundation pit elevator shaft water seepage prevention structure and construction method thereof
CN206512698U (en) A kind of layer of blowing-filling sludge superficial recently Quick uniform processing structure
CN102900144A (en) Undermining floor drain automatic drainage structure capable of preventing leakage of toilet
CN106480981A (en) Radiator structure in Basement Mass Concrete process of setting and the method pouring Basement Mass Concrete
CN107747317B (en) Soft rock foundation impervious wall groove bottom sediment treatment method and soft rock foundation impervious wall groove bottom structure
CN207499071U (en) toilet
CN202882098U (en) In-pit floor drain automatic drainage structure capable of preventing toilet from leaking
CN216586626U (en) Basement post-cast strip drainage system
CN206545257U (en) A kind of novel greening band water storage structure
CN101881041B (en) Floor drain sunk same-layer drainage construction method
CN202247922U (en) Water lowering and discharging device for water collecting well in blind ditch with deep base pit
CN210946854U (en) Anti-seepage structure of foundation pit elevator shaft
CN205093378U (en) Ecological fish pond structure
CN204876008U (en) Prevention of seepage mounting structure of squatting pan
CN211006723U (en) Drainage structures of precipitation well

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 325000 Room 101, 832 Gaotong Road, Panqiao Street, Ouhai District, Wenzhou City, Zhejiang Province

Patentee after: ZHEJIANG ZHENGLI HIGH TECHNOLOGY CONSTRUCTION CO., LTD.

Address before: 325000 Great Wall Group, Jingshan Street, Ouhai District, Wenzhou City, Zhejiang Province, Room 301-310

Patentee before: Wenzhou Zhonghai Construction Co., Ltd.

CP03 Change of name, title or address