CN206396732U - It is a kind of to reduce the tunnel structure of slope excavating - Google Patents

It is a kind of to reduce the tunnel structure of slope excavating Download PDF

Info

Publication number
CN206396732U
CN206396732U CN201720005418.0U CN201720005418U CN206396732U CN 206396732 U CN206396732 U CN 206396732U CN 201720005418 U CN201720005418 U CN 201720005418U CN 206396732 U CN206396732 U CN 206396732U
Authority
CN
China
Prior art keywords
tunnel
slope
reduce
tunnel body
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720005418.0U
Other languages
Chinese (zh)
Inventor
张涛
俞灵光
秦晓亮
彭继乐
赵继勇
余志超
刘淑芳
赵星
张毅驰
孙楠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Guiyang Engineering Corp Ltd
Original Assignee
PowerChina Guiyang Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Guiyang Engineering Corp Ltd filed Critical PowerChina Guiyang Engineering Corp Ltd
Priority to CN201720005418.0U priority Critical patent/CN206396732U/en
Application granted granted Critical
Publication of CN206396732U publication Critical patent/CN206396732U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a kind of tunnel structure that can reduce slope excavating and, including the tunnel body intersected with side slope, tunnel body is provided with the reinforced concrete soil suite arch for being provided with and matching with tunnel body vault at the top of the concrete guard wall arranged vertically, concrete guard wall close to the side wall of side slope.The utility model solves the problems, such as the environmental disruption that extensive excavation slope is brought using half dark half bright tunnel, and is changed from passive to active compared with conventional method, shortens the construction period, improves project benefit.

Description

It is a kind of to reduce the tunnel structure of slope excavating
Technical field
The utility model is related to tunnel and its technical field of construction, and in particular to a kind of to reduce the tunnel knot of slope excavating Structure.
Background technology
In Hydraulic and Hydro-Power Engineering construction and running, most of power stations are located at mountain area, in highway geometry, tunnel axle In the case that line adjustment is difficult, Shang Ba highways and Chang Nei highways are during excavating or biasing serious tunnel mouth hanging, unavoidable shape Excavated into Slope with multi-step, then need to carry out dam public affairs in excavation formation in side slope position in the case of original excavation circuit is unalterable Road Huo Changnei highways, when being excavated in side slope position, traditional scheme is by all cubic meters of wholes of predetermined excavation position Excavate, form Shang Ba highway Huo Changnei highways builds space, the slope after excavation is then subjected to supporting, severe is excavated not only A large amount of original vegetation can be destroyed, high slope rockmass is also thus brought, increases construction fussy degree, and have delayed the duration, together When also increase investment.For medium and small project, the problem of reducing slope excavating, investment reduction and shortening duration increasingly causes How the attention of people, take maximally effective processing scheme both to meet requirement of engineering, and ring water guaranteed request can be met again, becomes Passive is active, is one of the problem of designer's emphasis considers, but does not have corresponding technical scheme in the prior art.
Utility model content
The utility model aim to provide it is a kind of can reduce the tunnel structure of slope excavating, built with solving existing sharp hydroelectric project If middle Slope with multi-step difficulty of construction existing when excavating is big, construction period length, construction investment is big, vegetation deterioration is serious etc. asks Topic.
The utility model is achieved by following technical solution:
A kind of to reduce the tunnel structure of slope excavating, including the tunnel body intersected with side slope, tunnel body is close to side The side wall on slope is provided with the top of the concrete guard wall arranged vertically, concrete guard wall provided with the reinforcing bar matched with tunnel body vault Concrete jacket encircles.
The tunnel body vault is provided with horizontal and vertical side slope slip casting solidification anti-skid structure.
The tunnel inner body wall is provided with the reinforced concrete lining layer layer fitted with it.
The tunnel body outer wall is provided with the steelframe fitted with it and supported.
The concrete guard wall bottom is provided with some friction piles.
Concrete guard wall is inserted on the friction pile top.
The beneficial effects of the utility model are:
Compared with prior art, what the utility model was provided can reduce the tunnel structure of slope excavating, using hazy Tunnel structure form, in the case where Shang Ba highways, Chang Nei highways, tunnel mouth hanging equal-pitch contour are difficult, by Shang Ba highways Side is set hazy compared with positions such as tunnel mouth hangings serious compared with high slope section, bias on the inside of high slope section, Chang Nei highways Tunnel structure, reduces excavation and the supporting of side slope, and then ensures the safety of highway communication or tunnel mouth hanging.Solve extensive The environmental disruption problem that excavation slope is brought, changes from passive to active compared with conventional method, shortens the construction period, improve work Cheng Xiaoyi.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
In figure:1- friction piles, 2- concrete guard walls, 3- reinforced concretes soil suite arch, 4- transverse direction grouting tubes, 5- steelframe branch Support, 6- reinforced concrete lining layers layer, 7- longitudinal directions grouting tube, 8- side slopes, 9- tunnel bodies.
Embodiment
The technical solution of the utility model is described further below in conjunction with drawings and Examples, but required protection Scope is not limited to described;
As shown in figure 1, the utility model provide can reduce the tunnel structure of slope excavating, including intersect with side slope 8 Tunnel body 9, tunnel body 9 is provided with the concrete guard wall 2 arranged vertically close to the side wall of side slope 8, and the top of concrete guard wall 2 is set There is the reinforced concrete soil suite arch 3 matched with the vault of tunnel body 9.
The vault of tunnel body 9 is provided with horizontal and vertical side slope slip casting solidification anti-skid structure.The tunnel body 9 Inwall is provided with the reinforced concrete lining layer layer 6 fitted with it.The outer wall of tunnel body 9 is provided with the steel fitted with it Frame support 5.The bottom of concrete guard wall 2 is provided with some friction piles 1.Concrete guard wall 2 is inserted on the top of friction pile 1.
Embodiment:
The tunnel mouth hanging position big to High Side Slope of Highway section, bias in upper dam High Side Slope of Highway section, field is reconnoitred, Determine the construction location of side slope 8 and formulate construction plan, be ready for construction equipment;Side slope 8 to construction location is cleared up, Remove vegetation and excavate out barricade casting space;Friction pile 1 is set below barricade casting space, and the spacing of friction pile 1 is 3m, Friction pile 1 is poured in place concrete structure or precast concrete;Backplate is laid in the top of friction pile 1 and pours out coagulation Native barricade 2, concrete guard wall 2 is C20 concrete, and the inwall of concrete guard wall 2 is vertical, outer wall is tilted;Concrete guard wall 2 meets age Reinforcing bar is laid after phase at the top of it, the reinforced concrete soil suite arch 3 matched with the vault of tunnel body 9 is then poured out;In side slope 8 Interior some longitudinal directions of insertion and the longitudinal grouting tube 7 being spaced apart, longitudinal grouting tube 7 is according to the vault radian cloth of tunnel body 9 Put;If in the horizontal grouting tube 4 that longitudinal top of grouting tube 7 insertion dried layer is perpendicular with longitudinal grouting tube 7;Pass through respectively Longitudinal grouting tube 7 and horizontal grouting tube 4 inject concrete slurry into side slope 8;Inject the concrete slurry and steel of side slope 8 Reinforced concrete set arch 3 meets tunnel excavation body 9 after age, and a phase is carried out using steelframe support 5 while tunnel excavation body 9 Supporting;5 surface pouring reinforcement concrete lining cutting 6 are supported in steelframe after the completion of first liner timbering, reinforced concrete lining layer 6 is C25 steel Reinforced concrete, after the completion of reinforced concrete lining layer 6 is laid.
Above-described embodiment is only a preferred embodiment of the present utility model, is not used to limit protection of the present utility model Scope, all deformation, modification or equivalent substitution made on the basis of the technical solution of the utility model etc., this reality all should be fallen into With new protection domain.

Claims (6)

1. a kind of can reduce the tunnel structure of slope excavating, it is characterised in that:Including the tunnel body (9) intersected with side slope (8), Tunnel body (9) is provided with the top of the concrete guard wall (2) arranged vertically, concrete guard wall (2) close to the side wall of side slope (8) and is provided with Encircle (3) with the reinforced concrete soil suite that tunnel body (9) vault matches.
2. according to claim 1 can reduce the tunnel structure of slope excavating, it is characterised in that:The tunnel body (9) Vault is provided with horizontal and vertical side slope slip casting solidification anti-skid structure.
3. according to claim 1 can reduce the tunnel structure of slope excavating, it is characterised in that:The tunnel body (9) Inwall is provided with the reinforced concrete lining layer layer (6) fitted with it.
4. according to claim 1 can reduce the tunnel structure of slope excavating, it is characterised in that:The tunnel body (9) Outer wall is provided with the steelframe fitted with it and supports (5).
5. according to claim 1 can reduce the tunnel structure of slope excavating, it is characterised in that:The concrete guard wall (2) bottom is provided with some friction piles (1).
6. according to claim 5 can reduce the tunnel structure of slope excavating, it is characterised in that:Friction pile (1) top End insertion concrete guard wall (2).
CN201720005418.0U 2017-01-04 2017-01-04 It is a kind of to reduce the tunnel structure of slope excavating Active CN206396732U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720005418.0U CN206396732U (en) 2017-01-04 2017-01-04 It is a kind of to reduce the tunnel structure of slope excavating

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720005418.0U CN206396732U (en) 2017-01-04 2017-01-04 It is a kind of to reduce the tunnel structure of slope excavating

Publications (1)

Publication Number Publication Date
CN206396732U true CN206396732U (en) 2017-08-11

Family

ID=59516927

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720005418.0U Active CN206396732U (en) 2017-01-04 2017-01-04 It is a kind of to reduce the tunnel structure of slope excavating

Country Status (1)

Country Link
CN (1) CN206396732U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106638509A (en) * 2017-01-04 2017-05-10 中国电建集团贵阳勘测设计研究院有限公司 Tunnel structure capable of reducing slope excavation and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106638509A (en) * 2017-01-04 2017-05-10 中国电建集团贵阳勘测设计研究院有限公司 Tunnel structure capable of reducing slope excavation and construction method thereof

Similar Documents

Publication Publication Date Title
CN103981898B (en) A kind of inverse underground engineering construction method done of overall open cut node
CN102606167B (en) Settlement control construction method for transverse grouting guide pipe of shallow underground excavation tunnel
CN105927272A (en) Floor anchoring constraint tunnel lining structure
CN106761778A (en) A kind of underground digging in subway station construction technology suitable for upper-soft lower-hard ground
CN107119691A (en) One kind is applied to the square deep basal pit of the high pressure-bearing of rich water sand gravel layer and its excavation method
CN103953351B (en) Enlarging construction method is dug under existing tunnel in the case of a kind of uninterrupted traffic
CN206408655U (en) The top plate sidewall structure of covered back-digging construction
CN101270582A (en) Method for setting bracing column in underground cavity
CN106761768A (en) A kind of novel steel tube curtain structure support system and its construction method
CN105951712A (en) Underground diaphragm wall construction method for cutting through underground structure under ground limitation condition
CN106812540A (en) A kind of shield launching element wall closing water sealing consolidation structure and construction technology
CN107965325A (en) Just branch bow member replaces construction method to a kind of small interval shallow tunnel
CN106638509A (en) Tunnel structure capable of reducing slope excavation and construction method thereof
CN108343035A (en) River construction method is worn under shallow tunnel
CN106761771A (en) A kind of construction method for crossing native shallow tunnel on rock under the location of mountain valley
CN206396732U (en) It is a kind of to reduce the tunnel structure of slope excavating
CN204551510U (en) A kind of filled-up ground catchments pressure reduction well drop and drainage structure
CN109812271A (en) A kind of shield crosses the construction method for invading limit box culvert
CN108868789A (en) A kind of stratum active support and change method suitable for shield construction tunnel
CN105926665B (en) A kind of prefabricated block brick assembly concrete drainage pipeline pedestal and its construction method
CN208605191U (en) It is a kind of elder generation tunnel after stand arch-wall method step excavation buried station structure
CN107905795A (en) Subway station is inverse under a kind of operation condition widens method
CN216342124U (en) Disposal structure of tunnel side lower part karst cave
CN206144569U (en) Confined is advance in advance and is protected tunnel structure
CN215292503U (en) Tunnel structure passing through karst cavity

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant