CN206396732U - It is a kind of to reduce the tunnel structure of slope excavating - Google Patents
It is a kind of to reduce the tunnel structure of slope excavating Download PDFInfo
- Publication number
- CN206396732U CN206396732U CN201720005418.0U CN201720005418U CN206396732U CN 206396732 U CN206396732 U CN 206396732U CN 201720005418 U CN201720005418 U CN 201720005418U CN 206396732 U CN206396732 U CN 206396732U
- Authority
- CN
- China
- Prior art keywords
- tunnel
- slope
- reduce
- tunnel body
- concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
The utility model discloses a kind of tunnel structure that can reduce slope excavating and, including the tunnel body intersected with side slope, tunnel body is provided with the reinforced concrete soil suite arch for being provided with and matching with tunnel body vault at the top of the concrete guard wall arranged vertically, concrete guard wall close to the side wall of side slope.The utility model solves the problems, such as the environmental disruption that extensive excavation slope is brought using half dark half bright tunnel, and is changed from passive to active compared with conventional method, shortens the construction period, improves project benefit.
Description
Technical field
The utility model is related to tunnel and its technical field of construction, and in particular to a kind of to reduce the tunnel knot of slope excavating
Structure.
Background technology
In Hydraulic and Hydro-Power Engineering construction and running, most of power stations are located at mountain area, in highway geometry, tunnel axle
In the case that line adjustment is difficult, Shang Ba highways and Chang Nei highways are during excavating or biasing serious tunnel mouth hanging, unavoidable shape
Excavated into Slope with multi-step, then need to carry out dam public affairs in excavation formation in side slope position in the case of original excavation circuit is unalterable
Road Huo Changnei highways, when being excavated in side slope position, traditional scheme is by all cubic meters of wholes of predetermined excavation position
Excavate, form Shang Ba highway Huo Changnei highways builds space, the slope after excavation is then subjected to supporting, severe is excavated not only
A large amount of original vegetation can be destroyed, high slope rockmass is also thus brought, increases construction fussy degree, and have delayed the duration, together
When also increase investment.For medium and small project, the problem of reducing slope excavating, investment reduction and shortening duration increasingly causes
How the attention of people, take maximally effective processing scheme both to meet requirement of engineering, and ring water guaranteed request can be met again, becomes
Passive is active, is one of the problem of designer's emphasis considers, but does not have corresponding technical scheme in the prior art.
Utility model content
The utility model aim to provide it is a kind of can reduce the tunnel structure of slope excavating, built with solving existing sharp hydroelectric project
If middle Slope with multi-step difficulty of construction existing when excavating is big, construction period length, construction investment is big, vegetation deterioration is serious etc. asks
Topic.
The utility model is achieved by following technical solution:
A kind of to reduce the tunnel structure of slope excavating, including the tunnel body intersected with side slope, tunnel body is close to side
The side wall on slope is provided with the top of the concrete guard wall arranged vertically, concrete guard wall provided with the reinforcing bar matched with tunnel body vault
Concrete jacket encircles.
The tunnel body vault is provided with horizontal and vertical side slope slip casting solidification anti-skid structure.
The tunnel inner body wall is provided with the reinforced concrete lining layer layer fitted with it.
The tunnel body outer wall is provided with the steelframe fitted with it and supported.
The concrete guard wall bottom is provided with some friction piles.
Concrete guard wall is inserted on the friction pile top.
The beneficial effects of the utility model are:
Compared with prior art, what the utility model was provided can reduce the tunnel structure of slope excavating, using hazy
Tunnel structure form, in the case where Shang Ba highways, Chang Nei highways, tunnel mouth hanging equal-pitch contour are difficult, by Shang Ba highways
Side is set hazy compared with positions such as tunnel mouth hangings serious compared with high slope section, bias on the inside of high slope section, Chang Nei highways
Tunnel structure, reduces excavation and the supporting of side slope, and then ensures the safety of highway communication or tunnel mouth hanging.Solve extensive
The environmental disruption problem that excavation slope is brought, changes from passive to active compared with conventional method, shortens the construction period, improve work
Cheng Xiaoyi.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
In figure:1- friction piles, 2- concrete guard walls, 3- reinforced concretes soil suite arch, 4- transverse direction grouting tubes, 5- steelframe branch
Support, 6- reinforced concrete lining layers layer, 7- longitudinal directions grouting tube, 8- side slopes, 9- tunnel bodies.
Embodiment
The technical solution of the utility model is described further below in conjunction with drawings and Examples, but required protection
Scope is not limited to described;
As shown in figure 1, the utility model provide can reduce the tunnel structure of slope excavating, including intersect with side slope 8
Tunnel body 9, tunnel body 9 is provided with the concrete guard wall 2 arranged vertically close to the side wall of side slope 8, and the top of concrete guard wall 2 is set
There is the reinforced concrete soil suite arch 3 matched with the vault of tunnel body 9.
The vault of tunnel body 9 is provided with horizontal and vertical side slope slip casting solidification anti-skid structure.The tunnel body 9
Inwall is provided with the reinforced concrete lining layer layer 6 fitted with it.The outer wall of tunnel body 9 is provided with the steel fitted with it
Frame support 5.The bottom of concrete guard wall 2 is provided with some friction piles 1.Concrete guard wall 2 is inserted on the top of friction pile 1.
Embodiment:
The tunnel mouth hanging position big to High Side Slope of Highway section, bias in upper dam High Side Slope of Highway section, field is reconnoitred,
Determine the construction location of side slope 8 and formulate construction plan, be ready for construction equipment;Side slope 8 to construction location is cleared up,
Remove vegetation and excavate out barricade casting space;Friction pile 1 is set below barricade casting space, and the spacing of friction pile 1 is 3m,
Friction pile 1 is poured in place concrete structure or precast concrete;Backplate is laid in the top of friction pile 1 and pours out coagulation
Native barricade 2, concrete guard wall 2 is C20 concrete, and the inwall of concrete guard wall 2 is vertical, outer wall is tilted;Concrete guard wall 2 meets age
Reinforcing bar is laid after phase at the top of it, the reinforced concrete soil suite arch 3 matched with the vault of tunnel body 9 is then poured out;In side slope 8
Interior some longitudinal directions of insertion and the longitudinal grouting tube 7 being spaced apart, longitudinal grouting tube 7 is according to the vault radian cloth of tunnel body 9
Put;If in the horizontal grouting tube 4 that longitudinal top of grouting tube 7 insertion dried layer is perpendicular with longitudinal grouting tube 7;Pass through respectively
Longitudinal grouting tube 7 and horizontal grouting tube 4 inject concrete slurry into side slope 8;Inject the concrete slurry and steel of side slope 8
Reinforced concrete set arch 3 meets tunnel excavation body 9 after age, and a phase is carried out using steelframe support 5 while tunnel excavation body 9
Supporting;5 surface pouring reinforcement concrete lining cutting 6 are supported in steelframe after the completion of first liner timbering, reinforced concrete lining layer 6 is C25 steel
Reinforced concrete, after the completion of reinforced concrete lining layer 6 is laid.
Above-described embodiment is only a preferred embodiment of the present utility model, is not used to limit protection of the present utility model
Scope, all deformation, modification or equivalent substitution made on the basis of the technical solution of the utility model etc., this reality all should be fallen into
With new protection domain.
Claims (6)
1. a kind of can reduce the tunnel structure of slope excavating, it is characterised in that:Including the tunnel body (9) intersected with side slope (8),
Tunnel body (9) is provided with the top of the concrete guard wall (2) arranged vertically, concrete guard wall (2) close to the side wall of side slope (8) and is provided with
Encircle (3) with the reinforced concrete soil suite that tunnel body (9) vault matches.
2. according to claim 1 can reduce the tunnel structure of slope excavating, it is characterised in that:The tunnel body (9)
Vault is provided with horizontal and vertical side slope slip casting solidification anti-skid structure.
3. according to claim 1 can reduce the tunnel structure of slope excavating, it is characterised in that:The tunnel body (9)
Inwall is provided with the reinforced concrete lining layer layer (6) fitted with it.
4. according to claim 1 can reduce the tunnel structure of slope excavating, it is characterised in that:The tunnel body (9)
Outer wall is provided with the steelframe fitted with it and supports (5).
5. according to claim 1 can reduce the tunnel structure of slope excavating, it is characterised in that:The concrete guard wall
(2) bottom is provided with some friction piles (1).
6. according to claim 5 can reduce the tunnel structure of slope excavating, it is characterised in that:Friction pile (1) top
End insertion concrete guard wall (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720005418.0U CN206396732U (en) | 2017-01-04 | 2017-01-04 | It is a kind of to reduce the tunnel structure of slope excavating |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720005418.0U CN206396732U (en) | 2017-01-04 | 2017-01-04 | It is a kind of to reduce the tunnel structure of slope excavating |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206396732U true CN206396732U (en) | 2017-08-11 |
Family
ID=59516927
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720005418.0U Active CN206396732U (en) | 2017-01-04 | 2017-01-04 | It is a kind of to reduce the tunnel structure of slope excavating |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206396732U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106638509A (en) * | 2017-01-04 | 2017-05-10 | 中国电建集团贵阳勘测设计研究院有限公司 | Tunnel structure capable of reducing slope excavation and construction method thereof |
-
2017
- 2017-01-04 CN CN201720005418.0U patent/CN206396732U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106638509A (en) * | 2017-01-04 | 2017-05-10 | 中国电建集团贵阳勘测设计研究院有限公司 | Tunnel structure capable of reducing slope excavation and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103981898B (en) | A kind of inverse underground engineering construction method done of overall open cut node | |
CN102606167B (en) | Settlement control construction method for transverse grouting guide pipe of shallow underground excavation tunnel | |
CN105927272A (en) | Floor anchoring constraint tunnel lining structure | |
CN106761778A (en) | A kind of underground digging in subway station construction technology suitable for upper-soft lower-hard ground | |
CN107119691A (en) | One kind is applied to the square deep basal pit of the high pressure-bearing of rich water sand gravel layer and its excavation method | |
CN103953351B (en) | Enlarging construction method is dug under existing tunnel in the case of a kind of uninterrupted traffic | |
CN206408655U (en) | The top plate sidewall structure of covered back-digging construction | |
CN101270582A (en) | Method for setting bracing column in underground cavity | |
CN106761768A (en) | A kind of novel steel tube curtain structure support system and its construction method | |
CN105951712A (en) | Underground diaphragm wall construction method for cutting through underground structure under ground limitation condition | |
CN106812540A (en) | A kind of shield launching element wall closing water sealing consolidation structure and construction technology | |
CN107965325A (en) | Just branch bow member replaces construction method to a kind of small interval shallow tunnel | |
CN106638509A (en) | Tunnel structure capable of reducing slope excavation and construction method thereof | |
CN108343035A (en) | River construction method is worn under shallow tunnel | |
CN106761771A (en) | A kind of construction method for crossing native shallow tunnel on rock under the location of mountain valley | |
CN206396732U (en) | It is a kind of to reduce the tunnel structure of slope excavating | |
CN204551510U (en) | A kind of filled-up ground catchments pressure reduction well drop and drainage structure | |
CN109812271A (en) | A kind of shield crosses the construction method for invading limit box culvert | |
CN108868789A (en) | A kind of stratum active support and change method suitable for shield construction tunnel | |
CN105926665B (en) | A kind of prefabricated block brick assembly concrete drainage pipeline pedestal and its construction method | |
CN208605191U (en) | It is a kind of elder generation tunnel after stand arch-wall method step excavation buried station structure | |
CN107905795A (en) | Subway station is inverse under a kind of operation condition widens method | |
CN216342124U (en) | Disposal structure of tunnel side lower part karst cave | |
CN206144569U (en) | Confined is advance in advance and is protected tunnel structure | |
CN215292503U (en) | Tunnel structure passing through karst cavity |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |