CN106761768A CN201610988201.6A CN201610988201A CN106761768A CN 106761768 A CN106761768 A CN 106761768A CN 201610988201 A CN201610988201 A CN 201610988201A CN 106761768 A CN106761768 A CN 106761768A
Authority
CN
China
Prior art keywords
steel pipe
steel
pipe
support system
curtain structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610988201.6A
Other languages
Chinese (zh)
Other versions
CN106761768B (en
Inventor
赵文
贾鹏蛟
韩健勇
李慎刚
陈阳
刘恒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Northeastern University China
Original Assignee
Northeastern University China
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Northeastern University China filed Critical Northeastern University China
Priority to CN201610988201.6A priority Critical patent/CN106761768B/en
Publication of CN106761768A publication Critical patent/CN106761768A/en
Application granted granted Critical
Publication of CN106761768B publication Critical patent/CN106761768B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/001Improving soil or rock, e.g. by freezing; Injections

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Soil Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Piles And Underground Anchors (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The invention discloses a kind of novel steel tube curtain structure support system and its construction method, it is related to underground tunneling support technology field, it is used to solve the problems, such as the junction stress weakness of the adjacent steel pipe of pipe curtain structure in the prior art, it is necessary to set up a large amount of temporary supports to ensure overall structure stability.Novel steel tube curtain structure includes the first steel pipe, the second steel pipe and the 3rd steel pipe, multiple first steel pipes are arranged in order to form N-shaped structure, it is attached by the 3rd steel pipe between two the first steel pipes of arbitrary neighborhood, first steel pipe is formed and two the second steel pipes for being located at same level is respectively equipped with two legs of N-shaped structure, and concrete has been poured into the first steel pipe, the second steel pipe and the 3rd steel pipe.Novel steel tube curtain structure support system and its construction method improve the lateral stiffness and bearing capacity of pipe curtain support system in the present invention, without setting up a large amount of temporary supports, reduce construction costs, shorten the duration, simplify working procedure, effectively prevent ground settlement, improve construction quality.

Description

A kind of novel steel tube curtain structure support system and its construction method
Technical field
The present invention relates to underground tunneling support technology field, a kind of novel steel tube curtain structure support system is more particularly related to And its construction method.
Background technology
At present, the developable space in ground is fewer and feweri, and the development underground space is the inexorable trend of international metropolis, greatly The type underground space uses tunneling mode as the construction of subway station etc..Pipe curtain construction method is that a kind of new underground engineering is dark Digging technology, is a kind of construction party that large span cross-section underground project dug underground is constructed on the basis of large-diameter steel pipe solid matter supporting Method, be particularly well-suited to intensive urban architecture, the busy section of traffic above-ground, under wear existing important structures building, an ultra shallow bury and In large section tunnel engineering, there is obvious advantage.
However, only being connected with fore shaft between traditional adjacent steel pipe of pipe curtain structure, cause the lateral stiffness of integral tube curtain and hold , it is necessary to set up a large amount of temporary supports to ensure integrally-built stability when carrying power weaker, therefore excavating the pipe curtain inside soil body, cause Construction speed is slower.In addition horizontal section is generally domes, low space utilization.
The content of the invention
The present invention provides a kind of novel steel tube curtain structure support system and its construction method, is used to solve manage in the prior art The junction stress weakness of the adjacent steel pipe of curtain structure is, it is necessary to set up a large amount of temporary supports to ensure asking for integrally-built stability Topic.
Specifically, novel steel tube curtain structure support system, pipe curtain structure includes the first steel pipe, the second steel pipe and the 3rd steel Pipe, the first steel pipe, the second steel pipe and the 3rd steel pipe are multiple, and multiple first steel pipes are arranged in order to form N-shaped structure, any phase It is attached by the 3rd steel pipe between adjacent two the first steel pipes, the first steel pipe is formed and set respectively at two legs of N-shaped structure There are two the second steel pipes for being located at same level, concrete has been poured into the first steel pipe, the second steel pipe and the 3rd steel pipe.
Preferably, the pipe axle of the 3rd steel pipe is perpendicular with the pipe axle of the first steel pipe of two neighboring connection, the 3rd steel pipe and Connected using welding manner between two neighboring first steel pipe, the first steel pipe is provided with injected hole.
Preferably, fixed also by the 3rd steel-pipe welding between the second steel pipe and the first adjacent steel pipe.
Preferably, also including the first soil stabilization layer and the second soil stabilization layer, the first soil stabilization layer is arranged at second The bottom of steel pipe, the second soil stabilization layer is arranged at two the first steel pipe outsides of arbitrary neighborhood.
Preferably, the external diameter of the first steel pipe is 1.2-1.4m, and the external diameter of the second steel pipe is 1.8-2.2m, outside the 3rd steel pipe Footpath is 0.3-0.5m.
Preferably, the end of the 3rd steel pipe is circumferentially provided with 4 high-strength bolts, and high-strength bolt is 8.8 grade high-strength bolts, And external diameter is M22, high-strength bolt is evenly distributed on the tube wall of the 3rd steel pipe, and first row stomata is additionally provided with the 3rd steel pipe.
Preferably, the first steel pipe and the second steel pipe are respectively arranged at two ends with closure steel plate, are arranged at the first steel pipe and second The closure steel plate of steel pipe one end is provided with filling concrete hole and secondary grouting hole, and the closure steel plate of the other end is provided with second row Stomata.
Preferably, bottom wing listrium, bottom wing listrium and the first steel-pipe welding are additionally provided between two the first steel pipes of arbitrary neighborhood It is fixed.
The construction method of novel steel tube curtain structure support system, comprises the following steps:
S1, preparation of construction:According to the shape of design pipe curtain structure, the size and quantity required of various steel pipes are determined, excavate Vertical shaft, builds operation platform;
S2, the first steel pipe for heading into N-shaped structure successively in design attitude, and one side jacking is while dig out in the first steel pipe The earthwork in portion;
S3, horizontal two the second steel pipes of jacking of difference at two legs of N-shaped structure, and to the soil on the outside of the first steel pipe Body and the second steel pipe bottom soil body carry out grouting and reinforcing, are correspondingly formed the second soil stabilization layer and the first soil stabilization layer;
S4, the first steel pipe and the second steel pipe be pre-designed at position slot, remove the first steel pipe and the second steel pipe fluting The soil body at place, the 3rd fastener for connection is used by the first adjacent steel pipe, and by the second steel pipe and adjacent with the second steel pipe first Steel pipe uses the 3rd fastener for connection, and first row stomata is reserved on the 3rd steel pipe;
S5, the uniform multiple high-strength bolts of installation on the two ends tube wall of the 3rd steel pipe;
S6, the first steel pipe and the second steel pipe two ends are respectively welded closure steel plate, and in the first steel pipe and the second steel pipe one Filling concrete hole and secondary grouting hole are reserved on the closure steel plate at end, second row stomata is reserved on the closure steel plate of the other end;
S7, to the first steel pipe, the second steel pipe and concrete perfusion in the 3rd steel pipe;
S8, after concrete reaches design strength, carry out pipe curtain structure lower section the soil body excavation, on one side excavation the soil body, one While welding bottom wing listrium on tube wall on the inside of the first steel pipe of arbitrary neighborhood.
Preferably, specific novel steel tube curtain structure support system and its construction method, in step S7, in advance in the first steel pipe Top built-in slip casting pipe, by filling concrete hole to the first steel pipe, the second steel pipe and concrete perfusion in the 3rd steel pipe, when When not filling concrete in one steel pipe, the second steel pipe and the 3rd steel pipe, by Grouting Pipe connecting secondary injected hole again to first Steel pipe, the second steel pipe and concrete perfusion in the 3rd steel pipe.
The invention has the advantages that:
Connected with the 3rd steel pipe and bottom wing listrium between adjacent first steel pipe in the present invention, compensate for each steel of conventional tube curtain structure Only connected with lock between pipe, the shortcoming for causing the junction stress of the adjacent steel pipe of pipe curtain structure very weak;It is proposed by the present invention New pipe curtain support system substantially increases its lateral stiffness and bearing capacity, big without setting up when excavating the steel pipe curtain lower section soil body The temporary support of amount, and then construction cost is reduced, shorten the duration, simplify working procedure;Pipe curtain structure top proposed by the present invention It is horizontal plane, overall section is rectangular configuration, relative to crowned section, substantially increases the utilization rate of the underground space;The present invention Two second steel pipes being relatively large in diameter of bottom jacking of two side pipes curtain, and grouting and reinforcing is carried out to the second steel pipe bottom, increase The rigidity of both sides steel pipe curtain bottoms, effectively reduces the downward sedimentation of overall steel pipe curtain, and then reduces ground settlement, carries Construction quality high.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing The accompanying drawing to be used needed for having technology description is briefly described, it should be apparent that, drawings in the following description are only this Some embodiments of invention, for those of ordinary skill in the art, on the premise of not paying creative work, can be with Other accompanying drawings are obtained according to these accompanying drawings.
Fig. 1 is the novel steel tube curtain structure support system structural representation that the embodiment of the present invention 1 is provided;
Fig. 2 is adjacent first steel pipe connection structure in the novel steel tube curtain structure support system that the embodiment of the present invention 1 is provided Schematic diagram;
Bolt distribution map on 3rd steel pipe in the novel steel tube curtain structure support system that Fig. 3 is provided for the embodiment of the present invention 1;
Fig. 4 is closure steel plate structure schematic diagram in the novel steel tube curtain structure support system that the embodiment of the present invention 1 is provided;
Slip casting hole site on first steel pipe in the novel steel tube curtain structure support system that Fig. 5 is provided for the embodiment of the present invention 1 Schematic diagram.
Description of reference numerals:
The steel pipes of 1- first, 11- injected holes, the steel pipes of 2- second, the steel pipes of 3- the 3rd, 31- high-strength bolts, the soil stabilizations of 4- first Layer, 5- bottom wing listriums, the soil stabilizations of 6- second layer, 7- ground, 8- closure steel plates, 81- filling concretes hole, 82- secondary groutings Hole, 83- steam vents.
Specific embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole embodiments.It is based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not made Embodiment, belongs to the scope of protection of the invention.
Embodiment 1
As Figure 1-5, the embodiment of the present invention 1 provides a kind of novel steel tube curtain structure support system, and pipe curtain structure includes First steel pipe 1, the second steel pipe 2 and the 3rd steel pipe 3, the first steel pipe 1, the second steel pipe 2 and the 3rd steel pipe 3 are multiple, Duo Ge One steel pipe 1 is arranged in order to form N-shaped structure, is attached by the 3rd steel pipe 3 between two the first steel pipes 1 of arbitrary neighborhood, the One steel pipe 1 forms and two the second steel pipes 2 for being located at same level, the first steel pipe is respectively equipped with two legs of N-shaped structure 1st, concrete has been poured into the second steel pipe 2 and the 3rd steel pipe 3.
Wherein, the external diameter of the first steel pipe 1 is 1.2m, and the external diameter of the second steel pipe 2 is 1.8m, and the external diameter of the 3rd steel pipe 3 is 0.3m, the pipe axle of the 3rd steel pipe 3 is perpendicular with the pipe axle of the first steel pipe 1 of two neighboring connection, the 3rd steel pipe 3 and two neighboring Connected using welding manner between first steel pipe 1, the first steel pipe 1 is provided with injected hole 11, be easy to the soil to the outside of the first steel pipe 1 Body carries out grouting and reinforcing;Fixed also by the 3rd steel-pipe welding between second steel pipe 2 and the first adjacent steel pipe 1, support system Also include the first soil stabilization layer 4 and the second soil stabilization layer 6, the first soil stabilization layer 4 is arranged at the bottom of the second steel pipe 2, Second steel pipe 2 and the first soil stabilization layer 4 are effectively increased the bottom rigidity of steel pipe curtain structure both sides, reduce overall steel pipe The downward sedimentation of curtain, reduces ground settlement, improves construction quality;Second soil stabilization layer 6 is arranged at arbitrary neighborhood two The outside of the first steel pipe 1, by the injected hole 11 on the first steel pipe 1 to grouting and reinforcing in the soil body, forms the second soil stabilization layer 6, increase the intensity of pipe curtain structure horizontal plane;The end of the 3rd steel pipe 3 is circumferentially provided with 4 high-strength bolts 31, high-strength bolt 31 From 8.8 grade high-strength bolts, and external diameter is M22, and 4 high-strength bolts 31 are evenly distributed on the tube wall of the 3rd steel pipe 3, the 3rd First row stomata is additionally provided with steel pipe 3, high-strength bolt 31 can strengthen pulling capacity and cohesive force of the 3rd steel pipe 3 in concrete, Concrete can be irrigated closely knit by first row stomata in concrete perfusion inside the 3rd steel pipe 3;First steel pipe 1 and second Being respectively arranged at two ends with for steel pipe 2 blocks steel plate 8, and the closure steel plate 8 for being arranged at the first steel pipe 1 and the one end of the second steel pipe 2 is provided with Filling concrete hole 81 and secondary grouting hole 82, the closure steel plate 8 of the other end are provided with second row stomata 83, filling concrete hole 81 are used for concrete perfusion in the first steel pipe 1 and the second steel pipe 2, and second row stomata 83 is used in concrete perfusion to outside Exhaust, makes filling concrete closely knit, and secondary grouting hole 82 is disposed to prevention steel pipe inner concrete perfusion leakiness, can be Later stage carries out secondary grouting;Bottom wing listrium 5, the steel pipe of bottom wing listrium 5 and first are additionally provided between two the first steel pipes 1 of arbitrary neighborhood 1 is welded and fixed, and the 3rd steel pipe 3 and bottom wing listrium 5 connect the first adjacent steel plate 1 simultaneously, strengthen adjacent first steel pipe 1 and connect The stress at place, improves pipe curtain structure lateral stiffness and bearing capacity.
Specifically, novel steel tube curtain structure support system and its construction method, comprise the following steps:
S1, preparation of construction:According to the shape of design pipe curtain structure, the size and quantity required of various steel pipes are determined, excavate Vertical shaft, builds operation platform;
S2, the first steel pipe 1 of N-shaped structure is headed into successively in the envisaged underneath position of ground 7, and one side jacking is while dig out The earthwork inside first steel pipe 1;
S3, horizontal two the second steel pipes 2 of jacking of difference at two legs of N-shaped structure, and to the outside of the first steel pipe 1 The soil body and the bottom soil body of the second steel pipe 2 carry out grouting and reinforcing, are correspondingly formed the second soil stabilization layer 6 and the first soil stabilization layer 4;
S4, the first steel pipe 1 and the second steel pipe 2 be pre-designed at position slot, remove the first steel pipe 1 and the second steel pipe 2 The soil body at fluting, the first adjacent steel pipe 1 is connected using the 3rd steel pipe 3, and by the second steel pipe 2 and with the phase of the second steel pipe 2 The first adjacent steel pipe 1 is connected using the 3rd steel pipe 3, and first row stomata is reserved on the 3rd steel pipe 3;
S5,4 high-strength bolts 31 of uniform installation on the two ends tube wall of the 3rd steel pipe 3;
S6, the first steel pipe 1 and the two ends of the second steel pipe 2 are respectively welded closure steel plate 8, and in the first steel pipe 1 and the second steel Filling concrete hole 81 and secondary grouting hole 82 are reserved on the closure steel plate 8 of the one end of pipe 2, is reserved on the closure steel plate 8 of the other end Second row stomata 83;
S7, in advance in the top built-in slip casting pipe of the first steel pipe 1, by blocking the filling concrete hole 81 reserved on steel plate 8 To the first steel pipe 1, the second steel pipe 2 and concrete perfusion in the 3rd steel pipe 3, when the first steel pipe 1, the second steel pipe 2 and the 3rd steel pipe 3 In when not filling concrete, it is mixed to being irrigated in the first steel pipe 1, the second steel pipe 2 and the 3rd steel pipe 3 again by secondary grouting hole 82 Solidifying soil;
S8, after concrete reaches design strength, carry out pipe curtain structure lower section the soil body excavation, on one side excavation the soil body, one While welding bottom wing listrium 5 on the inner side tube wall of the first steel pipe 1 of arbitrary neighborhood.
, but those skilled in the art once know basic creation although preferred embodiments of the present invention have been described Property concept, then can make other change and modification to these embodiments.So, appended claims are intended to be construed to include excellent Select embodiment and fall into having altered and changing for the scope of the invention.
Obviously, those skilled in the art can carry out various changes and modification without deviating from essence of the invention to the present invention God and scope.So, if these modifications of the invention and modification belong to the scope of the claims in the present invention and its equivalent technologies Within, then the present invention is also intended to comprising these changes and modification.

Claims (10)

1. a kind of novel steel tube curtain structure support system, it is characterised in that the pipe curtain structure includes the first steel pipe (1), second Steel pipe (2) and the 3rd steel pipe (3), first steel pipe (1), second steel pipe (2) and the 3rd steel pipe (3) are many Individual, multiple first steel pipes (1) are arranged in order to form N-shaped structure, pass through between first steel pipe (1) of arbitrary neighborhood two 3rd steel pipe (3) is attached, and first steel pipe forms and two are respectively equipped with two legs of N-shaped structure positioned at same Second steel pipe (2) of one horizontal plane, has poured into first steel pipe (1), the second steel pipe (2) and the 3rd steel pipe (3) Concrete.
2. novel steel tube curtain structure support system according to claim 1, it is characterised in that the 3rd steel pipe (3) Pipe axle is perpendicular with the pipe axle of first steel pipe (1) of two neighboring connection, the 3rd steel pipe (3) and two neighboring described Connected using welding manner between first steel pipe (1), first steel pipe (1) is provided with injected hole (11).
3. novel steel tube curtain structure support system according to claim 1, it is characterised in that second steel pipe (2) with It is welded and fixed also by the 3rd steel pipe (3) between adjacent first steel pipe (1).
4. novel steel tube curtain structure support system according to claim 1, it is characterised in that also including the first soil stabilization Layer (4) and the second soil stabilization layer (6), first soil stabilization layer (4) are arranged at the bottom of second steel pipe (2), institute State the second soil stabilization layer (6) and be arranged at the first steel pipe (1) outside of arbitrary neighborhood two.
5. novel steel tube curtain structure support system according to claim 1, it is characterised in that first steel pipe (1) External diameter is 1.2-1.4m, and the external diameter of second steel pipe (2) is 1.8-2.2m, and the external diameter of the 3rd steel pipe (3) is 0.3- 0.5m。
6. novel steel tube curtain structure support system according to claim 1, it is characterised in that the 3rd steel pipe (3) End is circumferentially provided with 4 high-strength bolts (31), and the high-strength bolt (31) is 8.8 grade high-strength bolts, and external diameter is M22, The high-strength bolt (31) is evenly distributed on the tube wall of the 3rd steel pipe (3), and first is additionally provided with the 3rd steel pipe (3) Steam vent.
7. novel steel tube curtain structure support system according to claim 1, it is characterised in that first steel pipe (1) and Being respectively arranged at two ends with for second steel pipe (2) blocks steel plate (8), is arranged at first steel pipe (1) and second steel pipe (2) the closure steel plate (8) of one end is provided with filling concrete hole (81) and secondary grouting hole (82), the closure steel of the other end Plate (8) is provided with second row stomata (83).
8. novel steel tube curtain structure support system according to claim 1, it is characterised in that arbitrary neighborhood two described Bottom wing listrium (5) is additionally provided between one steel pipe (1), the bottom wing listrium (5) is welded and fixed with first steel pipe (1).
9. the construction method of a kind of novel steel tube curtain structure support system as described in claim 1-8 is any, it is characterised in that Comprise the following steps:
S1, preparation of construction:According to the shape of design pipe curtain structure, the size and quantity required of various steel pipes are determined, excavating shaft, Build operation platform;
S2, the first steel pipe (1) for heading into N-shaped structure successively in design attitude, and one side jacking is while dig out the first steel pipe (1) The internal earthwork;
S3, horizontal two the second steel pipes (2) of jacking are distinguished at two legs of N-shaped structure, and to the first steel pipe (1) on the outside of The soil body and the second steel pipe (2) bottom soil body carry out grouting and reinforcing, are correspondingly formed the second soil stabilization layer (6) and the first soil stabilization Layer (4);
S4, it is pre-designed at position in the first steel pipe (1) and the second steel pipe (2) and is slotted, removes the first steel pipe (1) and the second steel pipe (2) soil body at fluting, adjacent the first steel pipe (1) is connected using the 3rd steel pipe (3), and by the second steel pipe (2) and with the Adjacent the first steel pipe (1) of two steel pipes (2) is connected using the 3rd steel pipe (3), and first row stomata is reserved on the 3rd steel pipe (3);
S5, the uniform multiple high-strength bolts (31) of installation on the two ends tube wall of the 3rd steel pipe (3);
S6, the first steel pipe (1) and the second steel pipe (2) two ends are respectively welded closure steel plate (8), and in the first steel pipe (1) and the Filling concrete hole (81) and secondary grouting hole (82) are reserved on the closure steel plate (8) of two steel pipes (2) one end, the closure of the other end Second row stomata (83) is reserved on steel plate (8);
S7, to the first steel pipe (1), the second steel pipe (2) and concrete perfusion in the 3rd steel pipe (3);
S8, after concrete reaches design strength, carry out pipe curtain structure lower section the soil body excavation, on one side excavation the soil body, while Bottom wing listrium (5) is welded on first steel pipe (1) the inner side tube wall of arbitrary neighborhood.
10. the construction method of novel steel tube curtain structure support system according to claim 9, it is characterised in that step S7 In, in advance in the first steel pipe (1) top built-in slip casting pipe, by filling concrete hole (81) to the first steel pipe (1), the second steel pipe (2) concrete perfusion and in the 3rd steel pipe (3), it is mixed when not filled in the first steel pipe (1), the second steel pipe (2) and the 3rd steel pipe (3) During solidifying soil, by Grouting Pipe connecting secondary injected hole (82) again to the first steel pipe (1), the second steel pipe (2) and the 3rd steel pipe (3) Middle concrete perfusion.
CN201610988201.6A 2016-11-10 2016-11-10 A kind of steel pipe curtain structure support system and its construction method Active CN106761768B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610988201.6A CN106761768B (en) 2016-11-10 2016-11-10 A kind of steel pipe curtain structure support system and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610988201.6A CN106761768B (en) 2016-11-10 2016-11-10 A kind of steel pipe curtain structure support system and its construction method

Publications (2)

Publication Number Publication Date
CN106761768A true CN106761768A (en) 2017-05-31
CN106761768B CN106761768B (en) 2019-01-04

Family

ID=58972784

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610988201.6A Active CN106761768B (en) 2016-11-10 2016-11-10 A kind of steel pipe curtain structure support system and its construction method

Country Status (1)

Country Link
CN (1) CN106761768B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108278116A (en) * 2018-01-22 2018-07-13 东北大学 A kind of Shallow Large Span pipe curtain support system and its construction method
CN109653772A (en) * 2019-02-03 2019-04-19 东北大学 A kind of shallow buried tube curtain support system and its construction method
CN110344842A (en) * 2019-07-30 2019-10-18 中铁九局集团第七工程有限公司 Main traffic road pipe curtain construction is worn under Subway tunnel
CN110952993A (en) * 2019-11-19 2020-04-03 东北大学 Semi-assembly type pipe curtain structure based on steel reinforced concrete connection and construction process
CN112597618A (en) * 2020-08-18 2021-04-02 西南交通大学 Method and device for predicting ground surface settlement of tunnel engineering pipe curtain support construction
CN113279692A (en) * 2021-05-09 2021-08-20 苏州中车建设工程有限公司 Soft soil body area pipe shed supporting structure and construction method thereof
CN113982625A (en) * 2021-10-12 2022-01-28 中国化学工程第十六建设有限公司 Reinforcing device and method for preventing subway tunnel from settling in soft soil
CN116006217A (en) * 2022-12-27 2023-04-25 中铁十四局集团隧道工程有限公司 Pipe curtain structure and construction method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090114863A (en) * 2008-04-30 2009-11-04 원하종합건설 주식회사 Parallelly connected iron tube and construction method for underground structure using the same
CN101845955A (en) * 2009-03-27 2010-09-29 株式会社Ntsenc Underground tunnel formation infrastructure establishment method
CN103321659A (en) * 2013-07-22 2013-09-25 中铁隧道集团有限公司 Large-diameter tube curtain support underground excavation construction super-shallow burying large-section subway station structure and construction method
CN203476354U (en) * 2013-05-27 2014-03-12 中铁工程设计咨询集团有限公司 Underground excavation engineering major structure
CN104832196A (en) * 2015-03-31 2015-08-12 中铁时代建筑设计院有限公司 Pipe roof freezing method supporting structure and construction method thereof
CN105464675A (en) * 2016-02-01 2016-04-06 北京首尔工程技术有限公司 Novel surface contact pipe curtain structure and construction method thereof
CN106089243A (en) * 2016-06-12 2016-11-09 东北大学 A kind of pipe curtain supporting construction connected based on concrete filled steel tube

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090114863A (en) * 2008-04-30 2009-11-04 원하종합건설 주식회사 Parallelly connected iron tube and construction method for underground structure using the same
CN101845955A (en) * 2009-03-27 2010-09-29 株式会社Ntsenc Underground tunnel formation infrastructure establishment method
CN203476354U (en) * 2013-05-27 2014-03-12 中铁工程设计咨询集团有限公司 Underground excavation engineering major structure
CN103321659A (en) * 2013-07-22 2013-09-25 中铁隧道集团有限公司 Large-diameter tube curtain support underground excavation construction super-shallow burying large-section subway station structure and construction method
CN104832196A (en) * 2015-03-31 2015-08-12 中铁时代建筑设计院有限公司 Pipe roof freezing method supporting structure and construction method thereof
CN105464675A (en) * 2016-02-01 2016-04-06 北京首尔工程技术有限公司 Novel surface contact pipe curtain structure and construction method thereof
CN106089243A (en) * 2016-06-12 2016-11-09 东北大学 A kind of pipe curtain supporting construction connected based on concrete filled steel tube

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108278116A (en) * 2018-01-22 2018-07-13 东北大学 A kind of Shallow Large Span pipe curtain support system and its construction method
CN108278116B (en) * 2018-01-22 2020-04-07 东北大学 Shallow-buried large-span pipe curtain supporting system and construction method thereof
CN109653772B (en) * 2019-02-03 2020-07-21 东北大学 Shallow buried pipe curtain supporting system and construction method thereof
CN109653772A (en) * 2019-02-03 2019-04-19 东北大学 A kind of shallow buried tube curtain support system and its construction method
CN110344842A (en) * 2019-07-30 2019-10-18 中铁九局集团第七工程有限公司 Main traffic road pipe curtain construction is worn under Subway tunnel
CN110952993B (en) * 2019-11-19 2021-03-16 东北大学 Semi-assembly type pipe curtain structure based on steel reinforced concrete connection and construction process
CN110952993A (en) * 2019-11-19 2020-04-03 东北大学 Semi-assembly type pipe curtain structure based on steel reinforced concrete connection and construction process
CN112597618A (en) * 2020-08-18 2021-04-02 西南交通大学 Method and device for predicting ground surface settlement of tunnel engineering pipe curtain support construction
CN112597618B (en) * 2020-08-18 2022-09-23 西南交通大学 Method and device for predicting ground surface settlement of tunnel engineering pipe curtain support construction
CN113279692A (en) * 2021-05-09 2021-08-20 苏州中车建设工程有限公司 Soft soil body area pipe shed supporting structure and construction method thereof
CN113279692B (en) * 2021-05-09 2022-05-03 苏州中车建设工程有限公司 Soft soil body area pipe shed supporting structure and construction method thereof
CN113982625A (en) * 2021-10-12 2022-01-28 中国化学工程第十六建设有限公司 Reinforcing device and method for preventing subway tunnel from settling in soft soil
CN116006217A (en) * 2022-12-27 2023-04-25 中铁十四局集团隧道工程有限公司 Pipe curtain structure and construction method thereof
CN116006217B (en) * 2022-12-27 2024-01-23 中铁十四局集团隧道工程有限公司 Pipe curtain structure and construction method thereof

Also Published As

Publication number Publication date
CN106761768B (en) 2019-01-04

Similar Documents

Publication Publication Date Title
CN106761768A (en) A kind of novel steel tube curtain structure support system and its construction method
CN103195076B (en) Muddy Bottoms deep-excavation tower crane foundation construction method
CN205742213U (en) Foundation pit supporting construction
CN102644466A (en) Joist arching method for constructing ultra-shallow buried large-span underground excavated subway station in rocky stratum
CN103485790A (en) Shallow tunneling method for pipe-proof-supporting structure combined system
WO2022016720A1 (en) Temporary passage construction method employing support structure in deep foundation pit
CN102995659B (en) Method for constructing from central area to periphery of ultra-large type underground engineering
CN107090851B (en) The inverted side-wall construction method of downtown area open cut groove
CN205024712U (en) Combined tower crane foundation
CN105545323A (en) Construction method for open cut tunnel lining
CN105672450A (en) Laying method for large-aperture water draining pipeline parallel to upper part of existing metro tunnel structure
CN104652444A (en) Construction method for overall reverse operation of ultra-large type deep foundation pit center island type alternative earth excavation
CN104005571A (en) Slanting construction trestle combined with internal supporting system
CN205036380U (en) Block of four encircles PBA and secretly digs subway station major structure
CN104453915B (en) Big cross section vertical shaft pre-pouring grout reinforces Rapid Excavation method
CN103527204A (en) Wall-first arch-second cross middle partition wall tunnel construction method
CN203476354U (en) Underground excavation engineering major structure
CN108049891A (en) For building the rectangular steel pipe support system of underground engineering with shallow and its construction method
CN105178356A (en) Setting-up construction method for vertical joint bars of columns in reverse building method
CN214883716U (en) Supporting structure for reinforcing foundation pit in loess area for overdue service
CN112343614B (en) U-shaped shield tunneling machine-based overlapped-spliced comprehensive pipe gallery construction method
CN212114733U (en) Protection device for shallow pipeline that buries around subway station foundation ditch excavation
CN209704560U (en) Build the scaffolding structure that an ultra shallow buries Large Underground space
CN210031905U (en) Pile plate type platform structure for slope-caving excavation subway station hoisting shield
CN208907211U (en) A kind of Hoisting Steel Pipe Arch hoisting frame

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Zhao Wen

Inventor after: Jia Pengjiao

Inventor after: Zhang Chaozhe

Inventor after: Han Jianyong

Inventor after: Li Shengang

Inventor after: Chen Yang

Inventor after: Liu Heng

Inventor before: Zhao Wen

Inventor before: Jia Pengjiao

Inventor before: Han Jianyong

Inventor before: Li Shengang

Inventor before: Chen Yang

Inventor before: Liu Heng

CB03 Change of inventor or designer information