CN104005571A - Slanting construction trestle combined with internal supporting system - Google Patents
Slanting construction trestle combined with internal supporting system Download PDFInfo
- Publication number
- CN104005571A CN104005571A CN201410269049.7A CN201410269049A CN104005571A CN 104005571 A CN104005571 A CN 104005571A CN 201410269049 A CN201410269049 A CN 201410269049A CN 104005571 A CN104005571 A CN 104005571A
- Authority
- CN
- China
- Prior art keywords
- trestle
- construction
- slanting
- combined
- supporting system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The invention discloses a slanting construction trestle combined with an internal supporting system of a foundation pit. The slanting construction trestle is arranged between an upper support and a lower support, and a trestle wharf is arranged in the middle of the lower support at the same time. The slanting construction trestle is combined with the internal supporting system, column piles are used for vertical supporting and horizontal supporting, and shear walls or trusses are arranged between the supports and the trestle to reinforce the integrity of the trestle and the supports. By means of the slanting construction trestle, a construction channel from the ground to the inside of the foundation pit is established, an earth cutting machine can directly descend into the pit for earth cutting construction and transportation operation without limitation of the cutting depth of the foundation pit, and therefore the earth cutting efficiency is improved to a great extent; since the slanting construction trestle is combined with the internal supporting system, the lateral stability of the trestle is improved; moreover, the column piles of the supporting system are used for supporting the trestle vertically and horizontally, a supporting beam is used as a frame beam of the trestle, and therefore a large amount of engineering cost can be saved.
Description
Technical field
The present invention relates to build underground engineering field, specifically a kind of oblique construction bridge closing with the tying of foundation ditch inner supporting body.
Background technology
Foundation ditch island formula earthwork digging method is a kind of important earthwork digging method, and its advantage is to complete foundation ditch periphery soil excavation and support system construction within a short period of time, to foundation ditch inside uplift of soil, controls comparatively favourable.The major way of island formula soil excavation is divided into two kinds.Mode is: cubic metre of earth entrucking excavator operation on foundation ditch limit or foundation ditch limit trestle platform, after fetching earth, by hole limit earthwork transport vehicle, the earthwork is transported outward; Another kind of mode is: cubic metre of earth entrucking excavator, in the operation of island soil body end face, is transported outward the earthwork by inside and outside connected slight slope by the earthwork transport vehicle on island soil body end face after fetching earth.
Adopt the first digging mode, construction flexibly, is not subject to the restriction of cutting depth.But foundation ditch middle part cubic metre of earth must be by foundation ditch, excavator transportation by lighter is repeatedly to foundation ditch limit, construction machinery loss is larger, and shoveling efficiency is lower, particularly evident for the foundation ditch that excavation area is large.Adopt the second digging mode, shoveling efficiency is higher, is widely used, but is subject to the restriction of cutting depth.General Requirements slight slope in easy flights in 1:8, when cutting depth chin-deep, required slight slope length is longer, by the digging mode of the outer haul volume of slight slope, can not implement.
The construction bridge form adopting now mainly comprises horizontal trestle and oblique construction bridge independently, wherein, the former is limited by the excavation of foundation pit degree of depth, for the darker foundation ditch of cutting depth, can not meet earth moving plant and directly carry out excavation and construction and hauling operation in lower hole, shoveling efficiency is lower; The latter is due to the combination of discord support system, and lateral stability is poor, and trestle beam slab system and stand column pile need be additionally set, and engineering cost is high.
Summary of the invention
The technical problem to be solved in the present invention is, provides a kind of and can improve shoveling efficiency, is not subject to the restriction of the excavation of foundation pit degree of depth, can be for loaded vehicle walking and the oblique construction bridge closing with inner supporting body tying, the above-mentioned defect existing to overcome prior art.
Technical solution of the present invention is, a kind of oblique construction bridge closing with inner supporting body tying is provided, and it is arranged on upper track and supports between He Xia road supports, and meanwhile, Xia road supports middle part open jetty is set.It is characterized in that, described trestle and inner supporting body tying are closed, and utilize stand column pile as vertical and horizontal supporting, and between support and trestle, shear wall or truss are set, to strengthen the globality of trestle and support.
The present invention compared with prior art, there is following remarkable advantage and effective benefit: set up by ground and led to the construction passage in foundation ditch, make earth moving plant directly carry out excavation and construction and hauling operation in lower hole, and be not subject to the restriction of the excavation of foundation pit degree of depth, improved to a great extent shoveling efficiency; Oblique construction bridge and inner supporting body tying are closed, and have improved the lateral stability of trestle, and the stand column pile of utilizing support system as trestle vertical and horizontal supporting, utilize brace summer as trestle Vierendeel girder, can save a large amount of engineering costs.
Accompanying drawing explanation
Fig. 1 is the plan structure schematic diagram of a kind of oblique construction bridge closing with inner supporting body tying of the present invention.
Fig. 2 is the side-looking structural representation of a kind of oblique construction bridge closing with inner supporting body tying of the present invention.
Shown in figure 1, ring beam, 2, support, 3, coupling beam, 4, oblique construction bridge, 5, horizontal construction bridge, 6, open jetty, 7, column, 8, shear wall.
The specific embodiment
Below in conjunction with accompanying drawing, the invention will be further described with concrete embodiment, but not as any limitation of the invention.
As shown in Figure 1 and Figure 2, the present invention is a kind of oblique construction bridge 4 closing with inner supporting body tying, and it is arranged on upper track and supports between 2 He Xia roads supports 2 ', and meanwhile, Xia road supports 2 ' middle part open jetty 6 is set.It is characterized in that, described oblique construction bridge 4 closes with inner supporting body tying, utilizes column 7 as vertical and horizontal supporting, and between support and trestle, shear wall 8 is set, to strengthen oblique construction bridge 4 and to support 2 globality.
Described oblique construction bridge 4 is steel concrete trestle.
Because oblique construction bridge 4 is arranged on upper support 2 He Xia roads, support between 2 ', meet the current requirement of earth moving plant, while arranging, the trestle gradient is unsuitable excessive.More suitable trestle gradient scope is for being not more than 1:8.
Claims (2)
1. the oblique construction bridge (4) closing with the tying of foundation ditch inner supporting body, it is arranged on upper track and supports between (2) He Xia road support (2 '), simultaneously, Xia road supports (2 ') middle part open jetty (6) is set, it is characterized in that, described trestle (4) closes with inner supporting body tying, utilizes stand column pile (7) as vertical and horizontal supporting, and between support (2) and trestle (4), shear wall (8) or truss are set, to strengthen the globality of trestle (4) and support (2).
2. the oblique construction bridge closing with the tying of foundation ditch inner supporting body according to claim 1, is characterized in that, described oblique construction bridge (4) is steel concrete trestle.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410269049.7A CN104005571A (en) | 2014-06-17 | 2014-06-17 | Slanting construction trestle combined with internal supporting system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410269049.7A CN104005571A (en) | 2014-06-17 | 2014-06-17 | Slanting construction trestle combined with internal supporting system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104005571A true CN104005571A (en) | 2014-08-27 |
Family
ID=51366455
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410269049.7A Pending CN104005571A (en) | 2014-06-17 | 2014-06-17 | Slanting construction trestle combined with internal supporting system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104005571A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104452575A (en) * | 2014-10-22 | 2015-03-25 | 中国建筑第四工程局有限公司 | Inclined trestle structure for reverse construction method excavation construction and earth excavation method |
CN106758852A (en) * | 2017-02-21 | 2017-05-31 | 浙江浙耀建设集团有限公司 | Across foundation pit enclosure to support beam trestle construction technology |
CN110004936A (en) * | 2019-05-20 | 2019-07-12 | 中建四局土木工程有限公司 | A kind of unearthed ramp and construction method based on deep foundation pit supporting structure |
CN110485428A (en) * | 2019-08-31 | 2019-11-22 | 杭州悦为科技有限公司 | The oblique trestle construction method of deep foundation pit reinforced concrete inner support |
CN114961342A (en) * | 2022-06-14 | 2022-08-30 | 浙江大学建筑设计研究院有限公司 | Unearthed passage structure utilizing existing diagonal braces in foundation pit |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002371556A (en) * | 2001-06-18 | 2002-12-26 | Kumagai Gumi Co Ltd | Heave preventing construction method for excavated bottom face using temporary cutoff wall |
CN201546228U (en) * | 2009-11-21 | 2010-08-11 | 华丰建设股份有限公司 | Protective device of inclined trestle |
CN201581656U (en) * | 2009-12-04 | 2010-09-15 | 中建四局第六建筑工程有限公司 | Steel trestle for large-scale complicated construction sites |
CN201695398U (en) * | 2010-04-22 | 2011-01-05 | 上海市第一建筑有限公司 | Stepped top-down pit excavation trestle |
CN204152240U (en) * | 2014-06-17 | 2015-02-11 | 浙江华展工程研究设计院有限公司 | A kind of oblique construction bridge closed with inner supporting body tying |
-
2014
- 2014-06-17 CN CN201410269049.7A patent/CN104005571A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002371556A (en) * | 2001-06-18 | 2002-12-26 | Kumagai Gumi Co Ltd | Heave preventing construction method for excavated bottom face using temporary cutoff wall |
CN201546228U (en) * | 2009-11-21 | 2010-08-11 | 华丰建设股份有限公司 | Protective device of inclined trestle |
CN201581656U (en) * | 2009-12-04 | 2010-09-15 | 中建四局第六建筑工程有限公司 | Steel trestle for large-scale complicated construction sites |
CN201695398U (en) * | 2010-04-22 | 2011-01-05 | 上海市第一建筑有限公司 | Stepped top-down pit excavation trestle |
CN204152240U (en) * | 2014-06-17 | 2015-02-11 | 浙江华展工程研究设计院有限公司 | A kind of oblique construction bridge closed with inner supporting body tying |
Non-Patent Citations (4)
Title |
---|
王晓宇等: "施工栈桥在深大基坑工程中的应用研究", 《江苏建筑》, no. 6, 30 June 2009 (2009-06-30) * |
王磊等: "紧临地铁车站的深基坑工程设计与施工", 《建筑科学》, vol. 27, no. 11, 30 November 2011 (2011-11-30) * |
范裕明等: "利用混凝土支撑修筑下坑栈桥解决大型深基坑深层土方挖运的成功实践", 《建筑施工》, vol. 31, no. 11, 30 November 2009 (2009-11-30) * |
贺文学等: "软土基坑斜栈桥结合码头式挖土施工技术", 《施工技术》, vol. 39, no. 9, 30 September 2010 (2010-09-30) * |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104452575A (en) * | 2014-10-22 | 2015-03-25 | 中国建筑第四工程局有限公司 | Inclined trestle structure for reverse construction method excavation construction and earth excavation method |
CN106758852A (en) * | 2017-02-21 | 2017-05-31 | 浙江浙耀建设集团有限公司 | Across foundation pit enclosure to support beam trestle construction technology |
CN110004936A (en) * | 2019-05-20 | 2019-07-12 | 中建四局土木工程有限公司 | A kind of unearthed ramp and construction method based on deep foundation pit supporting structure |
CN110485428A (en) * | 2019-08-31 | 2019-11-22 | 杭州悦为科技有限公司 | The oblique trestle construction method of deep foundation pit reinforced concrete inner support |
CN110485428B (en) * | 2019-08-31 | 2021-07-27 | 杭州悦为科技有限公司 | Construction method of reinforced concrete inner support oblique trestle for deep foundation pit |
CN114961342A (en) * | 2022-06-14 | 2022-08-30 | 浙江大学建筑设计研究院有限公司 | Unearthed passage structure utilizing existing diagonal braces in foundation pit |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102691300B (en) | Construction method of foundation pit earthwork | |
CN101270582B (en) | Method for setting bracing column in underground cavity | |
CN104005571A (en) | Slanting construction trestle combined with internal supporting system | |
CN103696784B (en) | Large-diameter long pipe curtain construction method for shallowly-buried large-span under-tunnel-passing architectural structure | |
CN106930321B (en) | The construction method of underground structure is built in a kind of stake of pipe-jacking with large diameter combination hole | |
CN102505704A (en) | Large open caisson construction method in soft geological shaft | |
CN104294769B (en) | A kind of piling and the construction method increasing the built bridge abutment structure of platform cap composite reinforcement | |
CN106761768A (en) | A kind of novel steel tube curtain structure support system and its construction method | |
CN105672356A (en) | Underground structure of municipal pipeline group spanning tunnel and construction method for underground structure | |
CN203514345U (en) | Connection type precast concrete retaining wall | |
CN104790412B (en) | Big width foundation pit supporting construction in the case of artesian water | |
CN205557532U (en) | Combine secretly section of burying construction city deep tunnel's interim construction passageway of speciality open cut | |
CN103290847A (en) | Inner oblique beam supporting structure for oversized-area deep foundation pit and construction method | |
CN109356169A (en) | Foundation pit row pile supporting system and construction method thereof | |
CN201943086U (en) | Underground building wall body | |
CN105421463A (en) | Longitudinal excavation construction method of long-span dense-support super-long deep foundation pit | |
CN106869138A (en) | A kind of load retaining wall Retaining Structure with Double-row Piles and its foundation ditch excavation method | |
CN103161498B (en) | Method for filling coal pillar beside roadway in steep coal seam section | |
CN205024712U (en) | Combined tower crane foundation | |
CN102071675A (en) | Soft soil foundation consolidation method combining drainage pile loading prepressing and deep mixing piles | |
CN104652444A (en) | Construction method for overall reverse operation of ultra-large type deep foundation pit center island type alternative earth excavation | |
CN107938680A (en) | A kind of excavation of foundation pit safe construction method | |
CN101554105A (en) | Method for undisturbed relocation and recovery of soil and die for fixing undisturbed earthwork | |
CN204097889U (en) | A kind of piling and the built bridge abutment structure of increase platform cap composite reinforcement | |
CN102966109A (en) | Method for constructing zonal deep foundation pit bottom sealing of soft soil foundation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C53 | Correction of patent of invention or patent application | ||
CB02 | Change of applicant information |
Address after: 315010 496 Xin Dian Road, Haishu District, Zhejiang, Ningbo Applicant after: Zhejiang Huazhan Engineering Research & Design Institute Co., Ltd. Address before: 315010 Zhejiang Province, Ningbo city Haishu District Baoshan Road No. 166 Applicant before: Zhejiang Huazhan Engineering Research & Design Institute Co., Ltd. |
|
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20140827 |