CN206384642U - A kind of power construction pay off rack - Google Patents

A kind of power construction pay off rack Download PDF

Info

Publication number
CN206384642U
CN206384642U CN201720031584.8U CN201720031584U CN206384642U CN 206384642 U CN206384642 U CN 206384642U CN 201720031584 U CN201720031584 U CN 201720031584U CN 206384642 U CN206384642 U CN 206384642U
Authority
CN
China
Prior art keywords
wire
rack
winding pole
wire winding
baffle plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720031584.8U
Other languages
Chinese (zh)
Inventor
席宁
徐凤叶
林岩
侯振凯
张学杰
郭启海
岳军龙
张展
曹张峰
王强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720031584.8U priority Critical patent/CN206384642U/en
Application granted granted Critical
Publication of CN206384642U publication Critical patent/CN206384642U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The utility model discloses a kind of power construction pay off rack, including wire-unfolding rack and wire winding pole, the inside of wire-unfolding rack is installed with baffle plate and mentioned and baffle plate, clamping device is also installed between baffle plate and baffle plate are mentioned, the bottom of wire-unfolding rack is installed with base, fix bar is provided between wire-unfolding rack and base, fix bar is fixedly connected by the spiral nail installed in its bottom with base, and the inside of wire-unfolding rack is additionally provided with hydraulic cylinder;Wire winding pole is arranged on the top of wire-unfolding rack, wire winding pole surface is provided with limited block and bolt bar, support bar is also equipped with below wire winding pole, wire winding pole is fixedly connected by the support bar installed thereunder with hydraulic cylinder, be additionally provided with moving block on the top of support bar, the power construction wire-unfolding rack can fast assembling-disassembling, the mutual cooperation with hydraulic cylinder is mentioned by baffle plate, the high high adjustment for placing electric wire is realized, it is easy to use.

Description

A kind of power construction pay off rack
Technical field
The utility model is related to pay off rack technical field, specially a kind of power construction pay off rack.
Background technology
With China's expanding economy and the quick emergence of building trade, it is required for applying in various building fields Man-hour carry out cable laying, and in the process of deployment of electric wire substantial amounts of cable due to the weight of its own it is larger, reduce Actual laying efficiency, so be accomplished by using pay off rack, common pay off rack species have active actinobacillus frame and passive pay off rack, Vertical type coil holder and Horizontal despooling frame, there are a shaft type pay off rack and shaftless pay off rack, various pay off racks give actual electric power Work progress brings certain facility.
The hydraulic pay-off stand used during usual manual stringing is that height is adjusted by hydraulic cylinder, but current Although design common problem is can to adjust height, when fixed to certain height, it is impossible to stable placement In certain height, this just makes troubles to actual unwrapping wire process.
Utility model content
For problem above, the utility model provides a kind of power construction pay off rack, and Stability Analysis of Structures is easy to adjust, The problem of effectively can solving in background technology.
To achieve the above object, the utility model provides following technical scheme:A kind of power construction pay off rack, including put Line bracket and wire winding pole, the inside of the wire-unfolding rack are installed with baffle plate and mentioned and baffle plate, and baffle plate is mentioned and is arranged on gear The left and right sides of plate, is also installed with clamping device between baffle plate and baffle plate are mentioned, and the bottom of the wire-unfolding rack is fixed Base is installed, fix bar is provided between wire-unfolding rack and base, fix bar by the spiral nail installed in its bottom with Base is fixedly connected, and the inside of the wire-unfolding rack is additionally provided with hydraulic cylinder, and hydraulic cylinder is fixedly mounted on the upper surface of base; The wire winding pole is arranged on the top of wire-unfolding rack, is provided with limited block and bolt bar on wire winding pole surface, and limited block and Bolt bar is fixedly mounted on below the left and right sides of wire winding pole, the wire winding pole and is also equipped with support bar, and wire winding pole passes through The support bar installed thereunder is fixedly connected with hydraulic cylinder, and moving block is additionally provided with the top of support bar.
As a kind of preferred technical scheme of the utility model, the surface of the base is provided with perforation, and multiple perforation Arranged parallel.
As a kind of preferred technical scheme of the utility model, the bolt bar is turned by the activity on the inside of it Axle is fixedly connected with wire winding pole.
As a kind of preferred technical scheme of the utility model, the bottom of the wire-unfolding rack is also installed with universal move Wheel.
As a kind of preferred technical scheme of the utility model, the quantity of the hydraulic cylinder is two, and two hydraulic cylinders It is respectively and fixedly installed to the both sides of wire winding pole.
Compared with prior art, the beneficial effects of the utility model are:The power construction pay off rack, by setting coiling Bar so that electric wire fixes the surface for being wrapped in wire winding pole, while coordinate the limited block and bolt bar installed in wire winding pole surface, Both the surface for being wrapped in wire winding pole of electric wire had neatly been facilitated, and had facilitated manual unwrapping wire process again, movable rotation-shaft is set so that spiral handle It can effectively be connected between hand and wire winding pole, the rotation of wire winding pole is driven by rotating bolt bar manually, manual unwrapping wire is realized Process, sets support bar, the height of right wire winding pole is adjusted by the hydraulic cylinder of support bar bottom, when wire winding pole is highly adjusted to one During definite value, pass through the clamping device installed in wire winding pole left and right ends so that wire winding pole is mentioned solid with wire-unfolding rack by baffle plate Fixed connection, can effectively adjust height, and ensure that the structural stability of pay off rack, will not cause structure because of overload Breakage, it is separation design to set between fix bar, and fix bar and base, facilitates it to dismantle and installation process, is set universal Driving wheel, can quickly move pay off rack to the position specified.The structure of the pay off rack is more stablized, and dismounting more facilitates, and moves It is dynamic more quick, it is adaptable to the use during power construction.
Brief description of the drawings
Fig. 1 is the utility model structural representation;
Fig. 2 is wire-unfolding rack left view.
In figure:1- wire-unfolding racks;2- wire winding poles;3- baffle plates are mentioned;4- baffle plates;5- clamping devices;6- bases;7- is fixed Bar;8- spiral nails;9- hydraulic cylinders;10- limited blocks;11- bolt bars;12- support bars;13- moving blocks;14- perforates;15- lives Dynamic rotating shaft;The universal driving wheels of 16-.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belongs to the scope of the utility model protection.
Embodiment:
Fig. 1 and Fig. 2 are referred to, the utility model provides a kind of technical scheme:A kind of power construction pay off rack, including put Line bracket 1 and wire winding pole 2, the inside of wire-unfolding rack 1 are installed with baffle plate and mention 3 and baffle plate 4, and baffle plate is mentioned 3 and is arranged on The left and right sides of baffle plate 4, is also installed with clamping device 5 between baffle plate 4 and baffle plate mention 3, and the bottom of wire-unfolding rack 1 is consolidated Dingan County is equipped with base 6, fix bar 7 is provided between wire-unfolding rack 1 and base 6, fix bar 7 passes through the spiral shell installed in its bottom Rotation nail 8 is fixedly connected with base 6, and the inside of wire-unfolding rack 1 is additionally provided with hydraulic cylinder 9, and hydraulic cylinder 9 is fixedly mounted on base 6 Upper surface;Wire winding pole 2 is arranged on the top of wire-unfolding rack 1, and the surface of wire winding pole 2 is provided with limited block 10 and bolt bar 11, and limited block 10 and bolt bar 11 are fixedly mounted on the left and right sides of wire winding pole 2, the lower section of wire winding pole 2 is also equipped with branch Strut 12, wire winding pole 2 is fixedly connected by the support bar 12 installed thereunder with hydraulic cylinder 9, on the top of support bar 12 also It is provided with moving block 13.
Wherein, the surface of base 6 is provided with perforation 14, and 14 arranged parallels of multiple perforation.
Wherein, bolt bar 11 is fixedly connected by the movable rotation-shaft 15 on the inside of it with wire winding pole 2.
Wherein, the bottom of wire-unfolding rack 1 is also installed with universal driving wheel 16.
Wherein, the quantity of hydraulic cylinder 9 is two, and two hydraulic cylinders 9 are respectively and fixedly installed to the both sides of wire winding pole 2.
Operation principle of the present utility model:
Power construction pay off rack, by setting wire winding pole 2 so that electric wire fixes the surface for being wrapped in wire winding pole 2, together Shi Peihe is arranged on the limited block 10 and bolt bar 11 on the surface of wire winding pole 2, both facilitated electric wire neatly be wrapped in wire winding pole 2 Surface, facilitates manual unwrapping wire process again, sets movable rotation-shaft 15 so that can effectively connect between bolt bar 11 and wire winding pole 2 Connect, the rotation of wire winding pole 2 is driven by rotating bolt bar 11 manually, realize manual unwrapping wire process, support bar 12 is set, passed through The hydraulic cylinder 9 of the bottom of support bar 12 adjusts the height of right wire winding pole 2, when wire winding pole 2 is highly adjusted to certain value, by installing Clamping device 5 in the left and right ends of wire winding pole 2 so that wire winding pole 2 is mentioned 3 by baffle plate and is fixedly connected with wire-unfolding rack 1, can Effectively regulation height, and ensure that the structural stability of pay off rack, will not cause structural failure because of overload, set solid It is separation design between fixed pole 7, and fix bar 7 and base 6, facilitates it to dismantle and installation process, universal driving wheel 16, energy is set Reach and quickly move pay off rack to the position specified.The structure of the pay off rack is more stablized, and dismounting more facilitates, and movement is more accelerated It is prompt, it is adaptable to the use during power construction.
Preferred embodiment of the present utility model is the foregoing is only, it is all at this not to limit the utility model Any modifications, equivalent substitutions and improvements made within the spirit and principle of utility model etc., should be included in the utility model Protection domain within.

Claims (5)

1. a kind of power construction pay off rack, including wire-unfolding rack (1) and wire winding pole (2), the inside of the wire-unfolding rack (1) are consolidated (3) and baffle plate (4) are mentioned equipped with baffle plate by Dingan County, and baffle plate mentions the left and right sides that (3) are arranged on baffle plate (4), baffle plate (4) with Baffle plate is also installed with clamping device (5) between mentioning (3), it is characterised in that:Peace is fixed in the bottom of the wire-unfolding rack (1) Equipped with base (6), fix bar (7) is provided between wire-unfolding rack (1) and base (6), fix bar (7) passes through installed in its bottom The spiral nail (8) at end is fixedly connected with base (6), and the inside of the wire-unfolding rack (1) is additionally provided with hydraulic cylinder (9), and hydraulic pressure Cylinder (9) is fixedly mounted on the upper surface of base (6);The wire winding pole (2) is arranged on the top of wire-unfolding rack (1), in wire winding pole (2) surface is provided with limited block (10) and bolt bar (11), and limited block (10) and bolt bar (11) be fixedly mounted on around Support bar (12) is also equipped with below the left and right sides of line bar (2), the wire winding pole (2), wire winding pole (2) is by installed in it The support bar (12) of lower section is fixedly connected with hydraulic cylinder (9), and moving block (13) is additionally provided with the top of support bar (12).
2. a kind of power construction pay off rack according to claim 1, it is characterised in that:The surface of the base (6) is set It is equipped with perforation (14), and multiple perforation (14) arranged parallels.
3. a kind of power construction pay off rack according to claim 1, it is characterised in that:The bolt bar (11) passes through Movable rotation-shaft (15) on the inside of it is fixedly connected with wire winding pole (2).
4. a kind of power construction pay off rack according to claim 1, it is characterised in that:The bottom of the wire-unfolding rack (1) End is also installed with universal driving wheel (16).
5. a kind of power construction pay off rack according to claim 1, it is characterised in that:The quantity of the hydraulic cylinder (9) For two, and two hydraulic cylinders (9) are respectively and fixedly installed to the both sides of wire winding pole (2).
CN201720031584.8U 2017-01-12 2017-01-12 A kind of power construction pay off rack Expired - Fee Related CN206384642U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720031584.8U CN206384642U (en) 2017-01-12 2017-01-12 A kind of power construction pay off rack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720031584.8U CN206384642U (en) 2017-01-12 2017-01-12 A kind of power construction pay off rack

Publications (1)

Publication Number Publication Date
CN206384642U true CN206384642U (en) 2017-08-08

Family

ID=59493406

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720031584.8U Expired - Fee Related CN206384642U (en) 2017-01-12 2017-01-12 A kind of power construction pay off rack

Country Status (1)

Country Link
CN (1) CN206384642U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110282486A (en) * 2019-06-14 2019-09-27 国网山东省电力公司临沂供电公司 Power construction actinobacillus device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110282486A (en) * 2019-06-14 2019-09-27 国网山东省电力公司临沂供电公司 Power construction actinobacillus device

Similar Documents

Publication Publication Date Title
CN206174588U (en) Simple and easy power transmission tower convenient to installation
CN105024310A (en) Adjustable slewing bearing device for laying cable bridge
CN206384642U (en) A kind of power construction pay off rack
CN204607463U (en) Building operation material handling lifting auxiliary device
CN203833394U (en) Labor-saving winding tool flexible in winding and unwinding
CN111807142A (en) Power distribution engineering uses wire winding multi-functional processing apparatus that flare-outs
CN204144815U (en) A kind of convenient cable rack
CN206502068U (en) A kind of automatic binding machine with wire-clamping device
CN206466801U (en) A kind of lift cable unreeling rack
CN206494656U (en) Iron core rollover stand
CN206306965U (en) A kind of mounting bracket of electric-control system
CN212334276U (en) Small-diameter cable threading is with accomodating frame
CN209670417U (en) The adjustable substation framework of wire position
CN210594717U (en) Winding drum capable of collecting sizes of various steel cords
CN209922654U (en) Can receive and release detachable device of electric wire
CN103343646B (en) A kind of movable communication tower
CN201667509U (en) Simple cable reel supporting and lifting device
CN205670674U (en) Wire supporting frame
CN105788816B (en) A kind of combined type distribution transformer stand and its application method
CN210312912U (en) Can prevent winding electric power construction pay off rack
CN205500469U (en) Electronic perpendicular cylinder earth connection winding and unwinding devices
CN207098441U (en) Load transfer instrument and electric power maintenance equipment
CN211491509U (en) Multifunctional clamp
CN221876071U (en) Electric power engineering pay-off
CN220376215U (en) Electric hoist device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170808

Termination date: 20180112