CN206376615U CN201621285442.6U CN201621285442U CN206376615U CN 206376615 U CN206376615 U CN 206376615U CN 201621285442 U CN201621285442 U CN 201621285442U CN 206376615 U CN206376615 U CN 206376615U
Authority
CN
China
Prior art keywords
lifting
pedestal
lifting seat
jack
chimney
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201621285442.6U
Other languages
English (en)
Inventor
秦龙海
江涌波
张伟斌
谭镜潮
周艳芬
陈品强
林先环
林君伟
陈嘉威
黎永宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGZHOU FOURTH CONSTRUCTION Co Ltd
Original Assignee
GUANGZHOU FOURTH CONSTRUCTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGZHOU FOURTH CONSTRUCTION Co Ltd filed Critical GUANGZHOU FOURTH CONSTRUCTION Co Ltd
Priority to CN201621285442.6U priority Critical patent/CN206376615U/zh
Application granted granted Critical
Publication of CN206376615U publication Critical patent/CN206376615U/zh
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

本实用新型属于建筑物施工设备的一种烟囱钢内筒提升装置,其基座与升降座之间均布地安装若干部千斤顶及锚具,所述锚具穿设钢丝绳。升降座作为活动的吊装平台,在多部千斤顶的共同协作下,升降座的上升拉动钢丝绳实现钢内筒整体被平台平衡地吊起,吊装过程吊力均匀以提高钢内筒吊装倒装过程安全性。

Description

烟囱钢内筒提升装置
技术领域
本实用新型属于建筑物施工设备,特别是涉及一种烟囱钢内筒提升装置。
背景技术
高耸烟囱常采用混凝土外筒与钢内筒相结合的结构形式,钢内筒吊装方法常采用倒装法,即在混凝土外筒顶部有设吊装动力装置,以烟囱底为施工场地,将钢内筒标准节逐节焊接拼接提升,自下而上拼接完成这个钢内筒。
烟囱钢内筒吊装倒装法动力装置设在烟囱顶部搭建的钢架上,一般吊装动力装置采用千斤顶,钢丝绳穿过千斤顶与下部钢内筒相连,形成整个提升体系。但一般烟囱钢内筒吊装提升体系所用千斤顶均独立工作,各千斤顶受力状态独立无关联,吊装过程中,千斤顶在钢架上随着吊装荷载增大难免发生垂直下降及水平歪斜,独立受力的千斤顶很容易降低钢内筒吊装施工过程安全性。
实用新型内容
为了解决现有技术存在的问题,本实用新型提出了一种整体受力平衡以提升吊装过程安全性的烟囱钢内筒提升装置。
为了实现以上目的,本实用新型采用的技术方案是:一种烟囱钢内筒提升装置,其特征在于:包括基座与升降座,基座与升降座之间均布地安装若干部千斤顶及锚具,所述锚具穿设钢丝绳。
进一步地,所述基座为正四边形框架,升降座为正八边形框架,基座与升降座的内切圆相同且升降座的其中四条对称切边与基座的四条切边重合。
所述锚具设置于重合切边。
所述基座的千斤顶处焊接有护板。
所述基座与升降座均为圆形体。
实施上述技术方案,本实用新型由于在基座与升降座之间设置若干部千斤顶,升降座作为活动的吊装平台,在多部千斤顶的共同协作下,升降座的上升拉动钢丝绳实现钢内筒整体被平台平衡地吊起,吊装过程吊力均匀以提高钢内筒吊装倒装过程安全性。
附图说明
图1是烟囱钢内筒提升装置的结构示意图。
其中,1-基座;2-升降座;3-千斤顶;4-护板;5-基座锚具;6-升降座锚具;7-钢丝绳。
具体实施方式
如图1所示,烟囱钢内筒提升装置由基座1、升降座2、千斤顶3、锚具5、护板4和钢丝绳6组成。
基座1与升降座2之间设置四部千斤顶3,千斤顶3的顶头支撑升降座2。基座1为正四边形框架,升降座2为正八边形框架,基座1与升降座2的内切圆相同,且升降座2的其中四条切边与基座1的四条切边重合。千斤顶3均布于基座1和升降座2的四条重合切边的中部。每条重合切边均开设两个吊装孔,在吊装孔处安装锚具5,锚具5穿设钢丝绳6。基座1与升降座2的横截面结构均为中空结构或箱形截面,有利于开设吊装孔,也能减轻提升装置的重量。
基座1千斤顶3处焊接有护板4,起到防止千斤顶3水平移动的作用。为了防止锚具下局部压应力集中,锚具周边设置垫板。
烟囱钢内筒提升装置的安装过程是:将基座1放置在专门用于烟囱钢内筒吊装用的钢架上,四个千斤顶3分别放置于基座1四个边的上部中心位置,每个千斤顶3的底部与基座1焊接连接,之后在每个千斤顶3两侧对称焊接护板4;在千斤顶3上部放置升降座2;在基座1和升降座2上吊装孔分别安装锚具5;最后将钢丝绳6从上向下分别穿过锚具5。
烟囱钢内筒提升装置的工作过程是:钢丝绳6下端与被吊装的烟囱钢内筒上端连接,当指令千斤顶3作上升动作时,升降座2上升的同时通过钢丝绳6将烟囱钢内筒吊装上升;钢内筒到位后,往上标准节下方塞进下标准节,待焊接成一体后,松开钢丝绳6下端,指令千斤顶3复位地作下降动作,等待下一次钢内筒的吊装。整个吊装过程,基座1自始至终固定不动,基座1起承载着上升吊装时钢内筒的重量。随着升降座2每一次上升,完成自下往上的多个钢内筒叠加装配。

Claims (5)

1.一种烟囱钢内筒提升装置,其特征在于:包括基座与升降座,基座与升降座之间均布地安装若干部千斤顶及锚具,所述锚具穿设钢丝绳。
2.根据权利要求1所述的烟囱钢内筒提升装置,其特征在于,所述基座为正四边形框架,升降座为正八边形框架,基座与升降座的内切圆相同且升降座的其中四条对称切边与基座的四条切边重合。
3.根据权利要求2所述的烟囱钢内筒提升装置,其特征在于,所述锚具设置于重合切边。
4.根据权利要求3所述的烟囱钢内筒提升装置,其特征在于,所述基座的千斤顶处焊接有护板。
5.根据权利要求1所述的烟囱钢内筒提升装置,其特征在于,所述基座与升降座均为圆形体。
CN201621285442.6U 2016-11-28 2016-11-28 烟囱钢内筒提升装置 Withdrawn - After Issue CN206376615U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621285442.6U CN206376615U (zh) 2016-11-28 2016-11-28 烟囱钢内筒提升装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621285442.6U CN206376615U (zh) 2016-11-28 2016-11-28 烟囱钢内筒提升装置

Publications (1)

Publication Number Publication Date
CN206376615U true CN206376615U (zh) 2017-08-04

Family

ID=59406319

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621285442.6U Withdrawn - After Issue CN206376615U (zh) 2016-11-28 2016-11-28 烟囱钢内筒提升装置

Country Status (1)

Country Link
CN (1) CN206376615U (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106522641A (zh) * 2016-11-28 2017-03-22 广州市第四建筑工程有限公司 烟囱钢内筒提升装置

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106522641A (zh) * 2016-11-28 2017-03-22 广州市第四建筑工程有限公司 烟囱钢内筒提升装置
CN106522641B (zh) * 2016-11-28 2019-04-19 广州市第四建筑工程有限公司 烟囱钢内筒提升装置

Similar Documents

Publication Publication Date Title
CN208701729U (zh) 一种采用预制承台的海上风电高桩承台基础
CN104895335B (zh) 一种吊柱的安装方法
CN203639095U (zh) 内边柱倒装法提升装置
CN110777826B (zh) 围堰吊装下放施工装置及围堰吊装下放施工方法
CN206376615U (zh) 烟囱钢内筒提升装置
CN208748518U (zh) 一种浇筑模板支撑装置
CN207277197U (zh) 一种适用于高墩波形钢腹板悬臂安装的操作平台
CN110040632A (zh) 一种大跨度型钢梁的分段吊装施工方法
CN106522641B (zh) 烟囱钢内筒提升装置
CN214401746U (zh) 逆作法一柱一桩施工结构
CN202347846U (zh) 简易提升式定型化楼梯钢模板
CN108221702A (zh) 一种内倾式钢箱拱桥拱肋的整体提升装置
JP2006077456A (ja) 塔状建造物の架設方法および架設装置
CN210560547U (zh) 一种高炉围管吊装结构
CN107558607B (zh) 设于既有混凝土结构上的塔吊系统及其施工方法
CN111196566A (zh) 超高层内爬塔吊的施工结构及施工方法
CN109505304A (zh) 一种永冻土地区输电线路铁塔装配式基础预制模板
CN110359756A (zh) 750kV升压站构架安装方法
CN209538714U (zh) 一种用于悬挑卸料平台的牛腿装置
CN217516497U (zh) 一种吊装用穿心千斤顶索具
CN205243147U (zh) 直升机组立特高压输电铁塔时使用的吊具
CN211998555U (zh) 超高层内爬塔吊的施工结构
CN218292018U (zh) 一种悬空塔吊基础底座支撑加固结构
CN212450429U (zh) 一种提升机用承重平台
CN221700916U (zh) 一种钢筋骨架吊具

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20170804

Effective date of abandoning: 20190419

AV01 Patent right actively abandoned

Granted publication date: 20170804

Effective date of abandoning: 20190419

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned