CN206375527U - Attached wall structure for building hoist - Google Patents

Attached wall structure for building hoist Download PDF

Info

Publication number
CN206375527U
CN206375527U CN201621441589.XU CN201621441589U CN206375527U CN 206375527 U CN206375527 U CN 206375527U CN 201621441589 U CN201621441589 U CN 201621441589U CN 206375527 U CN206375527 U CN 206375527U
Authority
CN
China
Prior art keywords
fixed
link
wall structure
attached wall
building hoist
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621441589.XU
Other languages
Chinese (zh)
Inventor
赵友明
闫新康
陈建
王云坡
赵光
赵友光
陈建立
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Nine Rainbow China Construction Machinery Co Ltd
Original Assignee
Beijing Nine Rainbow China Construction Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Nine Rainbow China Construction Machinery Co Ltd filed Critical Beijing Nine Rainbow China Construction Machinery Co Ltd
Priority to CN201621441589.XU priority Critical patent/CN206375527U/en
Application granted granted Critical
Publication of CN206375527U publication Critical patent/CN206375527U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a kind of attached wall structure for building hoist, including the fix bar being fixed on guide rail bracket, it is fixed on the fixed seat on building, and the wall-attached frame fixed between fix bar and fixed seat, wall-attached frame includes the support frame fixed with fix bar, and two expansion links set between support frame and fixed seat, linkage is set between two expansion links.In attached wall inside configuration, synchronous stretching device, the length of convenient regulation attached wall structure are set.

Description

Attached wall structure for building hoist
Technical field
The utility model is related to a kind of wall-attaching equipment of building hoist, more specifically, it relates to which a kind of be used to apply The attached wall structure of work lift.
Background technology
Building hoist is usually used in construction, is easy to manned or loading, interior and exterior finishes, bridge available for skyscraper The construction of beam, chimney etc..In installation lift, basis, system are being made at the distance of 3-3.6 meters of building Perform and underframe is installed after basis, guide rail bracket is fixed on underframe, guide rail bracket is assembled by more standard section.Guide rail bracket reaches After certain altitude, between guide rail bracket and building set attached wall structure, it is therefore intended that ensure guide rail bracket stability and Adjust the perpendicularity of guide rail bracket.
The attached wall structure of conventional building hoist is that attached wall structure includes shown in CN203486702U such as Authorization Notice No. The fix bar being fixed on guide rail bracket, the fixed seat being fixed on building, and be erected at attached in fix bar and fixed seat Wall stand.Due to there is a certain distance between guide rail bracket and building, when building guide rail bracket beside different buildings, the distance It can change within the specific limits.It is Collapsible structure by attached wall structure setting to adapt to this change.It is fixed in the patent Bar is connected with link, and fixed seat is connected with expansion link, sets retainer ring on link in addition, and expansion link is set in retainer ring Portion, it is flexibly connected with retainer ring.The length of attached wall structure is adjusted by adjustable telescopic rod, but in the drawing for adjusting two expansion links During elongation, it is impossible to realize and be adjusted in synchronism, regulation is inconvenient.
Utility model content
In view of the deficienciess of the prior art, the purpose of this utility model is to provide a kind of for the attached of building hoist Wall construction, synchronous stretching device, the length of convenient regulation attached wall structure are set in attached wall inside configuration.
To achieve the above object, the utility model provides following technical scheme:A kind of attached wall for building hoist Structure, including the fix bar being fixed on guide rail bracket, are fixed on the fixed seat on building, and fix bar and fixed seat it Between fixed wall-attached frame, wall-attached frame includes the support frame fixed with fix bar, and set between support frame and fixed seat Linkage is set between two expansion links, two expansion links.
Using above technical scheme, when the guide rail bracket of lift is installed beside skyscraper, guide rail bracket point multistage is built, In order to ensure that guide rail bracket is consistent with the distance between skyscraper, wall-attached frame, attached wall are set up between guide rail bracket and skyscraper Frame is fixed on guide rail bracket by fix bar, is fixed on by fixed seat on skyscraper.Influenceed by construction method, guide rail bracket and The distance between skyscraper can not be completely the same.In order to keep the distance between guide rail bracket and skyscraper, wall-attached frame as far as possible On be additionally provided with two expansion links, can be for the distance between adjustment wall-attached frame and fixed seat.Set between two expansion links Linkage, adjusts the linkage, two expansion link synchronization telescopes.
The utility model is further arranged to, and the linkage includes the joining beam being arranged between two expansion links, connection Bar two ends are provided with and expansion link meshed gears.
Using above technical scheme, joining beam is set between two expansion links, joining beam two ends are provided with what is engaged with expansion link Gear.When rotating joining beam, pinion rotation is corresponding to the expansion link that gear is engaged to stretch.
The utility model is further arranged to, and support frame includes the first link fixed with fix bar, and with first The second link that link is fixedly connected.
Using above technical scheme, the distance between usual guide rail bracket and building are in 3-3.6 meters, the width ratio of guide rail bracket Narrower, the distance between two fix bars being fixed on guide rail bracket are also smaller.If the guide rail bracket extends directly into building, It may fix insecure.In order to increase the distance between the fastness of wall-attached frame and building, two expansion links of increase, second connects Frame is connect as transition from the first link to expansion link gradually to expand.
The utility model is further arranged to, and reinforcement is equipped with the first link and the second link.
In order to increase the steadiness of the first link and the second link, set between the first link and the second link Put reinforcement.
The utility model is further arranged to, and two expansion links are provided with shackle member close to the end of the second link.
Using above technical scheme, shackle member is set close to the end of the second link in expansion link, it is to avoid stretch in adjustment Contracting bar apart from when, expansion link is deviate from from the second connector.
The utility model is further arranged to, and fixture is additionally provided between expansion link and joining beam.
Using above technical scheme, rotating link control expansion link stretches, and reaches behind certain position, in order to ensure to stretch Bar and the fastness of joining beam junction, set fixture between expansion link and joining beam.
The utility model is further arranged to, and the fixture includes the retainer plate of one end open, and fixed trap, which is located at, to be stretched The fastener of fixed expansion link is additionally provided with contracting bar, on retainer plate.
Using above technical scheme, the retainer plate using one end open uses at opening bolt as fixture Connection, can adjust the elastic of retainer plate, after the completion of regulation, be fixed using fastener, expansion link can be more firmly fixed.
Beneficial effect:Attached wall frame end is fixed on guide rail bracket by fix bar, and the other end is fixed on high level by fixed seat It is architectural.Wall-attached frame is provided between two expansion links, two expansion links and sets linkage.Adjust the linkage, two Expansion link synchronization telescope, can be for the distance between adjustment wall-attached frame and fixed seat.
Brief description of the drawings
Fig. 1 is the structural representation of building hoist;
Fig. 2 is the attached wall structure of building hoist and the connection diagram of guide rail bracket;
Fig. 3 is the schematic diagram that attached wall structure shows expansion link internal structure;
Fig. 4 is the enlarged drawing of part A in Fig. 3;
Fig. 5 is the enlarged drawing of part B in Fig. 3.
Description of reference numerals:1st, underframe;2nd, guide rail bracket;3rd, cage;4th, attached wall structure;41st, fix bar;411st, connecting rod; 42nd, fixed seat;43rd, fixed support;431st, the first U-shaped connector;432nd, the second U-shaped connector;433rd, the first reinforcement;434、 First retainer plate;44th, the first link;441st, fixing pipe;442nd, fixed plate;443rd, tilting bar;444th, bearing bar;445th, second Reinforcement;446th, stator;447th, the second retainer plate;4471st, connection sheet;4472nd, fastener;45th, the second link;451st, stretch Contracting bar;452nd, shackle member;453rd, joining beam;454th, gear;455th, rack;456th, bracing piece.
Embodiment
A kind of attached wall structure for building hoist, when being constructed to high-rise, it is necessary to be risen using construction Drop machine is aided in.As shown in figure 1, beside high-rise at metope 3-3.6 rice fixed frame 1, on underframe 1 pacify Fill the guide rail bracket 2 being assembled into by four section standard knots.After the perpendicularity for adjusting guide rail bracket 2, surrounding fence and fence gate are installed Frame.Cage 3 is installed in surrounding fence, by the electric crane at the top of cage 3, realizes and increases in the top supernumerary segment of guide rail bracket 2. In order to ensure the steadiness and perpendicularity of guide rail bracket 2, it is necessary to install attached wall knot after guide rail bracket 2 increases to certain height Structure 4.
As shown in Fig. 2 attached wall structure 4 includes the fix bar 41 fixed with guide rail bracket 2, the fixed seat fixed with building 42, and the expansion bracket connected between fix bar 41 and fixed seat 42.Expansion bracket mainly includes and consolidating that fix bar 41 is connected Fixed rack 43, the first link 44 fixed with fixed support 43, the second link 45 fixed with the first link 44.
With reference to Fig. 3, fix bar 41 includes two parallel connecting rods 411, and connecting rod 411 is bolted on guide rail bracket On 2.
Fixed support 43 includes the first U-shaped connector 431 fixed with two connecting rods 411, the first U-shaped connector 431 Two side walls and connecting rod 411 be connected using bolt.In outside weldings the second U-shaped connector of the first U-shaped connector 431 432, the opening sleeve of the second U-shaped connector 432 is in the outside of the first U-shaped connector 431.In the bottom of the first U-shaped connector 431 And second U-shaped connector 432 bottom between diagonal on weld the first reinforcement 433, in the second U-shaped connector 432 Two the first retainer plates 434 are respectively welded close to the position of bottom in two side-wall outer sides.
First link 44 includes being set in the first retainer plate 434, the fixing pipe 441 welded with the first retainer plate 434, Two fixing pipes 441 are connected by fixed plate 442.Welded in fixed plate 442 with fix bar 41 and fixed support 43 same Outside two open tilting bars 443 of individual plane, the one end of tilting bar 443 away from fixed plate 442 is welded using bearing bar 444 Connect, fixed plate 442, two tilting bars 443 and bearing bar 444 enclose inside composition trapezoid support, trapezoid support diagonally wire bonding Connect the second reinforcement 445.Further reinforcing is welded using stator 446 between bearing bar 444 and two tilting bars 443, Gu Two the second retainer plates 447 are respectively welded away from the position of trapezoid support in stator 446.Second retainer plate 447 includes being welded on admittedly Connection sheet 4471 on stator 446, and use bolted fastener 4472 with connection sheet 4471.Connection sheet 4471 and card The inside of component 4472 is provided with groove, and elastic rubber ring is provided with inside grooves(Not shown in figure).
With reference to Fig. 4 and Fig. 5, the second link 45 includes being set in the second retainer plate 447, is lived with the second retainer plate 447 The expansion link 451 of dynamic connection, expansion link 451 is welded with shackle member 452 close to the end of the first link 44, and shackle member 452 can To prevent that expansion link 451 is deviate from from the second retainer plate 447 when stretching expansion link 451.Expansion link 451 is close to fixed seat 42 End fixed with fixed seat 42 using bolt.
Joining beam 453 is set between two expansion links 451, and joining beam 453 is arranged between two stators 446, and is passed through Stator 446 engages slip with two expansion links 451.Two relative positions of expansion link 451 are offered along the length of expansion link 451 The groove in direction, rack 455 is welded in inside grooves, and two ends of joining beam 453 are set and the meshed gears 454 of rack 455. When rotating joining beam 453, the gear 454 on joining beam 453 drives length direction of the expansion link 451 along expansion link 451 to move forward and backward.Two The two piece bracing pieces 456 parallel with joining beam 453 are also welded between individual stator 446.
The installation procedure of whole building hoist is as follows:
Make basic according to foundation drawing, 3.2 meters of foundation bolt centre distance metope, foundation bolt top surface is above ground level 120mm.Underframe 1 is arranged on foundation bolt, tightened using nut.
The guide rail bracket 2 that four section standard knots are assembled into is arranged on underframe 1, is adjusted the perpendicularity of guide rail bracket 2 and is tightened nut It is fixed.Surrounding fence and fence doorframe are installed in the periphery on basis, two cages 3 are installed on underframe 1, cage 3, which is used, to be driven Dynamic device realizes lifting.Carry out increasing on guide rail bracket 2 on installation, guide rail bracket 2 every nine section standard knots in guide rail bracket 2 and building Attached wall structure 4 is installed between thing metope.
When attached wall structure 4 is installed, fix bar 41 is fixed on guide rail bracket 2 first by bolt.Firm banking is installed extremely On building masonry wall.According to the length of the attached wall of selection distance adjustment expansion link 451, unscrew the bolt of the second retainer plate 447, block Component 4472 and connection sheet 4471 depart from.Joining beam 453 is rotated, the displacement of expansion link 451, the length of expansion link 451 is adjusted After fixation, the fastener 4472 of the second retainer plate 447 is pressed on expansion link 451 and fixed with connection sheet 4471.Afterwards By the handling of attached wall structure 4 in place, it is connected with firm banking.The perpendicularity of corrective rail frame 2.All bolts are finally fastened, and are installed Split pin.
Described above is only preferred embodiment of the present utility model, and protection domain of the present utility model is not limited merely to Above-described embodiment, all technical schemes belonged under the utility model thinking belong to protection domain of the present utility model.It should refer to Go out, for those skilled in the art, some improvement under the premise of the utility model principle is not departed from and Retouching, these improvements and modifications also should be regarded as protection domain of the present utility model.

Claims (7)

1. a kind of attached wall structure for building hoist, including it is fixed on guide rail bracket(2)On fix bar(41), it is fixed on and builds Build the fixed seat on thing(42), and in fix bar(41)And fixed seat(42)Between fixed wall-attached frame, it is characterised in that:It is attached Wall stand includes and fix bar(41)Fixed support frame, and in support frame and fixed seat(42)Between two expansion links setting (451), two expansion links(451)Between linkage is set.
2. the attached wall structure according to claim 1 for building hoist, it is characterised in that:The linkage includes It is arranged on two expansion links(451)Between joining beam(453), joining beam(453)Two ends are provided with and expansion link(451)Meshed gears (454).
3. the attached wall structure according to claim 2 for building hoist, it is characterised in that:Support frame includes and fixation Bar(41)The first fixed link(44), and with the first link(44)The second link being fixedly connected(45).
4. the attached wall structure according to claim 3 for building hoist, it is characterised in that:First link(44)With Second link(45)Inside it is equipped with reinforcement.
5. the attached wall structure according to claim 4 for building hoist, it is characterised in that:Two expansion links(451) Close to the second link(45)End be provided with shackle member(452).
6. the attached wall structure according to claim 5 for building hoist, it is characterised in that:Expansion link(451)And connection Bar(453)Between be additionally provided with fixture.
7. the attached wall structure according to claim 6 for building hoist, it is characterised in that:The fixture includes one The retainer plate of end opening, fixed trap is located at expansion link(451)On, fixed expansion link is additionally provided with retainer plate(451)Engaging Part(4472).
CN201621441589.XU 2016-12-26 2016-12-26 Attached wall structure for building hoist Expired - Fee Related CN206375527U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621441589.XU CN206375527U (en) 2016-12-26 2016-12-26 Attached wall structure for building hoist

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621441589.XU CN206375527U (en) 2016-12-26 2016-12-26 Attached wall structure for building hoist

Publications (1)

Publication Number Publication Date
CN206375527U true CN206375527U (en) 2017-08-04

Family

ID=59409076

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621441589.XU Expired - Fee Related CN206375527U (en) 2016-12-26 2016-12-26 Attached wall structure for building hoist

Country Status (1)

Country Link
CN (1) CN206375527U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109867188A (en) * 2019-04-10 2019-06-11 上海庞源机械施工有限公司 A kind of novel construction elevator wall-attached frame
CN112079232A (en) * 2020-08-28 2020-12-15 北京中冶设备研究设计总院有限公司 Attachment device for construction hoist
CN112723102A (en) * 2020-12-03 2021-04-30 安徽中旭机械科技有限公司 Construction elevator adheres to auxiliary fixed bolster

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109867188A (en) * 2019-04-10 2019-06-11 上海庞源机械施工有限公司 A kind of novel construction elevator wall-attached frame
CN112079232A (en) * 2020-08-28 2020-12-15 北京中冶设备研究设计总院有限公司 Attachment device for construction hoist
CN112723102A (en) * 2020-12-03 2021-04-30 安徽中旭机械科技有限公司 Construction elevator adheres to auxiliary fixed bolster

Similar Documents

Publication Publication Date Title
CN206375527U (en) Attached wall structure for building hoist
CN106219419B (en) The large-scale swing arm tower crane original position of high-rise building is converted to plug-in construction method by interior climb
JP4966977B2 (en) Improved construction system, method and apparatus
CN110306658B (en) Steel structure assembly system for assembly type building and construction method
CN104594352B (en) A kind of robust structure and drilling platform construction method based on this robust structure
CN107975251B (en) Assembled building wallboard joint support device
CN106930401A (en) A kind of assembled industrialization steel structure house
JP6304551B2 (en) Unit construction method for solar panels
CN109279480A (en) A kind of steel structure lift shaft splicing apparatus and method
CN206530078U (en) A kind of support meanss
CN208563658U (en) A kind of prefabricated lattice compound shear wall assembly monomer
CN206220534U (en) The pump line support meanss of concrete pumping equipment
CN206530077U (en) A kind of support frame
WO2019151880A1 (en) The method of installation of steel power line poles
JP5680367B2 (en) Lifting equipment
CN213174742U (en) Top bracing steel stand structure
CN209907886U (en) Adjustable assembled stair construction platform
CN203782716U (en) Unilateral template support structure of circuit purlin in cast-in-place pile support
CN208633584U (en) A kind of prefabricated mounting of roof plate supporting frame of wall-attached
CN112942817A (en) Adjustable support jacking for concrete inclined structure and using method
CN202265806U (en) Rapid installing device for large water conservancy and hydropower engineering tainter gates
CN215558585U (en) Prefabricated flue lifting device
CN107245956A (en) A kind of construction method of steel arch bridge
CN203545531U (en) Correcting device for tower crane
CN117988460B (en) Assembled building structure for earthquake resistance and construction process

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170804

Termination date: 20211226