WO2019151880A1 PCT/PL2018/000128 PL2018000128W WO2019151880A1 WO 2019151880 A1 WO2019151880 A1 WO 2019151880A1 PL 2018000128 W PL2018000128 W PL 2018000128W WO 2019151880 A1 WO2019151880 A1 WO 2019151880A1
Authority
WO
WIPO (PCT)
Prior art keywords
pole
frame
steel
elements
assembly
Prior art date
Application number
PCT/PL2018/000128
Other languages
French (fr)
Inventor
Aleksander PANAŚ
Janusz KOST
Marek Ciesielski
Michał STRZĘPECK
Original Assignee
Heavy-Mont Spółka Z Organiczoną Odpowiedzialnością
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Heavy-Mont Spółka Z Organiczoną Odpowiedzialnością filed Critical Heavy-Mont Spółka Z Organiczoną Odpowiedzialnością
Publication of WO2019151880A1 publication Critical patent/WO2019151880A1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/34Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
    • E04H12/345Arrangements for tilting up whole structures or sections thereof

Definitions

  • the subject of the invention is the method of installation of steel poles of power lines, which shortens the time of their installation and reduces the costs of installation.
  • the positioning of the pole itself which is a time-consuming operation, can be carried out without the use of a crane, which significantly reduces the cost of erecting the poles.
  • a ⁇ prefabricated reinforced concrete pole which contains a ground part and a foot for positioning and fixing on the ground is known from the patent description PL21 1814, with an intermediate part between the ground part of the pole and the foot, whose lower end is fixed to the foot fixed to the ground, and the other end is fixed in the ground part of the pole.
  • the ground part of the pole has at least one groove, situated in one of its walls, intended for the attachment of wall panels or other flat elements.
  • Patent application P.377800 indicates the assembly method as an articulated connection between the lower part of the steel element and the foundation element, where the connection is made in the horizontal position of the steel element and then lifted by means of a rigid rod connected to the jib by means of a traction device.
  • the kit for vertical setting of steelwork elements such as the pole and the chimney consists of a spatial jib, mounted on a steel element, a rigid rod connected to the corner of the jib and the tractor as a traction device.
  • the purpose of the invention is to provide a solution concerning the method of assembly of the steel power line poles, which will provide the shortening of the time of assembly of power line poles, eliminate heavy assembly cranes, and thus enable the reduction of the cost of assembly of the power line poles.
  • the method of assembling the pole according to the invention consists in joining the steel power pole at the level of 0.00 on the assembly supports in the horizontal position, then assembling the multifunctional auxiliary structure on the pole foundations, assembling the rotary frame, reinforcing the pole with the auxiliary structures and assembling the actuators with the rigging system and then raising the pole in six phases using the hydraulic actuators to the target position.
  • the advantage of the invention is the elimination of the heavy equipment used so far, as well as the construction of special access roads, even if it is not possible to get to the site with the deliveries of pole elements, it is possible to reload the supplies and transport them with a tractor and trailer to the place of assembly.
  • -/- The object of the invention is shown in the examples of the execution in the drawing in which fig. 1 shows the first phase of the assembly of the steel pole, fig. 2 shows the second phase of the pole assembly from the level 0.00 to 30° , fig. 3 shows the third phase of the pole assembly from an angle of 30° to 45°, fig. 4 shows the fourth phase of the assembly from an angle of 45° to 60°, fig.
  • FIG. 5 shows the fifth phase of the assembly from an angle of 60° to 85° and fig. 6 shows the sixth phase of the assembly from an angle of 85° to 90° using a set of bolted fixing and stabilizing structures with the pole foundation.
  • -/- In the example design, the E33P straight-line pole model was used for assembly, which is marked with the number 9 in the figure. -/-
  • Fig. 1 shows a method which consists in horizontal integration of a complete steel pole 9 on three assembly supports 4. -/-
  • Fig. 2 shows the raising of the pole from the level of 0.00 ⁇ o the angle of 30° using hydraulic actuators 7 and multifunctional auxiliary structures 2 two sets, fixed to the foundation feet 1 , and the rotating frame 3 fixed in the lower part to the auxiliary structure 2, while to the upper part of fhe rotating frame 3 the rigging system 8 is fixed, used to raise the pole 9 using the rope fixing elements on the upper level of the pole 5, and rope fixing elements on the lower level of fhe pole 6.
  • the rotary frame 3 is fixed in the lower part to the auxiliary structure 2, the auxiliary structures 2 are fixed to the foundation feet 1 of pole 9 which are fixed in fhe aboveground par ⁇ of the pole, and to the upper part of fhe rotary frame 3 fhe rigging system 8 is fixed, used for raising the pole 9. -/-
  • the elements of fhe assembly support 2 are screw systems for lowering the pole in the last phase of vertical alignment - transition from phase 5 ⁇ o phase 6.
  • hydraulic actuators 7 used for lifting pole 9 are attached.
  • Another assembly variant assumes the use of a frame built in fhe form of a ladder made of metal profiles with a square cross-section, which is equipped with two vertical rotating elements mounted on supports resting on reinforced elements of fhe frame.
  • a load-bearing rope is fixed, connecting the frame with the mounted pole.
  • the frame has a number of mounting holes for assembly of rotating elements, adjusting the lifting height.
  • the load-bearing frame and vertical rotating elements are additionally connected with elements in the upper part of the frame, which at fhe same time serve as an additional bracket for the mounted pole.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

Method of assembly of steel poles of power lines wherein in the first phase of assembly the steel power pole (9) is joined at the level of 0.00 on assembly supports (4) in the horizontal position, then multifunctional auxiliary structures (2) are mounted on the pole foundations, a rotary frame (3) is mounted, the pole is reinforced with auxiliary structures (5,6) with a rigging system (8), and with hydraulic actuators (7).

Description

The method of installation of steel power line poles.
The subject of the invention is the method of installation of steel poles of power lines, which shortens the time of their installation and reduces the costs of installation. The positioning of the pole itself, which is a time-consuming operation, can be carried out without the use of a crane, which significantly reduces the cost of erecting the poles. -/-
Reinforced concrete lighting pole reinforced with longitudinal and circular steel rods, with central two-diameter hole technologically converging upwards is known from patent description PL197355, consisting of upper pole with cross-section in the shape of a circle or polygon with a thickening at the bottom ended with a plane below which a central truncated cone or a correct truncated pyramid is made, converging to the bottom, with an apex angle of 0° ~ 0 56°, and at its smaller diameter a steel flat bar with a central hole perpendicular to the axis is concreted and from the lower, foundation part made with a central two-diameter hole converging to the top, ending from the top with a central hole converging downwards in the shape of a central truncated cone or a correct truncated pyramid with an apex angle corresponding to the apex angle of the cone in the lower part of the pole, and at its smaller diameter, in the central hole in the steel flat bar concreted perpendicular to the axis with a central hole, a nut is fixed axially with a vertical hole cooperating with a screw penetrating the flat bars from the top. -/-
In turn, a· prefabricated reinforced concrete pole, which contains a ground part and a foot for positioning and fixing on the ground is known from the patent description PL21 1814, with an intermediate part between the ground part of the pole and the foot, whose lower end is fixed to the foot fixed to the ground, and the other end is fixed in the ground part of the pole. The ground part of the pole has at least one groove, situated in one of its walls, intended for the attachment of wall panels or other flat elements. -/-
Patent application P.377800 indicates the assembly method as an articulated connection between the lower part of the steel element and the foundation element, where the connection is made in the horizontal position of the steel element and then lifted by means of a rigid rod connected to the jib by means of a traction device. The kit for vertical setting of steelwork elements such as the pole and the chimney consists of a spatial jib, mounted on a steel element, a rigid rod connected to the corner of the jib and the tractor as a traction device. -/-
The purpose of the invention is to provide a solution concerning the method of assembly of the steel power line poles, which will provide the shortening of the time of assembly of power line poles, eliminate heavy assembly cranes, and thus enable the reduction of the cost of assembly of the power line poles. -/-
The method of assembling the pole according to the invention consists in joining the steel power pole at the level of 0.00 on the assembly supports in the horizontal position, then assembling the multifunctional auxiliary structure on the pole foundations, assembling the rotary frame, reinforcing the pole with the auxiliary structures and assembling the actuators with the rigging system and then raising the pole in six phases using the hydraulic actuators to the target position. Once the components of the steel power pole have been delivered to the erection site, the ancillary structures for the erection of the pole have been delivered to the erection site, the assembly supports have been positioned and the complete pole has been joined horizontally, using a forklift truck and scaffolding or assembly lifts, in several phases using hydraulic actuators, the integrated pole is lifted. -/-
The advantage of the invention is the elimination of the heavy equipment used so far, as well as the construction of special access roads, even if it is not possible to get to the site with the deliveries of pole elements, it is possible to reload the supplies and transport them with a tractor and trailer to the place of assembly. -/- The object of the invention is shown in the examples of the execution in the drawing in which fig. 1 shows the first phase of the assembly of the steel pole, fig. 2 shows the second phase of the pole assembly from the level 0.00 to 30° , fig. 3 shows the third phase of the pole assembly from an angle of 30° to 45°, fig. 4 shows the fourth phase of the assembly from an angle of 45° to 60°, fig. 5 shows the fifth phase of the assembly from an angle of 60° to 85° and fig. 6 shows the sixth phase of the assembly from an angle of 85° to 90° using a set of bolted fixing and stabilizing structures with the pole foundation. -/- In the example design, the E33P straight-line pole model was used for assembly, which is marked with the number 9 in the figure. -/-
Fig. 1 shows a method which consists in horizontal integration of a complete steel pole 9 on three assembly supports 4. -/-
Fig. 2 shows the raising of the pole from the level of 0.00†o the angle of 30° using hydraulic actuators 7 and multifunctional auxiliary structures 2 two sets, fixed to the foundation feet 1 , and the rotating frame 3 fixed in the lower part to the auxiliary structure 2, while to the upper part of fhe rotating frame 3 the rigging system 8 is fixed, used to raise the pole 9 using the rope fixing elements on the upper level of the pole 5, and rope fixing elements on the lower level of fhe pole 6. -/-
The process of lifting the steel pole 9 is shown in fig. 2, fig. 3, fig. 4, fig. 5 and fig. 6, showing the subsequent phases of lifting Phase 2, Phase 3, Phase 4, Phase 5 and Phase 6. -/-
The rotary frame 3 is fixed in the lower part to the auxiliary structure 2, the auxiliary structures 2 are fixed to the foundation feet 1 of pole 9 which are fixed in fhe aboveground par† of the pole, and to the upper part of fhe rotary frame 3 fhe rigging system 8 is fixed, used for raising the pole 9. -/-
The elements of fhe assembly support 2 are screw systems for lowering the pole in the last phase of vertical alignment - transition from phase 5†o phase 6. -/- To the second set of auxiliary structure 2 hydraulic actuators 7 used for lifting pole 9 are attached. Another assembly variant assumes the use of a frame built in fhe form of a ladder made of metal profiles with a square cross-section, which is equipped with two vertical rotating elements mounted on supports resting on reinforced elements of fhe frame. To fhe lower par† of fhe frame and upper rotating elements a load-bearing rope is fixed, connecting the frame with the mounted pole. The frame has a number of mounting holes for assembly of rotating elements, adjusting the lifting height. The load-bearing frame and vertical rotating elements are additionally connected with elements in the upper part of the frame, which at fhe same time serve as an additional bracket for the mounted pole. -/-

Claims

Paten† claims
1.The method of assembly of the steel power line poles, where the power pole contains the ground part the foot for positioning and fixing on the ground and the integrated part of the pole, characterised in that the steel pole (9) is integrated at the level of 0.00 on the mounting supports (4) in a horizontal position, then on the foundations (1 ) of the pole auxiliary structures (2) are mounted, the rotary frame (3) is mounted, the pole is reinforced with auxiliary structures (5,6) with a rigging system (8) and hydraulic actuators (7) are mounted and the pole (9) is lifted in six phases using the hydraulic actuators (7) to the target position or a frame is used, constructed in the form of a ladder of metal profiles with a square cross-section, equipped with two vertical rotating elements mounted on supports resting on its reinforced elements. -/-
2. Method according to claim 1 , characterised in that the complete steel power pole (9) is assembled in a horizontal position on three mounting supports (4). -/-
3. Method according to claim 1 , characterised in that a multifunctional auxiliary structure (2) to which a rotating frame (3) is mounted in the lower part is used during lifting, and to the lower part of the frame and upper rotating elements a load- bearing rope is fixed, connecting the frame (3) with the mounted pole, where the frame has a number of mounting holes intended for the assembly of rotating elements, being the lifting height adjustment, where the frame (3) and vertical rotating elements are additionally connected with elements in the upper part of the frame, which also serve as an additional bracket for the assembled pole. -/-
4. Method according to claim 1 , characterised in that a rotating frame (3) is used for the steel pole (9) lifting operation so that a rigging system (8) is fixed to its upper part for lifting the pole (9) using elements of the auxiliary structures (5) at the upper level of the pole, and mounting elements of the auxiliary structures (6) at the lower level of the pole. -/-
5. Method according to claim 1 , characterised in that hydraulic actuators (7) are used for lifting the steel pole (9). -/-
6. Method according to claim 1 , characterised in that in the sixth phase of the assembly, the steel power pole (9) is lifted from the angle of 85° to the angle of 90° with the use of a set of screw fixing and stabilizing structures (2) with the foundation ( 1 ) of the pole. -/-
PCT/PL2018/000128 2018-02-03 2018-12-23 The method of installation of steel power line poles WO2019151880A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
PLP.424503 2018-02-03
PL424503A PL424503A1 (en) 2018-02-03 2018-02-03 Method for assembling of electrical supply line steel towers

Publications (1)

Publication Number Publication Date
WO2019151880A1 true WO2019151880A1 (en) 2019-08-08

Family

ID=65352070

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/PL2018/000128 WO2019151880A1 (en) 2018-02-03 2018-12-23 The method of installation of steel power line poles

Country Status (2)

Country Link
PL (1) PL424503A1 (en)
WO (1) WO2019151880A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113445812A (en) * 2021-05-24 2021-09-28 邵小东 Agricultural thing networking communication base station construction equipment
CN115162823A (en) * 2022-07-29 2022-10-11 中交路桥建设有限公司 Method for assembling steeple steel member

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4027441A (en) * 1975-10-02 1977-06-07 Grigory Vasilievich Pitelyaev Arrangement for erecting and dismounting an elongate object having one end articulated to a foundation
PL211814A1 (en) 1978-12-14 1980-06-16 Os Bad Rozwojowy Armatury Prze
PL377800A1 (en) 2005-10-24 2007-04-30 Instytut Warzywnictwa im. Emila Chroboczka Method for putting steel structure elements such as column or chimney stack in vertical position as well as a set for putting steel structure elements such as column or chimney stack in vertical position
PL197355B1 (en) 2001-06-04 2008-03-31 Bielinski Artur Reinforced concrete lamp post
US20110016804A1 (en) * 2009-07-22 2011-01-27 Lonnie Howard Ultra-light, re-usable, extended-height meteorological tower apparatus and method

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3715852A (en) * 1970-12-08 1973-02-13 Mitsubishi Heavy Ind Ltd Method of erecting tower-like structure
PL283593A1 (en) * 1990-01-31 1991-08-12 Jozef Lukaszewicz Steel chimney and method of assembling it
ES2304319B1 (en) * 2007-03-29 2009-07-21 GAMESA INNOVATION & TECHNOLOGY, S.L. A TOWER OF CELOSIA AND A METHOD OF ERECTION OF AN AEROGENERATOR WITH A TOWER OF CELOSIA.
GB0821775D0 (en) * 2008-11-28 2009-01-07 Rawlings Matthew J H An apparatus and method for erecting wind turbines
US8171614B2 (en) * 2010-12-28 2012-05-08 General Electric Company Systems and method of assembling a tower section
WO2013083802A2 (en) * 2011-12-07 2013-06-13 Dong Energy Wind Power A/S Support structure for wind turbine and method of mounting such support structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4027441A (en) * 1975-10-02 1977-06-07 Grigory Vasilievich Pitelyaev Arrangement for erecting and dismounting an elongate object having one end articulated to a foundation
PL211814A1 (en) 1978-12-14 1980-06-16 Os Bad Rozwojowy Armatury Prze
PL197355B1 (en) 2001-06-04 2008-03-31 Bielinski Artur Reinforced concrete lamp post
PL377800A1 (en) 2005-10-24 2007-04-30 Instytut Warzywnictwa im. Emila Chroboczka Method for putting steel structure elements such as column or chimney stack in vertical position as well as a set for putting steel structure elements such as column or chimney stack in vertical position
US20110016804A1 (en) * 2009-07-22 2011-01-27 Lonnie Howard Ultra-light, re-usable, extended-height meteorological tower apparatus and method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113445812A (en) * 2021-05-24 2021-09-28 邵小东 Agricultural thing networking communication base station construction equipment
CN115162823A (en) * 2022-07-29 2022-10-11 中交路桥建设有限公司 Method for assembling steeple steel member
CN115162823B (en) * 2022-07-29 2024-02-23 中交路桥建设有限公司 Assembling method of pinnacle steel member

Also Published As

Publication number Publication date
PL424503A1 (en) 2019-08-12

Similar Documents

Publication Publication Date Title
JP5629316B2 (en) Telescopic tower assembly and method
US8297025B2 (en) Method of building a hybrid tower for a wind generator
CN110230393B (en) Large concrete tank dome climbing high formwork support system and installation method
EP2479430A1 (en) Method for assembling shell segments for forming tower sections of a hybrid wind turbine tower
CA2823814C (en) Mounting assembly and method to erect in sections an annular tower for wind or heliostatic power generators in an energy farm
US20170167129A1 (en) Method and apparatus for raising a structure
CN104099934A (en) Supporting structure of large foundation pit
CN106930401A (en) A kind of assembled industrialization steel structure house
CN110552507A (en) Well is from automatic cloth system of concrete that climbs
WO2019151880A1 (en) The method of installation of steel power line poles
JP6831714B2 (en) Tower crane foundation and tower crane
CN205636516U (en) Convertible template system of hollow concrete leaning tower
CN205369229U (en) But walking hoisting frame suitable for manual hole digging pile steel reinforcement cage is laid
US20200284026A1 (en) Vertical slip form construction system with multi-function platform, and method of constructing a building therewith
JP2018044318A (en) Construction method of silo roof section, and silo roof structure
CN111847272A (en) Supporting method of tower crane for reconstruction of existing building
US4782634A (en) Building construction
CN216787874U (en) Large-scale ring type truss hoisting structure in large-span high altitude
US11761196B2 (en) Building system and method thereof
JP2579715B2 (en) External tower crane
JP2018096163A (en) Method of constructing building
CN210067523U (en) Umbrella-type ground storehouse roof reinforcing apparatus that backs to
CN214996126U (en) Lattice column direction control structure
CN217439509U (en) Operating platform for high-rise hollow structure internal mold construction
RU103822U1 (en) BIG SPAN BUILDING

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 18845421

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 18845421

Country of ref document: EP

Kind code of ref document: A1