CN206360455U - The huge square steel construction granulation tower tower mast system of lattice column - Google Patents

The huge square steel construction granulation tower tower mast system of lattice column Download PDF

Info

Publication number
CN206360455U
CN206360455U CN201621488769.3U CN201621488769U CN206360455U CN 206360455 U CN206360455 U CN 206360455U CN 201621488769 U CN201621488769 U CN 201621488769U CN 206360455 U CN206360455 U CN 206360455U
Authority
CN
China
Prior art keywords
column
core concrete
steel core
crossbeam
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621488769.3U
Other languages
Chinese (zh)
Inventor
郝际平
薛强
樊春雷
孙晓岭
何梦楠
王迎春
刘斌
刘瀚超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian University of Architecture and Technology
Architectural Design and Research Institute of Tsinghua University
Original Assignee
Xian University of Architecture and Technology
Architectural Design and Research Institute of Tsinghua University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian University of Architecture and Technology, Architectural Design and Research Institute of Tsinghua University filed Critical Xian University of Architecture and Technology
Priority to CN201621488769.3U priority Critical patent/CN206360455U/en
Application granted granted Critical
Publication of CN206360455U publication Critical patent/CN206360455U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The square steel construction granulation tower tower mast system of the huge lattice column of the utility model, including erect fixed four first steel core concrete columns and eight fixed second steel core concrete columns of setting;The square setting of four first steel core concrete columns and respectively corresponding vertex position distribution;With side is provided with equally distributed two second steel core concrete columns altogether between two first steel core concrete columns on one side;Piece first steel core concrete column distinguishes two second concrete filled steel tube column combinations piece lattice column of formation adjacent thereto, first steel core concrete column is connected with two second steel core concrete columns by some first crossbeams and some first column braces respectively, is connected respectively by some second cross beams and some second column braces between two second steel core concrete columns;The 3rd crossbeam between two second steel core concrete columns set between adjacent two lattice column by common side and the connection of the 3rd column braces surround to form granulation tower inner cylinder cavity, and alien invasion is into four-prism.

Description

The huge square steel construction granulation tower tower mast system of lattice column
Technical field
The utility model is related to a kind of granulation tower, the specially huge square steel construction granulation tower tower mast system of lattice column.
Background technology
Granulation tower be generally above and below equal diameter cylindrical structure, be mainly made up of circular cylinder body and building escalator two parts, building electricity The suitable attached side for being against tower body between ladder, when arranging building escalator, it is necessary to arranged according to tower diameter size reasonable, make it to tower bottom The influence of air inlet and tower top air outlet is minimum.Elevator hoistways must be closed and completely cut off completely with tower body, and elevator shaft door must not It is opened in face of tower body direction.Wherein, urea prilling tower mainly scrapes the bed of material, spray head layer operating room, hold water layer and roofing these Flooring is constituted.
Granulation tower is the core texture in chemical fertilizer plant process flow, and existing granulation tower uses concrete barrel knot mostly Structure, carrys out China's urea production capacity this year and increases to annual output more than 800,000 tons by 40,000 tons original of annual output, to the work of granulation tower Skill requirement proposes higher requirement.But research on granulation tower structure design and few, according to original annual value of production 4~6 Ten thousand tons, country is obviously no longer complies with using the universal design of Reinforced Concrete Share-wall Structure Supported By Frame and has advocated construction economizing type Society, the principles and policies developed a circular economy.Tradition granulation tower structure is generally reinforced concrete structure or is abound with supporting construction, around Tower body arrangement support is planar support, forms similar thin shelled tubular structure.The structural integrity of the type is stronger, but steel using amount It is too big, it is not economical enough.And armored concrete is generally cast in situs, construction is troublesome and larger by seasonal effect factor.Due to steel The deadweight of reinforced concrete tower is larger, also add the investment of foundation, high intensity Zone is more unfavorable to armored concrete tower.
Utility model content
For problems of the prior art, the utility model provides the huge square steel construction granulation tower tower mast of lattice column System, globality is strong, Stability Analysis of Structures, saves material, and easy to assembly, quick construction is good in economic efficiency.
The utility model is to be achieved through the following technical solutions:
The huge square steel construction granulation tower tower mast system of lattice column, including erect four fixed first steel core concrete columns With eight second steel core concrete columns for erectting fixation;
The square setting of four described first steel core concrete columns and respectively corresponding vertex position distribution;With on one side Two first steel core concrete columns between altogether side be provided with equally distributed two second steel core concrete columns;
Piece first steel core concrete column distinguishes two second concrete filled steel tube column combinations piece lattice of formation adjacent thereto Structure post, wherein, the first steel core concrete column passes through some first crossbeams and some with two second steel core concrete columns respectively One column braces are connected, and some second cross beams and some second column braces are passed through respectively between two second steel core concrete columns Connection;
The 3rd crossbeam and between two second steel core concrete columns set between adjacent two lattice column by common side The connection of three column braces surrounds to form granulation tower inner cylinder cavity, and four alien invasions of granulation tower surround to form four-prism.
It is preferred that, the first described column braces are arranged between two adjacent first crossbeams, and the second column braces are set Put between two adjacent second cross beams, the 3rd column braces are set between two adjacent the 3rd crossbeams.
It is preferred that, the first crossbeam of same layer high setting, one crossbeam face of second cross beam and the formation of the 3rd crossbeam;With granulation Crossbeam in the correspondence crossbeam face of high building face is using I-steel formation floor support, and the crossbeam of remainder uses steel pipe.
It is preferred that, the second cross beam of same layer high setting and the 3rd crossbeam pass sequentially through the second steel core concrete column and alternately set Put connection and form octagon, eight second steel core concrete column corresponding vertex position distributions;Each second steel core concrete column The annulus beam set in annulus is connected by pipe nipple beam on the inside of the octagon of same floor height;Be provided with the outside of 3rd crossbeam with Its parallel outer crossbeam.
It is preferred that, the external side parallel of one alien invasion of granulation tower is provided with four heel posts;Heel post is respectively by vertical The connecting cross beam of setting is connected with corresponding first steel core concrete column or the second steel core concrete column, is set between adjacent heel post Put the 4th crossbeam;It is provided with below each connecting cross beam and is fixed on corresponding first steel core concrete column or the second concrete filled steel tube Bearing diagonal on post;Surrounded between the attached facade of four heel posts formation and adjacent alien invasion to be formed granulation tower stair it is empty Between and subsidiary space, lift space is set in the lattice column adjacent with the alien invasion.
It is preferred that, the first buttress brace of vertical connection first crossbeam and steel core concrete column is provided with lattice column, with the At least one of the second parallel buttress brace of one crossbeam, and the 3rd buttress brace parallel with second cross beam.
It is preferred that, be arranged on same alien invasion and be distributed in first column braces between adjacent floor height crossbeam, One the 3rd column braces and first column braces, are sequentially connected in being wholely set, and form two ends and connect same alien invasion The integral support of upper two first steel core concrete columns;Two second steel core concrete columns being integrally supported with same alien invasion are welded Connect fixation.
It is preferred that, the concrete in four first steel core concrete columns and eight fixed second steel core concrete columns of setting The steel fibre of interior incorporation random distribution;Four first steel core concrete columns and eight second steel core concrete columns for erectting fixation Caliber reduces in steps from bottom to top.
It is preferred that, the first column braces are arranged between two adjacent first crossbeams, one end and a first crossbeam and first The connecting node connection of steel core concrete column, the connecting node of the other end and another first crossbeam and the second steel core concrete column Connection;Adjacent the first column braces ending in granulation tower bottom connects, and the first adjacent column braces of top are in same tilt court To setting.
It is preferred that, the second column braces and the 3rd column braces are in the shape of the letter V setting;Second column braces are arranged on two-phase Between adjacent second cross beam, two ends are connected with the connecting node of a second cross beam and the second steel core concrete column, intermediate vertex with Another second cross beam is connected;3rd column braces are arranged between two adjacent 3rd crossbeams, two ends and the 3rd crossbeam and The connecting node connection of second steel core concrete column, intermediate vertex is connected with another the 3rd crossbeam.
Compared with prior art, the utility model has following beneficial technique effect:
The utility model uses space truss structure, by first steel core concrete column at each angle and adjacent thereto Two second steel core concrete columns are combined into a lattice column;Again by the support between four lattice columns be connected as one it is whole Body, forms the tower structure of outer square column inner cylinder, and the globality of tower body is stronger, and the work of lacing is played using the column braces of setting With the crossbeam batten plate effect of setting plays the anti-bending strength for not only increasing pillar, and enhance the entirety of tower body structure Property so that structure is more stable, and Lateral resisting ability is more preferable compared with the thin wall shape tower body for being abound with support;And can be by the space of formation Truss structure, each load-bearing pillar is supported the tower structure for being connected as square-outside and round-inside cylinder, and its each junction power transmission is direct, each part Stress is clearly reasonable, and junction is easy to construction to assemble, comprehensive cost low;Compared to reinforced concrete structure, the knot of steel structure tower Structure is exquisitely carved, and profile is rich and varied, from heavy and light, and anti-seismic performance is good, and component can be prefabricated in the factory, building site is installed, quality assurance, Duration shortens, and economic benefit is improved on the whole, is more beneficial for opening up air inlet scraping bed of material above tower wall.
Further, the horizontal beam and column connected by the triangular element formed two-by-two between concrete filled steel tube in lattice column Between support formed space truss composition, so as to make full use of the intensity of material, than solid web girder save material, mitigate deadweight and increase Big rigidity.
Further, the heel post formation side elevation being fixed on using depending on steel core concrete column so that staircase It is arranged in outside the tower body of granulation tower, function division is clearer and more definite, and steel using amount is less.
Further, by the setting of a variety of web beams, the specific requirement that can be directed in different floors is adapted to Property set, better meet actual requirement, reduce steel using amount.
Further, by the integral support of setting, while alien invasion globality is strengthened, improve construction and assemble Efficiency, it is ensured that meet use requirement while reducing steel using amount.
Further, it is possible to increase compression bearing and tensile capacity of the steel core concrete column at node, improve Node district intensity, makes the design requirement that strong node is reached in overall construction design.
Brief description of the drawings
Fig. 1 is the structural plan layout drawing of granulation tower tower mast system described in the utility model example.
Fig. 2 for Fig. 1 1-1 to settings V-shaped support structural representation.
Fig. 3 for Fig. 1 2-2 to structural representation.
Fig. 4 for Fig. 1 3-3 to structural representation.
Fig. 5 for Fig. 1 1-1 to setting be integrally supported structural representation.
In figure:First steel core concrete column 1, the second steel core concrete column 2, first crossbeam 3, the first column braces 4, second Crossbeam 5, the second column braces 6, the 3rd crossbeam 7, the 3rd column braces 8, heel post 9, connecting cross beam 10, the 4th crossbeam 11, tiltedly Support 12, the first buttress brace 13, the second buttress brace 14, the 3rd buttress brace 15, pipe nipple beam 16, annulus beam 17, outer crossbeam 18.
Embodiment
The utility model is described in further detail with reference to specific embodiment, described is to the utility model Explanation rather than restriction.
The square steel construction granulation tower tower mast system of the huge lattice column of the utility model, to improve raw industry production efficiency, will be filled With change steel-tube construction form at home first Application on chemical fertilizer industry granulation tower and propose the square turriform of huge lattice column.This Utility model uses space truss structure, and three steel core concrete columns at each angle are combined into four lattice columns, the entirety of tower body Property it is stronger, Lateral resisting ability compared be abound with support thin wall shape tower body it is more preferable.Lattice column, which sews material form, mainly lacing and batten plate, lattice Being structurally characterized in that for post, material area is arranged to the place remote apart from the axes of inertia, increasing under the conditions of same axial drag is can guarantee that Strong component anti-bending strength, and save material.The utility model column braces play lacing, not only increase the anti-of pillar Curved performance, and enhance the globality of tower body structure so that structure is more stable.
The square steel construction granulation tower tower mast structure of the huge lattice column of novel fabricated that the utility model is proposed directly should Produced per year for Henan Supreme Being benefit fertilizer in the engineerings such as 850,000 tons of composite fertilizer's project granulation towers, there is good make in daily production process Use effect;Because new tower mast structure construction speed is fast, it can significantly shorten the duration, hence it is evident that increase economic efficiency.
Specifically, as Figure 1-Figure 5, it includes erectting four fixed first steel core concrete columns 1 and erects fixation Eight second steel core concrete columns 2;Four square settings of first steel core concrete column 1 and respectively corresponding vertex position point Cloth;With side is provided with equally distributed two second concrete filled steel tubes altogether between two first steel core concrete columns 1 on one side Post 2;Piece first steel core concrete column 1 distinguishes two second steel core concrete columns 2 combination adjacent thereto and forms a lattice Post, wherein, the first steel core concrete column 1 passes through some first crossbeams 3 and some with two second steel core concrete columns 2 respectively One column braces 4 are connected, and some second cross beams 5 and some second intercolumniations are passed through respectively between two second steel core concrete columns 2 Support 6 is connected;The 3rd crossbeam 7 between two second steel core concrete columns 2 set between adjacent two lattice column by common side Connected with the 3rd column braces 8, four lattice columns, which are sequentially connected, to surround to form granulation tower inner cylinder cavity, four of granulation tower Alien invasion surrounds to form four-prism.In this example, as shown in figure 1, by laterally the first steel core concrete column 1 from left to right, Second steel core concrete column 2, the second steel core concrete column 2 and the first steel core concrete column 1 correspondence longitudinal axis be designated B, C, D、E;The first steel core concrete column 1 from bottom to top, the second steel core concrete column 2, the second steel core concrete column 2 and the of longitudinal direction 1., 2., 3., 4. the corresponding axis of pitch of one steel core concrete column 1 is designated.
As Figure 2-Figure 5, the first described column braces 4 are arranged between two adjacent first crossbeams 3, the second post Between support 6 set between adjacent two second cross beams 5, the 3rd column braces 8 are set between two adjacent the 3rd crossbeams 7.
As Figure 1-Figure 5, the first crossbeam 3 of same layer high setting, the crossbeam 7 of second cross beam 5 and the 3rd one horizontal stroke of formation Beam face;Crossbeam in crossbeam face corresponding with granulation tower flooring is using I-steel formation floor support, and the crossbeam of remainder is used Steel pipe.The crossbeam 7 of second cross beam 5 and the 3rd of same layer high setting passes sequentially through the second steel core concrete column 2 and is arranged alternately connection Form octagon, eight corresponding vertex position distributions of second steel core concrete column 2;Each second steel core concrete column 2 is same The annulus beam 17 set in annulus is connected by pipe nipple beam 16 on the inside of the octagon of one floor height;The outside of 3rd crossbeam 7 is provided with Outer crossbeam 18 in parallel, the circular cylindrical chamber inside some annulus beams 17 formation granulation tower being coaxially disposed.
As depicted in figs. 1 and 2, the external side parallel of one alien invasion of granulation tower is provided with four heel posts 9;9 points of heel post Do not connected by vertically disposed connecting cross beam 10 with the corresponding steel core concrete column 2 of first steel core concrete column 1 or second, phase 4th crossbeam 11 is set between adjacent heel post 9;Each lower section of connecting cross beam 10, which is provided with, is fixed on corresponding first steel tube concrete Bearing diagonal 12 on the steel core concrete column 2 of earth pillar 1 or second;The attached facade of four formation of heel post 9 and adjacent alien invasion Between surround in the stair space to form granulation tower and subsidiary space, the lattice column adjacent with the alien invasion lift space be set.
As shown in figure 1, being provided with the first buttress brace of vertical connection first crossbeam 3 and steel core concrete column 1 in lattice column 13, at least one in the second buttress brace 14 parallel with first crossbeam 3, and the 3rd buttress brace 15 parallel with second cross beam 5 Kind.
As shown in figure 5, being arranged on same alien invasion and being distributed in a first intercolumniation branch between adjacent floor height crossbeam Support 4, the 3rd column braces 8 and first column braces 4, are sequentially connected in being wholely set, and form two ends connection same The integral support of two first steel core concrete columns 1 on alien invasion;Two second steel pipes being integrally supported with same alien invasion are mixed Solidifying earth pillar 2 is welded and fixed.
Mixed in concrete in four first steel core concrete columns 1 and eight fixed second steel core concrete columns 2 of setting Enter the steel fibre of random distribution;Four first steel core concrete columns 1 and the pipe for erectting eight fixed second steel core concrete columns 2 Footpath reduces in steps from bottom to top.
As shown in figs 2-4, the first column braces 4 are arranged between two adjacent first crossbeams 3, and one end is horizontal with one first The connecting node connection of the steel core concrete column 1 of beam 3 and first, the other end and another concrete filled steel tube of first crossbeam 3 and second The connecting node connection of post 2;Adjacent the first column braces 4 ending in granulation tower bottom connects, the first adjacent intercolumniation branch of top Support 4 is set in same tilt direction.
Second column braces 6 and the 3rd column braces 8 are in the shape of the letter V setting;Second column braces 6 are arranged on two adjacent Between two crossbeams 5, two ends are connected with the connecting node of a steel core concrete column 2 of second cross beam 5 and second, intermediate vertex with it is another One second cross beam 5 is connected;3rd column braces 8 are arranged between two adjacent 3rd crossbeams 7, two ends and the 3rd crossbeam 7 Connected with the connecting node of the second steel core concrete column 2, intermediate vertex is connected with another the 3rd crossbeam 7.

Claims (10)

1. the huge square steel construction granulation tower tower mast system of lattice column, it is characterised in that including erectting four fixed first steel Pipe concrete column (1) and eight second steel core concrete columns (2) for erectting fixation;
The square setting of four described first steel core concrete columns (1) and respectively corresponding vertex position distribution;With on one side Two first steel core concrete columns (1) between altogether side be provided with equally distributed two second steel core concrete columns (2);
Two second steel core concrete columns (2) combination adjacent thereto of piece the first steel core concrete column (1) difference forms one Lattice column, wherein, the first steel core concrete column (1) passes through some first crossbeams with two second steel core concrete columns (2) respectively (3) connected with some first column braces (4), some second cross beams are passed through respectively between two second steel core concrete columns (2) (5) connected with some second column braces (6);
The 3rd crossbeam (7) between two second steel core concrete columns (2) set between adjacent two lattice column by common side and The connection of 3rd column braces (8) surrounds to form granulation tower inner cylinder cavity, and four alien invasions of granulation tower surround to form positive four Prism.
2. the square steel construction granulation tower tower mast system of huge lattice column according to claim 1, it is characterised in that described First column braces (4) are arranged between two adjacent first crossbeams (3), and the second column braces (6) set adjacent two Between second cross beam (5), the 3rd column braces (8) are set between two adjacent the 3rd crossbeams (7).
3. the square steel construction granulation tower tower mast system of huge lattice column according to claim 1, it is characterised in that same layer The first crossbeam (3) of high setting, one crossbeam face of second cross beam (5) and the formation of the 3rd crossbeam (7);It is corresponding with granulation tower flooring horizontal Crossbeam in beam face is using I-steel formation floor support, and the crossbeam of remainder uses steel pipe.
4. the square steel construction granulation tower tower mast system of huge lattice column according to claim 1, it is characterised in that same layer The second cross beam (5) and the 3rd crossbeam (7) of high setting pass sequentially through the second steel core concrete column (2) and are being arranged alternately connection formation just Octagon, eight second steel core concrete column (2) corresponding vertex position distributions;Each second steel core concrete column (2) is same The annulus beam (17) set in annulus is connected by pipe nipple beam (16) on the inside of the octagon of floor height;Set on the outside of 3rd crossbeam (7) It is equipped with outer crossbeam (18) in parallel.
5. the square steel construction granulation tower tower mast system of huge lattice column according to claim 1, it is characterised in that granulation tower The external side parallel of one alien invasion is provided with four heel posts (9);Heel post (9) passes through vertically disposed connecting cross beam respectively (10) connect, set between adjacent heel post (9) with corresponding first steel core concrete column (1) or the second steel core concrete column (2) Put the 4th crossbeam (11);It is provided with below each connecting cross beam (10) and is fixed on corresponding first steel core concrete column (1) or the Bearing diagonal (12) on two steel core concrete columns (2);Between attached facade that four heel posts (9) are formed and adjacent alien invasion Surround in the stair space to form granulation tower and subsidiary space, the lattice column adjacent with the alien invasion and lift space is set.
6. the square steel construction granulation tower tower mast system of huge lattice column according to claim 1, it is characterised in that lattice column The first buttress brace (13) of vertical connection first crossbeam (3) and steel core concrete column (1) is inside provided with, it is flat with first crossbeam (3) At least one of capable the second buttress brace (14), and the 3rd buttress brace (15) parallel with second cross beam (5).
7. the square steel construction granulation tower tower mast system of huge lattice column according to claim 1, it is characterised in that be arranged on On same alien invasion and be distributed between adjacent floor height crossbeam first column braces (4), the 3rd column braces (8) With first column braces (4), it is sequentially connected in being wholely set, forms two ends and connect two first steel pipes on same alien invasion The integral support of concrete column (1);Two second steel core concrete columns (2) being integrally supported with same alien invasion are welded and fixed.
8. the square steel construction granulation tower tower mast system of huge lattice column according to claim 1, it is characterised in that four Incorporation random distribution in concrete in one steel core concrete column (1) and eight fixed second steel core concrete columns (2) of setting Steel fibre;The caliber of four first steel core concrete columns (1) and eight fixed second steel core concrete columns (2) of setting is under Reduce upwards in steps.
9. the square steel construction granulation tower tower mast system of huge lattice column according to claim 1, it is characterised in that the first post Between support (4) be arranged between two adjacent first crossbeams (3), one end and a first crossbeam (3) and the first steel core concrete column (1) connecting node connection, the connecting node of the other end and another first crossbeam (3) and the second steel core concrete column (2) connects Connect;Adjacent the first column braces (4) ending in granulation tower bottom connects, and adjacent the first column braces (4) in top incline in identical Tiltedly towards setting.
10. the square steel construction granulation tower tower mast system of huge lattice column according to claim 1, it is characterised in that second Column braces (6) and the 3rd column braces (8) are in the shape of the letter V setting;Second column braces (6) are arranged on two adjacent second cross beams (5) between, two ends are connected with the connecting node of a second cross beam (5) and the second steel core concrete column (2), intermediate vertex with it is another One second cross beam (5) connection;3rd column braces (8) are arranged between two adjacent 3rd crossbeams (7), two ends with one the 3rd The connecting node connection of crossbeam (7) and the second steel core concrete column (2), intermediate vertex is connected with another the 3rd crossbeam (7).
CN201621488769.3U 2016-12-30 2016-12-30 The huge square steel construction granulation tower tower mast system of lattice column Expired - Fee Related CN206360455U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621488769.3U CN206360455U (en) 2016-12-30 2016-12-30 The huge square steel construction granulation tower tower mast system of lattice column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621488769.3U CN206360455U (en) 2016-12-30 2016-12-30 The huge square steel construction granulation tower tower mast system of lattice column

Publications (1)

Publication Number Publication Date
CN206360455U true CN206360455U (en) 2017-07-28

Family

ID=59379209

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621488769.3U Expired - Fee Related CN206360455U (en) 2016-12-30 2016-12-30 The huge square steel construction granulation tower tower mast system of lattice column

Country Status (1)

Country Link
CN (1) CN206360455U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106760879A (en) * 2016-12-30 2017-05-31 西安建筑科技大学 A kind of square steel construction granulation tower tower mast system of huge lattice column

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106760879A (en) * 2016-12-30 2017-05-31 西安建筑科技大学 A kind of square steel construction granulation tower tower mast system of huge lattice column
CN106760879B (en) * 2016-12-30 2022-09-20 西安建筑科技大学 Giant lattice column square steel structure prilling tower mast system

Similar Documents

Publication Publication Date Title
CN204715623U (en) Prefabricated Steel Reinforced Concrete Beams and post
CN208310382U (en) A kind of modular assembly formula steel construction lattice tower
CN206360455U (en) The huge square steel construction granulation tower tower mast system of lattice column
CN2620018Y (en) Combined column self-vertical iron tower
CN110388119A (en) A kind of modular assembly formula steel construction lattice tower
CN206015882U (en) The steel structure of housing system that a kind of lateral resisting and antigravity separate
CN108729546A (en) A kind of dry type beam-to-column joint structure for prefabricated assembling type reinforced concrete building
CN205776735U (en) A kind of beam-ends crossed arc post-tensioned prestressing muscle " dry type " assembling bean column node
CN108204039A (en) A kind of assembled architecture truss structure
CN102235030A (en) Extra-large-span cross-section-variable pre-stressed normally placed evacuating quadrangular pyramid space grid and manufacturing method thereof
CN205025154U (en) 330kVGIS distribution device place rigid connection sail formula framework
CN109098423B (en) Full steel pipe scaffold structure for assembling annular suspended dome structure and construction method thereof
CN204059756U (en) The truss of a kind of pre-stressed steel pipe concrete purlin sheet and structure thereof
CN109281390B (en) Assembled concrete truss shear wall building structure
CN103225344A (en) Hollow steel section-concrete combined framework and construction method thereof
CN106760879A (en) A kind of square steel construction granulation tower tower mast system of huge lattice column
CN206607919U (en) A kind of support system for the square steel construction granulation tower of huge lattice column
DE102010010868A1 (en) Multi-story building has closed outer facade, which is attached to supporting frame with ring-shaped ceilings, where supporting frame is made of multiple peripheral cores and multiple ceilings
CN206477607U (en) Basement roof returns back to top structure and its system
CN114622710A (en) High-altitude staggered-layer cantilever structure and construction method thereof
CN206580434U (en) A kind of large span staircase and girder structure
CN109281478B (en) Assembly method of shear wall-concrete truss cantilever type building
CN206831753U (en) Beam column airduct system
CN104110098A (en) Prestressed concrete-filled steel tube truss piece and truss built by truss pieces
CN206143932U (en) Node structure is reinforced to styletable in SC system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170728

Termination date: 20201230