CN205776735U - A kind of beam-ends crossed arc post-tensioned prestressing muscle " dry type " assembling bean column node - Google Patents

A kind of beam-ends crossed arc post-tensioned prestressing muscle " dry type " assembling bean column node Download PDF

Info

Publication number
CN205776735U
CN205776735U CN201620479555.3U CN201620479555U CN205776735U CN 205776735 U CN205776735 U CN 205776735U CN 201620479555 U CN201620479555 U CN 201620479555U CN 205776735 U CN205776735 U CN 205776735U
Authority
CN
China
Prior art keywords
reinforcing steel
presstressed reinforcing
arc
precast concrete
post
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620479555.3U
Other languages
Chinese (zh)
Inventor
郭正兴
管东芝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southeast University
Original Assignee
Southeast University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southeast University filed Critical Southeast University
Priority to CN201620479555.3U priority Critical patent/CN205776735U/en
Application granted granted Critical
Publication of CN205776735U publication Critical patent/CN205776735U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

Open a kind of beam-ends crossed arc post-tensioned prestressing muscle " dry type " the assembling bean column node of this utility model, including precast concrete column, precast concrete beam and presstressed reinforcing steel, precast concrete column reserves the first horizontal arc presstressed reinforcing steel duct and post side bracket in beam column node area, and the beam-ends bottom of precast concrete beam is provided with tongue and groove;Run through precast concrete beam end and be provided with the second horizontal arc presstressed reinforcing steel duct, the mutual top-bottom cross in lateral symmetry position second horizontal arc presstressed reinforcing steel duct in precast concrete beam, first horizontal arc presstressed reinforcing steel duct and the second mutual para-position in position, horizontal arc presstressed reinforcing steel duct, form complete arc presstressed reinforcing steel duct after docking;Presstressed reinforcing steel passes presstressed reinforcing steel duct, precast concrete column and precast concrete beam crimping is integrated by post-tensioned prestressing.This utility model is prone to regulation and control assembling concrete frame structure performance, reduces prestressed pore passage friction loss, improves construction speed.

Description

A kind of beam-ends crossed arc post-tensioned prestressing muscle " dry type " assembling bean column node
Technical field
This utility model relates to a kind of beam-ends crossed arc post-tensioned prestressing muscle " dry type " assembling bean column node, belongs to building Engineering assembling concrete construction field.
Background technology
Precast Concrete Frame can be greatly improved construction ability and construction speed, saves a large amount of labour force, has ensured and built Make quality, and be conducive to reaching the requirement of " four joint one environmental protection ", go into overdrive to carry out assembly concrete in country and build Build, promote, under the background of green building and green construction, there is good development prospect.For from structural behaviour, prefabricated The beam-column connection of concrete frame structure is related to the anti-seismic performance of total, and conventional structure earthquake shows that beam column is even Connect destruction of a node and often become the main cause causing structural failure, therefore precast concrete beam-column connection is concrete Soil frame structure is able to wide variety of key.
Prestressed concrete can preferably play precast concrete factorial praluction and the advantage of assembled installation, prestressing force Prepressing type connects the restorability that can provide good, it is simple to the reparation after earthquake disaster, has obtained paying attention to widely.But, The most conventional prepressing type prefabricated beam-to-column joint many employings prestress wire penetrates reserving hole channel in whole precast beam, prestressing force Muscle perforation workload is big, the inconvenience of longer duct grouting construction, and is not easy to precast concrete and installs by cross, reduces Precast concrete builds motility and speed of application.
Summary of the invention
Goal of the invention: in order to overcome the deficiencies in the prior art, after this utility model provides a kind of beam-ends crossed arc Tension prestress muscle " dry type " assembling bean column node, plays Precast Concrete Frame structure manufacture and quick for installation excellent Gesture, keeps the stronger restorability of precompressed precast beam Column border node, reduces end loss of prestress, it is simple to pre-stress construction and Assemble by cross, reduce the difficulty of construction of precast prestressed concrete structure.
Technical scheme: for achieving the above object, the technical solution of the utility model is as follows:
A kind of beam-ends crossed arc post-tensioned prestressing muscle " dry type " assembling bean column node, including precast concrete column, prefabricated Beams of concrete and presstressed reinforcing steel, described precast concrete column reserves the first horizontal arc presstressed reinforcing steel duct in beam column node area With post side bracket, the beam-ends bottom of described precast concrete beam is provided with stepped tongue and groove, and described precast concrete beam passes through beam The tongue and groove of end bottom is shelved on the bracket of post side;Run through described precast concrete beam end and be provided with the second horizontal arc prestressing force Muscle duct, described first horizontal arc presstressed reinforcing steel duct and the second mutual para-position in position, horizontal arc presstressed reinforcing steel duct, Form complete arc presstressed reinforcing steel duct in beam column node area after docking;Described complete arc presstressed reinforcing steel duct is two More than layer or two-layer, and between the complete arc presstressed reinforcing steel duct of upper and lower two-layer symmetrically, and mutually stagger;Institute State arc presstressed reinforcing steel duct complete after presstressed reinforcing steel passes docking, by " dry type " connected mode of post-tensioned prestressing Precast concrete column and precast concrete beam are crimped and is integrated.
Further, described first horizontal arc presstressed reinforcing steel duct and the second horizontal arc presstressed reinforcing steel duct radius of curvature Identical, it is circular arc.
Further, described precast concrete beam is pretensioned prestressed concrete girder or non-prestressed beam, and in its beam end both sides Presstressed reinforcing steel anchoring recess is reserved in face, and presstressed reinforcing steel anchoring recess side fixes pre-embedded steel slab face and the presstressed reinforcing steel of nut (7) axis is vertical, it is simple to presstressed reinforcing steel anchors with anchorage in beam end.
Further, the prestress steel screw rod that described presstressed reinforcing steel uses arc elongation percentage to be 15~17%.
Further, described first horizontal arc presstressed reinforcing steel duct can extend to post side bracket.
Beneficial effect: advantage is as follows:
(1) this utility model arranges post-tensioned prestressing muscle in portion of precast concrete beam end office (EO), pre-by beam-ends local posttension Stress " dry type " precast beam, post crimping are connected as one by connected mode, reduce wet trade, it is simple to assemble by cross, Improve construction motility and construction speed.
(2) local post-tensioned prestressing muscle is set to arc by this utility model, and intersect setting, it is simple to prestressing force is worn Hole works, and reduces pre-stress construction difficulty, improves the efficiency of construction that the crimping of precast concrete post-tensioned prestressing connects.
(3) this utility model post-tensioned prestressing muscle is only arranged at prefabricated beam-ends, and length can require to carry out according to malformation Design, has higher motility, reduces post-tensioned prestressing to integrally-built impact, decreases the use of presstressed reinforcing steel Amount and the perforation workload of post-tensioned prestressing muscle, reduce cost.
Accompanying drawing explanation
Accompanying drawing 1 is structural front view of the present utility model;
Accompanying drawing 2 is structure top view of the present utility model.
Detailed description of the invention
Below in conjunction with the accompanying drawings this utility model is further described.
Such as attached Fig. 1 and 2, a kind of beam-ends crossed arc post-tensioned prestressing muscle " dry type " assembling bean column node, including prefabricated Concrete column 1, precast concrete beam 4 and presstressed reinforcing steel 7, described precast concrete column 1 reserves in beam column node area One horizontal arc presstressed reinforcing steel duct 3 and post side bracket 2, according to the level course position according to presstressed reinforcing steel 7, the One horizontal arc presstressed reinforcing steel duct 3 can extend to post side bracket 2.The beam-ends bottom of described precast concrete beam 4 is provided with Stepped tongue and groove, described precast concrete beam 4 is shelved on post side bracket 2 by the tongue and groove of beam-ends bottom.Run through described Precast concrete beam 4 end is provided with the second horizontal arc presstressed reinforcing steel duct 5, described first horizontal arc presstressed reinforcing steel hole Road 3 is identical with the second horizontal arc presstressed reinforcing steel duct 5 radius of curvature, is circular arc;Described first horizontal arc is pre- Stress rib duct 3 and the second mutual para-position in horizontal position, arc presstressed reinforcing steel duct 5, formed in beam column node area after docking Complete arc presstressed reinforcing steel duct;The arc presstressed reinforcing steel duct that described presstressed reinforcing steel is complete after passing docking, by rear Precast concrete column 1 and precast concrete beam 4 are crimped and are integrated by " dry type " connected mode of tension prestress.Described complete Whole arc presstressed reinforcing steel duct needs can be set to more than two-layer or two-layer, and the arc that upper and lower two-layer is complete according to calculating Intersect between shape presstressed reinforcing steel duct and be symmetrical arranged, and mutually stagger.
Precast concrete beam 4 is different according to span, and described precast concrete beam 4 is pretensioned prestressed concrete girder or non-prestressed Beam, and presstressed reinforcing steel anchoring recess 6 is reserved in its beam end two sides, presstressed reinforcing steel anchoring recess 6 side fixes nut Pre-embedded steel slab face vertical with presstressed reinforcing steel 7 axis, it is simple to presstressed reinforcing steel 7 anchors with anchorage 8 in beam end.
The prestress steel screw rod that presstressed reinforcing steel 7 described in this utility model uses arc elongation percentage to be 15~17%.
The above is only preferred implementation of the present utility model, it should be pointed out that: for the ordinary skill of the art For personnel, on the premise of without departing from this utility model principle, it is also possible to make some improvements and modifications, these improve Also protection domain of the present utility model is should be regarded as with retouching.

Claims (5)

1. beam-ends crossed arc post-tensioned prestressing muscle " dry type " assembling bean column node, it is characterised in that: include pre- Concrete column processed (1), precast concrete beam (4) and presstressed reinforcing steel (7), described precast concrete column (1) is at beam column The first horizontal arc presstressed reinforcing steel duct (3) and post side bracket (2), described precast concrete beam (4) are reserved in node area Beam-ends bottom be provided with stepped tongue and groove, described precast concrete beam (4) is shelved on post side by the tongue and groove of beam-ends bottom On bracket (2);Run through described precast concrete beam (4) end and be provided with the second horizontal arc presstressed reinforcing steel duct (5), Described first horizontal arc presstressed reinforcing steel duct (3) and the second mutual para-position in horizontal arc presstressed reinforcing steel duct (5) position, Form complete arc presstressed reinforcing steel duct in beam column node area after docking;Described complete arc presstressed reinforcing steel duct is two More than layer or two-layer, and intersect between the complete arc presstressed reinforcing steel duct of upper and lower two-layer and be symmetrical arranged, and mutually Stagger;The arc presstressed reinforcing steel duct that described presstressed reinforcing steel is complete after passing docking, by " dry type " of post-tensioned prestressing Precast concrete column (1) and precast concrete beam (4) are crimped and are integrated by connected mode.
A kind of beam-ends crossed arc post-tensioned prestressing muscle " dry type " assembling bean column node, It is characterized in that: described first horizontal arc presstressed reinforcing steel duct (3) and the second horizontal arc presstressed reinforcing steel duct (5) Radius of curvature is identical, is circular arc.
A kind of beam-ends crossed arc post-tensioned prestressing muscle " dry type " assembling bean column node, It is characterized in that: described precast concrete beam (4) is pretensioned prestressed concrete girder or non-prestressed beam, and in its beam end Presstressed reinforcing steel anchoring recess (6) is reserved in two sides, and presstressed reinforcing steel anchoring recess (6) side fixes the pre-embedded steel slab of nut Face is vertical with presstressed reinforcing steel (7) axis, it is simple to presstressed reinforcing steel (7) anchors with anchorage (8) in beam end.
A kind of beam-ends crossed arc post-tensioned prestressing muscle " dry type " assembling bean column node, It is characterized in that: the prestress steel screw rod that described presstressed reinforcing steel (7) uses arc elongation percentage to be 15~17%.
A kind of beam-ends crossed arc post-tensioned prestressing muscle " dry type " assembling bean column node, It is characterized in that: described first horizontal arc presstressed reinforcing steel duct (3) can extend to post side bracket (2).
CN201620479555.3U 2016-05-24 2016-05-24 A kind of beam-ends crossed arc post-tensioned prestressing muscle " dry type " assembling bean column node Expired - Fee Related CN205776735U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620479555.3U CN205776735U (en) 2016-05-24 2016-05-24 A kind of beam-ends crossed arc post-tensioned prestressing muscle " dry type " assembling bean column node

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620479555.3U CN205776735U (en) 2016-05-24 2016-05-24 A kind of beam-ends crossed arc post-tensioned prestressing muscle " dry type " assembling bean column node

Publications (1)

Publication Number Publication Date
CN205776735U true CN205776735U (en) 2016-12-07

Family

ID=58113089

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620479555.3U Expired - Fee Related CN205776735U (en) 2016-05-24 2016-05-24 A kind of beam-ends crossed arc post-tensioned prestressing muscle " dry type " assembling bean column node

Country Status (1)

Country Link
CN (1) CN205776735U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105839775A (en) * 2016-05-24 2016-08-10 东南大学 Beam end crossed arc-shaped post-tensioned pre-stressed reinforcing steel dry-type assembling beam-column node
CN107795012A (en) * 2017-11-01 2018-03-13 大连理工大学 Active constraint formula cast in place frame bean column node system based on retarded adhesive prestressed technology
JP2021085150A (en) * 2019-11-25 2021-06-03 黒沢建設株式会社 Pc foundation structure and construction method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105839775A (en) * 2016-05-24 2016-08-10 东南大学 Beam end crossed arc-shaped post-tensioned pre-stressed reinforcing steel dry-type assembling beam-column node
CN107795012A (en) * 2017-11-01 2018-03-13 大连理工大学 Active constraint formula cast in place frame bean column node system based on retarded adhesive prestressed technology
JP2021085150A (en) * 2019-11-25 2021-06-03 黒沢建設株式会社 Pc foundation structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN105839775A (en) Beam end crossed arc-shaped post-tensioned pre-stressed reinforcing steel dry-type assembling beam-column node
CN109469202A (en) Prestressed assembly integral concrete frame structure system and construction method thereof
CN201433507Y (en) Honeycomb beam and steel building frame
CN201785865U (en) Structure and system for house combining external prestress post tensioning method steel beam and pretensioning method prestress composite beam
CN204282199U (en) Pile-column concrete hollow pile bridge pier structure
CN103046645B (en) A kind of whole casting structure and construction method of Large-span Precast
CN205369525U (en) Local prestressing force assembled power consumption beam column node
CN103243804A (en) Pre-stressed combined frame of thin wall section steels and concrete, and construction method thereof
CN209397709U (en) Lightgage steel joist steel frame composite structure
CN205776735U (en) A kind of beam-ends crossed arc post-tensioned prestressing muscle " dry type " assembling bean column node
CN201695572U (en) Stiff concrete column and reinforced concrete frame beam mixed structure
CN109898415A (en) Cylinder bridge tower in the cylinder of spatial mixing rope net suspension bridge with parabola arch tower cap
CN203569795U (en) Long span prestress cube type steel rib concrete superposed beam
CN201024538Y (en) Prefabricated prestressed concrete structural beam, column mixed connection node
CN203034599U (en) Unequal-height chord member open web overhanging steel truss structural system
CN201786045U (en) House structure with combined steel beam and pretensioning method prestress laminated beam
CN208309799U (en) A kind of prestressing force Self-resetting assembly concrete frame foot joint
CN203238845U (en) Cantilever beam component with high load-bearing capacity
CN107419806A (en) A kind of grid solid beam-string structure system across X-type greatly and its construction method
CN110847356A (en) Assembled frame beam column node structure
CN103225344A (en) Hollow steel section-concrete combined framework and construction method thereof
CN212427527U (en) Cantilever truss structure system
CN211735744U (en) Assembled reinforced concrete beam column section connection structure
CN109372123B (en) Interlayer overhanging concrete truss type building
CN105625571A (en) Prefabricated concrete beam-column joint using medium-strength prestressed tendons

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161207

Termination date: 20200524