CN110388119A - A modular assembled steel structure grid tower - Google Patents
A modular assembled steel structure grid tower Download PDFInfo
- Publication number
- CN110388119A CN110388119A CN201810360493.8A CN201810360493A CN110388119A CN 110388119 A CN110388119 A CN 110388119A CN 201810360493 A CN201810360493 A CN 201810360493A CN 110388119 A CN110388119 A CN 110388119A
- Authority
- CN
- China
- Prior art keywords
- modular
- unit
- steel construction
- layer
- lattice tower
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 65
- 239000010959 steel Substances 0.000 title claims abstract description 65
- 238000010276 construction Methods 0.000 claims abstract description 34
- 230000003014 reinforcing effect Effects 0.000 claims description 5
- 210000002615 epidermis Anatomy 0.000 claims 1
- 239000000203 mixture Substances 0.000 claims 1
- 238000013461 design Methods 0.000 abstract description 6
- 238000004519 manufacturing process Methods 0.000 abstract description 5
- 238000009434 installation Methods 0.000 abstract description 3
- 239000010410 layer Substances 0.000 description 22
- 238000001816 cooling Methods 0.000 description 14
- 238000007789 sealing Methods 0.000 description 13
- 238000010586 diagram Methods 0.000 description 10
- 239000011150 reinforced concrete Substances 0.000 description 6
- 238000000034 method Methods 0.000 description 5
- 238000003466 welding Methods 0.000 description 5
- 230000002787 reinforcement Effects 0.000 description 4
- 239000004567 concrete Substances 0.000 description 3
- 239000002356 single layer Substances 0.000 description 3
- 230000008602 contraction Effects 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000009776 industrial production Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000003912 environmental pollution Methods 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000010248 power generation Methods 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
- 230000001932 seasonal effect Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/02—Structures made of specified materials
- E04H12/08—Structures made of specified materials of metal
- E04H12/10—Truss-like structures
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H5/00—Buildings or groups of buildings for industrial or agricultural purposes
- E04H5/10—Buildings forming part of cooling plants
- E04H5/12—Cooling towers
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Chemical & Material Sciences (AREA)
- Materials Engineering (AREA)
- Wood Science & Technology (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
本发明公开了一种模块化装配式钢结构网格塔。所述钢结构网格塔是由一系列模块单元顶边在水平方向采用螺栓依次连接形成闭合环,上一层模块单元顶点与下层模块单元连接件通过螺栓连接,竖向层层装配组成;所述模块单元是由三根构件按一定角度与三个连接件连接组成三角形模块单元,或以三角形为基本单元衍生的四边形或六边形等不同形状模块单元;所述模块单元顶点连接件与相邻模块单元顶点连接件通过螺栓连接成一个整体,形成刚性节点。本发明自重轻、安装简单、精度高、施工速度快、综合造价低,便于实现标准化设计、工业化生产和装配化施工。
The invention discloses a modular assembled steel structure grid tower. The steel structure grid tower is composed of a series of top edges of modular units that are sequentially connected by bolts in the horizontal direction to form a closed loop, and the vertices of the upper module units and the connectors of the lower module units are connected by bolts and assembled vertically layer by layer; The modular unit is composed of three components connected with three connectors at a certain angle to form a triangular module unit, or a quadrilateral or hexagonal modular unit of different shapes derived from a triangle; The modular unit apex connectors are bolted together to form a rigid node. The invention has the advantages of light weight, simple installation, high precision, fast construction speed and low comprehensive cost, and is convenient for realizing standardized design, industrialized production and assembled construction.
Description
技术领域technical field
本发明属于工业与民用结构设计技术领域,特别涉及一种模块化装配式钢结构网格塔。The invention belongs to the technical field of industrial and civil structure design, in particular to a modular assembled steel structure grid tower.
背景技术Background technique
在发电领域,冷却塔基本上都是采用钢筋混凝土薄壳双曲线、直筒圆锥型冷却塔。在结构形式上,钢筋混凝土冷却塔属于典型的旋转薄壳结构。这一结构形式已经过多年的研究与实践,并在工程中大量应用。然而由于混凝土结构自重大、需要现场浇筑以及由此引发的工期长、成本上升等因素使其逐渐丧失优势,且生产和施工过程中资源消耗大和环境污染严重等问题也与当前倡导的环保理念相悖。在电厂建设中,冷却塔的施工是制约冬季施工工期的主要因素。钢筋混凝土冷却塔现场存在湿作业,施工难度大、周期长,并且近些年时而发生因赶工期造成的冷却塔施工安全事故。在此背景下,钢结构成为了冷却塔结构选型的新方向。In the field of power generation, cooling towers basically adopt reinforced concrete thin-shell hyperbolic, straight-conical cooling towers. In terms of structure, the reinforced concrete cooling tower is a typical rotating shell structure. This structural form has been researched and practiced for many years, and has been widely used in engineering. However, due to factors such as the heavy weight of the concrete structure, the need for on-site pouring, the long construction period and rising costs caused by it, it gradually loses its advantages, and the problems of large resource consumption and serious environmental pollution in the production and construction process are also contrary to the current environmental protection concept advocated. . In the construction of power plants, the construction of cooling towers is the main factor restricting the construction period in winter. There are wet operations on site for reinforced concrete cooling towers, and the construction is difficult and takes a long time. In recent years, there have been occasional cooling tower construction safety accidents caused by rushing construction deadlines. In this context, steel structure has become a new direction for cooling tower structure selection.
近两年,国家及各省市密集出台了相关标准和激励政策,要求大力发展装配式建筑,特别是钢结构建筑。钢结构自重轻,抗震、抗风性能优良;现场拼装简单、施工速度快,在寒冷地区施工不受季节限制,且综合造价低。钢结构建(构)筑物在达到使用寿命后,钢材可重新回收利用,绿色环保。In the past two years, the state and various provinces and cities have intensively issued relevant standards and incentive policies, requiring vigorous development of prefabricated buildings, especially steel structure buildings. The steel structure has light weight, excellent earthquake resistance and wind resistance; on-site assembly is simple, construction speed is fast, construction in cold regions is not subject to seasonal restrictions, and the overall cost is low. After the steel structure building (structure) reaches its service life, the steel can be recycled and reused, which is green and environmentally friendly.
为解决极寒冷地区钢筋混凝土冷却塔的施工问题,申请人申请的ZL201110330021.6“一种电厂用大型双曲线型钢结构冷却塔”,是采用直线斜立柱交叉组成的单层网壳结构,沿高度上设置加强环杆以增加单层网壳的抗侧刚度。但斜交网格为菱形网格,整体性差;构件计算长度大,稳定性差;并且现场焊接拼装难度大,焊接变形难以控制。In order to solve the construction problems of reinforced concrete cooling towers in extremely cold areas, the applicant applied for ZL201110330021.6 "A Large-scale Hyperbolic Steel Structure Cooling Tower for Power Plants", which is a single-layer reticulated shell structure composed of linear oblique columns crossed, along the height A reinforcing ring rod is set on the top to increase the lateral stiffness of the single-layer reticulated shell. However, the oblique grid is a rhombus grid, which has poor integrity; the calculated length of the component is large, and the stability is poor; and it is difficult to weld and assemble on site, and the welding deformation is difficult to control.
为解决单层交叉网格钢结构冷却塔用钢量大、不经济的问题,申请人申请的ZL201620061291.X“一种双曲线外形格构框架加斜撑钢结构冷却塔”,是采用格构框架加斜撑结构。但柱、环梁及支撑为双层结构,未能发挥出类混凝土旋转薄壳的整体空间作用,并且杆件多、节点多,现场焊接拼装难度大,焊接变形难以控制。In order to solve the problem of large steel consumption and uneconomical consumption of single-layer cross-grid steel structure cooling towers, the applicant applied for ZL201620061291. Frame plus diagonal bracing structure. However, the columns, ring beams, and supports are double-layer structures, which fail to play the overall spatial role of the concrete rotating thin shell, and there are many rods and nodes, which makes it difficult to weld and assemble on site, and the welding deformation is difficult to control.
申请人申请的ZL 201620075618.9“一种双曲线四管格构斜交网格钢结构冷却塔”,是采用四管格构斜交柱通过节点与四管格构圈梁相连为局部三角形的稳定结构。但整体为四管格构斜交网格结构,未能充发挥出类混凝土旋转薄壳的整体空间作用,并且杆件多、节点多,现场焊接拼装难度大,焊接变形难以控制。为实现钢结构冷却塔的装配施工,申请人申请的ZL 20161049769.1“一种由六杆四面体单元组成的装配式钢结构冷却塔”,是由一系列六杆四面体模块单元按一定规律连接组合而成,采用焊接球与法兰盘结合的节点,通过高强度螺栓连接。但所形成的结构中外层结构中无水平弦杆,内层结构中无竖向弦杆,未能发挥出类混凝土旋转薄壳的整体空间作用,并且一个单元同时连接四个法兰,要求加工精度高,法兰连接节点影响围护结构连接。The ZL 201620075618.9 "a hyperbolic four-tube lattice oblique grid steel structure cooling tower" applied by the applicant is a local triangular stable structure that adopts four-pipe lattice oblique columns connected with four-pipe lattice ring beams through nodes . However, the overall structure is a four-tube lattice oblique grid structure, which fails to give full play to the overall space function of the concrete-like rotating thin shell, and there are many rods and nodes, which makes it difficult to weld and assemble on site, and the welding deformation is difficult to control. In order to realize the assembly and construction of the steel structure cooling tower, the applicant applied for ZL 20161049769.1 "an assembled steel structure cooling tower composed of six-rod tetrahedron units", which is composed of a series of six-rod tetrahedron module units connected and combined according to certain rules It is made of a joint of welded ball and flange, connected by high-strength bolts. However, in the formed structure, there are no horizontal chords in the outer structure and no vertical chords in the inner structure, which fails to play the overall spatial role of a concrete rotating thin shell, and one unit connects four flanges at the same time, requiring processing High precision, flange connection nodes affect envelope structure connections.
因此,寻求一种能够充分发挥类混凝土旋转薄壳的整体空间作用,空间刚度大、稳定性好;能够标准化设计、工业化生产、全装配化施工;特别是适用于应用范围较广的中小型冷却塔的钢结构网格塔是本领域技术人员亟待解决的技术难题。Therefore, it is necessary to seek a method that can give full play to the overall spatial effect of the concrete-like rotating thin shell, with high spatial rigidity and good stability; it can be standardized in design, industrialized production, and fully assembled construction; it is especially suitable for small and medium-sized cooling systems with a wide range of applications. The steel grid tower of the tower is a technical problem to be solved urgently by those skilled in the art.
发明内容Contents of the invention
针对以上存在的问题,本发明目的是提供一种模块化装配式钢结构网格塔。该钢结构网格塔能够充分发挥出类混凝土旋转薄壳的整体空间作用,空间刚度大、稳定性好;构造简单,安装便捷,施工速度快;能够实现标准化设计、工业化生产、全装配化施工;用钢量低,造价低廉。In view of the above existing problems, the object of the present invention is to provide a modular assembled steel structure grid tower. The steel structure grid tower can give full play to the overall spatial effect of the concrete-like rotating thin shell, with high spatial rigidity and good stability; simple structure, convenient installation, and fast construction speed; it can realize standardized design, industrialized production, and fully assembled construction ; Low steel consumption and low cost.
为实现上述目的,本发明采用以下技术方案:To achieve the above object, the present invention adopts the following technical solutions:
所述钢结构网格塔是由一系列模块单元顶边在水平方向采用螺栓依次连接形成闭合环,上、下层模块单元通过螺栓连接,竖向层层装配组成;所述模块单元是由三根构件按一定角度与三个连接件连接组成三角形模块单元,或以三角形为基本单元衍生的四边形或六边形等不同形状模块单元。The steel structure grid tower is composed of a series of modular unit top edges which are sequentially connected by bolts in the horizontal direction to form a closed loop, and the upper and lower module units are connected by bolts and assembled vertically layer by layer; the modular units are composed of three components Connect with three connectors at a certain angle to form a triangular module unit, or a quadrilateral or hexagonal module unit of different shapes derived from the triangle as the basic unit.
进一步,所述模块单元中构件角度根据模块单元所处钢结构网格塔位置确定,同一层模块单元规格相同;Further, the component angles in the modular units are determined according to the position of the steel structure grid tower where the modular units are located, and the specifications of the modular units on the same floor are the same;
进一步,所述模块单元构件截面可采用圆管、方管、矩形管、H型钢等截面类型。Further, the cross-section of the modular unit member can adopt cross-section types such as round pipe, square pipe, rectangular pipe, and H-shaped steel.
进一步,所述模块单元顶点处的连接件上设置螺栓孔。Further, bolt holes are provided on the connectors at the vertices of the modular units.
进一步,所述模块单元顶点连接件与相邻模块单元顶点连接件通过螺栓将连接盖板和各模块连接件连接成一个整体,形成刚性节点。Further, the apex connectors of the module units and the apex connectors of adjacent module units are connected into a whole by bolts to connect the connecting cover plate and each module connector to form a rigid node.
进一步,所述模块单元的构件、连接件、螺栓孔的加工制作及其各部件间的焊接在工厂预制完成。Furthermore, the components, connectors, and bolt holes of the modular unit are prefabricated in the factory and welded between them.
进一步,所述钢结构网格塔在底部、颈部收缩位置或顶部等若干位置设置水平加强环。Further, the steel structure grid tower is provided with horizontal reinforcing rings at several positions such as the bottom, neck contraction position or top.
进一步,所述钢结构网格塔的内或外表面设置表皮。Further, the inner or outer surface of the steel grid tower is provided with a skin.
进一步,所述钢结构网格塔可用于直筒、圆锥、双曲线、其他曲线等形状的塔形。Further, the steel structure grid tower can be used in tower shapes such as straight cylinders, cones, hyperbolas, and other curves.
本发明具有以下有益效果:The present invention has the following beneficial effects:
1、与传统钢筋混凝土结构相比,其自重仅为钢筋混凝土结构的15%~20%,大幅度减轻了结构自重,可节约地基处理和基础的造价,且施工不受季节限制。1. Compared with the traditional reinforced concrete structure, its self-weight is only 15% to 20% of the reinforced concrete structure, which greatly reduces the self-weight of the structure, which can save the cost of foundation treatment and foundation, and the construction is not limited by seasons.
2、模块单元在工厂预制完成,现场仅通过螺栓连接,能够避免现场焊接残余变形,提高安装精度和工程质量;且安装工艺简单、安全可靠、速度快,工期较现场焊接钢结构网格塔可缩短25%~35%。2. The modular units are prefabricated in the factory, and the site is only connected by bolts, which can avoid the residual deformation of the site welding, improve the installation accuracy and engineering quality; and the installation process is simple, safe, reliable, and fast, and the construction period is faster than that of the site-welded steel structure grid tower. Shortened by 25% to 35%.
3、采用合理的结构布置和节点构造,可使模块单元规格尽量统一且易于拼装,便于实现标准化设计、工业化生产和装配化施工,标准化生产后的造价更低。3. The adoption of reasonable structural arrangement and node structure can make the module unit specifications as uniform as possible and easy to assemble, which facilitates the realization of standardized design, industrial production and assembly construction, and the cost after standardized production is lower.
附图说明Description of drawings
图1、直筒型钢结构网格塔轴测示意图Figure 1. Axonometric schematic diagram of a straight cylindrical steel structure grid tower
图2、直筒型钢结构网格塔结构单元组装示意图Figure 2. Schematic diagram of the assembly of the structural unit of the straight cylindrical steel structure grid tower
图3、直筒圆锥型钢结构网格塔轴测示意图Figure 3. Axonometric schematic diagram of straight conical steel grid tower
图4、直筒圆锥型钢结构网格塔结构单元组装示意图Figure 4. Schematic diagram of the assembly of the structural units of the straight conical steel structure grid tower
图5、双曲线型钢结构网格塔轴测示意图Figure 5. Axonometric schematic diagram of hyperbolic steel grid tower
图6、双曲线型钢结构网格塔结构单元组装示意图Figure 6. Schematic diagram of the assembly of the structural units of the hyperbolic steel grid tower
图7、钢结构网格塔结构单元组装详图Figure 7. Assembly details of the structural unit of the steel grid tower
图8、三角形模块单元示意图Figure 8. Schematic diagram of a triangular module unit
图9、三角形衍生的四边形模块单元示意图Figure 9. Schematic diagram of a quadrilateral modular unit derived from a triangle
图10、三角形衍生的六边形模块单元示意图Figure 10. Schematic diagram of a hexagonal modular unit derived from a triangle
图11、整体刚性连接节点示意图Figure 11. Schematic diagram of overall rigid connection nodes
图12、模块连接件详图Figure 12. Detailed view of module connectors
图中,1-钢结构网格塔主体;2-基本模块单元;3-连接件;4-构件;5-中间层连接节点;6-水平加强环;7-螺栓;8-螺栓孔;9-弧形板;10-侧面封板;11-端头封板;12-连接件盖板;13-顶节点;14-底节点;15-基础预埋连接件;16-基础。In the figure, 1-main body of the steel grid tower; 2-basic module unit; 3-connector; 4-member; 5-intermediate layer connection node; 6-horizontal reinforcement ring; -arc plate; 10-side sealing plate; 11-end sealing plate; 12-connector cover; 13-top node; 14-bottom node; 15-foundation embedded connector; 16-foundation.
具体实施方式Detailed ways
下面将结合附图具体说明本发明提出的一种模块化装配式钢结构网格塔的具体实施方式。然而,本发明可以体现为多种不同形式和用途,并不应理解为局限于本示例性实施例。A specific implementation of a modular assembled steel grid tower proposed by the present invention will be described in detail below with reference to the accompanying drawings. However, the present invention can be embodied in many different forms and uses, and should not be construed as being limited to the present exemplary embodiments.
如附图1、2和附图7~12所示为本发明实施例一。As shown in accompanying drawings 1 and 2 and accompanying drawings 7 to 12 is Embodiment 1 of the present invention.
本发明提出的一种模块化装配式钢结构网格塔,可用于直筒型钢结构网格塔。构件包括:直筒型网格塔主体(1);模块单元(2);连接件(3);构件(4);中间层节点(5);水平加强环(6);螺栓(7);螺栓孔(8);弧形板(9);侧面封板(10);端头封板(11);连接件盖板(12);顶节点(13);底节点(14);基础预埋连接件(15);基础(16)。The invention proposes a modular assembled steel structure grid tower, which can be used for a straight steel structure grid tower. The components include: the main body of the straight cylindrical grid tower (1); the module unit (2); the connector (3); the component (4); the middle layer node (5); hole (8); arc plate (9); side sealing plate (10); end sealing plate (11); connector cover plate (12); top node (13); bottom node (14); foundation embedded Connector (15); Foundation (16).
如附图1、2和附图7~11所示,所述直筒型钢结构网格塔(1)由一系列模块单元(2)在水平方向采用螺栓(7)依次连接成闭合圆环,上一层模块单元(2)顶点连接件(3)与下层模块单元(2)的连接件(3)通过螺栓(7)连接,竖向层层装配组成;所述模块单元(2)为三根构件(4)与三个连接件(3)组成的三角形模块单元或者以三角形为基本单元衍生的四边形或六边形模块单元;所述构件(4)按一定角度焊接在连接件(3)上;所述模块单元构件(4)角度全部相同,处于钢结构网格塔同一层的模块单元(2)规格相同;所述模块单元(2)之间通过螺栓(7)连接成一个整体。As shown in accompanying drawings 1 and 2 and accompanying drawings 7 to 11, the straight cylindrical steel structure grid tower (1) is composed of a series of modular units (2) connected in the horizontal direction with bolts (7) to form a closed ring in sequence, and the upper The apex connectors (3) of one layer of modular units (2) are connected with the connectors (3) of the lower layer of modular units (2) through bolts (7), assembled vertically layer by layer; the module units (2) are three components (4) A triangular module unit formed with three connectors (3) or a quadrilateral or hexagonal module unit derived from a triangle as a basic unit; the member (4) is welded on the connector (3) at a certain angle; The angles of the modular unit components (4) are all the same, and the specifications of the modular units (2) on the same floor of the steel grid tower are the same; the modular units (2) are connected as a whole by bolts (7).
如附图1所示,所述直筒型钢结构网格塔(1)可在底部、中间若干位置、顶部设置水平加强环(6)。As shown in accompanying drawing 1, the said straight cylindrical steel structure grid tower (1) can be provided with horizontal reinforcing rings (6) at the bottom, in several positions in the middle, and at the top.
如附图7所示,所述模块单元(2)顶点与基础(16)上的基础预埋连接件(15)采用螺栓连接。As shown in Figure 7, the apex of the modular unit (2) is connected to the foundation embedded connector (15) on the foundation (16) by bolts.
如附图2和附图7~11所示,模块单元在水平方向依次采用螺栓(7)连接而成闭合圆环,在两个模块单元(2)中间层连接节点(5)处形成一个V形企口,上一层模块单元(2)顶点连接件(3)放于企口内与下层模块单元(2)的连接件(3)以及连接件盖板(12)通过螺栓连接,重复以上过程,直至顶层,完成直筒型钢结构网格塔组装。As shown in Figure 2 and Figures 7-11, the modular units are sequentially connected by bolts (7) in the horizontal direction to form a closed ring, and a V is formed at the connecting node (5) of the middle layer of the two modular units (2). Shaped rebate, put the apex connector (3) of the module unit (2) on the upper layer into the groove and connect it with the connector (3) and the connector cover (12) of the module unit (2) on the lower layer through bolts, repeat the above process , up to the top floor, the assembly of the straight steel structure grid tower is completed.
如附图12所示,所述模块单元(2)顶点处的连接件(3)为弧形钢板(9),侧面封板(10),端头封板(11);所述侧面封板(10)和端头封板(11)超出弧形板一定距离,并设置螺栓孔(8)。As shown in accompanying drawing 12, the connector (3) at the apex of the modular unit (2) is an arc-shaped steel plate (9), a side sealing plate (10), and an end sealing plate (11); the side sealing plate (10) and end sealing plate (11) exceed arc plate certain distance, and bolt hole (8) is set.
如附图11、12所示,所述三角形模型单元(2)通过螺栓(7)将连接盖板(12)与连接件中的弧形钢板(9)及其侧面封板(10)和端头封板(11)连接装配成一个整体,形成刚性节点。As shown in accompanying drawings 11 and 12, the triangular model unit (2) connects the arc-shaped steel plate (9) and its side sealing plate (10) and end plate (12) in the connecting piece through bolts (7). The head seal plate (11) is connected and assembled into a whole to form a rigid node.
如附图7~10所示,所述构件(4)截面可采用圆管、方管、矩形管、H型钢等截面类型,不仅限于本实施例中的示意的截面类型。As shown in accompanying drawings 7-10, the cross section of the member (4) can adopt round pipe, square pipe, rectangular pipe, H-shaped steel and other cross section types, not limited to the schematic cross section type in this embodiment.
所述钢结构网格塔(1)内、外表面可设置内、外表皮。The inner and outer surfaces of the steel structure grid tower (1) can be provided with inner and outer skins.
如附图3、4和附图7~12所示为本发明实施例二。As shown in accompanying drawings 3 and 4 and accompanying drawings 7 to 12 are Embodiment 2 of the present invention.
本发明提出的一种模块化装配式钢结构网格塔,可用于直筒圆锥型钢结构网格塔。构件包括:直筒圆锥型网格塔主体(1);模块单元(2);连接件(3);构件(4);中间层节点(5);水平加强环(6);螺栓(7);螺栓孔(8);弧形板(9);侧面封板(10);端头封板(11);连接件盖板(12);顶节点(13);底节点(14);基础预埋连接件(15);基础(16)。The invention proposes a modular assembly type steel structure grid tower, which can be used for a straight cylindrical conical steel structure grid tower. The components include: a straight cylindrical conical grid tower main body (1); module units (2); connectors (3); components (4); intermediate layer nodes (5); horizontal reinforcing rings (6); Bolt hole (8); curved plate (9); side sealing plate (10); end sealing plate (11); connector cover plate (12); top node (13); bottom node (14); Buried connector (15); foundation (16).
如附图3、4和附图7~11所示,所述直筒圆锥型钢结构网格塔(1)由一系列模块单元(2)在水平方向采用螺栓(7)依次连接成闭合圆环,上一层模块单元(2)顶点连接件(3)与下层模块单元(2)的连接件(3)通过螺栓(7)连接,竖向层层装配组成;所述模块单元(2)为三根构件(4)与三个连接件(3)组成的三角形模块单元或者以三角形为基本单元衍生的四边形或六边形模块单元;所述构件(4)按一定角度焊接在连接件(3)上;所述模块单元构件(4)角度在圆锥形和直筒形范围内各自相同,处于钢结构网格塔同一层的模块单元(2)规格相同;所述模块单元(2)之间通过螺栓(7)连接成一个整体。As shown in accompanying drawings 3 and 4 and accompanying drawings 7 to 11, the straight cylindrical conical steel structure grid tower (1) is composed of a series of modular units (2) connected in turn by bolts (7) in the horizontal direction to form a closed ring, The apex connector (3) of the module unit (2) on the upper layer is connected with the connector (3) of the module unit (2) on the lower layer through bolts (7), assembled vertically layer by layer; the module unit (2) is three A triangular module unit composed of a member (4) and three connectors (3) or a quadrilateral or hexagonal module unit derived from a triangle as a basic unit; the member (4) is welded on the connector (3) at a certain angle ; The angles of the modular unit members (4) are the same in the range of conical and straight cylindrical shapes, and the modular units (2) on the same floor of the steel grid tower have the same specifications; the modular units (2) are connected by bolts ( 7) Connected into a whole.
如附图3所示,所述直筒圆锥型钢结构网格塔(1)可在底部、变截面处、中间若干位置、顶部设置水平加强环(6)。As shown in accompanying drawing 3, the straight cylindrical conical steel structure grid tower (1) can be provided with horizontal reinforcement rings (6) at the bottom, variable cross-section, several positions in the middle, and the top.
其余同实施例一。All the other are the same as embodiment one.
如附图5、6和附图7~12所示为本发明实施例三。Embodiment 3 of the present invention is shown in accompanying drawings 5 and 6 and accompanying drawings 7-12.
本发明提出的一种模块化装配式钢结构网格塔,可用于双曲线型钢结构网格塔。构件包括:双曲线型网格塔主体(1);模块单元(2);连接件(3);构件(4);中间层节点(5);水平加强环(6);螺栓(7);螺栓孔(8);弧形板(9);侧面封板(10);端头封板(11);连接件盖板(12);顶节点(13);底节点(14);基础预埋连接件(15);基础(16)。A modular assembly steel structure grid tower proposed by the invention can be used for a hyperbolic steel structure grid tower. The components include: a hyperbolic grid tower main body (1); module units (2); connectors (3); components (4); intermediate layer nodes (5); horizontal reinforcement rings (6); bolts (7); Bolt hole (8); curved plate (9); side sealing plate (10); end sealing plate (11); connector cover plate (12); top node (13); bottom node (14); Buried connector (15); foundation (16).
如附图5、6和附图7~11所示,所述双曲线型钢结构网格塔(1)由一系列模块单元(2)在水平方向采用螺栓(7)依次连接成闭合圆环,上一层模块单元(2)顶点连接件(3)与下层模块单元(2)的连接件(3)通过螺栓(7)连接,竖向层层装配组成;所述模块单元(2)为三根构件(4)与三个连接件(3)组成的三角形模块单元或者以三角形为基本单元衍生的四边形或六边形模块单元;所述构件(4)按一定角度焊接在连接件(3)上;处于钢结构网格塔同一层的模块单元(2)规格相同;所述模块单元(2)之间通过螺栓(7)连接成一个整体。As shown in accompanying drawings 5 and 6 and accompanying drawings 7 to 11, the hyperbolic steel structure grid tower (1) consists of a series of modular units (2) which are sequentially connected in the horizontal direction with bolts (7) to form a closed ring, The apex connector (3) of the module unit (2) on the upper layer is connected with the connector (3) of the module unit (2) on the lower layer through bolts (7), assembled vertically layer by layer; the module unit (2) is three A triangular module unit composed of a member (4) and three connectors (3) or a quadrilateral or hexagonal module unit derived from a triangle as a basic unit; the member (4) is welded on the connector (3) at a certain angle ; The modular units (2) on the same floor of the steel grid tower have the same specifications; the modular units (2) are connected into a whole by bolts (7).
如附图5所示,所述直筒圆锥型钢结构网格塔(1)可在底部、颈部收缩位置、顶部设置水平加强环(6)。其余同实施例一。As shown in Figure 5, the straight cylindrical conical steel structure grid tower (1) can be provided with horizontal reinforcement rings (6) at the bottom, neck contraction position, and top. All the other are the same as embodiment one.
本发明大幅度减轻了结构自重,节约地基处理和基础的造价,且施工不受季节限制;模块单元在现场仅通过螺栓连接,避免了现场焊接残余变形,提高了施工精度和质量;并且施工工艺简单、安全可靠、速度快、工期短;采用合理的结构布置和节点构造,可使模块单元规格尽量统一且易于拼装,便于实现标准化设计、工业化生产和装配化施工,造价低。The invention greatly reduces the self-weight of the structure, saves the foundation treatment and the cost of the foundation, and the construction is not restricted by the season; the module units are only connected by bolts on the site, avoiding the residual deformation of the site welding, and improving the construction accuracy and quality; and the construction process Simple, safe, reliable, fast, and short construction period; the use of reasonable structural layout and node structure can make the modular unit specifications as uniform as possible and easy to assemble, which is convenient for standardized design, industrial production and assembly construction, and low cost.
以上实施例是本发明提出的一种模块化装配式钢结构网格塔的三种应用,本发明还适用于不同形状、截面构件、连接节点形式等。应理解为本发明并不局限于以上实施例,符合本发明思想的各种变通形式均在本发明保护范围之内。The above embodiments are three applications of a modular assembled steel structure grid tower proposed by the present invention, and the present invention is also applicable to different shapes, cross-sectional members, connection node forms, etc. It should be understood that the present invention is not limited to the above embodiments, and various modifications conforming to the idea of the present invention are within the protection scope of the present invention.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201810360493.8A CN110388119A (en) | 2018-04-20 | 2018-04-20 | A modular assembled steel structure grid tower |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201810360493.8A CN110388119A (en) | 2018-04-20 | 2018-04-20 | A modular assembled steel structure grid tower |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN110388119A true CN110388119A (en) | 2019-10-29 |
Family
ID=68283230
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201810360493.8A Pending CN110388119A (en) | 2018-04-20 | 2018-04-20 | A modular assembled steel structure grid tower |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN110388119A (en) |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112727224A (en) * | 2021-01-06 | 2021-04-30 | 华电重工股份有限公司 | Module unit and cooling tower |
| CN113266181A (en) * | 2021-06-21 | 2021-08-17 | 华电重工股份有限公司 | Steel structure indirect air cooling tower with low tower wall heat conduction |
| CN113846895A (en) * | 2021-10-15 | 2021-12-28 | 峻江建设有限公司 | High-strength iron tower main rod and preparation method thereof |
| RU2771796C1 (en) * | 2021-01-14 | 2022-05-12 | Андрей Васильевич Макаров | Cooling tower |
| CN115270248A (en) * | 2022-07-14 | 2022-11-01 | 山东电力工程咨询院有限公司 | Design method and cooling tower of single-layer reticulated shell steel structure cooling tower |
| CN117027156A (en) * | 2023-07-20 | 2023-11-10 | 上海建筑设计研究院有限公司 | Building structure system |
Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| FR2350453A1 (en) * | 1976-05-05 | 1977-12-02 | Dziewolski Richard | Tubular framework connector for tower construction - has piece accommodating inclined component fixed to flattened ends of lengthwise components |
| CN2044144U (en) * | 1988-11-23 | 1989-09-13 | 王少青 | Easy disassembling conbinated round table with multiple purposes |
| CN202543815U (en) * | 2012-03-09 | 2012-11-21 | 东北石油大学 | Sectioned assembled light steel structure framed bent |
| CN204876695U (en) * | 2015-06-17 | 2015-12-16 | 北京首航艾启威节能技术股份有限公司 | Light section structure indirect air cooling tower of triangle -shaped unit check |
| US20160032588A1 (en) * | 2014-08-03 | 2016-02-04 | Carlos Anglade | Self supporting communication tower |
| CN205822858U (en) * | 2016-06-29 | 2016-12-21 | 北京市建筑设计研究院有限公司 | A kind of assembling type steel structure cooling tower being made up of six bar tetrahedron elements |
| CN206053435U (en) * | 2016-06-29 | 2017-03-29 | 北京市建筑设计研究院有限公司 | The steel structure cooling tower that a kind of triangular mesh supported by band is constituted |
| CN206844749U (en) * | 2017-06-12 | 2018-01-05 | 河南二建集团钢结构有限公司 | A kind of attachment structure of steel structure cooling tower |
| CN208310382U (en) * | 2018-04-20 | 2019-01-01 | 山东省冶金设计院股份有限公司 | A kind of modular assembly formula steel construction lattice tower |
-
2018
- 2018-04-20 CN CN201810360493.8A patent/CN110388119A/en active Pending
Patent Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| FR2350453A1 (en) * | 1976-05-05 | 1977-12-02 | Dziewolski Richard | Tubular framework connector for tower construction - has piece accommodating inclined component fixed to flattened ends of lengthwise components |
| CN2044144U (en) * | 1988-11-23 | 1989-09-13 | 王少青 | Easy disassembling conbinated round table with multiple purposes |
| CN202543815U (en) * | 2012-03-09 | 2012-11-21 | 东北石油大学 | Sectioned assembled light steel structure framed bent |
| US20160032588A1 (en) * | 2014-08-03 | 2016-02-04 | Carlos Anglade | Self supporting communication tower |
| CN204876695U (en) * | 2015-06-17 | 2015-12-16 | 北京首航艾启威节能技术股份有限公司 | Light section structure indirect air cooling tower of triangle -shaped unit check |
| CN205822858U (en) * | 2016-06-29 | 2016-12-21 | 北京市建筑设计研究院有限公司 | A kind of assembling type steel structure cooling tower being made up of six bar tetrahedron elements |
| CN206053435U (en) * | 2016-06-29 | 2017-03-29 | 北京市建筑设计研究院有限公司 | The steel structure cooling tower that a kind of triangular mesh supported by band is constituted |
| CN206844749U (en) * | 2017-06-12 | 2018-01-05 | 河南二建集团钢结构有限公司 | A kind of attachment structure of steel structure cooling tower |
| CN208310382U (en) * | 2018-04-20 | 2019-01-01 | 山东省冶金设计院股份有限公司 | A kind of modular assembly formula steel construction lattice tower |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112727224A (en) * | 2021-01-06 | 2021-04-30 | 华电重工股份有限公司 | Module unit and cooling tower |
| RU2771796C1 (en) * | 2021-01-14 | 2022-05-12 | Андрей Васильевич Макаров | Cooling tower |
| CN113266181A (en) * | 2021-06-21 | 2021-08-17 | 华电重工股份有限公司 | Steel structure indirect air cooling tower with low tower wall heat conduction |
| CN113846895A (en) * | 2021-10-15 | 2021-12-28 | 峻江建设有限公司 | High-strength iron tower main rod and preparation method thereof |
| CN115270248A (en) * | 2022-07-14 | 2022-11-01 | 山东电力工程咨询院有限公司 | Design method and cooling tower of single-layer reticulated shell steel structure cooling tower |
| CN117027156A (en) * | 2023-07-20 | 2023-11-10 | 上海建筑设计研究院有限公司 | Building structure system |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN110388119A (en) | A modular assembled steel structure grid tower | |
| CN106812214A (en) | A kind of assembling type steel structure beam column node connection device | |
| CN108331164B (en) | Connecting device for steel truss girder and lattice type steel column node and mounting method | |
| CN111677350A (en) | A natural draft cooling tower with double crossed inclined struts | |
| CN113006281A (en) | Vertical-face large-diamond-shaped grid giant inclined column super-high-rise structure with bottom conversion function and construction method | |
| CN205822858U (en) | A kind of assembling type steel structure cooling tower being made up of six bar tetrahedron elements | |
| CN106284838B (en) | A kind of lattice honeycomb girder segment and large span lattice girder steel and its fabrication and installation method | |
| CN208310382U (en) | A kind of modular assembly formula steel construction lattice tower | |
| CN205531511U (en) | Hyperbola appearance lattice frame adds bracing steel construction cooling tower | |
| CN105444612B (en) | A kind of Membrane of Tensile Buildings cooling tower structure | |
| CN211774542U (en) | Pipe truss and H shaped steel post bracket connection structure | |
| CN107165274A (en) | A kind of many high-rise assembled modularization Self-resetting steel construction H profile steel post frame systems | |
| CN219450459U (en) | A Construction Frame Body of a Cylindrical Bridge Pier Covering the Girder with Hoops | |
| CN211873356U (en) | Flat tubular column-U-shaped steel beam connecting node | |
| CN105971328B (en) | A kind of assembling type steel structure cooling tower being made of six bar tetrahedron elements | |
| CN112647596A (en) | O-shaped chamfered edge multi-azimuth truss-frame-core barrel combined super-high-rise structure forming method and application | |
| CN110130686A (en) | A steel structure cooling tower with cross plane truss system | |
| CN205531021U (en) | Post structure is restrainted to clod wash band steel pipe concrete | |
| CN204876695U (en) | Light section structure indirect air cooling tower of triangle -shaped unit check | |
| CN109869022A (en) | A kind of prestressed cable net steel cooling tower | |
| CN107916732A (en) | A kind of grid type steel plate shear force wall and its shear wall system of application | |
| CN202081576U (en) | Constraint profile steel high-strength concrete column with fiber reinforced plastic-steel composite tube | |
| CN107119800A (en) | A kind of many high-rise assembled modularization Self-resetting steel construction square tube post frame systems | |
| CN205025156U (en) | Hyperbola double layer reticulated shell steel construction cooling tower | |
| CN204435675U (en) | A kind of lattice salomonica structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| WD01 | Invention patent application deemed withdrawn after publication | ||
| WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20191029 |