CN206319311U - Complex Soil layer depth covering groove Continuous compacting device - Google Patents

Complex Soil layer depth covering groove Continuous compacting device Download PDF

Info

Publication number
CN206319311U
CN206319311U CN201621467849.0U CN201621467849U CN206319311U CN 206319311 U CN206319311 U CN 206319311U CN 201621467849 U CN201621467849 U CN 201621467849U CN 206319311 U CN206319311 U CN 206319311U
Authority
CN
China
Prior art keywords
pipe trench
soil layer
layer depth
support frame
lifting rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621467849.0U
Other languages
Chinese (zh)
Inventor
徐虎城
史晋华
周建军
肖逸飞
刘恒
加尔恒·多那依
路文甲
傅建生
李连根
邓建勇
白立强
郭亚飞
袁泽
张德民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANXI WATER CONSERVANCY CONSTRUCTION ENGINEERING BUREAU
Original Assignee
SHANXI WATER CONSERVANCY CONSTRUCTION ENGINEERING BUREAU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANXI WATER CONSERVANCY CONSTRUCTION ENGINEERING BUREAU filed Critical SHANXI WATER CONSERVANCY CONSTRUCTION ENGINEERING BUREAU
Priority to CN201621467849.0U priority Critical patent/CN206319311U/en
Application granted granted Critical
Publication of CN206319311U publication Critical patent/CN206319311U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The application is related to a kind of pipe trench compacting constructing device, more particularly to a kind of Complex Soil layer depth covering groove Continuous compacting device;It includes bogie, support frame, lifting rope, wheel carrier, compact wheel;The arranged on left and right sides of pipe trench is disposed with can be along the synchronization-moving bogie in pipe trench direction, two bogie upper end transverse strands are provided with the support frame across pipe trench, the lifting rope hung down and in pipe trench is connected with the middle part of support frame lower surface, lifting rope bottom is connected with wheel carrier, and wheel carrier center is hinged with seat in the compact wheel in pipe trench.Due to implementing above-mentioned technical proposal, the application is slowly run simultaneously in pipe trench arranged on left and right sides by two bogies, drive support movements, and moved by lifting rope dragging compact wheel along pipe trench direction, quick, round compacting is carried out to pipe trench bottom using the self gravitation of compact wheel, realize that complete mechanical is worked continuously, then carry out compacting operation;The compacting operation at extra long distance pipeline networking is particularly suitable for use in, a large amount of manpower financial capacities are saved.

Description

Complex Soil layer depth covering groove Continuous compacting device
Technical field
The application is related to a kind of pipe trench compacting constructing device, more particularly to a kind of Complex Soil layer depth covering groove Continuous compacting Device.
Background technology
Severe cold area winter temperature is relatively low, and aqueduct is to prevent from freezing, it is necessary to buried, the deep covering pipe trench of complex random systems Before pipeline lower berth, it is necessary to carry out compacting, the finishing operations of pipe trench bottom.Because in complex random systems, a large amount of intervals are present Stone, without fine sand backfill and compacting operation, the later stage will greatly damage pipeline, and the deep pipe trench covered is due to narrow space, Extremely be unfavorable for manual work, and corresponding hydraulic pressure, electrical shock compacting equipment or compacting machinary, it is adaptable to plane stratum or compared with Big foundation ditch, lacks professional equipment for deep covering, narrower pipe trench.
For pipe trench bottom of trench compacting operation, the artificial compacting construction combined with hand-held compaction apparatus is generally used at present Method, on the satisfactory stratum of soil layer sand performance, directly carries out compacting operation, to containing the more interval of stone, carrying out first Fine sand is backfilled, then carries out compacting operation, and work progress needs man-hour longer, and for restricted width pipe trench, can only use people Work mode, it is inestimable for the artificial, duration needed for the compacting operation at extra long distance pipeline networking, it is badly in need of a kind of can be achieved completely The construction method of do mechanization operation.
The content of the invention
The purpose of the application is to propose a kind of compacting operation efficiency for improving pipe trench bottom of trench, can be for complex random systems point Cloth, deep covering, narrow pipe trench carry out mechanization compacting operation, can continuously construct, stable Complex Soil layer depth covering groove connects Continuous compaction apparatus.
What the application was realized in:Complex Soil layer depth covering groove Continuous compacting device, it includes bogie, support Frame, lifting rope, wheel carrier, compact wheel;The arranged on left and right sides of pipe trench is disposed with can be along the synchronization-moving bogie in pipe trench direction, two loads Loaded vehicle upper end transverse strands are provided with the middle part of the support frame across pipe trench, support frame lower surface to be connected with and hung down and in pipe trench Lifting rope, lifting rope bottom is connected with wheel carrier, and wheel carrier center is hinged with seat in the compact wheel in pipe trench;Hanging between support frame and wheel carrier Rope length degree is not less than the vertical range between support frame and wheel carrier.
Further, support frame includes the mobile jib and Duo Gen connection reinforcement bars of three parallel distributions;The side view of three mobile jibs Projection is in be placed with many inclined connection reinforcement bars between upright triangular pitch, every two mobile jibs.
Further, it is fixedly connected with the mobile jib of top below triangle reinforcement, the center correspondence of triangle reinforcement Lifting rope tie point;Vertical strengthening ribs are further fixed between triangle reinforcement and the mobile jib of top.
Further, two mobile jib lower surfaces of lower section are fixedly connected with connecting bridge, and the connection of connecting bridge lower end center is oriented Under hang from above and the lifting rope in the pipe trench.
Further, every mobile jib of lower section is connected by least two Metal pipe straps with connecting bridge.
Further, lifting rope is single wire rope.
Further, the width of compact wheel and pipe trench width Corresponding matching.
Due to implementing above-mentioned technical proposal, the application is slowly run simultaneously in pipe trench arranged on left and right sides by two bogies, Support movements are driven, and compact wheel is dragged by lifting rope and are moved along pipe trench direction, using the self gravitation of compact wheel to pipe Ditch bottom carries out quick, round compacting, realizes that complete mechanical is worked continuously, then carry out compacting operation;It is particularly suitable for use in overlength Compacting operation apart from pipeline networking, saves a large amount of manpower financial capacities.
Brief description of the drawings:
The concrete structure of the application is provided by following drawings and Examples:
Fig. 1 is the structural representation of the application most preferred embodiment;
Fig. 2 is the side structure schematic view of support frame in Fig. 1, Metal pipe strap, connecting bridge and compact wheel.
Legend:1. bogie, 2. compact wheels, 3. lifting ropes, 4. wheel carriers, 5. Metal pipe straps, 6. pipe trench, 7. connecting bridges, 8. masters Bar, 9. connection reinforcement bars, 10. triangle reinforcements, 11. vertical strengthening ribs.
Embodiment:
The application is not limited by following embodiments, can be determined according to the technical scheme of the application with actual conditions specific Embodiment.
As shown in Figure 1, 2, Complex Soil layer depth covering groove Continuous compacting device includes bogie 1, support frame, lifting rope 3, wheel Frame 4, compact wheel 2;The arranged on left and right sides of pipe trench 6 is disposed with can be along the synchronization-moving bogie 1 in pipe trench direction, on two bogies 1 Transverse strands are held to be provided with the support frame across pipe trench 6, support frame lower surface middle part, which is connected with, to be hung down and hanging in pipe trench 6 Rope 3, the bottom of lifting rope 3 is connected with wheel carrier 4, and the center of wheel carrier 4 is hinged with seat in the compact wheel 2 in pipe trench 6;Between support frame and wheel carrier 4 The length of lifting rope 3 not less than vertical range between support frame and wheel carrier 4.
In use, being first connected compact wheel 2 with the consolidation of wheel carrier 4, the compaction apparatus of the bottom of trench of pipe trench 6 is constituted, it is logical with loop wheel machine Cross steel wire rope and compaction apparatus is hung in into pipe trench 6, the lifting rope 3 in the non-the application of the steel wire rope;
Then the support frame for welding completion in advance is lifted on the bogie 1 for being distributed in pipeline both sides with loop wheel machine, will propped up Support is fixedly connected with the bogie 1 at two ends, is kept symmetrical;
It will be connected between compaction apparatus and support frame in the bottom of trench of pipe trench 6 by lifting rope 3, check quality of connection;
To the satisfactory interval of bottom of trench soil property of pipe trench 6, the slow parallel traveling of bogie 1, lifting rope 3 drives compact wheel 2, according to Compacting operation is carried out by the gravity of compact wheel 2, situation is compacted according to soil property, is reciprocally compacted;
To the bottom of trench of pipe trench 6 containing stone it is more or other do not meet soil property requirement interval, to carry out in advance sand, element soil return Fill out the operation being compacted again.
The application can realize that complete mechanical is worked continuously, and the compact wheel 2 matched with width and pipe trench 6 is realized disposably Compacting operation, such as soil property do not reach compacting criteria, and bogie 1 is along the reciprocating working of pipe trench 6;It is particularly suitable for use in extra long distance pipe The compacting operation on gauze road, saves a large amount of manpower financial capacities.
Bogie 1 is using the vehicle of two same model load-carryings, synchronous operation;Or two bogies 1 are led by same Leading-in device is pulled by same power, and it is relatively steady to ensure that two bogies 1 are run with this.Being fixed with bogie 1 will prop up The fixed mounting bracket of support matching(Do not drawn in figure), support frame is bolted on bogie 1, support frame passes through metal Snap ring is fixed on bogie 1, by one of above-mentioned three kinds of methods or its combination, and support frame is connected firmly with bogie 1, dress Unload convenient.Compact wheel 2 is single solid steel compact wheel 2, and width is slightly less than the width of pipe trench 6.It is deep that the length of lifting rope 3 need to meet pipe trench 6 Degree requires that the length of lifting rope 3 that is, between support frame and wheel carrier 4 is not less than the vertical range between support frame and wheel carrier 4;And leave remaining Amount.
As shown in Figure 1, 2, support frame includes the mobile jib 8 and Duo Gen connection reinforcement bars 9 of three parallel distributions;Three mobile jibs 8 Side elevation be in upright triangular pitch, be placed with many inclined connection reinforcement bars 9 between every two mobile jibs 8.So Support frame intensity can be increased, the deformation at lifting, dragging compact wheel 2 is reduced.
As shown in figure 1, triangle reinforcement 10 is fixedly connected with the mobile jib 8 of top, the center correspondence of triangle reinforcement 10 The tie point of lifting rope 3 of lower section;Vertical strengthening ribs 11 are further fixed between triangle reinforcement 10 and the mobile jib of top 8.Increase support The local strength of frame connection lifting rope 3 part.
As shown in Figure 1, 2, two lower surfaces of mobile jib 8 of lower section are fixedly connected with connecting bridge 7, and the lower end center of connecting bridge 7 connects It is connected to the lifting rope 3 hung down and in pipe trench 6.By connecting bridge 7 by the point stress of two mobile jibs 8 of lower section be changed into line by Power, smaller concentrated stress increases the service life of mobile jib 8.
As shown in Figure 1, 2, the every mobile jib 8 of lower section is connected by least two Metal pipe straps 5 with connecting bridge 7.So Fast Installation, the dismounting of lifting rope 3 can be realized;Utilize Reusability.
As shown in Figure 1, 2, lifting rope 3 is single wire rope.The unbalance stress caused by the out-of-flatness of pipe trench 6 can so be prevented Even, steel wire rope is only with single, the safe operation of intensity guarantee compact wheel 2.
As shown in Figure 1, 2, the width of compact wheel 2 and the width Corresponding matching of pipe trench 6.
Above technical characteristic constitutes the most preferred embodiment of the application, and it has stronger adaptability and optimal implementation effect Really, inessential technical characteristic can be increased and decreased according to actual needs, the need for meeting different situations.

Claims (10)

1. a kind of Complex Soil layer depth covering groove Continuous compacting device, it is characterised in that:Including bogie, support frame, lifting rope, wheel Frame, compact wheel;The arranged on left and right sides of pipe trench is disposed with can be along the synchronization-moving bogie in pipe trench direction, and two bogie upper ends are horizontal There is the lifting rope for being connected with and hanging down and in pipe trench in the middle part of the support frame across pipe trench, support frame lower surface to erection, hang Rope bottom is connected with wheel carrier, and wheel carrier center is hinged with seat in the compact wheel in pipe trench;Lifting rope length between support frame and wheel carrier is not Less than the vertical range between support frame and wheel carrier.
2. Complex Soil layer depth covering groove Continuous compacting device according to claim 1, it is characterised in that:Support frame includes The mobile jib and Duo Gen connection reinforcement bars of three parallel distributions;The side elevation of three mobile jibs is in upright triangular pitch, every two Many inclined connection reinforcement bars are placed between root mobile jib.
3. Complex Soil layer depth covering groove Continuous compacting device according to claim 2, it is characterised in that:The mobile jib of top On be fixedly connected with triangle reinforcement, the lifting rope tie point below the center correspondence of triangle reinforcement;Triangle reinforcement and top Mobile jib between be further fixed on vertical strengthening ribs.
4. the Complex Soil layer depth covering groove Continuous compacting device according to Claims 2 or 3, it is characterised in that:Lower section Two mobile jib lower surfaces are fixedly connected with connecting bridge, and connecting bridge lower end center, which is connected with, to be hung down and hanging in pipe trench Rope.
5. Complex Soil layer depth covering groove Continuous compacting device according to claim 4, it is characterised in that:Every of lower section Mobile jib is connected by least two Metal pipe straps with connecting bridge.
6. the Complex Soil layer depth covering groove Continuous compacting device according to claim 1 or 2 or 3 or 5, it is characterised in that: Lifting rope is single wire rope.
7. Complex Soil layer depth covering groove Continuous compacting device according to claim 4, it is characterised in that:Lifting rope is single Steel wire rope.
8. the Complex Soil layer depth covering groove Continuous compacting device according to claim 1 or 2 or 3 or 5, it is characterised in that: The width of compact wheel and pipe trench width Corresponding matching.
9. Complex Soil layer depth covering groove Continuous compacting device according to claim 4, it is characterised in that:The width of compact wheel Degree and pipe trench width Corresponding matching.
10. Complex Soil layer depth covering groove Continuous compacting device according to claim 6, it is characterised in that:Compact wheel Width and pipe trench width Corresponding matching.
CN201621467849.0U 2016-12-29 2016-12-29 Complex Soil layer depth covering groove Continuous compacting device Expired - Fee Related CN206319311U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621467849.0U CN206319311U (en) 2016-12-29 2016-12-29 Complex Soil layer depth covering groove Continuous compacting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621467849.0U CN206319311U (en) 2016-12-29 2016-12-29 Complex Soil layer depth covering groove Continuous compacting device

Publications (1)

Publication Number Publication Date
CN206319311U true CN206319311U (en) 2017-07-11

Family

ID=59260938

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621467849.0U Expired - Fee Related CN206319311U (en) 2016-12-29 2016-12-29 Complex Soil layer depth covering groove Continuous compacting device

Country Status (1)

Country Link
CN (1) CN206319311U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109629615A (en) * 2019-02-16 2019-04-16 丁风海 A kind of military trench equipment of intelligence
CN113417275A (en) * 2021-08-20 2021-09-21 奥王建筑材料科技有限公司 Build ditch and use rolling equipment
CN113914286A (en) * 2021-11-19 2022-01-11 中电建十一局工程有限公司 Slope foundation compacting machine

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109629615A (en) * 2019-02-16 2019-04-16 丁风海 A kind of military trench equipment of intelligence
CN109629615B (en) * 2019-02-16 2021-10-29 黄万达 Intelligent military trench digging equipment
CN113417275A (en) * 2021-08-20 2021-09-21 奥王建筑材料科技有限公司 Build ditch and use rolling equipment
CN113417275B (en) * 2021-08-20 2021-11-02 奥王建筑材料科技有限公司 Build ditch and use rolling equipment
CN113914286A (en) * 2021-11-19 2022-01-11 中电建十一局工程有限公司 Slope foundation compacting machine

Similar Documents

Publication Publication Date Title
CN206319311U (en) Complex Soil layer depth covering groove Continuous compacting device
CN104878766B (en) A kind of long side slope protection concrete continuous fast pouring drawing-die system and construction method
CN110863498A (en) Deep foundation pit combined supporting construction method next to subway station
CN205557532U (en) Combine secretly section of burying construction city deep tunnel's interim construction passageway of speciality open cut
CN108396754B (en) Construction method of suspended floating splicing steel cofferdam
CN107724371B (en) Domatic soil body compaction system
CN109972621A (en) A kind of pile pulling device and its construction method for small headroom phytal zone steel-pipe pile
CN101858059A (en) Construction method of erecting prestressed concrete beam on river
CN109339096A (en) A kind of construction integrated constructing device of pipe gallery open cut precast assembly and its construction method
CN109296374A (en) A kind of deep-well confined space TBM lifting shift method
CN109236331A (en) A kind of steel arch rack trolley suitable for the micro- bench cut method in tunnel
CN102060199A (en) Transportation method for constructing high mountain building
CN102587284A (en) Independent derrick mast and beam plate mounting method
CN106930315A (en) A kind of moving tower crane foundation structure and construction method
CN108643058A (en) Anchor after cable crane main rope cross sliding type
CN102926388A (en) Earth moving device and method for deep foundation pit excavation
CN107100649A (en) A kind of construction technology for inclined shaft concreting
CN206753488U (en) A kind of artificial digging pile reaming auxiliary equipment
CN106480826A (en) The cast-in-place traversing construction engineering method of single line box beam pier top
CN209011837U (en) A kind of steel arch rack trolley suitable for the micro- bench cut method in tunnel
CN208376906U (en) Shift unit, dynamic compaction machinery, crane, continuous wall grab chute forming machine and rotary drilling rig
CN108118728B (en) Efficient soil excavating device and method for special-shaped deep foundation pit
CN207293981U (en) The hanging apparatus of two lining trolleys in a kind of sand gravel tunnel
CN212771960U (en) Whole device of demolising of 0# piece bracket of continuous rigid frame bridge
CN204919341U (en) Installing the system of prefabricated decking of dysmorphism on uncovered lattice formula girder steel of arched bridge

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170711

Termination date: 20171229

CF01 Termination of patent right due to non-payment of annual fee