CN108643058A - Anchor after cable crane main rope cross sliding type - Google Patents

Anchor after cable crane main rope cross sliding type Download PDF

Info

Publication number
CN108643058A
CN108643058A CN201810676942.XA CN201810676942A CN108643058A CN 108643058 A CN108643058 A CN 108643058A CN 201810676942 A CN201810676942 A CN 201810676942A CN 108643058 A CN108643058 A CN 108643058A
Authority
CN
China
Prior art keywords
anchorage
main rope
anchor
traversing
mechanical room
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810676942.XA
Other languages
Chinese (zh)
Inventor
于长彬
姜长斌
田波
李海松
张喆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 18th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd
Original Assignee
China Railway 18th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 18th Bureau Group Co Ltd, Second Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd filed Critical China Railway 18th Bureau Group Co Ltd
Priority to CN201810676942.XA priority Critical patent/CN108643058A/en
Publication of CN108643058A publication Critical patent/CN108643058A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/14Towers; Anchors ; Connection of cables to bridge parts; Saddle supports

Abstract

The present invention relates to anchors after a kind of cable crane main rope cross sliding type, including rear anchorage, main rope heavy frame, anchorage mechanical room, traversing slideway;Anchorage top surface sets anchorage mechanical room afterwards;Anchorage sets traversing slideway with anchorage machinery room afterwards;The traversing slideway of four rows is set on anchorage afterwards, wherein the traversing slideway of three rows is set to the rear anchorage top surface, a row is set to the rear anchorage outer bottom surface;The anchorage mechanical room is fixedly welded on the traversing slideway of rear anchorage top surface;The main rope heavy frame and the anchorage mechanical room are by being welded and fixed.Anchor after cable crane main rope cross sliding type of the present invention, the device is limited smaller by geology, landform, suitable for large-tonnage, large span cable crane, reduce limitation of the rear anchorage to geology, orographic condition, it is especially suitable for the steeper mountain area of the gradient, the anchorage mechanical room is traversing while driving cable crane track cable, hauling rope, hoisting rope transverse shifting, simplifies the operation of anchorage crossing system.

Description

Anchor after cable crane main rope cross sliding type
Technical field
The present invention relates to the cable cranes used in a kind of science of bridge building, in particular to a kind of cable crane owner Anchor after rope cross sliding type.
Background technology
Currently, the cable crane used in Longspan Bridge is typically required for the function of direction across bridge movement, and its traversing work( It can mainly be realized by the cable saddle transverse shifting of the horizontal sliding system of rear anchor and cable crane tower top.The latter by The cable saddle of the mobile cable crane tower top of constant of anchor location, can lead to changing for cable crane main rope stress after cable crane Become, generates larger security risk.
The predominantly rear anchor monoblock type sliding of anchor horizontal sliding system after existing.201296609 Y of Chinese patent application CN Anchor holds together device mobilely after proposing a kind of cable crane of bridge construction.But rear anchor integral slipping wants construction site It asks higher, is not suitable for the landform construction site poor compared with steep, geology, structure, complicated for operation, safety wind is dangerous big, and can only The cable crane smaller for lifting tonnage.
Invention content
Deficiency in for the above-mentioned prior art, the present invention provide a kind of wide adaptation range, disclosure satisfy that cable crane is big Tonnage, large span demand cable crane main rope cross sliding type after anchor.
The technical solution used in the present invention is:
Anchor after a kind of cable crane main rope cross sliding type,
Including rear anchorage, main rope heavy frame, anchorage mechanical room, traversing slideway;
Anchorage sets main rope heavy frame far from side in bridge span afterwards;
Anchorage top surface sets anchorage mechanical room afterwards;
Main rope heavy frame is fixed together by welding with anchorage mechanical room;
Anchorage sets traversing slideway with main rope heavy frame, anchorage machinery room afterwards.
The traversing slideway of four rows is set altogether on anchorage after described, wherein the traversing slideway of three rows is set to the rear anchorage top surface, a row Set on the rear anchorage outer bottom surface;
The traversing slideway is by the guide rail and frame for being embedded in the guide rail embedded board of rear anchorage, being welded on the guide rail embedded board The skid composition being located on the guide rail;
The bottom of the main rope heavy frame is weldingly fixed on the skid of the traversing slideway in rear anchorage outer bottom surface;
The anchorage mechanical room is weldingly fixed on the skid of the rear traversing slideway in anchorage top surface.
Traversing slideway both ends described in the twice on the outside of anchorage top surface respectively set a traversing traction supporting rack afterwards, described traversing to lead Draw supporting rack to be embedded on rear anchorage;
Hydraulic jack is set on the outside of the traversing traction supporting rack;
The hydraulic jack connects extra-high pressure electric oil pump, and steel strand wires are set between the hydraulic jack;
The anchorage mechanical room is connected among the steel strand wires;
The hydraulic jack, the extra-high pressure electric oil pump and the steel strand wires provide traction for the anchorage mechanical room together Power.
The cable crane track cable is set up at the top of the main rope heavy frame;
Setting rack winch and hoisting winding inside the anchorage mechanical room;
The hauling rope is connected across the traction guide wheel group with the rack winch;
The hoisting rope is connected across the lifting guide wheel group with the hoisting winding.
Anchorage is the combination anchor of gravity anchor and rock anchor combination after described,.
The gravity anchor be 12m × 8.65m × 7m reinforced concrete structure, the rock anchor bore diameter 194mm, Three rows, drillable length are divided to be followed successively by 30m, 40m, 50m from top to bottom.
The advantageous effect of the present invention compared with the prior art:
Anchor after cable crane main rope cross sliding type of the present invention, the device limited by geology, landform it is smaller, be suitable for large-tonnage, greatly across Cable crane is spent, can solve the problems, such as that cable crane direction across bridge is frequently moved.
Anchor after cable crane main rope cross sliding type of the present invention, rear anchorage are the combined type anchor that gravity anchor is combined with rock anchor Heavy stone used as an anchor reduces limitation of the rear anchorage to geology, orographic condition, especially suitable for the steeper mountain area of the gradient.Powerful rear anchor body System can meet the needs of cable crane large-tonnage, large span again;Main rope heavy frame is fixed on the anchorage mechanical room, described Anchorage mechanical room is traversing while driving cable crane track cable, hauling rope, hoisting rope transverse shifting, simplifies anchorage crossing system Operation.
Description of the drawings
Fig. 1 is the main structure diagram of anchor after cable crane main rope cross sliding type of the present invention;
Fig. 2 is the left view of Fig. 1;
Fig. 3 is rear anchorage top surface layout drawing.
In figure:1, rear anchorage;2, main rope heavy frame;3, anchorage mechanical room;4, traversing slideway;5, rock anchor;6, traversing traction Supporting rack;7, hydraulic jack;8, steel strand wires;9, rack winch;10, hoisting winding.
Specific implementation mode
Referring to the drawings and embodiment the present invention will be described in detail:
Attached drawing 1-3 it is found that anchor after a kind of cable crane main rope cross sliding type,
Including rear anchorage 1, main rope heavy frame 2, anchorage mechanical room 3, traversing slideway 4;
Anchorage 1 sets main rope heavy frame 2 far from side in bridge span afterwards;
1 top surface of anchorage sets anchorage mechanical room 3 afterwards;
Main rope heavy frame 2 is fixed together by welding with anchorage mechanical room 3;
Traversing slideway 4 is set between anchorage 1 and main rope heavy frame 2, anchorage mechanical room 3 afterwards.
Set the traversing slideway 4 of four rows altogether on anchorage after described, wherein the traversing slideway 4 of three rows be set to it is described after 1 top surface of anchorage, one Row is set to the rear 1 outer bottom surface of anchorage;
The traversing slideway 4 by be embedded in the guide rail embedded board of rear anchorage, the guide rail being welded on the guide rail embedded board and The skid composition being erected on the guide rail;
The bottom of the main rope heavy frame 2 is weldingly fixed on the skid of the traversing slideway in 1 outer bottom surface of rear anchorage 4;
The anchorage mechanical room 3 is weldingly fixed on the skid of the traversing slideway in 1 top surface of rear anchorage 4.
4 both ends of traversing slideway described in the twice on the outside of 1 top surface of anchorage respectively set a traversing traction supporting rack 6, the cross afterwards Traction supporting rack 6 is moved to be embedded on rear anchorage 1;
6 outside of the traversing traction supporting rack sets hydraulic jack 7;
The hydraulic jack 7 connects extra-high pressure electric oil pump, and steel strand wires 8 are set between the hydraulic jack 7;
The anchorage mechanical room 3 is connected among the steel strand wires 8;
The hydraulic jack 7, the extra-high pressure electric oil pump and the steel strand wires 8 are that the anchorage mechanical room 3 provides together Traction power.
2 top of the main rope heavy frame sets up the cable crane track cable;
3 inside setting rack winch 9 of the anchorage mechanical room and hoisting winding 10;
The hauling rope is connected across the traction guide wheel group with the rack winch;
The hoisting rope is connected across the lifting guide wheel group with the hoisting winding.
Anchorage 1 is the combination anchor of gravity anchor and the combination of rock anchor 5 after described,.
The gravity anchor is 12m(It is long)×8.65m(It is wide)×7m(It is high)Reinforced concrete structure, the rock anchor 5 Bore diameter 194mm divides three rows, drillable length to be followed successively by 30m, 40m, 50m from top to bottom.
Anchor after cable crane main rope cross sliding type of the present invention, the device limited by geology, landform it is smaller, be suitable for large-tonnage, Large span cable crane can solve the problems, such as that cable crane direction across bridge is frequently moved.
Since anchorage is combination anchor that gravity anchor is combined with rock anchor after described, reduce rear anchorage to geology, The limitation of orographic condition, it is especially suitable for the steeper mountain area of the gradient.It is big that powerful rear anchor system can meet cable crane again The demand of tonnage, large span.The main rope heavy frame is fixed on the anchorage mechanical room, and the anchorage mechanical room is traversing simultaneously Cable crane track cable, hauling rope, hoisting rope transverse shifting are driven, the operation of anchorage crossing system is simplified.
The traversing process of the present invention is as follows:
Anchorage mechanical room 3 each a branch of steel strand wires of fixation, steel strand wires other end on two angles for need moving direction bottom pass through Traversing traction supporting rack 6 and hydraulic jack 7, steel strand wires both ends install the tools such as anchor clipper, open extra-high pressure electric oil Pump, two jack synchronous averagings slowly pull anchorage mechanical room to be moved to same direction;Due to main rope heavy frame 2 and anchorage Mechanical room 3 is fixed together, and raising hoist engine and rack winch are set to inside anchorage mechanical room 3, so, anchorage machinery The traversing of cable crane main rope is realized while room 3 is traversing.
The above described is only a preferred embodiment of the present invention, not making in any form to the structure of the present invention Limitation.It is every according to the technical essence of the invention to any simple modification, equivalent change and modification made by above example, Belong within the scope of technical scheme of the present invention.

Claims (6)

1. anchor after a kind of cable crane main rope cross sliding type, which is characterized in that
Including rear anchorage, main rope heavy frame, anchorage mechanical room, traversing slideway;
Anchorage sets main rope heavy frame far from side in bridge span afterwards;
Anchorage top surface sets anchorage mechanical room afterwards;
Main rope heavy frame is fixed together by welding with anchorage mechanical room;
Anchorage sets traversing slideway with main rope heavy frame, anchorage machinery room afterwards.
2. setting the traversing slideway of four rows altogether on anchorage after described, wherein the traversing slideway of three rows is set to the rear anchorage top surface, a row sets The anchorage outer bottom surface after described;
The traversing slideway is by the guide rail and frame for being embedded in the guide rail embedded board of rear anchorage, being welded on the guide rail embedded board The skid composition being located on the guide rail;
The bottom of the main rope heavy frame is weldingly fixed on the skid of the traversing slideway in rear anchorage outer bottom surface;
The anchorage mechanical room is weldingly fixed on the skid of the rear traversing slideway in anchorage top surface.
3. traversing slideway both ends described in twice after on the outside of anchorage top surface respectively set a traversing traction supporting rack, the traversing traction Supporting rack is embedded on rear anchorage;
Hydraulic jack is set on the outside of the traversing traction supporting rack;
The hydraulic jack connects extra-high pressure electric oil pump, and steel strand wires are set between the hydraulic jack;
The anchorage mechanical room is connected among the steel strand wires;
The hydraulic jack, the extra-high pressure electric oil pump and the steel strand wires provide traction for the anchorage mechanical room together Power.
4. setting up the cable crane track cable at the top of the main rope heavy frame;
Setting rack winch and hoisting winding inside the anchorage mechanical room;
The hauling rope is connected across the traction guide wheel group with the rack winch;
The hoisting rope is connected across the lifting guide wheel group with the hoisting winding.
5. anchor after the cross sliding type of cable crane main rope according to claim 1, it is characterised in that:Anchorage is gravity type anchor after described The combination anchor that heavy stone used as an anchor and rock anchor combine,.
6. anchor after the cross sliding type of cable crane main rope according to claim 1, it is characterised in that:The gravity anchor is 12m The reinforced concrete structure of × 8.65m × 7m, the rock anchor bore diameter 194mm divide three rows from top to bottom, and drillable length is successively For 30m, 40m, 50m.
CN201810676942.XA 2018-06-27 2018-06-27 Anchor after cable crane main rope cross sliding type Pending CN108643058A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810676942.XA CN108643058A (en) 2018-06-27 2018-06-27 Anchor after cable crane main rope cross sliding type

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810676942.XA CN108643058A (en) 2018-06-27 2018-06-27 Anchor after cable crane main rope cross sliding type

Publications (1)

Publication Number Publication Date
CN108643058A true CN108643058A (en) 2018-10-12

Family

ID=63753611

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810676942.XA Pending CN108643058A (en) 2018-06-27 2018-06-27 Anchor after cable crane main rope cross sliding type

Country Status (1)

Country Link
CN (1) CN108643058A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110565530A (en) * 2019-08-28 2019-12-13 中铁大桥局集团有限公司 Main cable laying method of cable crane
CN114150593A (en) * 2021-12-16 2022-03-08 长沙理工大学 Simple arch bridge dismantling and rebuilding structure and arch bridge dismantling and rebuilding method
CN116695586A (en) * 2023-08-09 2023-09-05 贵州省公路工程集团有限公司 Transversely-movable large-tonnage tower-free cable hoisting system and construction method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU420546A1 (en) * 1972-08-07 1974-03-25 Е. П. Карцев
JP2005206355A (en) * 2004-01-26 2005-08-04 Kajima Corp Cable crane
CN202201647U (en) * 2011-07-05 2012-04-25 中铁港航局集团第二工程有限公司 Anchor device for bearing main rope
CN105565176A (en) * 2016-02-03 2016-05-11 中铁港航局集团有限公司 Single-tower asymmetric cable crane

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU420546A1 (en) * 1972-08-07 1974-03-25 Е. П. Карцев
JP2005206355A (en) * 2004-01-26 2005-08-04 Kajima Corp Cable crane
CN202201647U (en) * 2011-07-05 2012-04-25 中铁港航局集团第二工程有限公司 Anchor device for bearing main rope
CN105565176A (en) * 2016-02-03 2016-05-11 中铁港航局集团有限公司 Single-tower asymmetric cable crane

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110565530A (en) * 2019-08-28 2019-12-13 中铁大桥局集团有限公司 Main cable laying method of cable crane
CN114150593A (en) * 2021-12-16 2022-03-08 长沙理工大学 Simple arch bridge dismantling and rebuilding structure and arch bridge dismantling and rebuilding method
CN114150593B (en) * 2021-12-16 2024-02-23 长沙理工大学 Simple arch bridge dismantling and reconstructing structure and arch bridge dismantling and reconstructing method
CN116695586A (en) * 2023-08-09 2023-09-05 贵州省公路工程集团有限公司 Transversely-movable large-tonnage tower-free cable hoisting system and construction method thereof
CN116695586B (en) * 2023-08-09 2023-10-13 贵州省公路工程集团有限公司 Transversely-movable large-tonnage tower-free cable hoisting system and construction method thereof

Similar Documents

Publication Publication Date Title
CN104088449B (en) Safe and fast double-track construction platform of super high-rise curtain wall
CN105565176B (en) A kind of asymmetric cable crane of single column
CN108643058A (en) Anchor after cable crane main rope cross sliding type
CN108265628A (en) One kind rides cable-styled erection crane lifting cable-stayed bridge girder steel and bridge floor board construction method
CN105839537B (en) Construction method for hoisting stiffening girder of suspension bridge by adopting girdle-carrying traveling of deck erection gantry
CN108639968A (en) Whole lateral moving formula cable crane
CN201106155Y (en) Inclined guy cable auxiliary full cantaliver crane trussed steel beam device
CN105648916A (en) Bridge girder erection machine and erection method of bridge girder erection machine
CN106276627B (en) A kind of multi-tower continuous across hoist cable crane
CN102556854B (en) Mine hydraulic hoisting traveling crane
CN113882281B (en) Hanging basket walking system for bridge cantilever construction and operation method
CN103303817A (en) Hoisting mechanism and dynamic compactor
CN104495653B (en) A kind of multi-functional large-tonnage erecting crane and beam erecting method
CN212475874U (en) Bridge cable crane system
CN212374757U (en) Tower crane stable in installation
CN102926388A (en) Earth moving device and method for deep foundation pit excavation
CN108625270A (en) Nose girder gantry crane installs bridge prefabrication box girder construction method
CN210366808U (en) Lifting and dismantling device for rail walking
CN105645275B (en) Cable hoist and its construction method
CN103061268A (en) Expressway (double span) overpass bridge erecting method
CN102776841A (en) Long-span steel truss suspension bridge jointing method and device
CN201292509Y (en) Suspension bridge main girder construction segment conveying facilities
CN214613613U (en) Bridge deck hoisting equipment
CN211687988U (en) Segment assembling bridge girder erection machine hoisting trolley
CN201144134Y (en) Double herringbone hoisting derrick mast

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181012

RJ01 Rejection of invention patent application after publication