CN106930315A - A mobile tower crane foundation structure and construction method - Google Patents
A mobile tower crane foundation structure and construction method Download PDFInfo
- Publication number
- CN106930315A CN106930315A CN201710325531.1A CN201710325531A CN106930315A CN 106930315 A CN106930315 A CN 106930315A CN 201710325531 A CN201710325531 A CN 201710325531A CN 106930315 A CN106930315 A CN 106930315A
- Authority
- CN
- China
- Prior art keywords
- tower crane
- track
- connecting rod
- foundation structure
- base
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/42—Foundations for poles, masts or chimneys
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/44—Foundations for machines, engines or ordnance
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Jib Cranes (AREA)
Abstract
Description
技术领域technical field
本发明涉及工程技术领域,具体涉及一种移动塔吊基础结构及施工方法。The invention relates to the field of engineering technology, in particular to a mobile tower crane foundation structure and a construction method.
背景技术Background technique
我公司承建的阿尔及尼亚租售保障房项目,有100多栋10层以内多层楼房,一梯四户为一栋,属于大型住宅房建项目,采用隧道模工艺,根据项目特点每栋楼都需要安装塔吊进行施工,现在十分普遍的做法是一浇筑混凝土块作为塔吊基础,然而,现在做法在进行施工时,所浇筑混凝土基础的体积普遍较大,施工时还需要经过绑钢筋、支模板、预埋螺栓、和浇筑混凝土等工序,塔吊基础不能移动,采用这种方式制作的塔吊的基础施工工期长,建筑施工完成后,该塔吊的基础不能重复使用,并且,在塔吊拆除之后,混凝土基础还需另行进行爆破或者机械破碎拆除,显然,此种做法存在施工效率低下且环境污染严重、对资源造成极大浪费和工程成本增加。The Algeria rental and sale affordable housing project undertaken by our company has more than 100 multi-storey buildings with less than 10 floors, one building with four households per elevator. It is a large-scale residential housing construction project. Buildings need to install tower cranes for construction. Now it is very common to pour concrete blocks as the foundation of the tower crane. However, when the current method is in construction, the volume of the poured concrete foundation is generally large, and it is necessary to bind steel bars and support during construction. Formwork, pre-embedded bolts, and pouring concrete, etc., the foundation of the tower crane cannot be moved. The foundation construction period of the tower crane made in this way is long. After the construction is completed, the foundation of the tower crane cannot be reused, and after the tower crane is dismantled, The concrete foundation needs to be demolished by blasting or mechanical crushing. Obviously, this method has low construction efficiency, serious environmental pollution, great waste of resources and increased engineering costs.
发明内容Contents of the invention
本发明所要解决的技术问题是提供一种能够移动和重复使用的移动塔吊基础结构。The technical problem to be solved by the invention is to provide a mobile tower crane foundation structure that can be moved and reused.
本发明解决其技术问题所采用的技术方案是:包括基层,在基层上铺设有找平层,在找平层上设置有塔吊基础,所述塔吊基础包括底板、连接件、连接杆、锚固杆,底板设置在找平层的上表面,在底板上平行设置有轨道,在轨道端部开设有通孔,连接件设置在底板上,锚固杆上端与连接杆相连,下端锚入地下,连接杆包括横向连接杆和纵向连接杆,纵向连接杆通过连接件固定设置在底板上,横向连接杆与轨道相连,且穿过通孔与纵向连接杆相接,在轨道上设置有行走装置,行走装置上端固定连接有底座,底座上表面固定设置有塔架。The technical solution adopted by the present invention to solve its technical problems is: comprising a base layer, on which a leveling layer is laid, and a tower crane foundation is arranged on the leveling layer, and the tower crane foundation includes a base plate, connectors, connecting rods, anchor rods, base plate It is arranged on the upper surface of the leveling layer, and the track is arranged in parallel on the bottom plate, and a through hole is opened at the end of the track. Rods and longitudinal connecting rods, the longitudinal connecting rods are fixedly arranged on the bottom plate through connecting pieces, the transverse connecting rods are connected with the track, and pass through the through holes to connect with the longitudinal connecting rods, a running device is arranged on the track, and the upper end of the running device is fixedly connected There is a base, and a tower is fixedly arranged on the upper surface of the base.
进一步,行走装置包括连接板、车轮、高强螺栓,连接板上表面安放有橡胶垫,连接板通过高强螺栓和橡胶垫与底座相连,在连接板上还设置有夹轨器,车轮设置于连接板的下端,且与轨道滚动连接,在车轮上方位置处设置有驱动车轮行走的带有制动器的驱动电机。Further, the walking device includes a connecting plate, wheels, and high-strength bolts. Rubber pads are placed on the surface of the connecting plate. The connecting plate is connected to the base through high-strength bolts and rubber pads. A rail clamp is also arranged on the connecting plate. The lower end of the track is rollingly connected with the track, and a driving motor with a brake is provided at the position above the wheel to drive the wheel to travel.
进一步,在塔架上设置有连接耳Ⅰ,在底板上设置有连接耳Ⅱ,还包括支撑杆,支撑杆一端与连接耳Ⅰ连接,另一端与连接耳Ⅱ连接。Further, a connecting ear I is provided on the tower, a connecting ear II is provided on the bottom plate, and a support rod is also included, one end of the support rod is connected to the connecting ear I, and the other end is connected to the connecting ear II.
进一步,支撑杆的两端为外螺纹杆,中部为带内螺纹的钢管。Further, both ends of the support rod are externally threaded rods, and the middle part is a steel pipe with internal threads.
进一步,塔吊基础不少于两个。Further, there are no less than two tower crane foundations.
进一步,轨道之间设置有加强件。Further, reinforcements are provided between the rails.
进一步,在底板四周设置有多个圆孔。Further, a plurality of circular holes are arranged around the bottom plate.
进一步,在轨道端部还设置有轨道夹板。Further, a rail splint is also provided at the end of the rail.
本发明还提供了一种移动塔吊基础结构的施工方法,包括以下步骤:The present invention also provides a construction method for a mobile tower crane foundation structure, comprising the following steps:
步骤1:用挖掘机将塔吊安装范围的地基土进行整平处理,在地基上放线定位,将带有锥形端的锚固杆分别锤入地基土层,根据塔吊移动路线和地基土质情况确定锚固杆的数量和布置形式以及埋置深度;Step 1: Use an excavator to level the foundation soil in the installation range of the tower crane, position the wires on the foundation, hammer the anchor rods with tapered ends into the foundation soil layer, and determine the anchorage according to the moving route of the tower crane and the soil quality of the foundation The number and arrangement of rods and the depth of embedding;
步骤2:用压路机对地基土进行平整压实,压实范围比基层每边宽出300㎜,压实后在地基上摊铺100~200㎜厚的基层,摊铺宽度比塔吊基础每边宽出300㎜,压实找平,最后在其面上铺设有80㎜~100㎜的找平层,压实并找平,使得机构面强度和水平度符合施工规范要求;Step 2: Use a road roller to level and compact the foundation soil. The compaction range is 300mm wider than each side of the base layer. After compaction, spread a 100-200mm thick base layer on the foundation, and the paving width is wider than each side of the tower crane foundation. 300mm, compacted and leveled, and finally a leveling layer of 80mm to 100mm is laid on the surface, compacted and leveled, so that the strength and levelness of the mechanism surface meet the construction specification requirements;
步骤3:用吊装机械在找平层上方安装底板及轨道,安装好后依次将锚固杆上端与连接杆连接,连接杆与连接件和轨道上的通孔连接,通过连接杆与锚固杆、连接杆与连接件、连接杆与轨道的相互连接形成整体塔吊基础;Step 3: Install the bottom plate and track above the leveling layer with a hoisting machine. After installation, connect the upper end of the anchor rod to the connecting rod in turn, connect the connecting rod to the connecting piece and the through hole on the track, and connect the connecting rod to the anchor rod and the connecting rod The interconnection with connectors, connecting rods and rails forms the overall tower crane foundation;
步骤4:在轨道的加强件处安装行走装置,安装好后将夹轨器同时放下夹紧轨道固定,在行走装置的连接板上安放橡胶垫,橡胶垫上安装底座,并通过高强螺栓连接塔身底座,紧固螺母,支撑杆一端与塔架上的连接耳Ⅰ连接,另一端与底板上的连接耳Ⅱ连接,稳固好塔架,最后依次向上安装上部各组件,完成安装。Step 4: Install the running device at the reinforcement of the track. After installation, put down the rail clamp at the same time to clamp the track and fix it. Place a rubber pad on the connecting plate of the running device, install the base on the rubber pad, and connect the tower body with high-strength bolts The base, tighten the nuts, one end of the support rod is connected with the connecting ear Ⅰ on the tower, and the other end is connected with the connecting ear Ⅱ on the bottom plate, the tower is stabilized, and finally the upper components are installed upwards in turn to complete the installation.
与现有技术相比,本发明的有益效果是:Compared with prior art, the beneficial effect of the present invention is:
一种移动塔吊基础结构,在建筑施工过程中,需要移动时用吊装机械将两块底板交替移位实现塔吊在轨道上移动,操作简方便,结构简单,提高施工效率,施工完成后,底板、基层和锚固杆等均可重复使用,有利于节约成本。A mobile tower crane foundation structure. During the building construction process, when it is necessary to move, use a hoisting machine to alternately shift the two bottom plates to realize the movement of the tower crane on the track. The operation is simple and convenient, the structure is simple, and the construction efficiency is improved. After the construction is completed, the bottom plate, Both the base layer and the anchor rod can be reused, which is beneficial to cost saving.
一种移动塔吊基础结构的施工方法,无需浇筑混凝土塔吊基础块,施工时先把钢管锚入地下,然后将地基土和基层进行压实处理,铺设找平层,最后铺上底板,安装行走装置和塔身,该移动塔吊基础结构的施工方法简便,安全高效,减少施工所造成的环境污染和资源浪费,达到绿色施工的要求,节约施工成本。A construction method for a mobile tower crane foundation structure without pouring concrete tower crane foundation blocks. During construction, steel pipes are first anchored into the ground, then the foundation soil and the base are compacted, a leveling layer is laid, and finally the bottom plate is laid, and the walking device and The construction method of the mobile tower crane foundation structure is simple, safe and efficient, reduces environmental pollution and resource waste caused by construction, meets the requirements of green construction, and saves construction costs.
附图说明Description of drawings
图1是本发明结构示意图;Fig. 1 is a structural representation of the present invention;
图2本发明俯视图;Fig. 2 top view of the present invention;
图3是本发明侧视图;Fig. 3 is a side view of the present invention;
图1至图3所示附图标记分别表示为:1-基层,2-找平层,3-底板,4-轨道,5-通孔,6-连接件,7-锚固杆,8-横向连接杆,9-纵向连接杆,10-底座,11-塔架,101-连接板,102-车轮,103-高强螺栓,104-橡胶垫,105-夹轨器,107-驱动电机,12-连接耳Ⅰ,13-连接耳Ⅱ,14-支撑杆,15-加强件,16-圆孔,17-轨道夹板。The reference signs shown in Figure 1 to Figure 3 are respectively represented as: 1-base layer, 2-leveling layer, 3-bottom plate, 4-track, 5-through hole, 6-connector, 7-anchor rod, 8-transverse connection Rod, 9-longitudinal connecting rod, 10-base, 11-tower, 101-connecting plate, 102-wheel, 103-high-strength bolt, 104-rubber pad, 105-rail clamp, 107-drive motor, 12-connection Ear Ⅰ, 13-connecting ear Ⅱ, 14-support rod, 15-reinforcement, 16-round hole, 17-track splint.
具体实施方式detailed description
下面结合附图和实施例对本发明作进一步详细的说明。The present invention will be described in further detail below in conjunction with the accompanying drawings and embodiments.
如图1、图2所示,一种移动塔吊基础结构,包括基层1,在基层1上铺设有找平层2,在找平层2上设置有塔吊基础,所述塔吊基础包括底板3、连接件6、连接杆、锚固杆7,所述底板3设置在找平层2的上表面,在底板3上平行设置有轨道4,在轨道4端部开设有通孔5,连接件6设置在底板3上,锚固杆7上端与连接杆相连,下端锚入地下,所述连接杆包括横向连接杆8和纵向连接杆9,纵向连接杆9通过连接件6固定设置在底板3上,横向连接杆8与轨道4相连,且穿过通孔5与纵向连接杆9相接,在轨道4上设置有行走装置,行走装置上端固定连接有底座10,底座10上表面固定设置有塔架11;本发明中,基层采用100~200㎜厚的水泥稳定层,水泥稳定层是以级配碎石作骨料,采用胶凝材料和灰浆填充骨料的空隙,按嵌挤原理铺摊压实,水泥稳定层采用振动压实的方式铺设在地基土层上,保证稳固牢靠,以确保整体的稳定性,在基层1上铺设有找平层2,找平层2由压实的黄沙制成,其厚度为80~100㎜,在铺设找平层2时,要保证基层1的土建结构面强度和水平度达到施工规范要求,为塔吊基础的安装提供重要保障,塔吊基础设置在找平层2上,包括设置在找平层2上表面的底板3,所述底板采用35m*5m*40mm厚的钢板制成,其强度高、韧性高、具有良好的焊接性能和冷成型性能且具有良好的耐蚀性,能适应各种不同的工作环境条件,保证了装置的使用寿命,一定程度上节约了成本,在所述底板3上设置有轨道4,轨道4与底板3焊接连接,所述轨道4为两根,所述轨道4可采用轻轨或重轨,为了使其能承受更大的力,适应各种不同重物的加压,相比轻轨,重轨断面大,能承受更大的力,优选的所述轨道4采用重轨,在每根轨道4端部均开设有通孔5,所述通孔5为螺栓孔且为多个,位于轨道的两端,方便了轨道夹板17和连接杆的安装,连接件6固定设置在底板3上,锚固杆7上端与连接杆相连,下端锚入地下,为了便于锚固杆7锚入地下,所述锚固杆7底端设置为锥形,减小了锚固杆7入地时的阻力,可更加方便的将锚固杆7锚入地下较大深度,方便快捷,提高整体稳定性,所述连接件6为钢板扣件,有助于连接杆的安装固定,所述连接杆包括横向连接杆8和纵向连接杆9,纵向连接杆9通过连接件6固定设置在底板3上,横向连接杆8与轨道4相连,且穿过通孔5与纵向连接杆9相接,纵向连接杆与9横向连接杆8相连形成框型结构固定在底板3上,通过连接杆与锚固杆7、连接杆与连接件6、连接杆与轨道4的相互连接形成整体塔吊基础,通过各部件连接形成整体,共同承担上部塔身,大大加强了塔吊基础的整体稳定性,为其塔吊移动提供了重要保障,同时保证了在塔吊进行重物吊运时的稳定性,在轨道4上设置有行走装置,行走装置上端固定连接有底座10,底座10上表面固定设置有塔架11,行走装置带动了底座10及塔架11,实现了塔吊在轨道4上的移动,操作简方便,结构简单,提高施工效率,施工完成后,各零部件可拆卸,可进行重复使用,有利于节约成本。As shown in Figures 1 and 2, a mobile tower crane foundation structure includes a base layer 1, a leveling layer 2 is laid on the base layer 1, a tower crane foundation is arranged on the leveling layer 2, and the tower crane foundation includes a base plate 3, connectors 6. Connecting rods and anchoring rods 7, the bottom plate 3 is arranged on the upper surface of the leveling layer 2, a track 4 is arranged in parallel on the bottom plate 3, a through hole 5 is opened at the end of the track 4, and the connecting piece 6 is arranged on the bottom plate 3 Above, the upper end of the anchor rod 7 is connected with the connecting rod, and the lower end is anchored into the ground. The connecting rod includes a transverse connecting rod 8 and a longitudinal connecting rod 9. The longitudinal connecting rod 9 is fixedly arranged on the bottom plate 3 through the connecting piece 6. It is connected to the track 4 and connected to the longitudinal connecting rod 9 through the through hole 5. A running device is arranged on the track 4. The upper end of the running device is fixedly connected with a base 10, and the upper surface of the base 10 is fixedly provided with a tower 11; the present invention In the middle, the base layer adopts a 100-200mm thick cement stabilization layer. The cement stabilization layer uses graded crushed stone as aggregate, and uses cementitious materials and mortar to fill the gaps in the aggregate. The ground layer is laid on the foundation soil layer by vibratory compaction to ensure stability and stability, and to ensure the overall stability, a leveling layer 2 is laid on the base layer 1. The leveling layer 2 is made of compacted yellow sand, and its thickness is 80~100㎜. When laying the leveling layer 2, it is necessary to ensure that the strength and levelness of the civil structure surface of the base layer 1 meet the requirements of the construction specifications, which provides an important guarantee for the installation of the tower crane foundation. The tower crane foundation is set on the leveling layer 2, including setting in The bottom plate 3 on the upper surface of the leveling layer 2 is made of a steel plate with a thickness of 35m*5m*40mm, which has high strength, high toughness, good welding performance and cold forming performance, and good corrosion resistance, and can adapt to Various working environment conditions ensure the service life of the device and save costs to a certain extent. A track 4 is arranged on the bottom plate 3, and the track 4 is welded to the bottom plate 3. There are two tracks 4, so Said track 4 can adopt light rail or heavy rail, in order to make it bear greater power, adapt to the pressurization of various heavy objects, compared with light rail, heavy rail cross-section is big, can bear bigger force, preferably described The track 4 adopts a heavy rail, and a through hole 5 is provided at each end of the track 4. The through hole 5 is a plurality of bolt holes, located at both ends of the track, which facilitates the installation of the track splint 17 and the connecting rod. The connector 6 is fixedly arranged on the bottom plate 3, the upper end of the anchor rod 7 is connected with the connecting rod, and the lower end is anchored into the ground. In order to facilitate the anchor rod 7 to be anchored into the ground, the bottom end of the anchor rod 7 is set in a tapered shape, which reduces the size of the anchor rod. 7 into the ground, the anchor rod 7 can be more conveniently anchored into the ground to a greater depth, which is convenient and quick, and improves the overall stability. The connecting piece 6 is a steel plate fastener, which helps to install and fix the connecting rod. The connecting rods include a transverse connecting rod 8 and a longitudinal connecting rod 9, the longitudinal connecting rod 9 is fixedly arranged on the bottom plate 3 through the connector 6, the transverse connecting rod 8 is connected with the track 4, and passes through the through hole 5 to communicate with the longitudinal connecting rod 9 Connected, the longitudinal connecting rod is connected with 9 transverse connecting rods 8 to form a frame structure fixed on the bottom plate 3, connected with the anchor rod 7, The interconnection of rods and connectors 6, connecting rods and rails 4 forms the overall tower crane foundation, and the parts are connected to form a whole, which jointly undertakes the upper tower body, which greatly enhances the overall stability of the tower crane foundation and provides an important guarantee for its tower crane movement , while ensuring the stability when the tower crane is carrying out heavy lifting, a running device is arranged on the track 4, the upper end of the running device is fixedly connected with a base 10, and the upper surface of the base 10 is fixedly provided with a tower 11, and the running device drives the base 10 and the tower frame 11 realize the movement of the tower crane on the track 4, the operation is simple and convenient, the structure is simple, and the construction efficiency is improved. After the construction is completed, each part is detachable and can be reused, which is conducive to cost saving.
为了便于行走装置的安装和塔吊的移动,本发明中,所述行走装置包括连接板101、车轮102、高强螺栓103,连接板上表面安放有橡胶垫104,连接板101通过高强螺103栓和橡胶垫104与底座10相连,在连接板101上还设置有夹轨器105,所述车轮102设置于连接板101的下端,且与轨道4滚动连接,在所述车轮102上方位置处设置有驱动车轮行走的带有制动器的驱动电机107;连接板101通过高强螺栓103和橡胶垫104与底座1相连,通过高强螺栓103使其连接固定牢靠,通过橡胶垫104作用,防止了连接板103与底座1的连接发生松脱,保证了结构的稳固性,连接板103下部设置有车轮106,所述车轮共八个,每侧分别为四个,四个驱动轮,四个固定轮,供塔吊移动,在所述车轮102上方位置处设置有驱动车轮行走的带有制动器的驱动电机107,驱动电机107驱动车轮102带动塔吊在轨道4上行走,在驱动电机107带有制动器108,当塔吊到达预定位置时,通过制动器108的制动作用,保证车轮102不再行走,在连接板101上设置有夹轨器105,塔吊就位停机将夹轨器105放下加紧轨道4固定塔吊,操作简单,安全可靠。In order to facilitate the installation of the running gear and the movement of the tower crane, in the present invention, the running gear includes a connecting plate 101, wheels 102, and high-strength bolts 103, and a rubber pad 104 is placed on the upper surface of the connecting plate, and the connecting plate 101 is bolted by high-strength bolts 103 and The rubber pad 104 is connected with the base 10, and a rail clamp 105 is also arranged on the connecting plate 101. The wheels 102 are arranged at the lower end of the connecting plate 101 and are rollingly connected with the track 4. A position above the wheels 102 is provided with The drive motor 107 with the brake that drives the wheel to walk; the connecting plate 101 is connected to the base 1 through the high-strength bolt 103 and the rubber pad 104, and the high-strength bolt 103 makes its connection and fixing firm, and the rubber pad 104 acts to prevent the connecting plate 103 from The connection of the base 1 is loosened, which ensures the stability of the structure. The lower part of the connecting plate 103 is provided with wheels 106. There are eight wheels in total, four on each side, four driving wheels, and four fixed wheels for the tower crane. To move, a drive motor 107 with a brake for driving the wheel is set at the position above the wheel 102. The drive motor 107 drives the wheel 102 to drive the tower crane to walk on the track 4. The drive motor 107 has a brake 108. When the tower crane arrives At the predetermined position, the braking effect of the brake 108 is used to ensure that the wheels 102 are no longer walking. A rail clamp 105 is provided on the connecting plate 101. When the tower crane is in place, the rail clamp 105 is put down to tighten the track 4 and the tower crane is fixed. The operation is simple. Safe and reliable.
由于塔吊自身较高,上部塔架11部分稳定性能较差,为了塔吊基础稳定性能,本发明中,在所述塔架11上设置有连接耳Ⅰ12,在底板3上设置有连接耳Ⅱ13,还包括支撑杆14,支撑杆14一端与连接耳Ⅰ12连接,另一端与连接耳Ⅱ13连接;通过有连接耳Ⅰ12和连接耳Ⅱ13,支撑杆14使塔架11和塔吊基础连接形成一体,共同受力,增强了塔吊基础的稳定性,有效支撑上部塔架11,为塔吊吊运重物提供保障。Because the tower crane itself is relatively high, the stability of the upper tower 11 is relatively poor. In order to stabilize the foundation of the tower crane, in the present invention, the tower 11 is provided with a connection ear I12, and the bottom plate 3 is provided with a connection ear II13. Including the support rod 14, one end of the support rod 14 is connected with the connecting ear I12, and the other end is connected with the connecting ear II13; through the connecting ear I12 and the connecting ear II13, the supporting rod 14 makes the tower 11 and the tower crane foundation connected to form a whole, and jointly bear the force , the stability of the tower crane foundation is enhanced, the upper tower frame 11 is effectively supported, and a guarantee is provided for the tower crane to lift heavy objects.
为了便于与不同高度位置的连接耳连接,提高对塔架的支撑效果,本发明中,所述支撑杆14的两端为外螺纹杆,中部为带内螺纹的钢管;通过调节中部带内螺纹的钢管对支撑杆14进行调节,使其适应于不同高度位置的连接耳,结构简单,操作方便。In order to facilitate the connection with the connecting lugs at different heights and improve the supporting effect on the tower, in the present invention, the two ends of the support rod 14 are externally threaded rods, and the middle part is a steel pipe with internal threads; The steel pipe adjusts the support rod 14 to make it suitable for the connecting ears at different height positions, the structure is simple, and the operation is convenient.
当有较大的施工范围时,若塔吊基础仅为一个,则不能满足塔吊在轨道4上较大长度的移位,本发明中,所述塔吊基础不少于两个;塔吊在需要移位时,用吊装机械将两块底板3交替移位实现塔吊在轨道4上的移动,施工简单,操作方便,安全可靠。When there is a larger construction scope, if there is only one tower crane foundation, it cannot satisfy the larger displacement of the tower crane on the track 4. In the present invention, the tower crane foundations are not less than two; When using a hoisting machine, the two base plates 3 are alternately displaced to realize the movement of the tower crane on the track 4, which is simple in construction, convenient in operation, safe and reliable.
在进行塔吊吊装时,塔吊位于塔吊基础中部,为了提高吊装时塔吊整体稳定性,本发明中,所述轨道4之间设置有加强件15;所述加强件15呈“王字形”布置,加强件15由钢轨制成,与底板3和两根轨道4焊接,塔吊吊装时,将塔身设置在加强件15处,有效地提高塔吊稳定性。When the tower crane is hoisted, the tower crane is located in the middle of the tower crane foundation. In order to improve the overall stability of the tower crane during hoisting, in the present invention, reinforcements 15 are arranged between the rails 4; Part 15 is made of steel rails, and is welded with base plate 3 and two rails 4. When the tower crane is hoisting, the tower body is arranged at the reinforcing part 15, which effectively improves the stability of the tower crane.
为了便于锚固杆7锚入地下,本发明中,所述锚固杆7底端设置为锥形;底端设置为锥形,减小了锚固杆7入地时的阻力,可更加方便的将锚固杆7锚入地下较大深度,方便快捷。In order to anchor the anchor rod 7 into the ground, in the present invention, the bottom end of the anchor rod 7 is set to be tapered; Rod 7 is anchored into underground greater depth, convenient and quick.
由于塔吊的起吊重量和地基的承载力不同,影响着塔吊移动和起吊时的稳定性,本发明中,在所述底板3四周设置有多个圆孔16;圆孔16用于锚固杆7的穿过,根据起吊重量和地基承载力的不同,增加圆孔16的数量,锚固杆7下端穿过圆孔16锚入地下,防止在起吊过程中出现倾斜现象,提高整体稳定性。Because the lifting weight of the tower crane is different from the bearing capacity of the foundation, it affects the stability of the tower crane when it moves and hoists. In the present invention, a plurality of round holes 16 are arranged around the base plate 3; the round holes 16 are used for anchor rods 7 Pass through, according to the difference of hoisting weight and foundation bearing capacity, increase the quantity of circular hole 16, the lower end of anchor rod 7 passes circular hole 16 and anchors into the ground, prevents inclination phenomenon from occurring in the lifting process, improves overall stability.
在塔吊在需要移位时,用吊装机械将两块底板3交替移位实现塔吊在轨道4上的移动,两块底板3对接拼装,为了使两块底板3上轨道4正对整齐连接且稳定连接,本发明中,在轨道4的端部还设置有轨道夹板17,轨道夹板17通过夹板螺栓和通孔配合连接轨道4上,将相邻两个底板3上的轨道4连接,使相邻底板3上的轨道4位于同一直线上,供塔吊在轨道4上移动。When the tower crane needs to be shifted, use the hoisting machine to alternately shift the two bottom plates 3 to realize the movement of the tower crane on the track 4. The two bottom plates 3 are butted and assembled. , in the present invention, the end portion of track 4 is also provided with track splint 17, and track splint 17 cooperates on the connection track 4 by splint bolt and through hole, and the track 4 on two adjacent bottom plates 3 is connected, makes adjacent bottom plate The track 4 on the 3 is located on the same straight line for the tower crane to move on the track 4.
本发明中,对于塔吊及塔吊基础结构实现移位时,当一栋楼施工完成后,如果两栋楼距相对较近,先把移动方向上的基层1和找平层2稳固铺设好,铺设底板3,将相邻两块底板3对接拼装,使相邻两块底板3上的轨道4位于同一直线上,在轨道4两端安装好轨道夹板17,完成基础连接,再将底板3上的连接件6、连接杆和锚固杆7及轨道4相互连接形成整体,在进行移动时,拆除塔架11上的支撑杆14与连接耳Ⅰ12的连接,松开夹轨器105,启动驱动电机107驱动塔吊在轨道4上行走,由一块底板3的加强件15处移动到另一块底板加强件15处,就位后停机将夹轨器4同时放下加紧轨道4固定塔身,再将支撑杆14与连接耳Ⅰ12和连接耳Ⅱ13连接,稳固塔架11;如果两栋楼之间的距离远,可将塔吊拆除,用汽车把塔吊、行走装置、塔吊基础运至新建楼栋相应位置,再进行各部分的铺垫和安装。In the present invention, when the tower crane and the base structure of the tower crane are shifted, after the construction of a building is completed, if the distance between the two buildings is relatively close, the base layer 1 and the leveling layer 2 in the moving direction are first laid firmly, and the bottom plate is laid 3. Butt and assemble two adjacent base plates 3 so that the rails 4 on the adjacent two base plates 3 are on the same straight line, install track splints 17 at both ends of the track 4 to complete the basic connection, and then connect the joints on the base plate 3 Part 6, connecting rod, anchor rod 7 and track 4 are connected to each other to form a whole. When moving, remove the connection between the support rod 14 on the tower 11 and the connecting ear I12, loosen the rail clamp 105, and start the drive motor 107 to drive The tower crane walks on the track 4, and moves from the reinforcement 15 of one base plate 3 to the reinforcement 15 of the other base plate. After it is in place, the tower crane is stopped and the rail clamp 4 is put down at the same time to tighten the rail 4 to fix the tower body. Connect the connecting ear I12 to the connecting ear II13 to stabilize the tower frame 11; if the distance between the two buildings is long, the tower crane can be dismantled, and the tower crane, walking device, and tower crane foundation can be transported to the corresponding position of the new building by car, and then each Partial bedding and installation.
以上为本发明的一种移动塔吊基础结构的具体实施方式,从实施过程可以看出,本发明一种移动塔吊基础结构,在建筑施工过程中,需要移动时用吊装机械将两块底板交替移位实现塔吊在轨道上移动,操作简方便,结构简单,提高施工效率,施工完成后,底板、基层和锚固杆等均可重复使用,有利于节约成本。The above is a specific embodiment of a mobile tower crane foundation structure of the present invention. It can be seen from the implementation process that a mobile tower crane foundation structure of the present invention, in the building construction process, two base plates are alternately moved by a hoisting machine when it needs to be moved. The tower crane can be moved on the track at the same position, the operation is simple and convenient, the structure is simple, and the construction efficiency is improved. After the construction is completed, the bottom plate, the base layer and the anchor rod can be reused, which is conducive to saving costs.
本发明还提供了一种移动塔吊基础结构的施工方法,包括以下步骤:The present invention also provides a construction method for a mobile tower crane foundation structure, comprising the following steps:
步骤1:用挖掘机将塔吊安装范围的地基土进行整平处理,防止在后期塔吊及塔吊基础安装过程中出现倾斜,发生安全事故,在地基上放线定位,将带有锥形端的锚固杆7分别锤入地基土层,为塔吊及塔吊基础安装提供基础保障,根据塔吊移动路线和地基土质情况确定锚固杆7的数量和布置形式以及埋置深度;Step 1: Use an excavator to level the foundation soil in the installation range of the tower crane to prevent inclination and safety accidents during the installation of the tower crane and the foundation of the tower crane in the later stage. 7. Hammer into the foundation soil layer respectively to provide basic guarantee for tower crane and tower crane foundation installation, and determine the quantity, layout and embedding depth of anchor rods 7 according to the moving route of the tower crane and the soil quality of the foundation;
步骤2:用压路机对地基土进行平整压实,压实范围比基层1每边宽出300㎜,压实后在地基上摊铺100~200㎜厚的基层1,摊铺宽度比塔吊基础每边宽出300㎜,压实找平,最后在其面上铺设有80㎜~100㎜的找平层2,压实并找平,使得机构面强度和水平度符合施工规范要求,为塔吊设施整体安装提供重要保障;Step 2: Use a road roller to level and compact the foundation soil. The compaction range is 300mm wider than each side of the base layer 1. After compaction, spread a 100-200mm thick base layer 1 on the foundation. The width of the paving is wider than that of the tower crane foundation. The side width is 300㎜, compacted and leveled, and finally a leveling layer 2 of 80㎜~100㎜ is laid on the surface, compacted and leveled, so that the strength and levelness of the mechanism surface meet the requirements of the construction specifications, and provide the overall installation of tower crane facilities. Important Guarantee;
步骤3:用吊装机械在找平层2上方安装底板及轨道,安装好后依次将锚固杆7上端与连接杆连接,连接杆与连接件和轨道4上的通孔5连接,通过连接杆与锚固杆7、连接杆与连接件6、连接杆与轨道4的相互连接形成整体塔吊基础,通过各部件连接形成整体,共同承担上部塔身,大大加强了塔吊基础的整体稳定性,为其塔吊移动提供了重要保障,同时保证了在塔吊进行重物吊运时的稳定性;Step 3: Use a hoisting machine to install the bottom plate and track above the leveling layer 2. After installation, connect the upper end of the anchor rod 7 to the connecting rod in turn, connect the connecting rod to the connecting piece and the through hole 5 on the track 4, and connect the connecting rod to the anchor The interconnection of rod 7, connecting rod and connecting piece 6, connecting rod and rail 4 forms the foundation of the tower crane as a whole, and each part is connected to form a whole, which jointly bears the upper tower body, which greatly strengthens the overall stability of the tower crane foundation and facilitates the movement of the tower crane. Provides an important guarantee, and at the same time ensures the stability when the tower crane is lifting heavy objects;
步骤4:在轨道的加强件15处安装行走装置,安装好后将夹轨器105同时放下夹紧轨道4固定,在行走装置的连接板上101安放橡胶垫104,橡胶垫104上安装底座10,并通过高强螺栓连103接塔身底座,紧固螺母,支撑杆14一端与塔架上的连接耳Ⅰ12连接,另一端与底板3上的连接耳Ⅱ13连接,稳固好塔架,最后依次向上安装上部各组件,完成安装。Step 4: Install the running device at the reinforcing part 15 of the track. After installation, put down the rail clamp 105 at the same time to clamp the track 4 and fix it. Place the rubber pad 104 on the connecting plate 101 of the running device, and install the base 10 on the rubber pad 104 , and connected to the base of the tower body through high-strength bolts 103, tighten the nuts, one end of the support rod 14 is connected to the connecting ear I12 on the tower, and the other end is connected to the connecting ear II13 on the bottom plate 3, the tower is stabilized, and finally upwards in turn Install the upper components to complete the installation.
以上为本发明的一种移动塔吊基础结构的施工方法的具体实施方式,从实施过程可以看出,本发明提供的一种移动塔吊基础结构施工方法,其无需浇筑混凝土塔吊基础块,施工时先把钢管锚入地下,然后将地基土和基层进行压实处理,铺设找平层,最后铺上底板,安装行走装置和塔身,该移动塔吊基础结构的施工方法简便,安全高效,减少施工所造成的环境污染和资源浪费,达到绿色施工的要求,节约施工成本。The above is a specific embodiment of the construction method of a mobile tower crane foundation structure of the present invention. It can be seen from the implementation process that the construction method of a mobile tower crane foundation structure provided by the present invention does not need to pour concrete tower crane foundation blocks. Anchor the steel pipes into the ground, then compact the foundation soil and the base, lay the leveling layer, and finally lay the bottom plate, install the walking device and the tower body. The construction method of the mobile tower crane foundation structure is simple, safe and efficient, and reduces the construction costs. environmental pollution and waste of resources, meet the requirements of green construction, and save construction costs.
Claims (9)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201710325531.1A CN106930315B (en) | 2017-05-10 | 2017-05-10 | A mobile tower crane foundation structure and construction method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201710325531.1A CN106930315B (en) | 2017-05-10 | 2017-05-10 | A mobile tower crane foundation structure and construction method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN106930315A true CN106930315A (en) | 2017-07-07 |
| CN106930315B CN106930315B (en) | 2018-09-18 |
Family
ID=59429464
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201710325531.1A Active CN106930315B (en) | 2017-05-10 | 2017-05-10 | A mobile tower crane foundation structure and construction method |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN106930315B (en) |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108867683A (en) * | 2018-06-08 | 2018-11-23 | 中国建筑第二工程局有限公司 | Rail-type movable foundation and construction method thereof |
| CN109395436A (en) * | 2018-11-30 | 2019-03-01 | 中国冶集团有限公司 | Major diameter inverted cone pond groove bottom taper degree control device and control method |
| CN110407113A (en) * | 2019-07-15 | 2019-11-05 | 山东中建众力设备租赁有限公司 | A kind of construction method of derrick crane installation and displacement |
| CN115321304A (en) * | 2022-07-12 | 2022-11-11 | 中建一局集团第五建筑有限公司 | Construction elevator non-back jacking method arranged on garage top plate |
| WO2025236409A1 (en) * | 2024-05-15 | 2025-11-20 | 中建三局集团(浙江)有限公司 | Traveling tower crane foundation on step and construction method therefor |
Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE202007010645U1 (en) * | 2007-07-29 | 2007-10-11 | Graser, Uwe, Dipl.-Ing. | Device for foundation, attachment and / or securing |
| CN104674838A (en) * | 2014-12-31 | 2015-06-03 | 上海市机械施工集团有限公司 | Foundation structure of mobile tower crane and laying method of foundation structure |
-
2017
- 2017-05-10 CN CN201710325531.1A patent/CN106930315B/en active Active
Patent Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE202007010645U1 (en) * | 2007-07-29 | 2007-10-11 | Graser, Uwe, Dipl.-Ing. | Device for foundation, attachment and / or securing |
| CN104674838A (en) * | 2014-12-31 | 2015-06-03 | 上海市机械施工集团有限公司 | Foundation structure of mobile tower crane and laying method of foundation structure |
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108867683A (en) * | 2018-06-08 | 2018-11-23 | 中国建筑第二工程局有限公司 | Rail-type movable foundation and construction method thereof |
| CN109395436A (en) * | 2018-11-30 | 2019-03-01 | 中国冶集团有限公司 | Major diameter inverted cone pond groove bottom taper degree control device and control method |
| CN110407113A (en) * | 2019-07-15 | 2019-11-05 | 山东中建众力设备租赁有限公司 | A kind of construction method of derrick crane installation and displacement |
| CN110407113B (en) * | 2019-07-15 | 2020-04-24 | 山东中建众力设备租赁有限公司 | Construction method for installation and displacement of tower crane |
| CN115321304A (en) * | 2022-07-12 | 2022-11-11 | 中建一局集团第五建筑有限公司 | Construction elevator non-back jacking method arranged on garage top plate |
| CN115321304B (en) * | 2022-07-12 | 2023-08-15 | 中建一局集团第五建筑有限公司 | Construction lifter anti-returning method arranged on garage top plate |
| WO2025236409A1 (en) * | 2024-05-15 | 2025-11-20 | 中建三局集团(浙江)有限公司 | Traveling tower crane foundation on step and construction method therefor |
Also Published As
| Publication number | Publication date |
|---|---|
| CN106930315B (en) | 2018-09-18 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US8875471B2 (en) | Method and apparatus for lifting and leveling a concrete panel | |
| CN106930315B (en) | A mobile tower crane foundation structure and construction method | |
| CN103485288B (en) | A kind ofly pass through both wired double-deck jacking culvert construction technology | |
| US20150167260A1 (en) | Method and apparatus for lifting and securing a concrete panel in place above a road bed | |
| CN110904969B (en) | A slipform system for pouring concrete for high and steep slope slab corridor structure | |
| CN203383121U (en) | Prefabricated temporary pavement concrete slab convenient to assemble and disassemble | |
| JP6374353B2 (en) | How to build a bridge | |
| CN105714683A (en) | Installation and dismantling method of high bent cast-in-situ aqueduct suspension type bailey frames | |
| CN103711056B (en) | Steel tool-type temporary construction road and construction method thereof | |
| CN205662832U (en) | Under hold formula beiLei beam steel suspension bridge | |
| CN109505309B (en) | A displacement system for pipe gallery segments and a pipe gallery installation method using the displacement system | |
| CN110407113B (en) | Construction method for installation and displacement of tower crane | |
| CN104313993B (en) | A kind of highway bridge and construction method thereof | |
| CN107313628A (en) | A kind of basic digging-free assembled tower-type space garage and its construction method | |
| CN106480826A (en) | The cast-in-place traversing construction engineering method of single line box beam pier top | |
| CN207211869U (en) | A kind of basic digging-free assembled tower-type space garage | |
| CN113898006B (en) | Stable and rapid jacking construction method for box culvert under large excavation surface | |
| CN212294695U (en) | Foam concrete lightweight embankment structure for high and steep terrain | |
| CN211645930U (en) | Tunnel inverted arch construction trestle | |
| CN206753488U (en) | A kind of artificial digging pile reaming auxiliary equipment | |
| CN103225512A (en) | Construction method for making prestressed back for box-culvert jacking | |
| CN119221487A (en) | Combined system and construction method of reinforced concrete support and steel pipe support for deep foundation pit | |
| CN110029653B (en) | A kind of treatment method of steel pipe pile foundation for riprap seabed foundation | |
| CN114395945B (en) | Gantry crane track foundation | |
| CN108316128B (en) | A new type of road bridge slab structure and its construction method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |