CN206316095U - Waste and old pipeline cleaner and the drill bit for clearing up waste and old pipeline - Google Patents
Waste and old pipeline cleaner and the drill bit for clearing up waste and old pipeline Download PDFInfo
- Publication number
- CN206316095U CN206316095U CN201621399866.5U CN201621399866U CN206316095U CN 206316095 U CN206316095 U CN 206316095U CN 201621399866 U CN201621399866 U CN 201621399866U CN 206316095 U CN206316095 U CN 206316095U
- Authority
- CN
- China
- Prior art keywords
- waste
- rig
- drill bit
- old pipeline
- bracket
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Earth Drilling (AREA)
Abstract
A kind of drill bit the utility model discloses waste and old pipeline cleaner and for clearing up waste and old pipeline, waste and old pipeline cleaner includes conduit bracket, rig and rig bracket;Pipe level is erected above the ground by the conduit bracket;The rig is fixed on the rig bracket;Drilling rod is connected with the rig, drilling rod is stretched into pipeline from one end of pipeline.Drill bit for clearing up waste and old pipeline includes middle bit and surrounding drill bit;The afterbody of the middle bit is fixed on drill rod end;The surrounding drill bit is fixed on the middle part of the middle bit, and a circle of the surrounding drill bit around the middle bit cross section is placed equidistant.The utility model has the advantage of:Processing is simple, easy to operate, and special drill bit is coordinated using rig, can effectively clear up the mud being solidified and block up real waste and old pipeline, high working efficiency, cleaning effect is good, and safety coefficient is high, and the pipeline after cleaning is reusable, has saved production cost, prevent to waste.
Description
Technical field
The utility model is related to a kind of waste and old pipeline cleaning plant, more particularly to a kind of waste and old pipeline cleaner and for clear
Manage the drill bit of waste and old pipeline.
Background technology
Because underground coal mine rock stratum belongs to water-soluble mud stone mostly, traditional draining ditch water discharge can not meet mine drainage need
Will, the duct type drainage system typically used.But, with the deep propulsion of mine construction, along with roadway repairing and transformation,
Particularly whitewashing, mortar depositing construction operation when, substantial amounts of settleable solids enter drainpipe, are gradually adhered to pipeline inner wall and form product
Dirt, the incrustation of pipeline inner wall easily causes following harm:
1st, reduce in discharge pipe line and pass through, increase discharge pipe line resistance, reduce drainage efficiency.
2nd, the ability to ward off risks of whole drainage system is reduced.
3rd, the service life of discharge pipe line is reduced, production and maintenance cost are increased, while being caused to drainage equipment such as water pumps
Adverse effect.
Because mine drainage pipeline is in longtime running state mostly, seldom cleared up, therefore many drainpipes of mine
Road internal dirt product silt is thicker, accumulates over a long period and is easy to block drainage pipeline, and then threatens the safe operation of drainage system.Solution
Certainly the conventional method of drainage underground Incrustation of pipe is mainly replacing discharge pipe line, and more thoroughly, but cost is larger for this method ratio.If
Using manual cleaning pipeline, effect is limited, and some pipelines at all can not manual cleaning.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of waste and old pipeline for clearing up dirt in waste and old pipeline
Cleaner and the drill bit for clearing up waste and old pipeline.
The utility model is to solve above-mentioned technical problem by the following technical programs:Waste and old pipeline cleaner, including pipe
Road bracket, rig and rig bracket;Pipe level is erected above the ground by the conduit bracket;The rig is fixed on described
On rig bracket;Drilling rod is connected with the rig, drilling rod is stretched into pipeline from one end of pipeline along conduit axis direction, passed through
The movable of the rig bracket makes drilling rod be moved forward and backward in pipeline.
As the technical scheme of optimization, the conduit bracket includes at least two supports, and each support time interval support exists
Below pipeline.
As the technical scheme of optimization, the support includes two support bars and a cross bar, the cross bar level connection joint
Between the upper end of two support bars, constitute downwardly open up-small and down-big trapezoidal, duct frame is on the cross bar.
As the technical scheme of optimization, the support also includes the fixture for being fixed on every support bar lower end, the branch
Support fixes in orbit by the fixture;The support direction along ng a path time interval is set, and pipe level is erected at
In the middle of above track, conduit axis direction direction along ng a path.
As the technical scheme of optimization, the rig bracket includes four legs and top board;The top board is parallel to water
The rectangle of plane, the rig is fixed on the top of the top board;Four legs are fixed on the supported underneath institute of the top board
Top board is stated, the upper end of four legs connects four end points of the top board;The longitudinal section of the rig bracket is trapezoidal, and its is transversal
Face is the rectangle gradually increased from top to bottom.
As the technical scheme of optimization, the rig bracket also includes being located at the dividing plate below the top board, the dividing plate
For rectangle, between the middle part for being connected to four legs.
As the technical scheme of optimization, the rig bracket also includes sliding part, and the sliding part is connected to two legs
Lower end between, two sliding parts for being located at relative two sides of rectangle respectively are connected with four legs;The sliding part
For downwardly open rectangular flute profile, two sliding parts block the both sides of track respectively, make the rig bracket can be along before and after track
It is mobile.
As the technical scheme of optimization, the rig bracket also includes two wheel shafts, and two wheel shafts are connected to two
Between the two ends of sliding part, two wheel shafts and two sliding part composition rectangles, the two ends of every wheel shaft respectively connect a roller,
Roller is located in the groove of the sliding part.
A kind of drill bit for being used to clear up waste and old pipeline, including middle bit and surrounding drill bit;The afterbody of the middle bit
It is fixed on drill rod end;The surrounding drill bit is fixed on the drilling rod at the middle bit rear, and the surrounding drill bit is around brill
The circumference of bar cross section is placed equidistant.
As the technical scheme of optimization, the head of the middle bit is divided into two forks, totally five, the surrounding drill bit.
The big drill bit for being conventionally used to fire damp improvement is difficult to bore dynamic more obstinate dirt, this " spear type " composite drill bit
Cleaning effect is preferable.
The utility model has the advantage of:Processing is simple, easy to operate, and special drill bit is coordinated using rig, can be effective
Clear up the mud being solidified and block up real waste and old pipeline, high working efficiency, cleaning effect is good, and safety coefficient is high, the pipeline after cleaning
It is reusable, production cost has been saved, has prevented to waste.
Brief description of the drawings
Fig. 1 is the structural representation of the waste and old pipeline cleaner of the utility model.
Fig. 2 is the structural representation of the utility model support.
Fig. 3 is the structural representation of the utility model rig bracket.
Fig. 4 is the structural representation that the utility model is used to clear up the drill bit of waste and old pipeline.
Embodiment
As Figure 1-4, waste and old pipeline cleaner, including conduit bracket 1, rig 2 and rig bracket 3.
Pipe level is erected above the ground by conduit bracket 1.
Rig 2 uses pneumatic drilling machine, and rig 2 is fixed on rig bracket 3.
Drilling rod is connected with rig 2, drilling rod uses the auger stem of overstriking, and intensity is higher, and drilling rod is stretched from one end of pipeline
Enter in pipeline, movable by rig bracket 3 makes drilling rod be moved forward and backward in pipeline along conduit axis direction.
Conduit bracket 1 includes at least two supports 11, and 11 time interval supports of each support are below pipeline.
Support 11 includes two support bars 111 and a cross bar 112, and cross bar 112 is connected horizontally on two support bars 111
Between upper end, constitute downwardly open up-small and down-big trapezoidal, duct frame is on cross bar 112.
Support 11 also includes the fixture 113 for being fixed on the every lower end of support bar 111, and support 11 is solid by fixture 113
It is fixed in orbit;Support 11 direction along ng a path time intervals to set, pipe level is erected to middle above track, conduit axis
Direction direction along ng a path.
Rig bracket 3 includes four legs 31 and top board 32;Top board 32 is the rectangle parallel to horizontal plane, and rig 2 is consolidated
It is scheduled on the top of top board 32;Four legs 31 are fixed on the supported underneath top board 32 of top board 32, the upper end connection of four legs 31
Four end points of top board 32;The longitudinal section of rig bracket 3 is trapezoidal, and its cross section is the rectangle gradually increased from top to bottom.
Rig bracket 3 also includes the dividing plate 33 for being located at the lower section of top board 32, and dividing plate 33 is rectangle, is connected to four legs 31
Middle part between.
Rig bracket 3 also includes sliding part 34, and sliding part 34 is connected between the lower end of two legs 31, four legs 31
On be connected with two sliding parts 34 for being located at relative two sides of rectangle respectively;Sliding part 34 is downwardly open long square groove
Shape, two sliding parts 34 block the both sides of track respectively, make rig bracket 3 movable along track.
Rig bracket 3 also includes two wheel shafts 35, and two wheel shafts 35 are connected between the two ends of two sliding parts 34,
Two wheel shafts 35 and two composition rectangles of sliding part 34.
The two ends of every wheel shaft 35 respectively connect a roller, and roller is located in the groove of sliding part 34.
The end diameter of wheel shaft 35 is more than the diameter of intermediate portion, and the middle part of wheel shaft 35 is stuck in the card of the end of sliding part 34
In groove.
Conduit bracket 1 and rig bracket 3 use steelframe.
Drill bit for clearing up waste and old pipeline, including middle bit 4 and surrounding drill bit 5.
Middle bit 4 uses the drill bit of rock gangway jewel hole, and the afterbody of middle bit 4 is fixed on drill rod end, middle bit 4
Head is divided into two forks.
Surrounding drill bit 5 is fixed on the drilling rod at the rear 40mm of middle bit 4, and five surrounding drill bits 5 are transversal around drilling rod
The circumference in face is placed equidistant.
In use, conduit bracket 1 is welded in orbit by fixture 113, two supports the distance between 11 and pipe
Road length is consistent, and rig bracket 3 is blocked in orbit by sliding part 34;Then by duct frame on cross bar 112, it will be fixed on
The drilling rod of rig 2 on top board 32 is stretched into pipeline, and the height of rig bracket 3 is highly consistent with conduit bracket 1;Open rig
2, artificial passage rig bracket 3 makes rig bracket 3 mobile in orbit, and drilling rod rotarily drives the mud that drill bit will solidify in pipeline
Clean out, so that pipeline is reusable.
Rig 2 uses pneumatic drilling machine, and major impetus is pressure wind, can long-time Reusability, ground can be used with underground.
Preferred embodiment of the present utility model is the foregoing is only, it is all in this practicality not to limit the utility model
Any modification, equivalent and improvement made within new spirit and principle etc., should be included in guarantor of the present utility model
Within the scope of shield.
Claims (10)
1. a kind of waste and old pipeline cleaner, it is characterised in that:Including conduit bracket (1), rig (2) and rig bracket (3);It is described
Pipe level is erected above the ground by conduit bracket (1);The rig (2) is fixed on the rig bracket (3);It is described to bore
Drilling rod is connected with machine (2), drilling rod is stretched into pipeline from one end of pipeline along conduit axis direction.
2. waste and old pipeline cleaner as claimed in claim 1, it is characterised in that:The conduit bracket (1) includes at least two
Support (11), each support (11) time interval support is below pipeline.
3. waste and old pipeline cleaner as claimed in claim 2, it is characterised in that:The support (11) includes two support bars
(111) and a cross bar (112), the cross bar (112) is connected horizontally between the upper end of two support bars (111), constitute to
Under shed it is up-small and down-big trapezoidal, duct frame is on the cross bar (112).
4. waste and old pipeline cleaner as claimed in claim 3, it is characterised in that:The support (11) also includes being fixed on every
The fixture (113) of support bar (111) lower end, the support (11) is fixed in orbit by the fixture (113);It is described
Support (11) direction along ng a path time interval to set, pipe level is erected above track in the middle of, conduit axis direction is along rail
Road direction.
5. waste and old pipeline cleaner as claimed in claim 1, it is characterised in that:The rig bracket (3) includes four legs
And top board (32) (31);The top board (32) is the rectangle parallel to horizontal plane, and the rig (2) is fixed on the top board
(32) top;Four legs (31) are fixed on top board (32) described in the supported underneath of the top board (32), four legs (31)
Upper end connect four end points of the top board (32);The longitudinal section of the rig bracket (3) is trapezoidal, and its cross section is from upper
The rectangle gradually increased under.
6. waste and old pipeline cleaner as claimed in claim 5, it is characterised in that:The rig bracket (3) also includes being located at institute
The dividing plate (33) below top board (32) is stated, the dividing plate (33) is between rectangle, the middle part for being connected to four legs (31).
7. waste and old pipeline cleaner as claimed in claim 5, it is characterised in that:The rig bracket (3) also includes sliding part
(34), the sliding part (34) is connected between the lower end of two legs (31), is connected with and is located at respectively on four legs (31)
Two sliding parts (34) on two relative sides of rectangle;The sliding part (34) is downwardly open rectangular flute profile, two cunnings
Moving part (34) blocks the both sides of track respectively.
8. waste and old pipeline cleaner as claimed in claim 7, it is characterised in that:The rig bracket (3) also includes two wheels
Axle (35), two wheel shafts (35) are connected between the two ends of two sliding parts (34), two wheel shafts (35) and two slips
Part (34) constitutes rectangle, and the two ends of every wheel shaft (35) respectively connect a roller, and roller is located at the groove of the sliding part (34)
It is interior.
9. a kind of drill bit for being used to clear up waste and old pipeline, it is characterised in that:Including middle bit (4) and surrounding drill bit (5);It is described
The afterbody of middle bit (4) is fixed on drill rod end;The surrounding drill bit (5) is fixed at the middle bit (4) rear
On drilling rod, circumference of the surrounding drill bit (5) around drilling rod cross section is placed equidistant.
10. the drill bit as claimed in claim 9 for being used to clear up waste and old pipeline, it is characterised in that:The head of the middle bit (4)
Part is pitched into two, the surrounding drill bit (5) totally five.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621399866.5U CN206316095U (en) | 2016-12-20 | 2016-12-20 | Waste and old pipeline cleaner and the drill bit for clearing up waste and old pipeline |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621399866.5U CN206316095U (en) | 2016-12-20 | 2016-12-20 | Waste and old pipeline cleaner and the drill bit for clearing up waste and old pipeline |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206316095U true CN206316095U (en) | 2017-07-11 |
Family
ID=59258529
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621399866.5U Active CN206316095U (en) | 2016-12-20 | 2016-12-20 | Waste and old pipeline cleaner and the drill bit for clearing up waste and old pipeline |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206316095U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109530338A (en) * | 2019-01-21 | 2019-03-29 | 河南七星铜业有限公司 | Copper pipe slug collection storehouse |
CN110125108A (en) * | 2019-06-24 | 2019-08-16 | 长江大学 | It is a kind of to drill through cleaning device suitable for cementing truck section formula force density meter |
-
2016
- 2016-12-20 CN CN201621399866.5U patent/CN206316095U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109530338A (en) * | 2019-01-21 | 2019-03-29 | 河南七星铜业有限公司 | Copper pipe slug collection storehouse |
CN110125108A (en) * | 2019-06-24 | 2019-08-16 | 长江大学 | It is a kind of to drill through cleaning device suitable for cementing truck section formula force density meter |
CN110125108B (en) * | 2019-06-24 | 2023-11-14 | 长江大学 | Drilling through cleaning device suitable for cement truck department type force densimeter |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102003140A (en) | Traversing reverse circulating drilling method of horizontal directional drilling pipeline and special drilling bit | |
CN105257908B (en) | A kind of pushing tow drilling construction device and method of underground piping | |
CN206316095U (en) | Waste and old pipeline cleaner and the drill bit for clearing up waste and old pipeline | |
CN209779855U (en) | Sewage pipe network purification treatment device | |
CN104594199B (en) | A kind of Reinforced Concrete Bridge longitudinally connected construction method of framing longitudinal joint | |
KR100632978B1 (en) | The methods of continuous partial work for anold and timeworn sewer pipe | |
CN113482531B (en) | Long-distance directional drilling pipeline back-dragging slurry circulation construction process | |
CN107604903A (en) | A kind of miniature steel pipe isolation pile reinforced construction method | |
CN205153113U (en) | Clear away device of interior debris of drainage pipe | |
CN201581902U (en) | Sand layer pipe jacking shield machine | |
CN104005472A (en) | Trenchless pipe tunneling and dredging device operating with water | |
CN206554147U (en) | A kind of culvert mud and war dredging machine | |
WO2023241325A1 (en) | Artificial tornado sharp-dagger composite trenchless multistage pipe cleaning device and pipe cleaning method thereof | |
CN106677246A (en) | Culvert sludge and sundry dredger | |
CN203334421U (en) | Urban underground circular rainwater pipeline dredging device | |
CN109736151A (en) | Ballastless track sleeper separation and empty hoisting repair structure and method | |
CN114320148A (en) | Climbing type rock wall drilling machine | |
CN206190260U (en) | Coal seam drilling blowout preventer | |
CN109869154B (en) | Underpass device for existing railway | |
CN204370519U (en) | A kind of domatic flowing water and road surface water of utilizing is as the tunnel fire protection system at water source | |
CN200961487Y (en) | Gas-exhausting drilling dust-removing device | |
CN208717668U (en) | A kind of clear tiny fragments of stone, coal, etc. machine of small-sized railway | |
CN206859174U (en) | A kind of highway leads device with debris flow drainage | |
CN205243541U (en) | Tunnelling temporary support device | |
CN204343381U (en) | A kind of Tunnel Gushing that utilizes is as the tunnel fire protection system at water source |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |