CN206309116U - A kind of interim builder's temporary shed of Construction of Civil Engineering - Google Patents

A kind of interim builder's temporary shed of Construction of Civil Engineering Download PDF

Info

Publication number
CN206309116U
CN206309116U CN201621470647.1U CN201621470647U CN206309116U CN 206309116 U CN206309116 U CN 206309116U CN 201621470647 U CN201621470647 U CN 201621470647U CN 206309116 U CN206309116 U CN 206309116U
Authority
CN
China
Prior art keywords
bottom bar
sleeve
construction
rod
peg
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621470647.1U
Other languages
Chinese (zh)
Inventor
顾连胜
胡明华
王振华
邵炜星
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
East China Institute of Technology
Original Assignee
East China Institute of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by East China Institute of Technology filed Critical East China Institute of Technology
Priority to CN201621470647.1U priority Critical patent/CN206309116U/en
Application granted granted Critical
Publication of CN206309116U publication Critical patent/CN206309116U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model embodiment discloses a kind of interim builder's temporary shed of Construction of Civil Engineering, belong to the realm of building construction, the device includes bearing, the first bottom bar, the second bottom bar, vertical rod, cross bar, push rod, hound and tarpaulin, the utility model can overcome traditional interim builder's temporary shed intensity not enough, it is difficult to recycle, it is relatively costly, the problem of inconvenience is overlapped, it is easily manufactured with simple structure, it is readily disassembled, build conveniently, cost is relatively low, and working strength is high, reusable edible, is adapted to be promoted in the realm of building construction.

Description

A kind of interim builder's temporary shed of Construction of Civil Engineering
Technical field
The utility model is related to the realm of building construction, more particularly to a kind of interim builder's temporary shed of Construction of Civil Engineering.
Background technology
During engineering construction, generally require to build many interim builder's temporary sheds, to deposit construction material or stop temporarily Breath is enjoyed the cool and is used.Due to the simplification of interim builder's temporary shed, often working strength is inadequate, potential safety hazard easily occurs, and because have Provisional, engineering construction terminates construction party and is typically difficult to recycle in builder's temporary shed, causes the wasting of resources, and single use, into This is higher, overlaps also inconvenient.
In sum, in the prior art in the construction of interim builder's temporary shed, there is builder's temporary shed intensity not enough, it is difficult to recycle, It is relatively costly, overlap the problem of inconvenience.
Utility model content
The utility model provides a kind of interim builder's temporary shed of Construction of Civil Engineering, can solve in the prior art, interim builder's temporary shed When setting up, builder's temporary shed intensity is not enough, it is difficult to recycle, relatively costly, overlaps the problem of inconvenience.
A kind of interim builder's temporary shed of Construction of Civil Engineering, including bearing, the first bottom bar, the second bottom bar, vertical rod, cross bar, push rod, Hound and tarpaulin;The quantity of bearing is four, and the bearing has a base plate, and the plate upper surface is provided with by three pipes The supporting part of part composition, three pipe fitting axial lines are mutually perpendicular to and intersect at same crosspoint two-by-two, three pipe fittings There is bell and spigot away from the end in crosspoint, the bell and spigot offers internal thread;The lower surface of the base plate is provided with roller And supporting leg, coaxial threaded is connected with leg on the supporting leg;The quantity of the first bottom bar is three, and the two ends of first bottom bar have There is the external screw thread being engaged with the internal thread, the bearing is symmetrically mounted at the two ends of first bottom bar;Second bottom bar Quantity be one, the second bottom bar two ends have can be inserted into the bell and spigot the first connection-peg, second bottom bar The equal length of length and first bottom bar;The quantity of vertical rod is four, and the vertical rod includes head rod, described first The other end that connecting rod one end has the second connection-peg coordinated with the internal thread screw thread, the head rod has by three First Plug Division of individual first sleeve composition, three axial lines of the first sleeve are put down with the axial line of the head rod OK, the first sleeve is tangent with the head rod outer surface and is fixedly connected;The quantity of cross bar is four, the cross bar Two ends are respectively arranged with the 3rd connection-peg of the pluggable first sleeve;The quantity of push rod is one, and the push rod includes the Two connecting rods, the second connecting rod two ends have the second Plug Division being made up of two the second sleeve pipes respectively;The number of hound It is four to measure, and the hound includes the 3rd connecting rod, and one end of the 3rd connecting rod has the pluggable first sleeve 4th connection-peg, the other end have the 5th connection-peg that can be inserted into second sleeve pipe.
More preferably, second pitman shaft of the second sleeve pipe described in two described in is symmetrical arranged.
More preferably, the roller is universal wheel.
A kind of interim builder's temporary shed of Construction of Civil Engineering that the utility model is provided, simple structure is easily manufactured, it is easy to tear open Unload, build conveniently, cost is relatively low, and working strength is high, reusable edible.
Brief description of the drawings
A kind of Construction of Civil Engineering interim builder's temporary shed (not being arranged tarpaulin) structural representation that Fig. 1 is provided for the utility model Figure;
A kind of Construction of Civil Engineering that Fig. 2 is provided for the utility model structural representation of bearing in interim builder's temporary shed;
A kind of Construction of Civil Engineering that Fig. 3 is provided for the utility model structural representation of interim builder's temporary shed neutrality bar;
A kind of Construction of Civil Engineering that Fig. 4 is provided for the utility model structural representation of cross bar in interim builder's temporary shed;
A kind of Construction of Civil Engineering that Fig. 5 is provided for the utility model structural representation of push rod in interim builder's temporary shed;
A kind of Construction of Civil Engineering that Fig. 6 is provided for the utility model structural representation of hound in interim builder's temporary shed.
Description of reference numerals:
10- bearings, 11- bell and spigots, 111- internal threads, 12- rollers, 13- supporting legs, 14- legs, the bottom bars of 21- first, 22- Second bottom bar, 30- vertical rods, the connection-pegs of 31- second, 32- first sleeves, 33- head rods, 40- cross bars, the grafting of 41- the 3rd Head, 50- push rods, the connecting rods of 51- second, the sleeve pipes of 52- second, 60- hounds, the connecting rods of 61- the 3rd, the connection-pegs of 62- the 4th.
Specific embodiment
Below in conjunction with the accompanying drawings, a specific embodiment of the present utility model is described in detail, it is to be understood that this The protection domain of utility model is not limited by specific embodiment.
As shown in figs 1 to 6, a kind of interim builder's temporary shed of Construction of Civil Engineering, including bearing 10, the first bottom bar 21, the second bottom Bar 22, vertical rod 30, cross bar 40, push rod 50 and hound 60, the quantity of bearing 10 is four, respectively positioned at four base angles of builder's temporary shed Position, bearing 10 has a base plate, and plate upper surface is provided with the supporting part being made up of three pipe fittings, three pipe fitting axial lines two Two are mutually perpendicular to and intersect at same crosspoint, constitute a three-way piece, and three pipe fittings have socket joint away from the end in crosspoint Mouth 11, bell and spigot 11 offers internal thread 111;The lower surface of base plate is provided with roller 12 and supporting leg 13, and roller 12 is universal wheel, Coaxial threaded is connected with leg 14 on supporting leg 13, and leg 14 is provided with an operating portion tightened for spanner, and the bottom of leg 14 is also A disk is provided with, is set for this platform for being supported on;The quantity of the first bottom bar 21 is three, the two ends of the first bottom bar 21 have with The external screw thread that internal thread 111 is engaged, bearing 10 is symmetrically mounted at the two ends of the first bottom bar 21;The quantity of the second bottom bar 22 is One, the two ends of the second bottom bar 22 have the first connection-peg that can be inserted into bell and spigot 11, the length and the first bottom bar of the second bottom bar 22 21 equal length;The quantity of vertical rod 30 be four, vertical rod 30 include head rod 33, the one end of head rod 33 have with The second connection-peg 31 that the screw thread of internal thread 111 coordinates, the other end of head rod 33 has and is made up of three first sleeves 32 The first Plug Division, three first sleeves 32 are arranged on four T-shaped nodes and are connected with the section center of circle of connecting rod In T-shaped point of intersection, first sleeve 32 is tangent with connection rod outer surface and is fixedly connected in the section center of circle of bar;The quantity of cross bar 40 is Four, the two ends of cross bar 40 are respectively arranged with the 3rd connection-peg 41 of pluggable first sleeve 32;The quantity of push rod 50 is one, top Bar 50 includes the second connecting rod 51, and the two ends of the second connecting rod 51 have the second grafting being made up of two the second sleeve pipes 52 respectively Portion, two the second sleeve pipes 52 are set along the axial symmetry of the second connecting rod 51;The quantity of hound 60 is four, and hound 60 includes the Three connecting rods 61, there is the 4th connection-peg 62, other end that can be inserted into first sleeve 32 to have for one end of the 3rd connecting rod 61 can The 5th connection-peg of the second sleeve pipe 52 is inserted, bedding has tarpaulin above whole builder's temporary shed.
During overlap joint, first three first bottom bars 21 are threadedly coupled in the horizontally disposed bell and spigot 11 of bearing 10, form one Individual foursquare three side, then inserts one end of the second bottom bar 22 in the bell and spigot 11 of bearing 10, applies external force, makes structure light Light deformation, breach is expanded, and then by the corresponding bell and spigot 11 of other end insertion of the second bottom bar 22, is formed in a horizontal plane Interior square;Four second connection-pegs of vertical rod 30 are vertically held with four vertical directions of bearing 10 respectively again The coaxial threaded of socket 11 is connected, and the 3rd connection-peg 41 of four cross bars 40 is then inserted into the of two adjacent vertical rods 30 respectively In sleeve 32, the 4th connection-peg 62 of two hounds 60 is then inserted vacant of two adjacent vertical rods 30 respectively In sleeve 32, the triangle in a plane is formed, opposite carries out identical operation, then by four the 5th of hound 60 the Connection-peg is inserted in corresponding second sleeve pipe 52 of push rod 50 respectively from bottom, is finally set in entirely tarpaulin with conventional method In frame structure.
A kind of interim builder's temporary shed of Construction of Civil Engineering that the utility model is provided, simple structure is easily manufactured, it is easy to tear open Unload, build conveniently, cost is relatively low, and working strength is high, reusable edible.
Disclosed above is only several specific embodiments of the present utility model, but, the utility model embodiment not office It is limited to this, the changes that any person skilled in the art can think of should all fall into protection domain of the present utility model.

Claims (3)

1. the interim builder's temporary shed of a kind of Construction of Civil Engineering, it is characterised in that including:
Bearing (10), its quantity is four, and with a base plate, the plate upper surface is provided with by three pipes the bearing (10) The supporting part of part composition, three pipe fitting axial lines are mutually perpendicular to and intersect at same crosspoint two-by-two, three pipe fittings There is bell and spigot (11) away from the end in crosspoint, the bell and spigot (11) offers internal thread (111);The following table of the base plate Face is provided with roller (12) and supporting leg (13), and coaxial threaded is connected with leg (14) on the supporting leg (13);
First bottom bar (21), its quantity is three, and the two ends of first bottom bar (21) have and the internal thread (111) matching The external screw thread of conjunction, the bearing (10) is symmetrically mounted at the two ends of first bottom bar (21);
Second bottom bar (22), its quantity is one, and the second bottom bar (22) two ends have the pluggable bell and spigot (11) First connection-peg, the length of second bottom bar (22) and the equal length of first bottom bar (21);
Vertical rod (30), its quantity is four, and the vertical rod (30) includes head rod (33), the head rod (33) End has the second connection-peg (31) coordinated with the internal thread (111) screw thread, the other end tool of the head rod (33) By the first Plug Division being made up of three first sleeves (32), three axial lines of the first sleeve (32) connect with described first The axis parallel of extension bar (33), the first sleeve (32) and the head rod (33) outer surface are tangent and fixed connect Connect;
Cross bar (40), its quantity is four, and cross bar (40) two ends are respectively arranged with the pluggable first sleeve (32) 3rd connection-peg (41);
Push rod (50), its quantity is one, and the push rod (50) includes the second connecting rod (51), second connecting rod (51) two End has the second Plug Division being made up of two the second sleeve pipes (52) respectively;
Hound (60), its quantity is four, and the hound (60) includes the 3rd connecting rod (61), the 3rd connecting rod (61) one end has the 4th connection-peg (62), the other end that can be inserted into the first sleeve (32) with pluggable described second 5th connection-peg of sleeve pipe (52);
Tarpaulin.
2. the interim builder's temporary shed of a kind of Construction of Civil Engineering as claimed in claim 1, it is characterised in that second set described in two Pipe (52) is set along described the second connecting rod (51) axial symmetry.
3. the interim builder's temporary shed of a kind of Construction of Civil Engineering as claimed in claim 1, it is characterised in that the roller is universal Wheel.
CN201621470647.1U 2016-12-29 2016-12-29 A kind of interim builder's temporary shed of Construction of Civil Engineering Expired - Fee Related CN206309116U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621470647.1U CN206309116U (en) 2016-12-29 2016-12-29 A kind of interim builder's temporary shed of Construction of Civil Engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621470647.1U CN206309116U (en) 2016-12-29 2016-12-29 A kind of interim builder's temporary shed of Construction of Civil Engineering

Publications (1)

Publication Number Publication Date
CN206309116U true CN206309116U (en) 2017-07-07

Family

ID=59247769

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621470647.1U Expired - Fee Related CN206309116U (en) 2016-12-29 2016-12-29 A kind of interim builder's temporary shed of Construction of Civil Engineering

Country Status (1)

Country Link
CN (1) CN206309116U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2584444A (en) * 2019-06-03 2020-12-09 Simms Andrew A base component for a temporary structure
CN113863774A (en) * 2021-10-27 2021-12-31 长园电力技术有限公司 Intelligent installation environment control device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2584444A (en) * 2019-06-03 2020-12-09 Simms Andrew A base component for a temporary structure
CN113863774A (en) * 2021-10-27 2021-12-31 长园电力技术有限公司 Intelligent installation environment control device

Similar Documents

Publication Publication Date Title
CN206309116U (en) A kind of interim builder's temporary shed of Construction of Civil Engineering
CN206091264U (en) Outer wall scaffold frame is wall spare even
CN203603266U (en) Combined type assembly and stable supporting body composed of same
CN202936996U (en) Wall connecting piece for scaffold
CN207420002U (en) A kind of scaffold fixed structure for building
CN205764769U (en) A kind of can the group frame equipment of disposal molding
CN107165392A (en) Socket joint type disk button jacking screw structure and its application method
CN104372939A (en) Scaffold
CN207003983U (en) A kind of high-altitude English truss platform for construction
CN103401178A (en) Support frame for replacing vibration damper
CN207469718U (en) A kind of exterior wall scaffold drawknot device being used in turn
CN205134930U (en) Novel scaffold connecting structure
CN206784901U (en) One kind can have enough to meet the need outrigger wall-connecting piece
CN206769350U (en) Outer on large-sized station boiler Steel Structure chooses net scaffold
CN202055509U (en) Upright rod installation structure of directly-inserted scaffold
CN204940867U (en) A kind of wall form pull-tab extraction machine
CN209369021U (en) A kind of novel modularized building structure
CN104358406A (en) Scaffold mounting structure
CN108756221B (en) Form and position joint and switching vertical pipe, switching frame and switching frame thereof
CN210888048U (en) Sleeve pipe support module for building
CN204059607U (en) A kind of glass fiber reinforced plastic space net rack and Steel Space node thereof and rod member
CN208934141U (en) A kind of Super High rod iron attachment device
CN210316509U (en) Connecting device for quickly assembling scaffold
CN207211675U (en) Socket joint type disk button jacking screw structure
CN203891452U (en) Novel scaffold connecting structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170707

Termination date: 20171229

CF01 Termination of patent right due to non-payment of annual fee