CN209369021U - A kind of novel modularized building structure - Google Patents

A kind of novel modularized building structure Download PDF

Info

Publication number
CN209369021U
CN209369021U CN201920053317.XU CN201920053317U CN209369021U CN 209369021 U CN209369021 U CN 209369021U CN 201920053317 U CN201920053317 U CN 201920053317U CN 209369021 U CN209369021 U CN 209369021U
Authority
CN
China
Prior art keywords
anchor ear
hole
prefabricated house
buckle
sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920053317.XU
Other languages
Chinese (zh)
Inventor
张威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201920053317.XU priority Critical patent/CN209369021U/en
Application granted granted Critical
Publication of CN209369021U publication Critical patent/CN209369021U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of novel modularized building structure, including prefabricated house, mounting assembly, support tube, long hole slot, anchor ear, anchor ear buckle, buckle slot, double-row hole and fixation hole, the floor four corners of prefabricated house offer double-row hole and fixation hole respectively, the floor bottoms of prefabricated house are uniformly equipped with anchor ear by bolt, support tube is uniformly installed between anchor ear and the floor of prefabricated house, the back of anchor ear is evenly arranged with anchor ear buckle, the side of support tube is uniformly provided with buckle slot, anchor ear buckle is fit structure with buckle slot, the other side of support tube offers long hole slot, the floor bottoms of prefabricated house are equipped with mounting assembly, mounting assembly is by cushion block, nut, screw rod, water blocking set, bumper ring, ball rod, spiral fixed link, square toes bar, square toes rod aperture, sleeve, spherical groove, square groove, sleeve hole, locking pin and Locking pin stomidium composition, the utility model have the characteristics that facilitate installation and disassembly and applied widely.

Description

A kind of novel modularized building structure
Technical field
The utility model relates to modular architectural structural technical field, specially a kind of novel modularized building structure.
Background technique
Modular architectural is a kind of emerging architectural structure system, which is using each room as a module list Member, the various facilities in room, can carry out Prefabrication in the factory, be transported after the completion to scene and by reliably connecting It is whole that mode is assembled into building.
Traditional building technology needs scene to use concrete or steel construction, and installation steps are many and diverse, and the construction period is long, and needle Installation for the modular architectural structural under varying environment, need in advance to carry out the ground of infield it is regular, for disliking Bad environment, modular architectural can not be installed, narrow application range.Therefore, it designs and a kind of facilitates installation and disassembly and applied widely Novel modularized building structure be necessary.
Utility model content
The purpose of this utility model is to provide a kind of novel modularized building structure, to solve to mention in above-mentioned background technique Out the problem of.
In order to solve the above-mentioned technical problem, the utility model provides the following technical solutions: a kind of novel modularized building knot Structure, including prefabricated house, mounting assembly, support tube, long hole slot, anchor ear, anchor ear buckle, buckle slot, double-row hole and fixation hole, it is described The floor four corners of prefabricated house offer double-row hole and fixation hole respectively, and the floor bottoms of the prefabricated house are uniformly pacified by bolt Equipped with anchor ear, support tube is uniformly installed between the anchor ear and the floor of prefabricated house, the back of the anchor ear is evenly arranged with Anchor ear buckle, the side of the support tube are uniformly provided with buckle slot, and the anchor ear buckle and buckle slot are fit structure, described The other side of support tube offers long hole slot, and the floor bottoms of the prefabricated house are equipped with mounting assembly;The mounting assembly by Cushion block, nut, screw rod, water blocking set, bumper ring, ball rod, spiral fixed link, square toes bar, square toes rod aperture, sleeve, spherical groove, Square groove, sleeve hole, locking pin and locking pin stomidium form, and offer spherical groove, the spherical female at the top of the sleeve The opening of slot and the junction of ball rod are provided with bumper ring, and the inside of the spherical groove is equipped with ball rod, the bulb The top of bar is nested with water blocking set, the set by being welded with screw rod between the top of the sleeve and the bottom of screw rod The bottom of cylinder offers square groove, and the two sides of the square groove offer sleeve hole, and the inside of the square groove is equipped with square toes Bar, the top two sides of the square toes bar offer square toes rod aperture, and the bottom of the square toes bar is fixed by being welded with spiral Bar.
Further, the one end side of the support tube and the angle of vertical plane are 45 °.
Further, the bottom end of the spiral fixed link is provided with conical head.
Further, the anchor ear is bolted with double-row hole, and screw rod passes through the floor of fixation hole and prefabricated house, and Top is provided with cushion block and nut.
Further, the inside of the square toes rod aperture and sleeve hole, which is run through, locking pin, and one end locking pin of locking pin Stomidium, the inside of locking pin stomidium is inserted with bolt.
Compared with prior art, the utility model beneficial effect achieved is: the utility model, when needs arrive at random , can be by the quadrangle size of the prefabricated house disposed needed for measuring when building site is constructed for a long time, and do not interfering inner facility Under the premise of accomplish fluently fixation hole and double-row hole, after punching measure fixation hole positioning, beaten near building site according to the size of positioning Four spiral fixed links can be screwed into underground by spanner, and after fixing four spiral fixed links, prefabricated house is hung by crane It rises, and anchor ear, support tube and screw rod is installed at four angle punchings, screw rod connection has sleeve, after installing, by crane handle Prefabricated house is hung to above the four spiral fixed links fixed, by four sleeve alignment square toes bar installations, then according to adjustment silk Nut and gasket on bar make prefabricated house reach horizontal, which can overcome many out-of-flatness ground, exempt to look for Flat, waterproof uses bulb and connects between screw rod and spiral fixed link, effectively prevent reinstalling because deflecting angle asks Topic, the prefabricated house suitable for various sizes.
Detailed description of the invention
Attached drawing is used to provide a further understanding of the present invention, and constitutes part of specification, practical with this Novel embodiment is used to explain the utility model together, does not constitute limitations of the present invention.In the accompanying drawings:
Fig. 1 is the overall structure diagram of the utility model;
Fig. 2 is the mounting assembly structural schematic diagram of the utility model;
Fig. 3 is the tube-in-tube structure schematic diagram of the utility model;
Fig. 4 is the locking pin structure schematic diagram of the utility model;
Fig. 5 is the support tube mounting structure schematic diagram of the utility model;
Fig. 6 is the supporting tube structure schematic diagram of the utility model;
Fig. 7 is the prefabricated house floor panel structure schematic diagram of the utility model;
In figure: 1, prefabricated house;2, mounting assembly;3, cushion block;4, nut;5, screw rod;6, water blocking set;7, bumper ring;8, ball Head rod;9, spiral fixed link;10, square toes bar;11, square toes rod aperture;12, sleeve;13, spherical groove;14, square groove;15, sleeve Hole;16, locking pin;17, locking pin stomidium;18, support tube;19, long hole slot;20, anchor ear;21, anchor ear buckles;22, buckle slot; 23, double-row hole;24, fixation hole.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1-7 is please referred to, the utility model provides a kind of technical solution: a kind of novel modularized building structure, including work Dynamic room 1, mounting assembly 2, support tube 18, long hole slot 19, anchor ear 20, anchor ear buckle 21, buckle slot 22, double-row hole 23 and fixation hole 24, the floor four corners of prefabricated house 1 offer double-row hole 23 and fixation hole 24 respectively, and the floor bottoms of prefabricated house 1 pass through bolt Anchor ear 20 uniformly is installed, support tube 18 is uniformly installed, the back of anchor ear 20 is uniform between anchor ear 20 and the floor of prefabricated house 1 It is provided with anchor ear buckle 21, the side of support tube 18 is uniformly provided with buckle slot 22, and anchor ear buckle 21 is cooperation with buckle slot 22 Structure, the other side of support tube 18 offer long hole slot 19, and the floor bottoms of prefabricated house 1 are equipped with mounting assembly 2;Mounting assembly 2 by cushion block 3, nut 4, screw rod 5, water blocking set 6, bumper ring 7, ball rod 8, spiral fixed link 9, square toes bar 10, square toes rod aperture 11, Sleeve 12, spherical groove 13, square groove 14, sleeve hole 15, locking pin 16 and locking pin stomidium 17 form, and the top of sleeve 12 is opened Equipped with spherical groove 13, the opening of spherical groove 13 and the junction of ball rod 8 are provided with bumper ring 7, spherical groove 13 it is interior Portion is equipped with ball rod 8, the top of ball rod 8 by being welded with screw rod 5, the bottom of the top of sleeve 12 and screw rod 5 it Between be nested with water blocking set 6, the bottom of sleeve 12 offers square groove 14, and the two sides of square groove 14 offer sleeve hole 15, rectangular The inside of slot 14 is equipped with square toes bar 10, and the top two sides of square toes bar 10 offer square toes rod aperture 11, and the bottom of square toes bar 10 is logical It crosses and is welded with spiral fixed link 9;The one end side of support tube 18 and the angle of vertical plane are 45 °, be welded to each other it is L-shaped, It can play the role of increasing supporting surface;The bottom end of spiral fixed link 9 is provided with conical head, more easily can pierce ground Under;Anchor ear 20 is bolted with double-row hole 23, and screw rod 5 passes through the floor of fixation hole 24 and prefabricated house 1, and top is provided with Cushion block 3 and nut 4 can play effect that is firm and adjusting height;The inside of square toes rod aperture 11 and sleeve hole 15, which is run through, lock Rationed marketing 16, and one end locking pin stomidium 17 of locking pin 16, the inside of locking pin stomidium 17 can prevent nature inserted with bolt It is secure to loosen more safety;Two support tubes 18 are welded together, and are bolted on prefabricated house 1 with anchor ear 20 Four angles at, increase stability, guarantee to penetrate through between long hole slot 19 and fixation hole 24, by screw rod 5 pass through long 19 He of hole slot Fixation hole 24 is equipped with cushion block 3 on 5 top of screw rod and is attached at the top of the floor of prefabricated house 1, screws in nut 4 at the top of screw rod 5 It is attached to the top of cushion block 3, while cushion block 3 being installed in the bottom end of screw rod 5 and is attached to the bottom of support tube 18, at the bottom of screw rod 5 End screws in the bottom that nut 4 is attached to cushion block 3, when feeling that prefabricated house 1 is uneven, twists nut 4 by spanner, and make spiral shell Mother 4 moves on screw rod 5, and the floor movements of prefabricated house 1 are driven by cushion block 3, so that the floor four corners of prefabricated house 1 In a horizontal plane, avoid the quadrangle height of prefabricated house 1 uneven, convenient for enhancing the applicability of the modular architectural structural, Screw rod 5 is welded with ball rod 8, and connect with sleeve 12, and water blocking set 6 is nested between screw rod 5 and sleeve 12, can prevent inside Structure is because of rain erosion, and sleeve 12 and square toes bar 10 are fixed, and square toes bar 10 welds together with spiral fixed link 9, is fixed on ground Under, a variety of places are adapted to, are easily installed.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.
Finally, it should be noted that the above descriptions are merely preferred embodiments of the present invention, it is not limited to this Utility model, although the utility model is described in detail with reference to the foregoing embodiments, for those skilled in the art For, it is still possible to modify the technical solutions described in the foregoing embodiments, or to part of technical characteristic It is equivalently replaced.Within the spirit and principle of the utility model, any modification, equivalent replacement, improvement and so on, It should be included within the scope of protection of this utility model.

Claims (5)

1. a kind of novel modularized building structure, including prefabricated house (1), mounting assembly (2), support tube (18), long hole slot (19), Anchor ear (20), anchor ear buckle (21), buckle slot (22), double-row hole (23) and fixation hole (24), it is characterised in that: the prefabricated house (1) floor four corners offer double-row hole (23) and fixation hole (24) respectively, and the floor bottoms of the prefabricated house (1) pass through spiral shell Bolt is uniformly equipped with anchor ear (20), is uniformly equipped with support tube (18), institute between the anchor ear (20) and the floor of prefabricated house (1) The back for stating anchor ear (20) is evenly arranged with anchor ear buckle (21), and the side of the support tube (18) is uniformly provided with buckle slot (22), the anchor ear buckle (21) and buckle slot (22) is fit structure, and the other side of the support tube (18) offers long hole The floor bottoms of slot (19), the prefabricated house (1) are equipped with mounting assembly (2);The mounting assembly (2) is by cushion block (3), nut (4), screw rod (5), water blocking set (6), bumper ring (7), ball rod (8), spiral fixed link (9), square toes bar (10), square toes rod aperture (11), sleeve (12), spherical groove (13), square groove (14), sleeve hole (15), locking pin (16) and locking pin stomidium (17) group At being offered spherical groove (13) at the top of the sleeve (12), the company of the opening of the spherical groove (13) and ball rod (8) The place of connecing is provided with bumper ring (7), and the inside of the spherical groove (13) is equipped with ball rod (8), the top of the ball rod (8) By being welded with screw rod (5), water blocking set (6), institute are nested between the top of the sleeve (12) and the bottom of screw rod (5) The bottom for stating sleeve (12) offers square groove (14), and the two sides of the square groove (14) offer sleeve hole (15), the side The inside of shape slot (14) is equipped with square toes bar (10), and the top two sides of the square toes bar (10) offer square toes rod aperture (11), institute The bottom of square toes bar (10) is stated by being welded with spiral fixed link (9).
2. a kind of novel modularized building structure according to claim 1, it is characterised in that: the one of the support tube (18) The angle of end side surface and vertical plane is 45 °.
3. a kind of novel modularized building structure according to claim 1, it is characterised in that: the spiral fixed link (9) Bottom end be provided with conical head.
4. a kind of novel modularized building structure according to claim 1, it is characterised in that: the anchor ear (20) with it is double Hole (23) is bolted, and the screw rod (5) passes through the floor of fixation hole (24) and prefabricated house (1), and top is provided with pad Block (3) and nut (4).
5. a kind of novel modularized building structure according to claim 1, it is characterised in that: the square toes rod aperture (11) with The inside of sleeve hole (15), which is run through, to be had locking pin (16), and one end locking pin stomidium (17) of locking pin (16), the locking pin The inside of stomidium (17) is inserted with bolt.
CN201920053317.XU 2019-01-14 2019-01-14 A kind of novel modularized building structure Expired - Fee Related CN209369021U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920053317.XU CN209369021U (en) 2019-01-14 2019-01-14 A kind of novel modularized building structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920053317.XU CN209369021U (en) 2019-01-14 2019-01-14 A kind of novel modularized building structure

Publications (1)

Publication Number Publication Date
CN209369021U true CN209369021U (en) 2019-09-10

Family

ID=67825298

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920053317.XU Expired - Fee Related CN209369021U (en) 2019-01-14 2019-01-14 A kind of novel modularized building structure

Country Status (1)

Country Link
CN (1) CN209369021U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113482407A (en) * 2021-07-07 2021-10-08 苏州中晟盛金属材料制造有限公司 Intelligent prefabricated house

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113482407A (en) * 2021-07-07 2021-10-08 苏州中晟盛金属材料制造有限公司 Intelligent prefabricated house

Similar Documents

Publication Publication Date Title
CN209369021U (en) A kind of novel modularized building structure
CN101200961A (en) Variable angle connecting overlap-connected components and construction method for ceiling of continuous curve surface
CN111173249B (en) Overhanging support system attached to rectangular beam and column
CN101949186B (en) Mounting and adjusting structure of building curtain wall vertical column and building body
CN212775915U (en) Bolt ball node grid structure antidetonation gallows
CN212653364U (en) Ground screw height adjusting device
CN206800988U (en) A kind of civil engineering scaffold being easily installed
CN206309116U (en) A kind of interim builder's temporary shed of Construction of Civil Engineering
CN112025601A (en) Ground screw height adjusting device
CN205134930U (en) Novel scaffold connecting structure
CN209817104U (en) House frame connection structure
PH12017000270A1 (en) Joint structure between column and beam of steel construction architecture
CN113323256A (en) Fabricated suspended ceiling anti-support structure and mounting method thereof
CN209818911U (en) But height-adjusting's antidetonation gallows
CN110924431A (en) Comprehensive pipe gallery faces limit protector
CN209545495U (en) Rotating connector, photovoltaic bracket and photovoltaic system
CN220058780U (en) Structure of pull rod with adjustable length for disc buckle
CN214574675U (en) Cross connecting device
CN219795786U (en) Interlocking type one-way bolt for simple greenhouse steel structure
CN216380165U (en) Curtain wall transverse and vertical keel connecting structure convenient to install
CN220058473U (en) Stone curtain wall mounting structure
CN206346362U (en) Super High super large multiaspect abnormal shape unit curtain wall system
CN215888894U (en) Anti-bearing structure of assembled furred ceiling
CN214576177U (en) Security fence erection joint spare
CN218060709U (en) Connecting piece for assembled steel structure for building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190910

Termination date: 20200114