CN206800988U - A kind of civil engineering scaffold being easily installed - Google Patents

A kind of civil engineering scaffold being easily installed Download PDF

Info

Publication number
CN206800988U
CN206800988U CN201720535683.XU CN201720535683U CN206800988U CN 206800988 U CN206800988 U CN 206800988U CN 201720535683 U CN201720535683 U CN 201720535683U CN 206800988 U CN206800988 U CN 206800988U
Authority
CN
China
Prior art keywords
gim peg
fixing hole
fixing
civil engineering
easily installed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720535683.XU
Other languages
Chinese (zh)
Inventor
张苑艺
汪旭微
陈军华
朱文
林美珍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dawning Construction Co Ltd
Original Assignee
Dawning Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dawning Construction Co Ltd filed Critical Dawning Construction Co Ltd
Priority to CN201720535683.XU priority Critical patent/CN206800988U/en
Application granted granted Critical
Publication of CN206800988U publication Critical patent/CN206800988U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a kind of civil engineering scaffold being easily installed, including connector and connecting tube, connector includes matrix, matrix is shaped as square, six faces of matrix have been fixedly connected with fixing pipe, and the inwall of fixing pipe, which is fixed, offers the first fixing hole, and the surface of fixing pipe is fixedly connected with fixed block, fluted, the intracavity inter-connection of groove and fixing pipe is opened up on fixed block.One end of the utility model body is plugged in fixing pipe, first gim peg is connected in the second fixing hole, second gim peg is connected in the first fixing hole, so as to complete the fixation to connector and connecting tube, and because the first gim peg and the second gim peg are fixedly connected with the first spring and second spring respectively, so that the first gim peg and the second gim peg are compressible in vertical direction stress, so as to detach the first fixing hole and the second fixing hole, compared to traditional scaffold, the scaffold installation proposed in this programme is more convenient.

Description

A kind of civil engineering scaffold being easily installed
Technical field
Civil engineering technical field is the utility model is related to, specially a kind of civil engineering scaffold being easily installed.
Background technology
Scaffold refers to job site as operation and solves vertically and horizontally to transport the various supports set up, architecture field Generic term, refer to and exterior wall, inside fitting or the higher place that can not directly construct of floor height be used on construction site.
Scaffold in the market typically carries out mutual connection and fixation by bolt nut, and this also causes pin hand Frame, which is built, can expend very big construction volume and take the duration, simultaneously because long-term exposed in wind and rain, its link position of scaffold Also extremely get rusty easily, cause it to be difficult to dismounting if getting rusty and separate, this is also caused in the later stage demolishing process of scaffold Inconvenience.
Utility model content
(One)The technical problem of solution
In view of the shortcomings of the prior art, the utility model provides a kind of civil engineering scaffold being easily installed, solution The problem of scaffold installing/dismounting inconvenience in the market of having determined.
(Two)Technical scheme
To achieve the above object, the utility model provides following technical scheme:A kind of civil engineering pin being easily installed Hand cradle, including connector and connecting tube, the connector include matrix, and the matrix is shaped as square, the matrix Six faces have been fixedly connected with fixing pipe, and the inwall of the fixing pipe, which is fixed, offers the first fixing hole, the table of the fixing pipe Face is fixedly connected with fixed block, and fluted, the intracavity inter-connection of the groove and fixing pipe is opened up on the fixed block, described recessed The first gim peg is plugged with groove, the inwall of the groove offers chute, and the surface of first gim peg is fixedly connected with Limited block, the limited block are connected in chute, and the first spring, the both ends of first spring are fixedly connected with the groove Overlapped respectively with the inwall of groove and the surface of limited block.
The connecting tube includes body, and one end of the body is plugged in fixing pipe, and the surface of the body offers Second fixing hole, and the first gim peg is connected in the second fixing hole, the inwall fixed connecting sleeve of the body, described sleeve pipe Both ends be plugged with the second gim peg, and two relative one end of the second gim peg are fixedly connected by second spring, described One end of second gim peg is connected in the first fixing hole.
Preferably, first fixing hole, the first gim peg, the second fixing hole and the second gim peg are symmetrical two It is individual, and the first fixing hole, the first gim peg, the position of the second fixing hole and the second gim peg are mutually corresponding.
Preferably, the both ends of first gim peg and the second gim peg are smooth hemispherical.
Preferably, the connector and connecting tube, which are connected with each other, is combined into scaffolding structure.
Preferably, the length of the fixing pipe is 5-8 centimetres.
Preferably, the quantity of the chute is two, and two chutes are symmetrically arranged at the inwall of groove.
(Three)Beneficial effect
The utility model provides a kind of civil engineering scaffold being easily installed.Possesses following beneficial effect:
Connecting tube is connected with each other by the utility model by connector, and one end of body is plugged in fixing pipe, and first is solid Determine bolt to be connected in the second fixing hole, the second gim peg is connected in the first fixing hole, so as to complete to connector and connecting tube Fixation, and because the first gim peg and the second gim peg are fixedly connected with the first spring and second spring respectively so that It is compressible that the first gim peg and the second gim peg, which are obtained, in vertical direction stress, is fixed so as to detach the first fixing hole and second Hole, compared to traditional scaffold, the scaffold installation proposed in this programme is more convenient.
Brief description of the drawings
Fig. 1 is the cross-sectional view of the utility model front view.
In figure:1 connector, 101 matrixs, 102 fixing pipes, 103 first fixing holes, 104 fixed blocks, 105 grooves, 106 One gim peg, 107 chutes, 108 limited blocks, 109 first springs, 2 connecting tubes, 201 bodys, 202 second fixing holes, 203 sleeve pipes, 204 second gim pegs, 205 second springs.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belong to the scope of the utility model protection.
As shown in figure 1, the utility model provides a kind of technical scheme:A kind of civil engineering scaffold being easily installed, Including connector 1 and connecting tube 2, connector 1 and connecting tube 2 are connected with each other and are combined into scaffolding structure, and connector 1 includes base Block 101, matrix 101 are shaped as square, and six faces of matrix 101 have been fixedly connected with fixing pipe 102, fixing pipe 102 Length is 5-8 centimetres, and the inwall of fixing pipe 102, which is fixed, offers the first fixing hole 103, and the surface of fixing pipe 102 is fixedly connected There is fixed block 104, open up fluted 105 on fixed block 104, groove 105 and the intracavity inter-connection of fixing pipe 102, in groove 105 The first gim peg 106 is plugged with, the inwall of groove 105 offers chute 107, and the quantity of chute 107 is two, and two chutes 107 are symmetrically arranged at the inwall of groove 105, and the surface of the first gim peg 106 is fixedly connected with limited block 108, limited block 108 are connected in chute 107, are fixedly connected with the first spring 109 in groove 105, the both ends of the first spring 109 respectively with groove 105 inwall and the surface overlap joint of limited block 108.
Connecting tube 2 includes body 201, and one end of body 201 is plugged in fixing pipe 102, and the surface of body 201 offers Second fixing hole 202, and the first gim peg 106 is connected in the second fixing hole 202, the inwall fixed connecting sleeve of body 201 203, the both ends of sleeve pipe 203 are plugged with the second gim peg 204, and two relative one end of the second gim peg 204 pass through second Spring 205 is fixedly connected, and one end of the second gim peg 204 is connected in the first fixing hole 103.
First fixing hole 103, the first gim peg 106, the second fixing hole 202 and the second gim peg 204 are symmetrical two It is individual, and the first fixing hole 103, the first gim peg 106, the position of the second fixing hole 202 and the second gim peg 204 are mutually corresponding, The both ends of first gim peg 106 and the second gim peg 204 are smooth hemispherical.
It can to sum up obtain, connecting tube 2 is connected with each other by the utility model by connector 1, and one end of body 201 is plugged on admittedly In fixed tube 102, the first gim peg 106 is connected in the second fixing hole 202, and the second gim peg 204 is connected to the first fixing hole 103 It is interior, so as to complete the fixation to connector 1 and connecting tube 2, and because the first gim peg 106 and the second gim peg 204 are distinguished It is fixedly connected with the first spring 109 and second spring 205, so that the first gim peg 106 and the second gim peg 204 are vertical Direction stress is compressible, so as to detach the first fixing hole 103 and the second fixing hole 202, compared to traditional scaffold, sheet The scaffold installation proposed in scheme is more convenient.
It should be noted that herein, such as first and second or the like relational terms are used merely to a reality Body or operation make a distinction with another entity or operation, and not necessarily require or imply and deposited between these entities or operation In any this actual relation or order.Moreover, term " comprising ", "comprising" or its any other variant are intended to Nonexcludability includes, so that process, method, article or equipment including a series of elements not only will including those Element, but also the other element including being not expressly set out, or it is this process, method, article or equipment also to include Intrinsic key element.In the absence of more restrictions, the key element limited by sentence "including a ...", it is not excluded that Other identical element also be present in process, method, article or equipment including the key element.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out with a variety of changes in the case where not departing from principle of the present utility model and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of civil engineering scaffold being easily installed, including connector(1)And connecting tube(2), it is characterised in that:It is described Connector(1)Including matrix(101), the matrix(101)Be shaped as square, the matrix(101)Six faces it is solid Surely it is connected with fixing pipe(102), the fixing pipe(102)Inwall fix offer the first fixing hole(103), the fixing pipe (102)Surface be fixedly connected with fixed block(104), the fixed block(104)On open up it is fluted(105), the groove (105)With fixing pipe(102)Intracavity inter-connection, the groove(105)Inside it is plugged with the first gim peg(106), the groove (105)Inwall offer chute(107), first gim peg(106)Surface be fixedly connected with limited block(108), institute State limited block(108)It is connected to chute(107)It is interior, the groove(105)Inside it is fixedly connected with the first spring(109), described One spring(109)Both ends respectively with groove(105)Inwall and limited block(108)Surface overlap joint;
The connecting tube(2)Including body(201), the body(201)One end be plugged on fixing pipe(102)It is interior, the pipe Body(201)Surface offer the second fixing hole(202), and the first gim peg(106)It is connected to the second fixing hole(202)It is interior, The body(201)Inwall fixed connecting sleeve(203), described sleeve pipe(203)Both ends be plugged with the second gim peg (204), and two the second gim pegs(204)Relative one end passes through second spring(205)It is fixedly connected, second gim peg (204)One end be connected to the first fixing hole(103)It is interior.
A kind of 2. civil engineering scaffold being easily installed according to claim 1, it is characterised in that:Described first is solid Determine hole(103), the first gim peg(106), the second fixing hole(202)With the second gim peg(204)It is symmetrical two, and the One fixing hole(103), the first gim peg(106), the second fixing hole(202)With the second gim peg(204)Position it is mutually corresponding.
A kind of 3. civil engineering scaffold being easily installed according to claim 1, it is characterised in that:Described first is solid Determine bolt(106)With the second gim peg(204)Both ends be smooth hemispherical.
A kind of 4. civil engineering scaffold being easily installed according to claim 1, it is characterised in that:The connector (1)And connecting tube(2)Interconnection is combined into scaffolding structure.
A kind of 5. civil engineering scaffold being easily installed according to claim 1, it is characterised in that:The fixing pipe (102)Length be 5-8 centimetres.
A kind of 6. civil engineering scaffold being easily installed according to claim 1, it is characterised in that:The chute (107)Quantity be two, and two chutes(107)It is symmetrically arranged at groove(105)Inwall.
CN201720535683.XU 2017-05-12 2017-05-12 A kind of civil engineering scaffold being easily installed Active CN206800988U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720535683.XU CN206800988U (en) 2017-05-12 2017-05-12 A kind of civil engineering scaffold being easily installed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720535683.XU CN206800988U (en) 2017-05-12 2017-05-12 A kind of civil engineering scaffold being easily installed

Publications (1)

Publication Number Publication Date
CN206800988U true CN206800988U (en) 2017-12-26

Family

ID=60740259

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720535683.XU Active CN206800988U (en) 2017-05-12 2017-05-12 A kind of civil engineering scaffold being easily installed

Country Status (1)

Country Link
CN (1) CN206800988U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108204120A (en) * 2018-02-06 2018-06-26 重庆熵臻科技有限公司 A kind of high stability and anti-dumping obforms supporting mechanism for building
CN109537872A (en) * 2018-11-21 2019-03-29 郭忠标 A kind of building scaffold Fast Installation dismounting equipment
CN111379404A (en) * 2018-12-30 2020-07-07 徐倩 Assembled framework

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108204120A (en) * 2018-02-06 2018-06-26 重庆熵臻科技有限公司 A kind of high stability and anti-dumping obforms supporting mechanism for building
CN109537872A (en) * 2018-11-21 2019-03-29 郭忠标 A kind of building scaffold Fast Installation dismounting equipment
CN111379404A (en) * 2018-12-30 2020-07-07 徐倩 Assembled framework

Similar Documents

Publication Publication Date Title
CN206800988U (en) A kind of civil engineering scaffold being easily installed
CN102251586B (en) Beam hanger, building framework structure and installation method
CN201245896Y (en) Frame type box body structure combination assembled movable building
CN205475731U (en) Integrated house combination mosaic structure's building node
CN110008625B (en) Finite element analysis research method for structural mechanical property of prefabricated part of fabricated building
CN208347296U (en) A kind of belt lacing rod piece
CN216130342U (en) Be used for reinforced (rfd) power consumption device of timber structure tenon fourth of twelve earthly branches node
CN205875655U (en) Scaffold
CN201314115Y (en) Combined scaffold
CN104234189B (en) A kind of four tubular truss structures of prefabricated house
CN210459181U (en) New and old ground is wall T joint design node even
CN203701294U (en) Novel lattice framework connecting piece of raw bamboo building
CN205421997U (en) Embedded U -shaped slotted hole steel pipe support
CN209369021U (en) A kind of novel modularized building structure
CN106836259A (en) A kind of base station counterweight standard component, base station counterweight foundation and integrated base station
CN113737949A (en) Be used for reinforced (rfd) power consumption device of timber structure tenon fourth of twelve earthly branches node
CN206174123U (en) Grid structure truss column is hole ball connecting device alternately
CN202031377U (en) Shed frame rod connecting device
CN208309898U (en) A kind of grange masonry wall structure
CN2604485Y (en) Assembling scaffold for construction use
CN218060709U (en) Connecting piece for assembled steel structure for building
CN219993031U (en) Scaffold for building engineering
CN218376309U (en) Disc socket joint formula steel cat ladder
CN208633488U (en) A kind of water conservancy and hydropower construction string supports system connector
CN219471224U (en) Building steelframe connection mounting structure

Legal Events

Date Code Title Description
GR01 Patent grant