CN206308775U - A kind of rainwater oozes tubular construction - Google Patents

A kind of rainwater oozes tubular construction Download PDF

Info

Publication number
CN206308775U
CN206308775U CN201621332776.4U CN201621332776U CN206308775U CN 206308775 U CN206308775 U CN 206308775U CN 201621332776 U CN201621332776 U CN 201621332776U CN 206308775 U CN206308775 U CN 206308775U
Authority
CN
China
Prior art keywords
metalling
rainwater
cloth
layer
tubular construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621332776.4U
Other languages
Chinese (zh)
Inventor
覃大伟
张烽
方飞
张隽
陈茜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pvg Municipal Architecture Design And Research Institute Co Ltd
Original Assignee
Pvg Municipal Architecture Design And Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pvg Municipal Architecture Design And Research Institute Co Ltd filed Critical Pvg Municipal Architecture Design And Research Institute Co Ltd
Priority to CN201621332776.4U priority Critical patent/CN206308775U/en
Application granted granted Critical
Publication of CN206308775U publication Critical patent/CN206308775U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)
  • Revetment (AREA)

Abstract

The utility model is related to a kind of rainwater to ooze tubular construction, is made up of osmos tube, metalling, geotechnological layer of cloth and coarse sands layer, and metalling is filled in around osmos tube, osmos tube is coated, geotechnological layer of cloth is located at metalling periphery, and metalling is coated, and coarse sands layer is filled in the periphery of geotechnological layer of cloth.Compared with prior art, the utility model overcomes the shortcomings of existing drainage system, fully demonstrates the theory of Rainwater Resources, and flood peak clipping flow the time for delaying flood peak to occur, maintains nature hydrologic cycle, repairs ecological environment.It is few that rainwater oozes pipe floor space, effectively reduces city rainwater drainage amount, mitigates the discharge pressure of existing drainage pipeline networks, reduce drainage pipeline networks investment cost, realize that urban rainwater directly infiltrates underground recharge of groundwater, recover Ecological Groundwater, there is good economic benefit and social benefit.

Description

A kind of rainwater oozes tubular construction
Technical field
The utility model is related to rainwater treatment field, and in particular to a kind of rainwater oozes tubular construction.
Background technology
With the development of urbanization, many cities face the problem of shortage of water resources.Rainwater is a kind of most basic, most straight Connect, most economical water resource, be the important step in nature water circulation system, to regulation, supplement regional water, improve and Preserve the ecological environment and play extremely crucial effect.For a long time, storm sewer design phiolosophy is:In time, promptly arrange Except the surface runoff that rainfall is formed, people assign Urban Rainwater Pipe Networks single rainfall runoff discharge function, it is determined that rainwater sets The utilization and compression to Rainfall runoff are not accounted for during meter flow, substantial amounts of rainwater is directly discharged into water body, is lost in vain, cuts off Supply of the rainwater to underground water.As China's urban construction is developed rapidly, the construction of large amount of building and road etc. makes city Waterproof floor area rapid growth.The runoff coefficient of the impermeable surfaces such as roofing, concrete and bituminous paving typically takes fixation Value.If simple consider quickly to discharge rainfall runoff, capacity, the conveying capacity of the facility such as required storm sewer, rainfall pumping station Will therewith increase, on the one hand increased urban construction investment;On the other hand flood, the riverbank of outer displacement hull be also add The problems such as corroding the impact load with pollutant.
The many city water resources of China lack, and are on the one hand to use huge exhaust system by growing rainfall runoff Discharge city, is on the other hand but the wretched insufficiency of urban groundwater supply.Such as Stormwater Drainage System Design, plan for land and Rain penetration is considered on covered ground, rationally, storm water conservation underground water source is fully utilized, then city water resource can be alleviated Crisis, can increase the water content in soil, regulate the climate, so as to improve the ecological environment in city, moreover it is possible to reduce rainwater piping again Investment and operating cost, and mitigate city waterlogging harm and water pollution.Therefore, in the urgent need to from maintain natural water circulation and Repair the angle innovation rainwater draining technology of ecological environment.
Utility model content
The purpose of this utility model is exactly to provide a kind of rainwater in order to solve the above problems to ooze tubular construction, can be overcome existing The deficiency of drainage system, fully demonstrates the theory of Rainwater Resources, and flood peak clipping flow, is maintained the time for delaying flood peak to occur Natural hydrologic cycle, repairs ecological environment.
The purpose of this utility model is achieved through the following technical solutions:
A kind of rainwater oozes tubular construction, is made up of osmos tube, metalling, geotechnological layer of cloth and coarse sands layer, described metalling It is filled in around osmos tube, osmos tube is coated, described geotechnological layer of cloth is located at metalling periphery, metalling is coated, institute The coarse sands layer stated is filled in the periphery of geotechnological layer of cloth.
Further, described osmos tube is 95%-97% using circular draining blind pipe, surface percent opening, and voidage is 80%-95%.
Further, described circular draining blind pipe is for the modified poly ethylene plastic strip of 1-3mm is mutual by width The 3 D stereo network structure that contact welding is formed.
Further, the section of described metalling cladding osmos tube is rectangular, and the thickness of cladding is 30-50cm.
Further, it is the rubble of 25-30mm that described metalling uses particle diameter.
Further, the lap width of described geotechnological layer of cloth is 150-200mm.
Further, the thickness of described coarse sands layer is 100-120mm.
Rain pipe or open channel are changed to osmos tube, surrounding backfill gravel by the utility model on the basis of the discharge of traditional rainwater Stone, rainwater is permeated by being embedded in the porous tubing of underground to surrounding soil horizon, and rainwater is penetrated into below ground first, is supplemented , while reducing the discharge pressure of municipal pipeline, there is ponding so as to avoid ground in underground water.
The utility model is small using material hydrophobic, resistance, with high surface infiltration ability and internal water passing capacity Circular blind pipe uses geotextiles outsourcing as osmos tube, osmos tube outside using rubble filling outside metalling, geotextiles periphery sets Coarse sands layer.After rainwater drops to ground, enter rainwater through rain collection well and ooze pipe, a part of rainwater is made in gravity and pipeline internal pressure Oozed out under outside pipe, in penetrating into soil after the metalling, geotechnological layer of cloth and coarse sands layer filtering by water penetration, unnecessary water River course is entered by pipe network, while the filtration system of metalling, geotechnological layer of cloth and coarse sands layer composition can effectively prevent from permeating current Destruction to original natural soils Rotating fields, it is ensured that the stability of basic unit's soil body, coarse sand not only good water permeability, and can take on the spot Material, geotextiles periphery sets coarse sands layer can prevent pipeline to be damaged in the extrusion process of external force.
Compared with prior art, the utility model overcomes the shortcomings of existing drainage system, fully demonstrates Rainwater Resources Theory, flood peak clipping flow, maintains nature hydrologic cycle at the time for delaying flood peak to occur, and repairs ecological environment, and rainwater oozes pipe and accounts for Ground area is few, is easy to be set in city and residence district, comprehensive with rainwater piping, osmotic cell, infiltration well etc. can use, and also may be used To be used alone.Designed by the utility model, can effectively reduce city rainwater drainage amount, mitigate the draining of existing drainage pipeline networks Pressure, reduces drainage pipeline networks investment cost, realizes that urban rainwater directly infiltrates underground recharge of groundwater, recovers underground Ecology ring , there is good economic benefit and social benefit in border.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
In figure:1- osmos tubes;2- metallings;3- geotechnique's layer of cloths;4- coarse sands layers.
Specific embodiment
The utility model is described in detail with specific embodiment below in conjunction with the accompanying drawings.
Embodiment 1
A kind of rainwater oozes tubular construction, as described in Figure 1, by 4 groups of osmos tube 1, metalling 2, geotechnological layer of cloth 3 and coarse sands layer Into metalling 2 is filled in around osmos tube 1, and osmos tube 1 is coated, and geotechnological layer of cloth 3 is located at the periphery of metalling 2, by metalling 2 claddings, coarse sands layer 4 is filled in the periphery of geotechnological layer of cloth 3, and using circular draining blind pipe, surface percent opening is 95% to osmos tube 1, Voidage is 80%, is for the 3 D stereo that the mutual contact welding of modified poly ethylene plastic strip of 1mm is formed is netted by width Structure, the section of the cladding osmos tube 1 of metalling 2 is rectangular, and the thickness of cladding is 30cm, and it is 25mm's that metalling 2 uses particle diameter Rubble, the lap width of geotechnological layer of cloth 3 is 150mm, and the thickness of coarse sands layer is 100mm, the present embodiment, the draining blind pipe for being used A diameter of 1m.
Embodiment 2
A kind of rainwater oozes tubular construction, substantially the same manner as Example 1, and difference is that osmos tube 1 is blind using circular draining Pipe, surface percent opening is 96%, and voidage is 90%, is for the mutual contact of modified poly ethylene plastic strip of 2mm melts by width Connect the 3 D stereo network structure to be formed to be obtained, the thickness of the cladding of metalling 2 is 40cm, and it is 28mm's that metalling 2 uses particle diameter Rubble, the lap width position 180mm of geotechnological layer of cloth 3, the thickness of coarse sands layer is 110mm.
Embodiment 3
A kind of rainwater oozes tubular construction, substantially the same manner as Example 1, and difference is that osmos tube 1 is blind using circular draining Pipe, surface percent opening is 97%, and voidage is 95%, is for the mutual contact of modified poly ethylene plastic strip of 3mm melts by width Connect the 3 D stereo network structure to be formed to be obtained, the thickness of the cladding of metalling 2 is 50cm, and it is 30mm's that metalling 2 uses particle diameter Rubble, the lap width of geotechnological layer of cloth 3 is 200mm, and the thickness of coarse sands layer is 120mm.

Claims (7)

1. a kind of rainwater oozes tubular construction, it is characterised in that be made up of osmos tube, metalling, geotechnological layer of cloth and coarse sands layer, described Metalling be filled in around osmos tube, osmos tube is coated, described geotechnological layer of cloth be located at metalling periphery, by metalling Cladding, described coarse sands layer is filled in the periphery of geotechnological layer of cloth.
2. a kind of rainwater according to claim 1 oozes tubular construction, it is characterised in that described osmos tube is using circular draining Blind pipe, surface percent opening is 95%-97%, and voidage is 80%-95%.
3. a kind of rainwater according to claim 2 oozes tubular construction, it is characterised in that described circular draining blind pipe is by width Spend the 3 D stereo network structure formed for the mutual contact welding of the modified poly ethylene plastic strip of 1-3mm.
4. a kind of rainwater according to claim 1 oozes tubular construction, it is characterised in that described metalling cladding osmos tube Section is rectangular, and the thickness of cladding is 30-50cm.
5. a kind of rainwater according to claim 4 oozes tubular construction, it is characterised in that described metalling use particle diameter for The rubble of 25-30mm.
6. a kind of rainwater according to claim 1 oozes tubular construction, it is characterised in that the lap width of described geotechnological layer of cloth It is 150-200mm.
7. a kind of rainwater according to claim 1 oozes tubular construction, it is characterised in that the thickness of described coarse sands layer is 100- 120mm。
CN201621332776.4U 2016-12-07 2016-12-07 A kind of rainwater oozes tubular construction Expired - Fee Related CN206308775U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621332776.4U CN206308775U (en) 2016-12-07 2016-12-07 A kind of rainwater oozes tubular construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621332776.4U CN206308775U (en) 2016-12-07 2016-12-07 A kind of rainwater oozes tubular construction

Publications (1)

Publication Number Publication Date
CN206308775U true CN206308775U (en) 2017-07-07

Family

ID=59249969

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621332776.4U Expired - Fee Related CN206308775U (en) 2016-12-07 2016-12-07 A kind of rainwater oozes tubular construction

Country Status (1)

Country Link
CN (1) CN206308775U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109487897A (en) * 2018-11-19 2019-03-19 北京建筑大学 It stores and seeps device
CN114033109A (en) * 2021-11-19 2022-02-11 杭州法莱科技有限公司 Planting roof vegetation layer oozes drainage system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109487897A (en) * 2018-11-19 2019-03-19 北京建筑大学 It stores and seeps device
CN114033109A (en) * 2021-11-19 2022-02-11 杭州法莱科技有限公司 Planting roof vegetation layer oozes drainage system

Similar Documents

Publication Publication Date Title
CN203174665U (en) Urban rainwater collection and utilization system
CN204475100U (en) A kind of permeable urban road
CN105297575B (en) A kind of double useless pervious concrete pavements of cavernous body
CN206352331U (en) The concave herbaceous field structure of sponge the idea of the city
CN208857626U (en) A kind of permeable and water storage pavement structure
CN107034767A (en) A kind of full pervious concrete pavement structure of regeneration aggregate and its construction method
CN206308775U (en) A kind of rainwater oozes tubular construction
CN107761504A (en) Porous pavement with pervious concrete post
CN205637041U (en) Grit seepage well suitable for sponge city construction
CN204753291U (en) Be fit for at rainwater that laid on waterproof ground water storage device that permeates water
CN202265891U (en) Permeable rainwater drainage pipe
CN109338839B (en) Urban seepage storage system for recycling construction waste
CN207582619U (en) A kind of Rain Garden based on sponge city
CN106592580A (en) Self-pressurization rapid-permeating precast pile device and construction method thereof
CN203546876U (en) Novel rainwater interception, seeping and discharging integral system
CN105421647B (en) A kind of step building block of Collection utilization rainwater
CN105484125B (en) A kind of step of Collection utilization rainwater
CN207469190U (en) A kind of infitration galleries structure of efficient draining
CN207176431U (en) A kind of permeable pavement structure based on sponge the idea of the city
CN106801371A (en) High-bearing capacity permeable ground structure and laying method
CN206828912U (en) A kind of full pervious concrete pavement structure of regeneration aggregate
CN107083729B (en) It is a kind of to store permeable module and preparation method thereof
CN206090204U (en) Height ecological road surface structure of permeating water
CN206428546U (en) A kind of new gangue water-permeable brick
CN213417454U (en) Permeable pavement

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170707

Termination date: 20191207

CF01 Termination of patent right due to non-payment of annual fee