CN206308690U - Grout pile bottom stake side one grouting behind shaft or drift lining construction tool - Google Patents

Grout pile bottom stake side one grouting behind shaft or drift lining construction tool Download PDF

Info

Publication number
CN206308690U
CN206308690U CN201621274307.1U CN201621274307U CN206308690U CN 206308690 U CN206308690 U CN 206308690U CN 201621274307 U CN201621274307 U CN 201621274307U CN 206308690 U CN206308690 U CN 206308690U
Authority
CN
China
Prior art keywords
slip casting
pipe
grouting
stake side
stake
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621274307.1U
Other languages
Chinese (zh)
Inventor
郑祺恺
张宏刚
樊跃光
付强
黄跃楠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING GEO-ENGINEERING Co
Original Assignee
BEIJING GEO-ENGINEERING Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING GEO-ENGINEERING Co filed Critical BEIJING GEO-ENGINEERING Co
Priority to CN201621274307.1U priority Critical patent/CN206308690U/en
Application granted granted Critical
Publication of CN206308690U publication Critical patent/CN206308690U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

A kind of grout pile bottom stake side one grouting behind shaft or drift lining construction tool is disclosed in the utility model, include the body that a bottom is arranged and extended to along bored concrete pile bearing of trend, the bottom of the body is provided with slip casting shower nozzle, at least one three-way pipe one is provided with and communicated with the body, ring is provided with and communicated with the three-way pipe one in the annular slurry casting machine of stake side, the tubular body is movably provided with a slip casting inner tube, the end of the slip casting inner tube is provided with the orientation slurry casting machine of the only pulp in tubular body hospital areas, it is by the change to slip casting structure, allow once to lay the slip casting that Grouting Pipe completes a bottom and stake side.

Description

Grout pile bottom stake side one grouting behind shaft or drift lining construction tool
Technical field
The utility model is related to the realm of building construction, more particularly to a kind of grout pile bottom stake side one grouting behind shaft or drift lining construction work Tool.
Background technology
Bored concrete pile refers to by means shapes in foundation soil such as machine drilling, steel pipe soil compaction or manpower excavations in engineering site Into stake holes, and steel reinforcement cage, concrete perfusion and the stake made are placed in it.Current skyscraper uses cast-in-situ bored pile mostly Basis, in the hope of reaching the requirement of design bearing capacity and sedimentation.Cast-in-situ bored pile due to its construction technology causes that following lacking can be produced Fall into:1. pile bottom sediment is difficult to clean out, and reduces end bearing capacity of pile, increases stake settling amount;2. produce stake week using mud off One layer of mud skin, so as to reduce the side friction between stake and the soil body.To avoid above-mentioned factor from influenceing, in existing filling pile construction In technique, stake side skin friction, bearing capacity of pile tip are improved by stake bottom, stake side Post Grouting Technique, shorten that stake is long, reduce to reach The effect of sedimentation.
Authorization Notice No. discloses " pile end and slip casting around pile method " for the Chinese invention patent of CN1072746C, adopts When taking catheterized reperfusion underwater concrete, stake holes end or will at least will be sunk at least provided with the special water proof plug of a Grouting Pipe With a fixing device for Grouting Pipe stake holes end is sunk to common water proof plug;By at least provided with a stake side note for Grouting Pipe Sizing device is put into stake holes with steel reinforcement cage;The some depths in stake side of the stake after utilizing Grouting Pipe preceding to solidification after pile or hardening Degree position carries out slip casing by pressure.The patent could be at least completed to stake bottom stake side grouting behind shaft or drift lining using two Grouting Pipes.
Authorization Notice No. is disclosed " side rear grouting of compresol pile technique " for the Chinese invention patent of CN1138898C, is used To stake side grouting behind shaft or drift lining, the device includes the slip casting steel conduit being longitudinally attached on pile body steel reinforcement cage, slip casting to stake side post-grouting device Steel conduit upper end and the defeated slurry soft pipe connection of ground high pressure, slip casting steel conduit bottom is by inverted T-shaped three-way interface and reinforcement PVC Soft pipe connection, is distributed with slip casting check valve in reinforcement PVC hose.The patent can only carry out grouting behind shaft or drift lining to stake side.
Authorization Notice No. discloses " Pile side, pile bottom post grouting for the Chinese invention patent of CN1226491C Construction technology ", at least two pile side Grouting Pipes are furnished with by stake side along steel reinforcement cage border, have at least two pile bottoms in stake base fabric Grouting Pipe, after first cement mortar slip casting final set, secondary splitting grouting is carried out using Grouting Pipe, improves bearing capacity of pile tip and stake Side friction.The patent at least could complete a bottom stake side grouting behind shaft or drift lining using four Grouting Pipes.
There is following defect in technique in foregoing invention:Single Grouting Pipe can only be entered to one of them of stake bottom or stake side Row slip casting, when slip casting is carried out to stake bottom, stake side, because slip casting position is different, at least needs to lay Grouting Pipe twice.
Utility model content
The purpose of this utility model is to provide a kind of grout pile bottom stake side one grouting behind shaft or drift lining construction tool, and it passes through right The change of slip casting structure so that once laying Grouting Pipe can complete the slip casting of a bottom and stake side.
Above-mentioned purpose of the present utility model technical scheme is that:A kind of grout pile bottom stake side one Body grouting behind shaft or drift lining construction tool, includes the body that a bottom is arranged and extended to along bored concrete pile bearing of trend, the bottom of the body Slip casting shower nozzle is provided with, at least one three-way pipe one is provided with and communicated with the body, be provided with and communicated with the three-way pipe one Ring is movably provided with a slip casting inner tube in the annular slurry casting machine of stake side, the tubular body, and the end of the slip casting inner tube sets It is equipped with the orientation slurry casting machine of the only pulp in tubular body hospital areas.
By using above-mentioned technical proposal, body extends to the stake bottom of bored concrete pile, and three-way pipe one, edge are set on body The slip casting inner tube that tubular body activity is set brings cement mortar into tubular body, when carrying out pile grouting, orients slurry casting machine by water Mud sprays from slip casting shower nozzle;After the completion of the slip casting of bottom, slip casting inner tube to the pulp position and three for orienting slurry casting machine is moved up The valve port of siphunculus one is relative, and cement mortar is exported to annular slurry casting machine from three-way pipe one, finally by annular slurry casting machine by water Mud is sprayed onto a side.The stake bottom of bored concrete pile is arranged and can be completed with stake side by a body, without substep slip casting.
Further, the three-way pipe two docked with three-way pipe one is provided with the annular slurry casting machine, the body is by extremely Few two sections of pipes are spliced to form, and two direct-connected valve ports of the three-way pipe one are connected between two sections of pipes, another valve of three-way pipe one Mouth is docked and connected with a valve port of three-way pipe two.
By using above-mentioned technical proposal, two threeway docking, the cement mortar that the slip casting inner tube in body is brought into passes through to determine Three-way pipe one is passed through to slurry casting machine, then docking by three-way pipe one and three-way pipe two, cement mortar is introduced into three-way pipe two, threeway Cement mortar can be introduced and side slip casting is carried out inside it by outer two valve ports of the two of pipe two from the two ends of annular slurry casting machine respectively.
Further, the annular slurry casting machine 4 includes the flexible pipe with some plasma discharge holes, and sealing fixes the two of flexible pipe Hold in the snap ring on three-way pipe two.
Need together to be attached to ring in bored concrete pile when body is installed by using above-mentioned technical proposal, annular Grouting Pipe Stake side, therefore, in order to the process of down tube, and snap ring can be used to fix the two ends of flexible pipe using flexible pipe, can ensure to seal Property on the premise of, the installation effectiveness of the annular slurry casting machine of lifting.
Further, the pile crown one end on the body near bored concrete pile is provided with one-way control valve.
By using above-mentioned technical proposal, one-way control valve can outwards be extracted interior after the completion of stake bottom and slip casting around pile are equal During Grouting Pipe, the upper orifice of body 1 is turned off.
Further, the slip casting shower nozzle includes the interface end being screwed with bottom of the pipe, is laid with some injected holes Slip casting area and close the slip casting shower nozzle lower end blind end.
By using above-mentioned technical proposal, the lower end mouth of pipe closing of body is made what cement mortar was only gone by the Zhujiang River by blind end Injected hole is sprayed, and slip casting shower nozzle is threadedly coupled by interface end with body, can be in order to the Renewal process of slip casting shower nozzle.
Further, the orientation slurry casting machine includes the wedge-shaped rubber ring, the sealing orientation that are located on slip casting outer wall of inner tube The rubber stopper of slurry casting machine bottom and positioned between the two, slip casting parts that multiple perforation are laid on tube wall, the wedge shape The outer ring size of rubber ring and rubber stopper is with internal diameter of tube body size fit with the shape in the pipeline section of the body residing for slip casting part Into one section of closed area.
Sealed with inboard wall of tube body by using above-mentioned technical proposal, rubber stopper closing orientation slurry casting machine bottom, and its outer ring; Wedge-shaped rubber ring set is located at slip casting outer wall of inner tube, and outer ring also seals with inboard wall of tube body, and so, the cement mortar in slip casting part is only Can in the region sealed by rubber stopper and wedge-shaped rubber ring pulp, slip casting part is moved at slip casting shower nozzle, cement mortar Stake bottom is sprayed into, slip casting inner tube is moved up so that the annular slurry casting machine of closed area alignment, then cement mortar is only into annular slurry casting machine Carry out side slip casting.
Further, the upper end of the slip casting inner tube is provided with the defeated slurry of high pressure of the outside grouting equipment of connection and slip casting inner tube Flexible pipe.
Used by using above-mentioned technical proposal, the defeated slurry flexible pipe connection grouting equipment of high pressure and slip casting inner tube, slip casting inner tube Stereoplasm tube, movement that can be in order to slip casting inner tube in body.
In sum, the utility model has the advantages that:Body extends to the stake bottom of bored concrete pile, and on body Three-way pipe one is set, and the slip casting inner tube set along tubular body activity brings cement mortar into tubular body, when carrying out pile grouting, Orientation slurry casting machine sprays cement mortar from slip casting shower nozzle;After the completion of the slip casting of bottom, slip casting inner tube is moved up to orienting slurry casting machine Pulp position it is relative with the valve port of three-way pipe one, cement mortar is exported to annular slurry casting machine from three-way pipe one, finally by Cement mortar is sprayed onto a side by annular slurry casting machine.The stake bottom and stake side of bored concrete pile are arranged and can be completed by a body, without dividing Step slip casting.
Brief description of the drawings
Fig. 1 poured for cast-in-situ bored pile after schematic diagram;
Fig. 2 is the axonometric drawing of Grouting Pipe;
Fig. 3 is the explosive view of Grouting Pipe;
Fig. 4 is the sectional view in A-A directions in Fig. 1;
Fig. 5 is the B portions enlarged drawing of Fig. 4;
Reference:1st, body;11st, one-way control valve;12nd, external screw thread;13rd, internal thread;2nd, slip casting shower nozzle;21st, interface End;22nd, slip casting area;23rd, blind end;221st, injected hole;3rd, three-way pipe one;31st, port end;32nd, collar extension end;4th, annular slip casting Device;41st, three-way pipe two;42nd, snap ring;43rd, flexible pipe;431st, plasma discharge hole;5th, the defeated slurry flexible pipe of high pressure;6th, slip casting inner tube;7th, orientation note Slurry device;71st, wedge-shaped rubber ring;72nd, slip casting part;721st, perforate;73rd, rubber stopper;8th, base soil layer;81st, stake holes;82nd, gap; 821st, stake latasuture gap;822nd, stake bottom gap;9th, cast-in-situ bored pile;91st, steel reinforcement cage;911st, cage bar.
Specific embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.
Embodiment
As shown in figure 1, the schematic diagram after being poured for cast-in-situ bored pile 9, in order to improve bottom bearing capacity and a pile side friction, Using following instrument:
A kind of grout pile bottom stake side one grouting behind shaft or drift lining construction tool, with reference to Fig. 2 and Fig. 3, including some straight line connections Body 1 together, body 1 uses the stainless steel tube that specification is Φ 38 × 2.5 to make, one end of body 1 be provided with external screw thread 12, The other end is provided with internal thread 13, and an external screw thread 12 for the port of body 1 is engaged with the internal thread 13 of another port of body 1, So that two bodys 1 link together, as needed, some bodys 1 can be connected the slip casting of composition different length Pipe.
Be connected through a screw thread slip casting shower nozzle 2 positioned at the bottom of bottom body 1, slip casting shower nozzle 2 be using with the phase of body 1 Same specification, the stainless steel tube of length 300mm make, and slip casting shower nozzle 2 includes:For be threadedly coupled with body 1 interface end 21, in Between for outside slip casting slip casting area 22, end blind end 23, the 200mm long of slip casting area 22, which is provided with some injected holes 221, injected hole 221 uniformly lays 4 rows along generatrix direction, often arranges 4, altogether 16 injected holes 221, and injected hole 221 is diameter The circular hole of 5mm.
Three-way pipe 1 is provided with the centre position of Grouting Pipe, three-way pipe 1 is to contain two port ends, 31, collar extension End 32 constitutes the stainless joint water pipe of T-shaped, and three ports of three-way pipe 1 are provided with what is be engaged with external screw thread 12 on body 1 Internal thread 13, middle two adjacent bodys 1 are matched somebody with somebody with two internal threads of port end 31 13 respectively by the external screw thread 12 of termination Close so that middle two adjacent bodys 1 are connected by the straight line of three-way pipe 1.The collar extension end 32 of three-way pipe 1 is connected by screw thread Annular slurry casting machine 4 is connected to, annular slurry casting machine 4 includes three-way pipe 2 41, and three-way pipe 2 41 exists with the difference of three-way pipe 1 In:Collar extension end 32 is provided with external screw thread 12, and two port ends 31 are provided with snap ring 42.The collar extension end 32 of three-way pipe 2 41 and three-way pipe one 3 collar extension end 32 is connected through a screw thread, and the straight-through part of three-way pipe 2 41 is vertical with the straight-through part of three-way pipe 1.In threeway Be connected with a flexible pipe 43 on pipe 2 41, flexible pipe 43 is PVC wired hoses, the two ends of flexible pipe 43 respectively with three-way pipe 2 41 on Two connections of port end 31 form loop configuration, and are fixed by two snap rings of port end 31 42 clamping on three-way pipe 2 41, Ensure that flexible pipe 43 has good sealing with the interface of three-way pipe 2 41, and installing/dismounting can be facilitated, according to drill-pouring The circle diameter of the steel reinforcement cage 91 used by stake 9 can select the flexible pipe 43 of corresponding length.Some rows are formed around in flexible pipe 43 Slurry hole 431.Length with Grouting Pipe increases, and can equably set up some threeways between the body 1 at the middle part of Grouting Pipe The annular slurry casting machine 4 of pipe 1 and equivalent, to meet the slip casting around pile demand of different depth.
Body 1 positioned at the top is provided with one-way control valve 11, to realize the keying of slip casting passage.To avoid slip casting from spraying The concrete that the plasma discharge hole 431 on injected hole 221 and flexible pipe 43 on first 2 is poured stake is blocked, in injected hole 221 and plasma discharge hole 431 Upper placement drawing pin, and protective filmy layer is coated in outside, protecting film is the packing cloth of adhesive waterproof tape, or other materials.
With reference to Fig. 3 and Fig. 4, slip casting inner tube 6 is provided with the cavity in Grouting Pipe, slip casting inner tube 6 is 1 meter of galvanizing long 4 are in charge of, defeated slurry flexible pipe 5, the bottom connection orientation slurry casting machine 7 of the external isometrical high pressure in top of slip casting inner tube 6.With reference to Fig. 3 and Tu 5, orientation slurry casting machine 7 includes:Double-deck wedge-shaped rubber ring 71 in top, the rubber stopper 73 of middle slip casting part 72, bottom, slip casting Part 72 is in charge of by 100mm galvanizings 4 long and is made, and some perforation 721 are distributed with along its generatrix direction in slip casting part 72, and Each perforation 721 along slip casting part 72 radial penetration tube wall, slip casting part 72 is connected through a screw thread with slip casting inner tube 6.Wedge shape Rubber ring 71 is arranged the termination for being fixed on slip casting part 72, and the edge of wedge-shaped rubber ring 71 is contacted and sealed with Grouting Pipe so that Slip casting part 72 and the Grouting Pipe cavity isolation of top;Rubber stopper 73 is arranged the end for being fixed on slip casting part 72, rubber stopper 73 Edge contact and seal with Grouting Pipe so that the Grouting Pipe cavity isolation of slip casting part 72 and lower section, so as to orient slurry casting machine 7 The slurries of outflow are limited in the space at the place of slip casting part 72 to realize orienting slip casting.By outwards extracting or being inwardly put into height The length of the defeated slurry flexible pipe 5 of pressure can control slip casting inner tube 6 to be slid up and down along the length direction of Grouting Pipe, so that orientation slip casting The diverse location that device 7 rests on Grouting Pipe carries out slip casting.
Grout pile bottom stake side post grouting process is comprised the following steps:
S1:With reference to Fig. 1 and Fig. 4, cast-in-situ bored pile 9 is constructed:
(1)Drill and borehole cleaning:Stake holes 81 is drilled through using drilling machine at the stake position of base soil layer 8 first, in boring procedure Ensure that the perpendicularity in hole meets design requirement, after drilling reaches design requirement depth, reply hole depth, hole position, hole shape, aperture etc. Checked.Whole hole check comply fully with design requirement when, bottom hole cleaning should be carried out using suction dredge immediately, it is to avoid every when mistake Length is so that mud sediment, causes borehole collapse.
(2)Precast reinforced cage 91 and colligation Grouting Pipe:According to the steel reinforcement cage 91 needed for the prefabricated bored concrete pile of design requirement, will The body 1 of Grouting Pipe is tied up firmly along the length direction of cage bar 911 of steel reinforcement cage 91, and causes the slip casting shower nozzle 2 of bottom termination Grow the bottom of steel reinforcement cage 91, the body 1 of top termination is higher by bored concrete pile top surface to be made, and top the termination of body 1 and list Use polyethylene film to cover to control valve 11 to prevent from blocking.Then on demand at the middle part of bored concrete pile to be made on steel reinforcement cage 91 Position is accurately installed by annular slurry casting machine 4 so that flexible pipe 43 is set in the periphery of steel reinforcement cage 91, flexible pipe 43 along steel reinforcement cage 91 circle Week sets and is fixed with iron wire, to prevent the displacement of flexible pipe 43.
(3)Lay steel reinforcement cage 91 and concrete conduit:During the steel reinforcement cage 91 for tying up Grouting Pipe is hung onto stake holes 81, installation course It is middle to notice that protection Grouting Pipe is not damaged by, then from the placed on top concrete conduit of steel reinforcement cage 91.
(4)Perfusion pile body:By concrete tremie placing concrete, after concrete enters steel reinforcement cage 91, concrete rises should not be too fast, and concrete conduit exists Buried depth is unsuitable excessive in concrete, unsuitable too fast during lifting concrete conduit in strict accordance with Authority Contro1 between 2-6m, prevents concrete conduit Hook steel reinforcement cage 91 and brought up.Because concrete can not be combined completely with base soil layer 8, therefore cast-in-situ bored pile 9 and base soil Can there is gap 82 between layer 8.
S2:Treat that bored concrete pile completes 3 days grouting behind shaft or drift lining:
(1)Preparation:Remove for protecting the polyethylene film of the top port of body 1 and one-way control valve 11, and open One-way control valve 11 is switched;The defeated slurry flexible pipe 543 of high pressure is connected with slip casting inner tube 6 and ensures sealing joint, slip casting inner tube 6 And orientation slurry casting machine 7 is inserted into Grouting Pipe and is deep into bottom so that orientation slurry casting machine 7 is supported to slip casting shower nozzle 2.
(2)Pile grouting:By the defeated slurry conveying high-pressure cement grout of flexible pipe 543 of high pressure, high pressure cement slurries are through in slip casting Pipe 6 flow to orientation slurry casting machine 7, can ensure that now cement grout is only filled with slip casting bottom of the tube in the presence of wedge-shaped rubber ring 71. Because the stainless steel tube wall of slip casting shower nozzle 2 is in rigidity, the protecting film being coated on outside injected hole 221 has elasticity, therefore cement mortar Liquid passes through injected hole 221 and breaks through protecting film and flow in a bottom gap 822 under high pressure.Treat that pile grouting amount reaches design requirement Or grouting pressure is when reaching design load, pile grouting work is completed.
(3)Slip casting around pile:After the completion of pile grouting, outwards the defeated slurry flexible pipe 543 of lifting high pressure causes that slip casting inner tube 6 is promoted to Slip casting around pile region, orients the three-way pipe 1 on the slip casting part 72 and Grouting Pipe of slurry casting machine 7 in same confined space, starts Slip casting is oriented to stake side, now cement grout is full of annular slurry casting machine 4, because the compressive property of flexible pipe 43 is compared with protecting film Good, cement grout breaks through protecting film under high pressure carries out secondary splitting to the concrete on bored concrete pile top layer, so as to flow to a latasuture In gap 821.Because flexible pipe 43 is to surround steel reinforcement cage 91 to set, therefore cement grout can be filled up equably around grout pile side Gap 82, when slip casting around pile amount reaches design requirement or grouting pressure reaches design load, slip casting around pile work complete.Stop The conveying of cement grout, slip casting inner tube 6 is extracted, and closes one-way control valve 11 to block Grouting Pipe, completes whole slip casting work.
To sum up, by above-mentioned grout pile bottom stake side post grouting process, it is possible to achieve single Grouting Pipe is completed to bored concrete pile Stake bottom, stake side grouting behind shaft or drift lining work, improve a side skin friction, bearing capacity of pile tip, reach shorten stake it is long, reduce sedimentation effect Really.Because the medium position of Grouting Pipe can increase the quantity of annular slurry casting machine according to the length of Grouting Pipe, therefore can be to filling The different depth of note stake stake side carries out slip casting respectively, improves slip casting around pile effect.Simultaneously as the quantity of Grouting Pipe is reduced, The workload for tying up Grouting Pipe is reduced in construction, efficiency of construction is improve, and save consumptive material.
The above is only the preferred embodiment of the present invention, and protection scope of the present invention is not limited merely to above-mentioned implementation Example, all technical schemes belonged under thinking of the present invention belong to protection scope of the present invention.It should be pointed out that for the art Those of ordinary skill for, some improvements and modifications without departing from the principles of the present invention, these improvements and modifications Should be regarded as protection scope of the present invention.

Claims (7)

1. a kind of grout pile bottom stake side one grouting behind shaft or drift lining construction tool, includes and arranges and extend to along bored concrete pile bearing of trend The body at stake bottom(1), it is characterized in that:The body(1)Bottom be provided with slip casting shower nozzle, the body(1)Upper connection is set There is at least one three-way pipe one(3), the three-way pipe one(3)On be provided with and communicated with ring in the annular slurry casting machine of stake side(4), it is described Body(1)Inside is movably provided with a slip casting inner tube(6), the slip casting inner tube(6)End be provided with only in body(1)It is interior The orientation slurry casting machine of pulp in portion hospital areas(7).
2. grout pile bottom according to claim 1 stake side one grouting behind shaft or drift lining construction tool, it is characterized in that:The ring-shaped pouring Slurry device(4)On be provided with and three-way pipe one(3)The three-way pipe two of docking(41), the body(1)Splice shape by least two sections pipes Into the three-way pipe one(3)Two direct-connected valve ports be connected between two sections of pipes, three-way pipe one(3)Another valve port and threeway Pipe two(41)A valve port dock and connect.
3. grout pile bottom according to claim 1 and 2 stake side one grouting behind shaft or drift lining construction tool, it is characterized in that:The ring Shape slurry casting machine 4 includes carrying some plasma discharge holes(431)Flexible pipe(43), and the fixed flexible pipe of sealing(43)Two ends in three-way pipe Two(41)On snap ring(42).
4. grout pile bottom according to claim 3 stake side one grouting behind shaft or drift lining construction tool, it is characterized in that:The body (1)On pile crown one end of bored concrete pile is provided with one-way control valve(11).
5. grout pile bottom according to claim 1 stake side one grouting behind shaft or drift lining construction tool, it is characterized in that:The slip casting spray Head(2)Including with body(1)The interface end that lower end is screwed(21), be laid with some injected holes(221)Slip casting area(22) And close the slip casting shower nozzle(2)Lower end blind end(23).
6. grout pile bottom according to claim 1 stake side one grouting behind shaft or drift lining construction tool, it is characterized in that:The orientation note Slurry device(7)Including being located on slip casting inner tube(6)Wedge-shaped rubber ring on outer wall(71), sealing orientation slurry casting machine(7)Bottom Rubber stopper(73)And positioned between the two, multiple perforation are laid on tube wall(721)Slip casting part(72), the wedge-shaped rubber Glue ring(71)And rubber stopper(73)Outer ring size and body(1)Internal diameter size is adapted to in slip casting part(72)Residing pipe Body(1)Pipeline section in formed one section of closed area.
7. grout pile bottom according to claim 1 stake side one grouting behind shaft or drift lining construction tool, it is characterized in that:In the slip casting Pipe(6)Upper end be provided with the outside grouting equipment of connection and slip casting inner tube(6)The defeated slurry flexible pipe of high pressure(5).
CN201621274307.1U 2016-11-24 2016-11-24 Grout pile bottom stake side one grouting behind shaft or drift lining construction tool Expired - Fee Related CN206308690U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621274307.1U CN206308690U (en) 2016-11-24 2016-11-24 Grout pile bottom stake side one grouting behind shaft or drift lining construction tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621274307.1U CN206308690U (en) 2016-11-24 2016-11-24 Grout pile bottom stake side one grouting behind shaft or drift lining construction tool

Publications (1)

Publication Number Publication Date
CN206308690U true CN206308690U (en) 2017-07-07

Family

ID=59245075

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621274307.1U Expired - Fee Related CN206308690U (en) 2016-11-24 2016-11-24 Grout pile bottom stake side one grouting behind shaft or drift lining construction tool

Country Status (1)

Country Link
CN (1) CN206308690U (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107794925A (en) * 2017-10-31 2018-03-13 浙江大学城市学院 The grouting behind shaft or drift lining cast-in-situ concrete thin-wall and construction method of a kind of reserved grouting pipeline
CN108894232A (en) * 2018-07-28 2018-11-27 江苏地基工程有限公司 A kind of concrete precast pile post-grouting device and its forming method and grouting process
CN109487810A (en) * 2018-12-06 2019-03-19 中信重工机械股份有限公司 A kind of pipeline arrangement being suitable for different height lubricant injected hole after open caisson wall
CN111042142A (en) * 2019-12-29 2020-04-21 福建建中建设科技有限责任公司 Post-grouting construction and grouting failure treatment device and method for pile end
CN111353196A (en) * 2020-03-31 2020-06-30 上海城建市政工程(集团)有限公司 Composite stratum pile foundation displacement prediction method based on virtual columnar structure equivalent deformation model
CN111778980A (en) * 2020-07-31 2020-10-16 中建四局第一建筑工程有限公司 Large-diameter pile grouting device
CN112144511A (en) * 2020-09-24 2020-12-29 中国一冶集团有限公司 Vacuum-assisted post grouting device and method for cast-in-situ bored pile
CN112376571A (en) * 2020-11-23 2021-02-19 中建一局集团建设发展有限公司 Pile side and pile end integrated grouting device and construction method thereof
CN112459071A (en) * 2020-11-30 2021-03-09 中国一冶集团有限公司 Vacuum grouting device for cast-in-situ bored pile and construction method
CN113622418A (en) * 2021-08-10 2021-11-09 上海市机械施工集团有限公司 Prestressed concrete pipe pile structure and construction method
CN115369882A (en) * 2022-09-05 2022-11-22 中国建筑第七工程局有限公司 Post grouting device for cast-in-place pile and construction method
CN115613580A (en) * 2022-10-28 2023-01-17 中国十九冶集团有限公司 Single grouting pipe of cast-in-place pile and composite post-grouting method

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107794925A (en) * 2017-10-31 2018-03-13 浙江大学城市学院 The grouting behind shaft or drift lining cast-in-situ concrete thin-wall and construction method of a kind of reserved grouting pipeline
CN108894232A (en) * 2018-07-28 2018-11-27 江苏地基工程有限公司 A kind of concrete precast pile post-grouting device and its forming method and grouting process
CN108894232B (en) * 2018-07-28 2020-09-04 江苏地基工程有限公司 Post-grouting device for concrete precast pile and forming method and grouting process thereof
CN109487810A (en) * 2018-12-06 2019-03-19 中信重工机械股份有限公司 A kind of pipeline arrangement being suitable for different height lubricant injected hole after open caisson wall
CN109487810B (en) * 2018-12-06 2023-11-07 中信重工机械股份有限公司 Pipeline arrangement suitable for lubricant grouting holes with different heights behind open caisson wall
CN111042142B (en) * 2019-12-29 2021-09-28 福建建中建设科技有限责任公司 Post-grouting construction and grouting failure processing device for pile end
CN111042142A (en) * 2019-12-29 2020-04-21 福建建中建设科技有限责任公司 Post-grouting construction and grouting failure treatment device and method for pile end
CN111353196A (en) * 2020-03-31 2020-06-30 上海城建市政工程(集团)有限公司 Composite stratum pile foundation displacement prediction method based on virtual columnar structure equivalent deformation model
CN111778980A (en) * 2020-07-31 2020-10-16 中建四局第一建筑工程有限公司 Large-diameter pile grouting device
CN112144511A (en) * 2020-09-24 2020-12-29 中国一冶集团有限公司 Vacuum-assisted post grouting device and method for cast-in-situ bored pile
CN112376571A (en) * 2020-11-23 2021-02-19 中建一局集团建设发展有限公司 Pile side and pile end integrated grouting device and construction method thereof
CN112459071B (en) * 2020-11-30 2022-05-10 中国一冶集团有限公司 Vacuum grouting device for cast-in-situ bored pile and construction method
CN112459071A (en) * 2020-11-30 2021-03-09 中国一冶集团有限公司 Vacuum grouting device for cast-in-situ bored pile and construction method
CN113622418A (en) * 2021-08-10 2021-11-09 上海市机械施工集团有限公司 Prestressed concrete pipe pile structure and construction method
CN115369882A (en) * 2022-09-05 2022-11-22 中国建筑第七工程局有限公司 Post grouting device for cast-in-place pile and construction method
CN115369882B (en) * 2022-09-05 2024-03-26 中国建筑第七工程局有限公司 Post grouting device for cast-in-place pile and construction method
CN115613580A (en) * 2022-10-28 2023-01-17 中国十九冶集团有限公司 Single grouting pipe of cast-in-place pile and composite post-grouting method

Similar Documents

Publication Publication Date Title
CN206308690U (en) Grout pile bottom stake side one grouting behind shaft or drift lining construction tool
WO2021223573A1 (en) Construction structure for communication and connection between newly added mined channel and existing station hall layer
CN202124865U (en) Quick plugging device for dewatering wellhead of sand-free cement pipe deep well
CN110878700B (en) Tunnel waterproof structure and construction method thereof
CN109356162B (en) OPT occlusion pile side grouting water stopping method and grouting pipe device
CN109488371B (en) Waterproof system of full-enclosed waterproof station and dynamic setting and quantity-limiting drainage method
CN102286984A (en) Water-stop curtain and construction method thereof
CN108661078B (en) Comprehensive tunnel design construction method
CN206916753U (en) A kind of water sealing structure of diaphram wall and its seam crossing
CN201883435U (en) Preburied pipe pile grouting device
CN104847365B (en) A kind of small interval Four-Lane Road Shallow-buried Large-span Tunnel construction method
CN102839691B (en) Quick sealing method and device for sandless cement pipe deep well dewatering wellhead
CN202194149U (en) Water-proof curtain
CN105821884A (en) Grouting device and grouting method for gravel-cobble strata
CN106013078A (en) Construction method for strong permeable ground layer strengthened curtain structure
CN109681214B (en) Construction method for reinforcing stratum through full-section grouting
CN110777775A (en) Foundation pit structure and construction method thereof
CN109667586B (en) Grouting method of double-layer well wall grouting system
CN108978694B (en) Accurate guidance grouting method for building waterproof curtain in tunnel
CN206655716U (en) A kind of tunnel drainage structure
CN206110124U (en) Bored concrete pile stake end post grouting device
CN207553092U (en) A kind of New Anchor Cable for embankment side slope
CN216664152U (en) Water sealing structure for anchorage support
CN209816867U (en) A supporting construction for peripheral foundation ditch of existing building
TWI755611B (en) Pre-embedded perfusion tube set and method of using the same

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170707

Termination date: 20211124