CN206289531U - A kind of pre-buried steel part mounting and positioning device of pier cap damping tenon - Google Patents

A kind of pre-buried steel part mounting and positioning device of pier cap damping tenon Download PDF

Info

Publication number
CN206289531U
CN206289531U CN201621373416.9U CN201621373416U CN206289531U CN 206289531 U CN206289531 U CN 206289531U CN 201621373416 U CN201621373416 U CN 201621373416U CN 206289531 U CN206289531 U CN 206289531U
Authority
CN
China
Prior art keywords
steel part
buried steel
pier cap
positioning device
groove profile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621373416.9U
Other languages
Chinese (zh)
Inventor
张琦
柳仓太
杨金卫
芦巍
王俊峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fourth Engineering Co Ltd of China Railway 21st Bureau Group Co Ltd
Original Assignee
Fourth Engineering Co Ltd of China Railway 21st Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fourth Engineering Co Ltd of China Railway 21st Bureau Group Co Ltd filed Critical Fourth Engineering Co Ltd of China Railway 21st Bureau Group Co Ltd
Priority to CN201621373416.9U priority Critical patent/CN206289531U/en
Application granted granted Critical
Publication of CN206289531U publication Critical patent/CN206289531U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of pre-buried steel part mounting and positioning device of pier cap damping tenon, including the supporting steel frame installed in pier cap sizing punching block top, adjust the positioning groove profile block of the pre-buried steel part vertical and horizontal position, and for adjusting the adjusting means of the pre-buried steel part elevation location, located lateral plate is provided with the supporting steel frame, the mounting hole installed for the lateral adjustments bolt of the regulation pre-buried steel part lateral attitude is offered on the located lateral plate, the mounting hole installed for the longitudinally adjust bolt of the regulation pre-buried steel part lengthwise position is offered respectively on the edge of a wing of the positioning groove profile block both sides.The utility model simple structure and easy to operate, input cost is few, reasonable in design, it is easily installed, using effect is good and practical value is high, position to preburied component before shock mount, damping tenon are installed positions, and reduces human and material resources required when later stage installation shock mount, damping tenon, while improve the overall security of bridge.

Description

A kind of pre-buried steel part mounting and positioning device of pier cap damping tenon
Technical field
The utility model belongs to technical field of bridge, installs fixed more particularly, to a kind of pre-buried steel part of pier cap damping tenon Position device.
Background technology
With the continuous acceleration of the urbanization process of our countries, Provincial Communications Fundamental Construction becomes decision China economic lifeline Mainstay.The continuation in-depth of the railway of China, highway, the great development of municipal works great-leap-forward at this stage, along with science skill The progress of art, the high-strength of bridge construction material, lightweight, the research and development of multifunctional performance have promoted the fast development of science of bridge building.I National complicated various, the geological conditions various regions difference of vast in territory, topography and geomorphology it is very big, fault zone spreads all over the country, these Objective condition determines that the technical difficulty of science of bridge building is big, construction level requirement is high, from science of bridge building in the important of urban development For in meaning, science of bridge building has become an important symbol for urban construction level.
The construction of science of bridge building is a systemic engineering that technical requirements are high, difficulty of construction is big, various specialties cover, existing Stage our countries Bridge Construction always with scientific research, innovation interpromoting relation in five elements together, science of bridge building be exactly often one newly Technology, new technology application or technical research, the scientific research project promoted.In conventional Bridge Construction, subtract at bridge pier cap The installation for shaking the pre-buried steel part of bearing to be accurately positioned always be difficult to and controls, and as a result always position, absolute altitude error are larger, and the later stage subtracts Shake bearing, damping tenon mounting and adjusting size are big, installation quality has hidden danger, and it is time-consuming, taking a lot of work certainly will cause certain economic damage Lose.
Utility model content
Technical problem to be solved in the utility model is for above-mentioned deficiency of the prior art, there is provided a kind of pier cap The pre-buried steel part mounting and positioning device of damping tenon, its simple structure, reasonable in design, use value are high, accurate by positioning groove profile block Position horizontal and vertical when pre-buried steel part is installed is adjusted, while adjusting the absolute altitude position that screw mandrel adjusts pre-buried steel part by absolute altitude Put, make the installation site of later stage shock mount, damping tenon accurate, reduce pre-buried steel part installation and follow-up damping tenon is installed and needs to use Human and material resources deliver.
In order to solve the above technical problems, the technical solution adopted in the utility model is:A kind of pre-buried steel part of pier cap damping tenon Mounting and positioning device, it is characterised in that:Including the supporting steel frame installed in pier cap sizing punching block top, adjust described pre-buried The positioning groove profile block of steel part vertical and horizontal position and the adjusting means for adjusting the pre-buried steel part elevation location, institute State and be provided with supporting steel frame located lateral plate, offered on the located lateral plate for the regulation pre-buried steel part lateral attitude Lateral adjustments bolt install mounting hole, offered respectively on the edge of a wing of the positioning groove profile block both sides for regulation it is described pre-buried The mounting hole that the longitudinally adjust bolt of steel part lengthwise position is installed.
A kind of above-mentioned pre-buried steel part mounting and positioning device of pier cap damping tenon, it is characterized in that:The located lateral plate is by two groups Constituted along the located lateral plate that the supporting steel frame is longitudinally laid, located lateral plate described in every group is by two relative transverse directions laid Location-plate is constituted, and the mounting hole opened up on the located lateral plate is welded with the inside of the located lateral plate laterally to be adjusted with described The transverse weld nut that section bolt matches.
A kind of above-mentioned pre-buried steel part mounting and positioning device of pier cap damping tenon, it is characterized in that:The positioning groove profile block both sides Two mounting holes are transversely symmetrically offered on the edge of a wing respectively, on the inside of the edge of a wing of the mounting hole along the positioning groove profile block both sides It is welded with the longitudinal measure nut matched with the longitudinally adjust bolt.
A kind of above-mentioned pre-buried steel part mounting and positioning device of pier cap damping tenon, it is characterized in that:Adjust the pre-buried steel part absolute altitude The adjusting means of position is that absolute altitude adjusts screw mandrel, and the quantity of the absolute altitude regulation screw mandrel is four.
A kind of above-mentioned pre-buried steel part mounting and positioning device of pier cap damping tenon, it is characterized in that:Opened up on the positioning groove profile block The lower weld for having the mounting hole passed through for absolute altitude regulation screw mandrel, the mounting hole has and absolute altitude regulation screw mandrel phase The first adjusting nut matched somebody with somebody.
A kind of above-mentioned pre-buried steel part mounting and positioning device of pier cap damping tenon, it is characterized in that:It is described positioning groove profile block with it is described Pre-buried steel part adjusts screw mandrel and is connected to one by the absolute altitude, and the positioning groove profile block is arranged on the supporting steel frame Portion, and be laid in the plane of located lateral plate composition described in two groups.
A kind of above-mentioned pre-buried steel part mounting and positioning device of pier cap damping tenon, it is characterized in that:In located lateral plate described in every group Two distances of the relative institute's located lateral plate laid width big 50mm~100mm more horizontal than the positioning groove profile block, Length small 150mm of the width of the supporting steel frame longitudinal direction than the positioning groove profile block longitudinal direction.
A kind of above-mentioned pre-buried steel part mounting and positioning device of pier cap damping tenon, it is characterized in that:Fixed peace on the pre-buried steel part Equipped with two pieces of absolute altitude location-plates, every piece of absolute altitude location-plate be installed with that two confession absolute altitudes regulation screw mandrels pass through the Two adjusting nuts, four second adjusting nuts are arranged in same level.
A kind of above-mentioned pre-buried steel part mounting and positioning device of pier cap damping tenon, it is characterized in that:In the absolute altitude regulation screw mandrel Between position be welded with a fixing nut.
A kind of above-mentioned pre-buried steel part mounting and positioning device of pier cap damping tenon, it is characterized in that:First adjusting nut and second is adjusted Section nut is a pair positive and negative nuts.
The utility model has advantages below compared with prior art:
1. simple structure and easy to operate, input cost is few.The lateral adjustments bolt that is set on positioning groove profile block and vertical To regulating bolt can the pre-buried steel part of accurate adjustment install when horizontal and vertical position, it is easy to operate.
2. reasonable in design, is easily installed.The absolute altitude of pre-buried steel part adjusts screw mandrel to be adjusted by absolute altitude, and mark The first location nut and the second location nut that top adjustment screw mandrel two ends are set are that, with positive silk or with anti-silk, disclosure satisfy that operation Continuity of the personnel in operation.
3. using effect is good and practical value is high.Position to preburied component before shock mount, damping tenon are installed is entered Row positioning, reduces human and material resources required when later stage installation shock mount, damping tenon, while improve the overall peace of bridge Quan Xing.
In sum, the utility model simple structure and easy to operate, input cost is few;Reasonable in design, is easy to peace Dress;Using effect is good and practical value is high;The security of bridge is effectively improved, human and material resources are saved, construction work is shortened Phase.
Below by drawings and Examples, the technical solution of the utility model is described in further detail.
Brief description of the drawings
Fig. 1 is use state figure of the present utility model.
Fig. 2 is the top view of Fig. 1.
Fig. 3 is the upward view of Fig. 1.
Description of reference numerals:
1-supporting steel frame;2-positioning groove profile block;3-pre-buried steel part;
4-lateral adjustments top bolt;4-1-transverse weld nut;5-longitudinally adjust top bolt;
5-1-longitudinal measure nut;6-absolute altitude adjusts screw mandrel;6-1-the first adjusting nut;
6-2-fixing nut;6-3-the second location nut;7-located lateral plate;
8-absolute altitude location-plate.
Specific embodiment
The pre-buried steel part mounting and positioning device of a kind of pier cap damping tenon as shown in Figure 1, Figure 2, Figure 3 shows, including installed in described The supporting steel frame 1 on pier cap sizing punching block top, the positioning groove profile block 2 for adjusting the vertical and horizontal position of pre-buried steel part 3 and Adjusting means for adjusting the elevation location of pre-buried steel part 3, is provided with located lateral plate 7 on the supporting steel frame 1, described The mounting hole installed for the lateral adjustments bolt 4 of the regulation lateral attitude of pre-buried steel part 3, institute are offered on located lateral plate 7 The longitudinally adjust bolt 5 for the regulation lengthwise position of pre-buried steel part 3 is offered on the edge of a wing for stating the both sides of positioning groove profile block 2 respectively The mounting hole of installation.
When actually used, the horizontal tune for the regulation lateral attitude of pre-buried steel part 3 is offered on the located lateral plate 7 The mounting hole that section bolt 4 is installed, the diameter of mounting hole is preferably 24mm.
When actually used, offered respectively on the edge of a wing of the both sides of positioning groove profile block 2 and indulged for the regulation pre-buried steel part 3 To the mounting hole that the longitudinally adjust bolt 5 of position is installed, the diameter of mounting hole is preferably 24mm.
When actually used, positioning groove profile block 2 is the steel plate of δ=16mm, the groove profile of positioning groove profile block 2 welded using steel plate group or Person's bender bending is prepared from.
When actually used, supporting steel frame 1 is two angle steel of 50 × 5~∠ of ∠ 100 × 10 of transversely relative laying, according to The big I of weight of supporting steel frame 1 adds angle steel lacing on supporting steel frame 1, it is therefore an objective to strengthen the rigidity of supporting steel frame 1.
When actually used, lateral adjustments bolt 4 is the bolt of M20 × 150, the bolt of longitudinally adjust bolt 5M20 × 150.
As shown in Fig. 2 in the present embodiment, the located lateral plate 7 is by two groups of horizontal strokes laid along the longitudinal direction of the supporting steel frame 1 Constituted to location-plate 7, located lateral plate 7 described in every group is made up of two relative located lateral plates 7 laid, the located lateral The mounting hole opened up on plate 7 is welded with the horizontal weldering matched with the lateral adjustments bolt 4 in the inner side of the located lateral plate 7 Connected nut 4-1.
When actually used, transverse weld nut 4-1 is M20 nuts, and pre-buried steel part 3 is adjusted by lateral adjustments bolt 4 Lateral attitude on pier cap.
In the present embodiment, two mounting holes are transversely symmetrically offered respectively on the edge of a wing of the both sides of positioning groove profile block 2, The mounting hole is welded with vertical with what the longitudinally adjust bolt 5 matched along the edge of a wing inner side of the both sides of positioning groove profile block 2 To welded nut 5-1.
When actually used, longitudinal measure nut 5-1 is M20 nuts, logical to state longitudinally adjust bolt 5 to adjust pre-buried steel part 3 Lengthwise position on pier cap.
As shown in figure 3, in the present embodiment, adjusting the adjusting means of the elevation location of pre-buried steel part 3 for absolute altitude adjusts silk Bar 6, the quantity of the absolute altitude regulation screw mandrel 6 is four.
In the present embodiment, the mounting hole passed through for absolute altitude regulation screw mandrel 6, institute are offered on the positioning groove profile block 2 Stating the lower weld of mounting hole has the first adjusting nut 6-1 matched with absolute altitude regulation screw mandrel 6.
When actually used, the first adjusting nut 6-1 is M20 nuts.
When actually used, the first adjusting nut 6-1 is arranged on the middle part of the positioning groove profile block 2, preferably according to rectangle Lay, disclosure satisfy that the sized of the horizontal and vertical position of pre-buried steel part 3.
In the present embodiment, the positioning groove profile block 2 is adjusted screw mandrel 6 and is fixed and connected with the pre-buried steel part 3 by the absolute altitude One is connected in, the positioning groove profile block 2 is arranged on the top of the supporting steel frame 1, and is laid in 7 groups of located lateral plate described in two groups Into plane in.
The positioning groove profile block 2 is fixedly connected with the supporting steel frame 1 by way of welding.
In the present embodiment, the distance of two relative institute located lateral plates 7 laid compares institute in located lateral plate 7 described in every group Big 50mm~the 100mm of width of the transverse direction of positioning groove profile block 2 is stated, the width of the longitudinal direction of the supporting steel frame 1 is than the locating slot The small 150mm of length of the longitudinal direction of type block 2, meets the adjustment size requirement of the positioner.
In the present embodiment, two pieces of absolute altitude location-plates 8, every piece of absolute altitude positioning are installed with the pre-buried steel part 3 Plate 8 is installed with the second adjusting nut 6-3 that two confession absolute altitude regulation screw mandrels 6 are passed through, four the second regulation spiral shells Female 6-3 is arranged in same level.
When actually used, the second adjusting nut 6-3 is M20 nuts, and four the second adjusting nut 6-3 are preferably according to rectangle Lay, and meet the physical equilibrium during preburied component 3 is adjusted.
When actually used, absolute altitude location-plate 8 as bottom the second adjusting nut 6-3 of absolute altitude regulation screw mandrel 6 location-plate.
In the present embodiment, the middle part of the absolute altitude regulation screw mandrel 6 is welded with a fixing nut 6-2.
When actually used, fixing nut 6-2 is M20 nuts, during as adjusting pre-buried 3 absolute altitude of steel part, the torsion of spanner Square impetus, fixing nut 6-2 can cause positioning groove profile block 2 to change with the spacing of pre-buried steel part 3 for the rotation of M20 nuts, So as to realize that pre-buried steel part 3 reaches the purpose of predetermined absolute altitude.
In the present embodiment, the first adjusting nut 6-1 and the second adjusting nut 6-3 is a pair positive and negative nuts, meets and is adjusting The habituation and continuity of operating personnel's operation when saving the absolute altitude of pre-buried steel part 3.
The above, is only preferred embodiment of the present utility model, and not the utility model is imposed any restrictions, every Any simple modification, change and the equivalent structure change made to above example according to the utility model technical spirit, still Belong in the protection domain of technical solutions of the utility model.

Claims (10)

1. the pre-buried steel part mounting and positioning device of a kind of pier cap damping tenon, it is characterised in that:Including installed in pier cap sizing steel The supporting steel frame (1) on mould top, positioning groove profile block (2) for adjusting pre-buried steel part (3) the vertical and horizontal position and it is used for The adjusting means of pre-buried steel part (3) elevation location is adjusted, located lateral plate (7), institute are provided with the supporting steel frame (1) State the peace for being offered on located lateral plate (7) and being installed for the lateral adjustments bolt (4) of regulation pre-buried steel part (3) lateral attitude Dress hole, offers for the vertical of regulation pre-buried steel part (3) lengthwise position respectively on the edge of a wing of positioning groove profile block (2) both sides To the mounting hole that regulating bolt (5) is installed.
2. according to the pre-buried steel part mounting and positioning device of a kind of pier cap damping tenon described in claim 1, it is characterised in that:The horizontal stroke It is made up of two groups of located lateral plates (7) longitudinally laid along the supporting steel frame (1) to location-plate (7), it is laterally fixed described in every group Position plate (7) is made up of two relative located lateral plates (7) laid, and the mounting hole opened up on the located lateral plate (7) is in institute State located lateral plate (7) inner side and be welded with the transverse weld nut (4-1) matched with the lateral adjustments bolt (4).
3. according to the pre-buried steel part mounting and positioning device of a kind of pier cap damping tenon described in claim 1, it is characterised in that:It is described fixed Two mounting holes are transversely symmetrically offered respectively on the edge of a wing of position groove profile block (2) both sides, and the mounting hole is along the locating slot The edge of a wing inner side of type block (2) both sides is welded with the longitudinal measure nut (5-1) matched with the longitudinally adjust bolt (5).
4. according to the pre-buried steel part mounting and positioning device of a kind of pier cap damping tenon described in claim 1, it is characterised in that:Regulation institute The adjusting means of pre-buried steel part (3) elevation location is stated for absolute altitude adjusts screw mandrel (6), the quantity of absolute altitude regulation screw mandrel (6) is Four.
5. according to the pre-buried steel part mounting and positioning device of a kind of pier cap damping tenon described in claim 1 or 4, it is characterised in that:Institute State to be offered in positioning groove profile block (2) and adjust the mounting hole that screw mandrel (6) is passed through, the lower weld of the mounting hole for the absolute altitude Have and adjust the first adjusting nut (6-1) that screw mandrel (6) matches with the absolute altitude.
6. according to the pre-buried steel part mounting and positioning device of a kind of pier cap damping tenon described in claim 1 or 4, it is characterised in that:Institute Positioning groove profile block (2) is stated to be connected to one by absolute altitude regulation screw mandrel (6) with the pre-buried steel part (3), it is described fixed Position groove profile block (2) is arranged on the supporting steel frame (1) top, and is laid in the plane of located lateral plate (7) composition described in two groups It is interior.
7. according to the pre-buried steel part mounting and positioning device of a kind of pier cap damping tenon described in claim 6, it is characterised in that:Every group of institute Two distances of relative institute's located lateral plate (7) for laying are more horizontal than positioning groove profile block (2) in stating located lateral plate (7) To width big 50mm~100mm, the length of the width than positioning groove profile block (2) longitudinal direction of supporting steel frame (1) longitudinal direction Small 150mm.
8. according to the pre-buried steel part mounting and positioning device of a kind of pier cap damping tenon described in claim 5, it is characterised in that:It is described pre- Bury and two pieces of absolute altitude location-plates (8) are installed with steel part (3), every piece of absolute altitude location-plate (8) is installed with two confessions The absolute altitude adjusts the second adjusting nut (6-3) that screw mandrel (6) is passed through, and four second adjusting nuts (6-3) are arranged on together On one horizontal plane.
9. according to the pre-buried steel part mounting and positioning device of a kind of pier cap damping tenon described in claim 4, it is characterised in that:The mark The middle part of top adjustment screw mandrel (6) is welded with a fixing nut (6-2).
10. according to the pre-buried steel part mounting and positioning device of a kind of pier cap damping tenon described in claim 8, it is characterised in that:First Adjusting nut (6-1) and the second adjusting nut (6-3) are a pair positive and negative nuts.
CN201621373416.9U 2016-12-14 2016-12-14 A kind of pre-buried steel part mounting and positioning device of pier cap damping tenon Active CN206289531U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621373416.9U CN206289531U (en) 2016-12-14 2016-12-14 A kind of pre-buried steel part mounting and positioning device of pier cap damping tenon

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621373416.9U CN206289531U (en) 2016-12-14 2016-12-14 A kind of pre-buried steel part mounting and positioning device of pier cap damping tenon

Publications (1)

Publication Number Publication Date
CN206289531U true CN206289531U (en) 2017-06-30

Family

ID=59104706

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621373416.9U Active CN206289531U (en) 2016-12-14 2016-12-14 A kind of pre-buried steel part mounting and positioning device of pier cap damping tenon

Country Status (1)

Country Link
CN (1) CN206289531U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107498703A (en) * 2017-09-01 2017-12-22 中天建设集团有限公司 The two-way automatic Tensioning mould of prestressing force mortar Decorative hanging board
CN111502307A (en) * 2020-05-01 2020-08-07 重庆交通大学 Multidirectional positioning device and positioning method for underground embedded steel pipe column
CN111926707A (en) * 2020-07-14 2020-11-13 中建安装集团有限公司 Positioning device and method for realizing assembly joint connection in assembly bridge engineering

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107498703A (en) * 2017-09-01 2017-12-22 中天建设集团有限公司 The two-way automatic Tensioning mould of prestressing force mortar Decorative hanging board
CN111502307A (en) * 2020-05-01 2020-08-07 重庆交通大学 Multidirectional positioning device and positioning method for underground embedded steel pipe column
CN111926707A (en) * 2020-07-14 2020-11-13 中建安装集团有限公司 Positioning device and method for realizing assembly joint connection in assembly bridge engineering

Similar Documents

Publication Publication Date Title
CN206289531U (en) A kind of pre-buried steel part mounting and positioning device of pier cap damping tenon
CN203640309U (en) Adjustable pipe carrier used on large-span steel structure roof primary truss general assembly jig frame
CN201746778U (en) Installation regulating device for camber-type steel pipe arch bridge arch rib erection
CN210421957U (en) Be used for prefabricated wall body installation bearing diagonal device
CN103628417B (en) Support Method installs tubular arch arch sections Coordinate Adjusting device
CN206268622U (en) A kind of adjustable oil field pipe support frame
CN202164809U (en) Adjustable support of climbing type scaffold
CN106049857A (en) Turbine screw type continuous-adjustment supporting device for hydraulic climbing formwork system
CN103737235A (en) Box girder partition positioning tool and positioning method
CN202627214U (en) Beam-column connecting structure for steel reinforced concrete composite structure of high-rise building
CN201990391U (en) Rail steering device
CN107881914B (en) Wire-dividing tube type cable saddle back field assembly type positioning device and assembly method
CN203751586U (en) Box girder clapboard positioning tool
CN206364481U (en) A kind of comprehensive adjustable rotary cable support
CN206784865U (en) A kind of detachable adjustable for height subway tunnel section construction operation platform
CN206220973U (en) For the self-propelled hydraulic formwork jumbo that Deep Foundation Pit of Metro Stations engineering top board is poured
CN205908014U (en) Support arrangement for a but, turbine screw continuously adjustable for hydraulic climbing formwork system
CN203180383U (en) Mechanism case installation special device
CN206110137U (en) Combination formula supporting adjusting device that can two -wayly adjust
CN208281627U (en) Adjustable support guide rail used in a kind of jacking construction process
CN206233259U (en) A kind of supporting construction for carrying elevation regulator
CN206438605U (en) A kind of steel crane beam attachment structure
CN203960751U (en) A kind of adjustable steel case beam moulding bed bracing or strutting arrangement
CN206379690U (en) One kind is exempted to weld flexible crane span structure
CN206016248U (en) For the lower support meanss that the hand wheel type on-line continuous of hydraulic climbing die block system are adjusted

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant