CN103628417B - Support Method installs tubular arch arch sections Coordinate Adjusting device - Google Patents

Support Method installs tubular arch arch sections Coordinate Adjusting device Download PDF

Info

Publication number
CN103628417B
CN103628417B CN201310697450.6A CN201310697450A CN103628417B CN 103628417 B CN103628417 B CN 103628417B CN 201310697450 A CN201310697450 A CN 201310697450A CN 103628417 B CN103628417 B CN 103628417B
Authority
CN
China
Prior art keywords
slideway
arch
sliding base
jack
adjusting device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310697450.6A
Other languages
Chinese (zh)
Other versions
CN103628417A (en
Inventor
姚予东
任亚杰
李平
高荣峰
王建军
黄枝花
王振
孟俊杰
刘文杰
许月香
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China State Railway Group Co Ltd
China Railway Sixth Group Co Ltd
Taiyuan Railway Construction Co Ltd of China Railway Sixth Group Co Ltd
Original Assignee
TAIYUAN RAILWAY CONSTRUCTION Co Ltd ZHONGTIE 6-BUREAU GROUP
China Railway Sixth Group Co Ltd
China Railway Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TAIYUAN RAILWAY CONSTRUCTION Co Ltd ZHONGTIE 6-BUREAU GROUP, China Railway Sixth Group Co Ltd, China Railway Corp filed Critical TAIYUAN RAILWAY CONSTRUCTION Co Ltd ZHONGTIE 6-BUREAU GROUP
Priority to CN201310697450.6A priority Critical patent/CN103628417B/en
Publication of CN103628417A publication Critical patent/CN103628417A/en
Application granted granted Critical
Publication of CN103628417B publication Critical patent/CN103628417B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of Support Method and tubular arch arch sections Coordinate Adjusting device is installed, comprise sliding base, grooved slideway, rack beam, slideway support post, traversing jack, vertical shift jack and cross spacing frame, two cross spacing framves are separately fixed at rack beam two ends, grooved slideway is supported in above slideway support post and vertical shift jack, sliding base loads in flute profile slideway, traversing jack is arranged between sliding base and cross spacing frame opposite flank, is provided with billet between slideway support post and flute profile slideway.Tubular arch arch sections is arranged on sliding base, and sliding base laterally can slide in grooved slideway under the effect of horizontal jack, and grooved slideway can move up and down under the effect of vertical jack, thus tubular arch is encircleed sections accurately locates.Adjusting device of the present invention can regulate tubular arch arch sections to reach absolute altitude fast, safely, exactly.

Description

Support Method installs tubular arch arch sections Coordinate Adjusting device
Technical field
The present invention relates to a kind of Coordinate Adjusting device, particularly a kind of Support Method when installing tubular arch arch sections and CFST X-type arch arch sections Coordinate Adjusting device is installed.
Background technology
Because the physical dimension of the arch sections of long-span Steel Arch is large, weight is large, need to adopt large lifting equipment lifting, when tubular arch sections is installed, mileage direction error of coordinate can by last closure section length adjustment of installing, and the coordinate that is horizontal, height of the arch sections mouth of pipe needs accurately location.Because CFST X-type arch arch sections mouth of pipe three-dimensional coordinate can interact when adjusting, needing repeatedly to adjust and just can reach requirement, and it is very difficult to use large lifting equipment accurately to locate arch sections position.
Common way is large lifting equipment cooperation, and manually by jack, small-size jack draws, pushing tow operates, and not only there is accurate adjustment arch pipe joint mouth coordinate in construction needs to expend for a long time, and there is the risk of constructor by object strike in operation.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of Support Method that can steel tube arch rib mouth of pipe absolute altitude be made to reach installation requirement fast, safely, accurately and installs tubular arch arch sections Coordinate Adjusting device.
For solving above technical problem, the present invention by the following technical solutions.
A kind of Support Method installs tubular arch arch sections Coordinate Adjusting device, comprise sliding base, grooved slideway, rack beam, slideway support post, traversing jack, vertical shift jack and cross spacing frame, two cross spacing framves are separately fixed at rack beam two ends, two slideway support posts and two vertical shift jack are individually fixed in rack beam both sides, grooved slideway is supported in above slideway support post and vertical shift jack, sliding base loads in flute profile slideway, and traversing jack is arranged between sliding base and cross spacing frame opposite flank.
Tubular arch arch sections is arranged on sliding base, and sliding base laterally can slide in grooved slideway under the effect of horizontal jack, and grooved slideway can move up and down under the effect of vertical jack, thus tubular arch is encircleed sections accurately locates.
As the preferred scheme of one, described sliding base comprises sliding base base plate, and vertical sliding base base plate is fixed with sliding base web, and sliding base web stiffener is fixed in sliding base web both sides.
As the preferred scheme of another kind, between slideway support post and flute profile slideway, be provided with billet.Space billet between grooved slideway and slideway support post, when laterally sliding, pads, avoids flute profile slideway to tilt by base.
Adjusting device of the present invention can regulate tubular arch arch sections to reach absolute altitude fast, safely, exactly, decreases construction workload, reduces difficulty of construction, ensure that homework precision and construction safety.
Accompanying drawing explanation
Fig. 1 is the structural representation of tubular arch of the present invention arch sections Coordinate Adjusting device.
Fig. 2 is the I-I schematic cross-section of Fig. 1.
Fig. 3 is sliding base composition schematic diagram.
Fig. 4 application example tubular arch arch bay structural schematic diagram.
Fig. 5 is the using state figure of the tubular arch arch sections Coordinate Adjusting device described in invention.
In figure, 1-sliding base, 2-grooved slideway, 3-rack beam, 4-slideway support post, the traversing jack of 5-, 6-vertical shift jack, 7-cross spacing frame, 8-sliding base base plate, 9-sliding base web, 10-sliding base web stiffener, 11-billet, 12-string pipe, 13-batten plate, 14-web.
Detailed description of the invention
In order to make those skilled in the art better understand the present invention, below in conjunction with accompanying drawing, explanation clear, complete is further done to the present invention.
As shown in Figure 1, a kind of Support Method of the present invention installs tubular arch arch sections Coordinate Adjusting device, comprise sliding base 1, grooved slideway 2, rack beam 3, slideway support post 4, traversing jack 5, vertical shift jack 6 and cross spacing frame 7, two cross spacing framves 7 are separately fixed at rack beam 3 two ends, two slideway support posts 4 and two vertical shift jack 6 are individually fixed in rack beam 3 both sides, grooved slideway 2 is supported in above slideway support post 4 and vertical shift jack 6, as shown in Figure 2, sliding base 1 loads in flute profile slideway 2, traversing jack 5 is arranged between sliding base 1 and cross spacing frame 7 opposite flank.
Sliding base 1 and grooved slideway 2 adopt steel plate to make, and slideway support post 4 adopts steel pipe manufacturing, and cross spacing frame 7 I-shaped steel is done, and jack adopts jacking thin type jack.
As shown in Figure 3, described sliding base 1 comprises sliding base base plate 8, and vertical sliding base base plate 8 is fixed with sliding base web 9, and sliding base web stiffener 10 is fixed in sliding base web 9 both sides.
Billet 10 is provided with between slideway support post 4 and flute profile slideway 2.Billet 10 adopts the steel plate of the different-thickness of 1mm ~ 30mm.When sliding base 1 does and laterally slides, the space billet 11 between flute profile slideway 2 and slideway support post 4 is padded.
An application example is below provided.Shuozhou to accurate Ge Er newly built railway Yellow River Bridge is made up of access bridge and the main bridge of concrete-filled steel tube arch, main bridge tubular arch is basket type, arch ring is made up of two arch ribs, the horizontal leaning angle 8 ° of arch rib, on first sections, two arch rib joints are without connecting rod, need to adopt Support Method to install, arch rib width 4m, arch springing place arch rib height 12.5m, arch rib is made up of the string pipe 12 of 4 φ 1500mm, wall thickness 30 ~ 35mm, be connected to form dumbbell shape by batten plate 13 between string pipe 12, connect between upper and lower dumbbell with web 14, tubular arch arch bay structural as shown in Figure 4.First segment arch rib makes time-division two parts, dumbbell shape lower chord tube is a part, and web and the pipe that winds up are a part of in addition, Fig. 5 lower chord tube scheme of installation, lower chord tube is arranged in sliding base, makes tubular arch encircle sections to reach absolute altitude by adjusting traversing jack 5 and vertical shift jack 6.
The scope of protection of present invention is not limited to above detailed description of the invention; to those skilled in the art; the present invention can have various deformation and change, all in design of the present invention and any amendment, the improvement done within principle be equal to replacement and all should be included within protection scope of the present invention.

Claims (2)

1. a Support Method installs tubular arch arch sections Coordinate Adjusting device, it is characterized in that: comprise sliding base (1), grooved slideway (2), rack beam (3), slideway support post (4), traversing jack (5), vertical shift jack (6) and cross spacing frame (7), two cross spacing framves (7) are separately fixed at rack beam (3) two ends, rack beam (3) both sides are all fixed with two slideway support posts (4) and two vertical shift jack (6), grooved slideway (2) is supported in slideway support post (4) and vertical shift jack (6) top, sliding base (1) loads in flute profile slideway (2), traversing jack (5) is arranged between sliding base (1) and cross spacing frame (7) opposite flank, described sliding base (1) comprises sliding base base plate (8), and vertical sliding base base plate (8) is fixed with sliding base web (9), and sliding base web stiffener (10) is fixed in sliding base web (9) both sides.
2. Support Method according to claim 1 installs tubular arch arch sections Coordinate Adjusting device, it is characterized in that: be provided with billet (11) between slideway support post (4) and flute profile slideway (2).
CN201310697450.6A 2013-12-19 2013-12-19 Support Method installs tubular arch arch sections Coordinate Adjusting device Expired - Fee Related CN103628417B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310697450.6A CN103628417B (en) 2013-12-19 2013-12-19 Support Method installs tubular arch arch sections Coordinate Adjusting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310697450.6A CN103628417B (en) 2013-12-19 2013-12-19 Support Method installs tubular arch arch sections Coordinate Adjusting device

Publications (2)

Publication Number Publication Date
CN103628417A CN103628417A (en) 2014-03-12
CN103628417B true CN103628417B (en) 2015-11-18

Family

ID=50209844

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310697450.6A Expired - Fee Related CN103628417B (en) 2013-12-19 2013-12-19 Support Method installs tubular arch arch sections Coordinate Adjusting device

Country Status (1)

Country Link
CN (1) CN103628417B (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106948268B (en) * 2017-04-24 2023-07-21 中铁七局集团武汉工程有限公司 Variable-section steel box girder pushing combined device and using method thereof
CN107503287A (en) * 2017-08-24 2017-12-22 广西路桥工程集团有限公司 A kind of steel tube arch rib section deviation correcting device and method for correcting error
CN107841932A (en) * 2017-10-19 2018-03-27 中国建筑土木建设有限公司 Method for manufacturing, installing and positioning tied arch bridge arch rib segment
CN108360389A (en) * 2018-05-02 2018-08-03 长沙理工大学 Inclined arch rib positioning device and positioning method
CN109722992A (en) * 2018-12-19 2019-05-07 中铁广州工程局集团有限公司 A kind of device and method of dumbbell-shaped arch rib installation positioning
CN111827118B (en) * 2020-07-12 2024-04-19 中交路桥建设有限公司 Adjusting and positioning device for installing steel pipe arch rib
CN113106867A (en) * 2021-03-22 2021-07-13 中铁二局集团有限公司 Accurate adjustment and alignment connection construction method for arch segment air attitude
CN113073568B (en) * 2021-04-10 2022-02-15 中铁广州工程局集团有限公司 Arch beam mounting and positioning device and positioning method
CN114592429B (en) * 2021-12-23 2023-12-08 安徽省公路桥梁工程有限公司 Auxiliary splicing construction system and construction method for tied arch bridge arch rib and air bracing
CN218813214U (en) * 2022-11-14 2023-04-07 中铁上海工程局集团有限公司 Lateral limiting device for space special-shaped arch rib construction
CN219195648U (en) * 2022-11-14 2023-06-16 中铁上海工程局集团有限公司 Space abnormal-shaped arch rib supporting and adjusting device

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101736699A (en) * 2009-12-15 2010-06-16 中交路桥华北工程有限公司 Accurate positioning method of sliding of full-support frame steel box girder
KR20100111550A (en) * 2009-04-07 2010-10-15 주식회사 에이스이엔씨 Method for constructing arch type psc beam
CN201746778U (en) * 2010-07-27 2011-02-16 中铁大桥局集团第三工程有限公司 Installation regulating device for camber-type steel pipe arch bridge arch rib erection
CN102220811A (en) * 2011-04-18 2011-10-19 武船重型工程有限公司 Truss arching-erecting splicing method of extra-large-pan steel pipe
CN102251477A (en) * 2011-04-19 2011-11-23 中铁二十三局集团第三工程有限公司 Traversing construction method for tie bar arch
CN202559236U (en) * 2012-04-19 2012-11-28 中铁十局集团有限公司 Arch rib limited and fixed steel support
CN202831000U (en) * 2012-08-10 2013-03-27 中油吉林化建工程有限公司 Fixed tower crane overall moving mechanism
CN203625785U (en) * 2013-12-19 2014-06-04 中铁六局集团有限公司 Coordinate adjusting device for arch sections of steel pipe arch mounted in support method

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20100111550A (en) * 2009-04-07 2010-10-15 주식회사 에이스이엔씨 Method for constructing arch type psc beam
CN101736699A (en) * 2009-12-15 2010-06-16 中交路桥华北工程有限公司 Accurate positioning method of sliding of full-support frame steel box girder
CN201746778U (en) * 2010-07-27 2011-02-16 中铁大桥局集团第三工程有限公司 Installation regulating device for camber-type steel pipe arch bridge arch rib erection
CN102220811A (en) * 2011-04-18 2011-10-19 武船重型工程有限公司 Truss arching-erecting splicing method of extra-large-pan steel pipe
CN102251477A (en) * 2011-04-19 2011-11-23 中铁二十三局集团第三工程有限公司 Traversing construction method for tie bar arch
CN202559236U (en) * 2012-04-19 2012-11-28 中铁十局集团有限公司 Arch rib limited and fixed steel support
CN202831000U (en) * 2012-08-10 2013-03-27 中油吉林化建工程有限公司 Fixed tower crane overall moving mechanism
CN203625785U (en) * 2013-12-19 2014-06-04 中铁六局集团有限公司 Coordinate adjusting device for arch sections of steel pipe arch mounted in support method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
黄河特大桥S1拱节支架的设计;程戈等;《山西建筑》;20101231;第36卷(第34期);全文 *

Also Published As

Publication number Publication date
CN103628417A (en) 2014-03-12

Similar Documents

Publication Publication Date Title
CN103628417B (en) Support Method installs tubular arch arch sections Coordinate Adjusting device
CN201746778U (en) Installation regulating device for camber-type steel pipe arch bridge arch rib erection
CN105484361B (en) Hyperbolic closo steel latticed structures replace substep jacking apparatus and its construction method
CN203625785U (en) Coordinate adjusting device for arch sections of steel pipe arch mounted in support method
CN102828469B (en) Positioning mounting construction method for triangular steel constructed pillar of inclined-leg steel box
CN205295963U (en) Long span steel case back pushes away construction with bearing structure that transversely rectifies
CN103306208A (en) Formwork creeping method for novel 1.6 parabola-shaped four-column type hollow variable section high pier
CN204570499U (en) A kind of large span vertical curve steel box-girder walking type pushing device
CN104594201B (en) A kind of method utilizing one-sided pier-side bracket to set up pier top girder steel
CN103451338B (en) Ascending pipe and five-way ball mounting method for blast furnace gas system
CN205917601U (en) Integrally lift up device of bridge arch rib
CN105648923A (en) Stay cable saddle positioning device and positioning method thereof
CN203034821U (en) Large-span arch inverted triangular pipe truss assembling integral mould
CN202116984U (en) Dragging-adjustable cross-brace device for continuous beams of spatial steel pipe trusses
CN103663053B (en) Movable wall-attached device and movable wall-attached frame thereof
CN203213019U (en) Long cantilever bent cap cast-in-place construction support system
CN205369043U (en) Long span steel case back pushes away construction and uses interim bearing structure
CN204370314U (en) A kind of lower hanging steel bridge erects suspension rod
CN204024056U (en) A kind of construction formwork supported rod erecting
CN103484584A (en) Method for installing down pipe of blast furnace gas system
CN202347884U (en) Overhaul platform for water turbine
CN203034605U (en) Jacking support for reticulated shell structure
CN204980800U (en) Portable step baffle installation structure
CN107605142A (en) A kind of attachment type raise scaffold structure
CN206346201U (en) A kind of sand control alignment system for being used to lay lattice column

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: CHINA RAILWAY CORPORATION

Free format text: FORMER OWNER: CHINA RAILWAY SIXTH GROUP CO., LTD.

Effective date: 20150723

Owner name: CHINA RAILWAY SIXTH GROUP CO., LTD. TAIYUAN RAILWA

Free format text: FORMER OWNER: TAIYUAN RAILWAY CONSTRUCTION CO., LTD., ZHONGTIE 6-BUREAU GROUP

Effective date: 20150723

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20150723

Address after: 100844 Fuxing Road, Beijing, Haidian District, No. 10

Applicant after: CHINA RAILWAY Corp.

Applicant after: CHINA RAILWAY SIXTH GROUP Co.,Ltd.

Applicant after: CHINA RAILWAY 6TH GROUP TAIYUAN RAILWAY CONSTRUCTION Co.,Ltd.

Address before: 100036 Haidian District, Wanshou Road, No. 2,

Applicant before: CHINA RAILWAY SIXTH GROUP Co.,Ltd.

Applicant before: CHINA RAILWAY 6TH GROUP TAIYUAN RAILWAY CONSTRUCTION Co.,Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151118