CN103628417B - Support Method installs tubular arch arch sections Coordinate Adjusting device - Google Patents
Support Method installs tubular arch arch sections Coordinate Adjusting device Download PDFInfo
- Publication number
- CN103628417B CN103628417B CN201310697450.6A CN201310697450A CN103628417B CN 103628417 B CN103628417 B CN 103628417B CN 201310697450 A CN201310697450 A CN 201310697450A CN 103628417 B CN103628417 B CN 103628417B
- Authority
- CN
- China
- Prior art keywords
- slideway
- arch
- sliding base
- jack
- adjusting device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000000034 method Methods 0.000 title claims abstract description 10
- 239000003351 stiffener Substances 0.000 claims description 4
- 229910000831 Steel Inorganic materials 0.000 description 7
- 239000010959 steel Substances 0.000 description 7
- 238000010276 construction Methods 0.000 description 4
- 238000010586 diagram Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 230000007423 decrease Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310697450.6A CN103628417B (en) | 2013-12-19 | 2013-12-19 | Support Method installs tubular arch arch sections Coordinate Adjusting device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310697450.6A CN103628417B (en) | 2013-12-19 | 2013-12-19 | Support Method installs tubular arch arch sections Coordinate Adjusting device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103628417A CN103628417A (en) | 2014-03-12 |
CN103628417B true CN103628417B (en) | 2015-11-18 |
Family
ID=50209844
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310697450.6A Expired - Fee Related CN103628417B (en) | 2013-12-19 | 2013-12-19 | Support Method installs tubular arch arch sections Coordinate Adjusting device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103628417B (en) |
Families Citing this family (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106948268B (en) * | 2017-04-24 | 2023-07-21 | 中铁七局集团武汉工程有限公司 | Variable-section steel box girder pushing combined device and using method thereof |
CN107503287A (en) * | 2017-08-24 | 2017-12-22 | 广西路桥工程集团有限公司 | A kind of steel tube arch rib section deviation correcting device and method for correcting error |
CN107841932A (en) * | 2017-10-19 | 2018-03-27 | 中国建筑土木建设有限公司 | Method for manufacturing, installing and positioning tied arch bridge arch rib segment |
CN108360389A (en) * | 2018-05-02 | 2018-08-03 | 长沙理工大学 | Inclined arch rib positioning device and positioning method |
CN109722992A (en) * | 2018-12-19 | 2019-05-07 | 中铁广州工程局集团有限公司 | A kind of device and method of dumbbell-shaped arch rib installation positioning |
CN111827118B (en) * | 2020-07-12 | 2024-04-19 | 中交路桥建设有限公司 | Adjusting and positioning device for installing steel pipe arch rib |
CN113106867A (en) * | 2021-03-22 | 2021-07-13 | 中铁二局集团有限公司 | Accurate adjustment and alignment connection construction method for arch segment air attitude |
CN113073568B (en) * | 2021-04-10 | 2022-02-15 | 中铁广州工程局集团有限公司 | Arch beam mounting and positioning device and positioning method |
CN114592429B (en) * | 2021-12-23 | 2023-12-08 | 安徽省公路桥梁工程有限公司 | Auxiliary splicing construction system and construction method for tied arch bridge arch rib and air bracing |
CN218813214U (en) * | 2022-11-14 | 2023-04-07 | 中铁上海工程局集团有限公司 | Lateral limiting device for space special-shaped arch rib construction |
CN219195648U (en) * | 2022-11-14 | 2023-06-16 | 中铁上海工程局集团有限公司 | Space abnormal-shaped arch rib supporting and adjusting device |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101736699A (en) * | 2009-12-15 | 2010-06-16 | 中交路桥华北工程有限公司 | Accurate positioning method of sliding of full-support frame steel box girder |
KR20100111550A (en) * | 2009-04-07 | 2010-10-15 | 주식회사 에이스이엔씨 | Method for constructing arch type psc beam |
CN201746778U (en) * | 2010-07-27 | 2011-02-16 | 中铁大桥局集团第三工程有限公司 | Installation regulating device for camber-type steel pipe arch bridge arch rib erection |
CN102220811A (en) * | 2011-04-18 | 2011-10-19 | 武船重型工程有限公司 | Truss arching-erecting splicing method of extra-large-pan steel pipe |
CN102251477A (en) * | 2011-04-19 | 2011-11-23 | 中铁二十三局集团第三工程有限公司 | Traversing construction method for tie bar arch |
CN202559236U (en) * | 2012-04-19 | 2012-11-28 | 中铁十局集团有限公司 | Arch rib limited and fixed steel support |
CN202831000U (en) * | 2012-08-10 | 2013-03-27 | 中油吉林化建工程有限公司 | Fixed tower crane overall moving mechanism |
CN203625785U (en) * | 2013-12-19 | 2014-06-04 | 中铁六局集团有限公司 | Coordinate adjusting device for arch sections of steel pipe arch mounted in support method |
-
2013
- 2013-12-19 CN CN201310697450.6A patent/CN103628417B/en not_active Expired - Fee Related
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20100111550A (en) * | 2009-04-07 | 2010-10-15 | 주식회사 에이스이엔씨 | Method for constructing arch type psc beam |
CN101736699A (en) * | 2009-12-15 | 2010-06-16 | 中交路桥华北工程有限公司 | Accurate positioning method of sliding of full-support frame steel box girder |
CN201746778U (en) * | 2010-07-27 | 2011-02-16 | 中铁大桥局集团第三工程有限公司 | Installation regulating device for camber-type steel pipe arch bridge arch rib erection |
CN102220811A (en) * | 2011-04-18 | 2011-10-19 | 武船重型工程有限公司 | Truss arching-erecting splicing method of extra-large-pan steel pipe |
CN102251477A (en) * | 2011-04-19 | 2011-11-23 | 中铁二十三局集团第三工程有限公司 | Traversing construction method for tie bar arch |
CN202559236U (en) * | 2012-04-19 | 2012-11-28 | 中铁十局集团有限公司 | Arch rib limited and fixed steel support |
CN202831000U (en) * | 2012-08-10 | 2013-03-27 | 中油吉林化建工程有限公司 | Fixed tower crane overall moving mechanism |
CN203625785U (en) * | 2013-12-19 | 2014-06-04 | 中铁六局集团有限公司 | Coordinate adjusting device for arch sections of steel pipe arch mounted in support method |
Non-Patent Citations (1)
Title |
---|
黄河特大桥S1拱节支架的设计;程戈等;《山西建筑》;20101231;第36卷(第34期);全文 * |
Also Published As
Publication number | Publication date |
---|---|
CN103628417A (en) | 2014-03-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103628417B (en) | Support Method installs tubular arch arch sections Coordinate Adjusting device | |
CN201746778U (en) | Installation regulating device for camber-type steel pipe arch bridge arch rib erection | |
CN105484361B (en) | Hyperbolic closo steel latticed structures replace substep jacking apparatus and its construction method | |
CN203625785U (en) | Coordinate adjusting device for arch sections of steel pipe arch mounted in support method | |
CN102828469B (en) | Positioning mounting construction method for triangular steel constructed pillar of inclined-leg steel box | |
CN205295963U (en) | Long span steel case back pushes away construction with bearing structure that transversely rectifies | |
CN103306208A (en) | Formwork creeping method for novel 1.6 parabola-shaped four-column type hollow variable section high pier | |
CN204570499U (en) | A kind of large span vertical curve steel box-girder walking type pushing device | |
CN104594201B (en) | A kind of method utilizing one-sided pier-side bracket to set up pier top girder steel | |
CN103451338B (en) | Ascending pipe and five-way ball mounting method for blast furnace gas system | |
CN205917601U (en) | Integrally lift up device of bridge arch rib | |
CN105648923A (en) | Stay cable saddle positioning device and positioning method thereof | |
CN203034821U (en) | Large-span arch inverted triangular pipe truss assembling integral mould | |
CN202116984U (en) | Dragging-adjustable cross-brace device for continuous beams of spatial steel pipe trusses | |
CN103663053B (en) | Movable wall-attached device and movable wall-attached frame thereof | |
CN203213019U (en) | Long cantilever bent cap cast-in-place construction support system | |
CN205369043U (en) | Long span steel case back pushes away construction and uses interim bearing structure | |
CN204370314U (en) | A kind of lower hanging steel bridge erects suspension rod | |
CN204024056U (en) | A kind of construction formwork supported rod erecting | |
CN103484584A (en) | Method for installing down pipe of blast furnace gas system | |
CN202347884U (en) | Overhaul platform for water turbine | |
CN203034605U (en) | Jacking support for reticulated shell structure | |
CN204980800U (en) | Portable step baffle installation structure | |
CN107605142A (en) | A kind of attachment type raise scaffold structure | |
CN206346201U (en) | A kind of sand control alignment system for being used to lay lattice column |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
ASS | Succession or assignment of patent right |
Owner name: CHINA RAILWAY CORPORATION Free format text: FORMER OWNER: CHINA RAILWAY SIXTH GROUP CO., LTD. Effective date: 20150723 Owner name: CHINA RAILWAY SIXTH GROUP CO., LTD. TAIYUAN RAILWA Free format text: FORMER OWNER: TAIYUAN RAILWAY CONSTRUCTION CO., LTD., ZHONGTIE 6-BUREAU GROUP Effective date: 20150723 |
|
C41 | Transfer of patent application or patent right or utility model | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20150723 Address after: 100844 Fuxing Road, Beijing, Haidian District, No. 10 Applicant after: CHINA RAILWAY Corp. Applicant after: CHINA RAILWAY SIXTH GROUP Co.,Ltd. Applicant after: CHINA RAILWAY 6TH GROUP TAIYUAN RAILWAY CONSTRUCTION Co.,Ltd. Address before: 100036 Haidian District, Wanshou Road, No. 2, Applicant before: CHINA RAILWAY SIXTH GROUP Co.,Ltd. Applicant before: CHINA RAILWAY 6TH GROUP TAIYUAN RAILWAY CONSTRUCTION Co.,Ltd. |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151118 |