CN107841932A - Method for manufacturing, installing and positioning tied arch bridge arch rib segment - Google Patents

Method for manufacturing, installing and positioning tied arch bridge arch rib segment Download PDF

Info

Publication number
CN107841932A
CN107841932A CN201710979651.3A CN201710979651A CN107841932A CN 107841932 A CN107841932 A CN 107841932A CN 201710979651 A CN201710979651 A CN 201710979651A CN 107841932 A CN107841932 A CN 107841932A
Authority
CN
China
Prior art keywords
rib
lifting section
model
pipe
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710979651.3A
Other languages
Chinese (zh)
Inventor
刘斌
刘永福
敖长江
龙廷
于忠永
马明磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Civil Engineering Co Ltd
Original Assignee
China Construction Civil Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Civil Engineering Co Ltd filed Critical China Construction Civil Engineering Co Ltd
Priority to CN201710979651.3A priority Critical patent/CN107841932A/en
Publication of CN107841932A publication Critical patent/CN107841932A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D4/00Arch-type bridges
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Geometry (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • General Physics & Mathematics (AREA)
  • Computer Hardware Design (AREA)
  • Theoretical Computer Science (AREA)
  • Computational Mathematics (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Evolutionary Computation (AREA)
  • General Engineering & Computer Science (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention provides a method for manufacturing, installing and positioning a tie rod arch bridge arch rib segment, which comprises the following steps: carrying out three-dimensional modeling on the arch rib sections to form an arch rib section model, dividing the arch rib section model into a plurality of sections of pipe section models and carrying out computer lofting; performing plate rolling on the blanked plate according to the size of the multi-section pipe joint model after lofting by a computer, enabling two sides of the plate to be close to each other to form a longitudinal seam, welding the longitudinal seam to form a longitudinal welding seam, and welding the plate to form a circular pipe; three-dimensionally scanning the circular tube by a three-dimensional scanner to form a point cloud model of the circular tube, and rechecking and matching the point cloud model of the circular tube with the tube joint model after lofting by the computer; and according to the position of the multi-section pipe joint model after computer lofting, welding a plurality of circular pipes with the linear error smaller than a certain numerical value in rechecking matching to form the arch rib section. The invention can accurately control the line shape and size of the arch rib segment and also can accurately control the installation and positioning precision of the arch rib segment.

Description

Bowstring arch bridge rib-lifting section makes and installation and locating method
Technical field
The present invention relates to bridge construction field, relates in particular to a kind of bowstring arch bridge rib-lifting section and makes and install positioning Method.
Background technology
At present, the making for continuous beam arch rib of growing up and installation have strict technical requirements.Traditional arch rib makes master Will be by manual measurement means, its workload is big, precision reliability bottom;And traditional arch rib installation is using the peace of crane and parallels Dress mode, difficulty of construction is big, and installation positioning precision is low.
The content of the invention
In view of the foregoing, the technical problems to be solved by the invention are to provide a kind of making precision that can improve arch rib The making of bowstring arch bridge rib-lifting section and installation and locating method with the installation accuracy of arch rib.
To realize above-mentioned technique effect, the invention discloses a kind of bowstring arch bridge rib-lifting section preparation method, including it is following Step:
Three-dimensional modeling is carried out to rib-lifting section and forms a rib-lifting section model, the rib-lifting section model is divided into multistage pipe Save model and computer lofting is simultaneously carried out to tube coupling model described in multistage, setting-out goes out size and the position of every section of tube coupling model;
The size of tube coupling model carries out plate cutting respectively according to the multistage after computer lofting;
Pipe crimping is carried out to the sheet material after blanking, makes the both sides of the sheet material mutually draw close to form longitudinal joint;
Welding is carried out to the longitudinal joint and forms longitudinal seam, makes the sheet material weld to form pipe;
3-D scanning is carried out to the pipe by spatial digitizer and forms the point cloud model of the pipe, by the circle The point cloud model of pipe carries out review matching with the tube coupling model after corresponding computer lofting;
The position of tube coupling model as described in the multistage after computer lofting, Linear Error is less than a fixed number in being matched to review Multiple pipes of value are welded, and form the rib-lifting section.
The beneficial effects of the present invention are:Linear (crooked radian) and size of rib-lifting section can accurately be controlled.
Bowstring arch bridge rib-lifting section preparation method of the present invention further improvement is that, in the plate to after blanking Material carries out pipe crimping, the both sides of the sheet material is mutually drawn close before the step of forming longitudinal joint, in addition to step:The sheet material is entered Row pre-bending.
Bowstring arch bridge rib-lifting section preparation method of the present invention further improvement is that, it is described press computer lofting after The position of tube coupling model described in multistage, Linear Error welds less than multiple pipes of certain numerical value in being matched to review Connect, in the step of forming the rib-lifting section:The longitudinal seam of the adjacent pipe is mutually staggered 200mm to 400mm.
Bowstring arch bridge rib-lifting section preparation method of the present invention further improvement is that, it is described press computer lofting after it is more The position of Duan Suoshu tube coupling models, Linear Error welds less than multiple pipes of certain numerical value in being matched to review, The step of forming the rib-lifting section includes:Installation positioning is carried out to the pipe by assembled moulding bed, adjust the pipe it Between relative position so that integral linear and the rib-lifting section model between the pipe it is linear between error be less than Equal to 2mm.
Bowstring arch bridge rib-lifting section preparation method of the present invention further improvement is that, in it is described press computer lofting after The position of tube coupling model described in multistage, Linear Error welds less than multiple pipes of certain numerical value in being matched to review Connect, after the step of forming the rib-lifting section, in addition to step:By spatial digitizer to the arch rib after the completion of welding Section carries out 3-D scanning and forms the point cloud model of the rib-lifting section, by the point cloud model of the rib-lifting section and the arch Rib Segment Model carries out review matching.
The further improvement of bowstring arch bridge rib-lifting section preparation method of the present invention is that the rib-lifting section model also wraps Two rib-lifting sections being parallel to each other are included, are connected between two rib-lifting sections by web.
The invention also discloses a kind of installation and locating method of bowstring arch bridge rib-lifting section, it is characterised in that including following Step:
According to the installation site of rib-lifting section, in the mounting bracket that rib-lifting section is set up on bowstring arch bridge, the installation branch Frame is provided with support block and limited block, and the mounting bracket is provided with the first regulation machine for being used for adjusting the support block up and down Structure, the mounting bracket are provided with the second governor motion for limited block described in left and right adjusting;
The rib-lifting section is lifted to the mounting bracket by loop wheel machine, by being lowered on first governor motion The support block is saved, the end of the rib-lifting section is placed in the support block;Adjusted by described second governor motion or so The limited block is saved, the side of the end of the rib-lifting section is support on the limited block.
The beneficial effects of the present invention are:The installation positioning precision of rib-lifting section can accurately be controlled.
Bowstring arch bridge rib-lifting section of the present invention installation and locating method further improvement is that, it is described by loop wheel machine by institute State rib-lifting section to lift to the mounting bracket, the support block is adjusted up and down by first governor motion, made described The end of rib-lifting section is placed in the support block;By limited block described in the second governor motion left and right adjusting, make described The step of side of the end of rib-lifting section is support on the limited block includes:The peace of the rib-lifting section is detected by total powerstation Dress position location ensures that the site error between the installation site of the rib-lifting section and actually required installation site is less than In 2mm.
Bowstring arch bridge rib-lifting section of the present invention installation and locating method further improvement is that, the support block is provided with For supporting the deep-slotted chip breaker of the rib-lifting section.
The invention also discloses a kind of bowstring arch bridge rib-lifting section mounting and positioning device, including
The mounting bracket being erected on bowstring arch bridge;
For placing the support block of rib-lifting section, the support block liftable is in the mounting bracket;And
The limited block of the mounting bracket is slidably coupled to, the limited block sliding is positioned at by fixture afterwards in place In the mounting bracket and side of the rib-lifting section is support on the limited block.
Brief description of the drawings
Fig. 1 is the Making programme figure of rib-lifting section in bowstring arch bridge rib-lifting section making of the present invention and installation and locating method.
Fig. 2 is pipe crimping working state schematic representation in bowstring arch bridge rib-lifting section making of the present invention and installation and locating method.
Fig. 3 is the installation positioning dress of rib-lifting section in bowstring arch bridge rib-lifting section making of the present invention and installation and locating method Put.
Embodiment
For the benefit of to the understanding of the present invention, illustrated below in conjunction with drawings and Examples.
Fig. 1 to Fig. 2 is referred to, the present invention provides a kind of bowstring arch bridge rib-lifting section preparation method, and it comprises the following steps (as shown in Figure 1):
Step 101:Three-dimensional modeling is carried out to rib-lifting section and forms a rib-lifting section model, rib-lifting section model is divided into more Duan Guanjie models simultaneously carry out computer lofting to multistage tube coupling model, and setting-out goes out size and the position of every section of tube coupling model;
Step 102:Plate cutting is carried out according to the size of the multistage tube coupling model after computer lofting respectively;
Step 103:Pipe crimping is carried out to the sheet material after blanking, makes the both sides of sheet material mutually draw close to form longitudinal joint;
Step 104:Welding is carried out to longitudinal joint and forms longitudinal seam, makes sheet material weld to form pipe;
Step 105:3-D scanning is carried out to pipe by spatial digitizer and forms the point cloud model of pipe, by pipe Point cloud model carries out review matching with the tube coupling model after corresponding computer lofting;
Step 106:By the position of the multistage tube coupling model after computer lofting, Linear Error is less than one in being matched to review Multiple pipes of fixed number value are welded, and form rib-lifting section.
In the present embodiment, by the position of the multistage tube coupling model after computer lofting, Linear Error is small in being matched to review Linear Error in the step of forming rib-lifting section by welding between multiple pipes of certain numerical value should be less than 0.5mm, And refer to that the Linear Error of each pipe should be less than 0.5mm.
According to theoretical arch equation, by the way that the position coordinates of each point on rib-lifting section is calculated, profit in the present embodiment Three-dimensional modeling is carried out to rib-lifting section with Tekla Structures softwares and forms a rib-lifting section model, while can also be drawn out Arch, multistage is divided into after optimizing analysis to rib-lifting section model structure using Tekla Structures softwares Tube coupling model, and computer lofting is carried out to each section of tube coupling model, setting-out goes out each section of tube coupling modal position and size.During blanking, The length and width of sheet material respectively according to the length of each section of tube coupling model and along tube coupling model circumferencial direction central core girth come Determine.Pipe crimping is carried out to the sheet material after blanking by veneer reeling machine;Need to be corrected wound steel pipe after the completion of roll bending, to eliminate The problems such as sheet material both sides are mutually drawn close issuable longitudinal joint dislocation, port misalignment, pulleying and rolled up less;Formed during sheet material pipe crimping vertical Seam, carries out that welding forms longitudinal seam and sheet material welds and to form pipe by using Lincoln weld welding technique to longitudinal joint;Weldering In termination process, longitudinal joint periphery can produce certain mistake circle phenomenon, therefore also need to carry out pipe again through veneer reeling machine after welding Justify in school.After the completion of being welded to longitudinal joint, longitudinal seam need to be detected a flaw, to avoid longitudinal seam from defect occur.
In the present embodiment described computer lofting refer to according to the physical dimension of rib-lifting section on construction drawing or according to Rib-lifting section designed by arch equation, with 1:1 ratio draws out the true shape and size of rib-lifting section in a computer, By computer disposal, rib-lifting section can be divided into multistage tube coupling model, draw the size of each tube coupling model and the position of each point Coordinate, foundation is provided for the blanking of sheet material.
It is preferred that carrying out pipe crimping to the sheet material after blanking, sheet material both sides are mutually drawn close before the step of forming longitudinal joint, also wrapped Include step:Pre-bending is carried out to sheet material;The termination remained straight edge of sheet material both sides is not easy to eliminate when this is due to pipe crimping, therefore is rolling up Guan Qianxu carries out pre-bending processing to sheet material.
It is preferred that by the position of the multistage tube coupling model after computer lofting, Linear Error is less than one in being matched to review Multiple pipes of fixed number value are welded, when forming the step of rib-lifting section:The longitudinal seam of adjacent pipe mutually staggers 200mm To 400mm, i.e., the longitudinal seam of adjacent pipe staggers in opposite direction.Further, pipe is pacified by assembled moulding bed Set position, adjust the relative position between pipe so that integral linear and rib-lifting section model between pipe it is linear between Error be less than or equal to 2mm, when pipe that will be corresponding with multistage tube coupling model carries out assembled, entirety that multiple pipes are formed Linear linear with rib-lifting section model between Linear Error be no more than 2mm;In the present embodiment, multiple pipes are formed whole The linear and rib-lifting section model of body it is linear between Linear Error specifically referred to no more than 2mm, by assembled moulding bed to more After individual pipe carries out assembled positioning, an entirety of multiple pipes compositions, its Linear Error between arch rib model does not surpass Cross 2mm.
In the present embodiment, when carrying out installation positioning to pipe by assembled moulding bed, installing the site error of anchor point should control For system within ± 0.5mm, the error of perpendicularity for installing anchor point is less than or equal to 0.5mm.Position is mounted opposite between multiple pipes The relative position put between multistage tube coupling model needs unanimously;Each section of tube coupling model can be numbered in three-dimensional modeling, Each sheet material is corresponded during blanking and is numbered;Each pipe is installed in position fixing process by adjusting each pipe on assembled moulding bed Between relative position make it that concordantly degree is no more than 2mm for docking port to be welded between adjacent pipe.CO is used between adjacent pipe2 Gas shielded arc welding welding technique carries out girth welding to adjacent pipe;Also need to detect bevel angle before welding, its error 5 ° are must not exceed, and weld gap should control each weld seam welding in 5~8mm, welding process at least complete between adjacent pipe Into 2/3 fusion length;Need to detect a flaw to weld seam after the completion of welding, avoid commissure from defect occur.
It is preferred that by the position of the multistage tube coupling model after computer lofting, Linear Error is less than one in being matched to review Multiple pipes of fixed number value are welded, formed rib-lifting section the step of after:Also include step:Pass through spatial digitizer butt welding Rib-lifting section after the completion of connecing carries out 3-D scanning and forms the point cloud model of rib-lifting section, by the point cloud model of rib-lifting section with Rib-lifting section model carries out review matching.
In the present embodiment, rib-lifting section model includes two rib-lifting sections being parallel to each other, and leads between two rib-lifting sections Cross web connection.Rib-lifting section in actual fabrication includes described in bowstring arch bridge rib-lifting section preparation method two pieces mutually Parallel rib-lifting section, two pieces of rib-lifting sections being parallel to each other are connected by two blocks of webs, each longitudinal direction on two rib-lifting sections Weld seam is between two blocks of webs.For ease of description, be parallel to each other two rib-lifting sections are referred to as in this specification String pipe and lower chord tube, two blocks of webs are respectively bottom web and epiplastron, and the welding step of web is specific as follows:
Will be linear consistent with the pipe that winds up (or lower chord tube) and the bottom web to connecting is layed on assembled moulding bed;
Winded up pipe and lower chord tube in installation on assembled moulding bed;
The pipe and bottom web that winds up, lower chord tube and bottom web are welded respectively, the whole of bottom web is ensured in welding process In the range of body Linear Error ± 2mm;
Epiplastron is installed, being provided with multiple temporary supports on bottom web is placed in epiplastron on multiple temporary supports, The pipe and epiplastron that winds up, lower chord tube and epiplastron are welded respectively, ensure that the integral linear of epiplastron misses in welding process Difference ± 2mm;
Detected a flaw after welding.
In the present embodiment, when being connected between two rib-lifting sections by web, bottom web or the installation of epiplastron horizontal direction It is positioned on assembled moulding bed, the flatness error of assembled moulding bed is controlled in the range of 2mm.
In the present embodiment, Holon 3D scanners, UMAX spatial digitizers, day figure spatial digitizer etc. can be selected to each section Rib-lifting section after the completion of pipe and welding carries out 3-D scanning and can distinguish the point cloud model and rib-lifting section of form pipe Point cloud model;Then the tube coupling model after the point cloud model of pipe and setting-out is carried out by review matching by computer, passes through meter The point cloud model of rib-lifting section and rib-lifting section model are carried out review matching by calculation machine.
Present invention also offers a kind of installation and locating method of bowstring arch bridge rib-lifting section, comprise the following steps (such as Fig. 2 institutes Show):
Step 201:According to the installation site of rib-lifting section, in the mounting bracket that rib-lifting section is set up on bowstring arch bridge, institute State mounting bracket and be provided with support block and limited block, the mounting bracket, which is provided with, to be used to adjust the first of the support block up and down Governor motion, the mounting bracket are provided with the second governor motion for limited block described in left and right adjusting;
Step 202:The rib-lifting section is lifted to the mounting bracket by loop wheel machine, passes through the described first regulation machine Structure adjusts the support block up and down, the end of the rib-lifting section is placed in the support block;Pass through the described second regulation machine Limited block described in structure left and right adjusting, the side of the end of the rib-lifting section is set to be support on the limited block.
In the present embodiment, before being lifted by loop wheel machine to rib-lifting section, the continuous beam bottom of bowstring arch bridge is added Gu its object is to improve the integrated support intensity of bridge floor at continuous beam, meet the current and lifting requirements of Large-scale Hoisting equipment. A section rib-lifting section of growing up can be lifted by Large-scale Hoisting equipment, by reducing the rib-lifting section number on arch rib, can dropped Increasing error (overall installation error) during low installation.
It is preferred that lifting the rib-lifting section to the mounting bracket by loop wheel machine, pass through the described first regulation machine Structure adjusts the support block up and down, the end of the rib-lifting section is placed in the support block;Pass through the described second regulation machine Limited block described in structure left and right adjusting, the step of making the side of the end of the rib-lifting section be support on the limited block, include:It is logical The upper-lower position of the first governor motion regulation support block is crossed, the right position of limited block is adjusted by the second governor motion, and is led to Crossing the installation position location of total powerstation detection rib-lifting section ensures the installation site of rib-lifting section and actually required installation site Site error be less than or equal to 2mm.Upper and lower, left and right position consistency in above-below direction, left and right directions and Fig. 3.
In the present embodiment, the first governor motion is that installation settings is adjusted in the first jack on support vertical direction, second It is the second jack being vertical on limiting plate to save mechanism, and the direction adjusted up and down and left and right adjusting direction are as shown in Figure 3 Up and down, left and right directions.
The invention also discloses a kind of bowstring arch bridge rib-lifting section mounting and positioning device (as shown in Figure 3), including:It is erected on Mounting bracket 1 on bowstring arch bridge, the support block 11 for placing rib-lifting section and it is slidably coupled to the spacing of mounting bracket Block 12;Wherein, for the liftable of support block 11 in mounting bracket 1, limited block 12 slides is positioned at peace by fixture afterwards in place On dress support 1 and the side of rib-lifting section is support on limited block 12.
In the present embodiment, the installation site of the position adjustment rib-lifting section 2 by adjusting support block 11 and limited block 12, with Meet actual installation precision, it is ensured that the site error of rib-lifting section 2 is less than or equal to 2mm.
It is preferred that the guide rail slid for limited block 12, the installation of rib-lifting section 2 are provided with mounting bracket 1 in left-right direction Its position need to accurately be detected by total powerstation in position fixing process, by the position for constantly adjusting support block 11 and limited block 12 Put so that the position error of rib-lifting section 2 is less than or equal to 2mm.
It is preferred that support block is connected to mounting bracket by the liftable of the first jack 13.
In the present embodiment, second jack 14 can be also also installed on the direction perpendicular to limited block, second is very heavy Top 14 is set in left-right direction, and when installation positioning is carried out to rib-lifting section 2, the side of rib-lifting section 2 is support on the second jack On.
Left and right directions in the present embodiment is consistent with the left and right directions in Fig. 3, is specifically shown in Fig. 3.
The beneficial effects of the present invention are:
(1) linear (crooked radian) and size of rib-lifting section can accurately be controlled.
(2) the installation positioning precision of rib-lifting section can accurately be controlled.
(3) using the lifting for section rib-lifting section of growing up, arch rib quantity is reduced, reduces installation increasing error.
During actual bridge construction, multistage rib-lifting section is divided into by arch rib, after the completion of each section of rib-lifting section assembly welding Assembly welding is carried out to multistage rib-lifting section again into required arch rib.Wherein, this can be selected in the preparation method of each section of rib-lifting section Bowstring arch bridge rib-lifting section preparation method in invention;The installation and locating method of each section of rib-lifting section can be selected in the present invention The installation and locating method of bar arch rib section, each section of rib-lifting section is installed in mounting bracket after having good positioning again to each adjacent Rib-lifting section carries out assembly welding and is finally completed required bridge arch rib.
The present invention is described in detail above in association with drawings and Examples, those skilled in the art can basis Described above makes many variations example to the present invention.Thus, some details in embodiment should not form limitation of the invention, The present invention will be used as protection scope of the present invention using the scope that appended claims define.

Claims (10)

1. bowstring arch bridge rib-lifting section preparation method, it is characterised in that comprise the following steps:
Three-dimensional modeling is carried out to rib-lifting section and forms a rib-lifting section model, the rib-lifting section model is divided into multistage tube coupling mould Type simultaneously carries out computer lofting to tube coupling model described in multistage, and setting-out goes out size and the position of every section of tube coupling model;
The size of tube coupling model carries out plate cutting respectively according to the multistage after computer lofting;
Pipe crimping is carried out to the sheet material after blanking, makes the both sides of the sheet material mutually draw close to form longitudinal joint;
Welding is carried out to the longitudinal joint and forms longitudinal seam, makes the sheet material weld to form pipe;
3-D scanning is carried out to the pipe by spatial digitizer and forms the point cloud model of the pipe, by the pipe Point cloud model carries out review matching with the tube coupling model after corresponding computer lofting;
The position of tube coupling model as described in the multistage after computer lofting, Linear Error is less than certain numerical value in being matched to review Multiple pipes are welded, and form the rib-lifting section.
2. bowstring arch bridge rib-lifting section preparation method according to claim 1, it is characterised in that in it is described to blanking after The sheet material carries out pipe crimping, the both sides of the sheet material is mutually drawn close before the step of forming longitudinal joint, in addition to step:To described Sheet material carries out pre-bending.
3. bowstring arch bridge rib-lifting section preparation method according to claim 1, it is characterised in that put described by computer The position of tube coupling model described in multistage after sample, Linear Error enters less than multiple pipes of certain numerical value in being matched to review Row welding, in the step of forming the rib-lifting section:The longitudinal seam of the adjacent pipe is mutually staggered 200mm to 400mm.
4. bowstring arch bridge rib-lifting section preparation method according to claim 1, it is characterised in that described to press computer lofting The position of tube coupling model described in multistage afterwards, Linear Error is less than multiple pipes progress of certain numerical value in being matched to review The step of welding, forming the rib-lifting section includes:Installation positioning is carried out to the pipe by assembled moulding bed, adjusts the circle Relative position between pipe so that integral linear and the rib-lifting section model between the pipe it is linear between error Less than or equal to 2mm.
5. bowstring arch bridge rib-lifting section preparation method according to claim 1, it is characterised in that put in described by computer The position of tube coupling model described in multistage after sample, Linear Error enters less than multiple pipes of certain numerical value in being matched to review Row welding, after the step of forming the rib-lifting section, in addition to step:By spatial digitizer to described in after the completion of welding Rib-lifting section carries out 3-D scanning and forms the point cloud model of the rib-lifting section, by the point cloud model of the rib-lifting section and institute State rib-lifting section model and carry out review matching.
6. the bowstring arch bridge rib-lifting section preparation method according to any one of claim 1 to 5, it is characterised in that:The arch Rib Segment Model also includes two rib-lifting sections being parallel to each other, and is connected between two rib-lifting sections by web.
7. a kind of installation and locating method of bowstring arch bridge rib-lifting section, it is characterised in that comprise the following steps:
According to the installation site of rib-lifting section, in the mounting bracket that rib-lifting section is set up on bowstring arch bridge, the mounting bracket Provided with support block and limited block, the mounting bracket is provided with the first governor motion for being used for adjusting the support block up and down, institute State mounting bracket and be provided with the second governor motion for being used for limited block described in left and right adjusting;
The rib-lifting section is lifted to the mounting bracket by loop wheel machine, institute is adjusted by first governor motion up and down Support block is stated, the end of the rib-lifting section is placed in the support block;Pass through the second governor motion left and right adjusting institute Limited block is stated, the side of the end of the rib-lifting section is support on the limited block.
8. the installation and locating method of bowstring arch bridge rib-lifting section according to claim 7, it is characterised in that will by loop wheel machine The rib-lifting section is lifted to the mounting bracket, is adjusted the support block up and down by first governor motion, is made institute The end for stating rib-lifting section is placed in the support block;By limited block described in the second governor motion left and right adjusting, make institute Stating the step of the side of the end of rib-lifting section is support on the limited block includes:The rib-lifting section is detected by total powerstation Installation position location ensures that the site error between the installation site of the rib-lifting section and actually required installation site is less than Equal to 2mm.
9. the installation and locating method of bowstring arch bridge rib-lifting section according to claim 7, it is characterised in that the support block It is provided with the deep-slotted chip breaker for being used for supporting the rib-lifting section.
A kind of 10. bowstring arch bridge rib-lifting section mounting and positioning device, it is characterised in that including:
The mounting bracket being erected on bowstring arch bridge;
For placing the support block of rib-lifting section, the support block liftable is in the mounting bracket;And
It is slidably coupled to the limited block of the mounting bracket, the limited block sliding is positioned at by fixture described afterwards in place In the mounting bracket and side of the rib-lifting section is support on the limited block.
CN201710979651.3A 2017-10-19 2017-10-19 Method for manufacturing, installing and positioning tied arch bridge arch rib segment Pending CN107841932A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710979651.3A CN107841932A (en) 2017-10-19 2017-10-19 Method for manufacturing, installing and positioning tied arch bridge arch rib segment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710979651.3A CN107841932A (en) 2017-10-19 2017-10-19 Method for manufacturing, installing and positioning tied arch bridge arch rib segment

Publications (1)

Publication Number Publication Date
CN107841932A true CN107841932A (en) 2018-03-27

Family

ID=61662589

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710979651.3A Pending CN107841932A (en) 2017-10-19 2017-10-19 Method for manufacturing, installing and positioning tied arch bridge arch rib segment

Country Status (1)

Country Link
CN (1) CN107841932A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109505223A (en) * 2018-11-30 2019-03-22 上海东鼎钢结构有限公司 Duplex steel arch bridge and its steel arch manufacturing method
CN109722992A (en) * 2018-12-19 2019-05-07 中铁广州工程局集团有限公司 A kind of device and method of dumbbell-shaped arch rib installation positioning
CN110130226A (en) * 2019-05-08 2019-08-16 中铁六局集团有限公司 The construction method of the positioning of bowstring arch bridge rib-hoisting and absolute altitude control
CN110453602A (en) * 2018-03-30 2019-11-15 中交路桥北方工程有限公司 Catenary arch rib construction lofting system
CN111395166A (en) * 2020-02-25 2020-07-10 中铁二十四局集团浙江工程有限公司 Tied arch bridge arch rib installation construction method
CN113802479A (en) * 2021-10-29 2021-12-17 合肥工业大学 Combined type unit support structure for dismantling tied arch bridge arch rib

Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101907439A (en) * 2010-03-17 2010-12-08 中国二十二冶集团有限公司 Stimulated measurement and detection method in architectural steel structure fabrication
CN102489947A (en) * 2011-11-30 2012-06-13 攀钢集团工程技术有限公司 Bottom chord tube manufacturing process of girder of steel tube concrete truss beam bridge
CN103406733A (en) * 2013-08-21 2013-11-27 安徽鸿路钢结构(集团)股份有限公司 Method for fabricating great bridge arch rib
CN103628417A (en) * 2013-12-19 2014-03-12 中铁六局集团有限公司 Coordinate adjustment device for mounting arch section of steel arch pipe by supporting method
CN103624488A (en) * 2013-11-15 2014-03-12 南通润邦重机有限公司 Technology for manufacturing pile leg of self-elevating offshore wind power work platform
CN104715113A (en) * 2015-03-19 2015-06-17 中铁二局第五工程有限公司 Method and device for conducting construction simulation on steel truss arch bridge through BIM
CN105421211A (en) * 2015-12-21 2016-03-23 中铁建大桥工程局集团第五工程有限公司 Manufacturing method for large-span single-arch-rib steel box arch
CN205152802U (en) * 2015-11-22 2016-04-13 中铁十八局集团有限公司 Improve structure of arched bridge strength nature skeleton building -site preparation precision
CN105603881A (en) * 2016-02-24 2016-05-25 广东省交通规划设计研究院股份有限公司 Integral erecting system for large sea-crossing arch bridge and construction method thereof
CN106294940A (en) * 2016-07-28 2017-01-04 浙江大学 A kind of large-scale bending in space round steel pipe multiple operation cumulative error control method
CN106354919A (en) * 2016-08-26 2017-01-25 北京星航机电装备有限公司 Digital and precise formation method for pipeline
CN106638323A (en) * 2016-12-30 2017-05-10 中铁二十三局集团第工程有限公司 Assembling construction method for arch ribs of tied arch bridge
CN106886659A (en) * 2017-03-21 2017-06-23 湖南联智监测科技有限公司 The virtual pre-splicing and detection method of steel structure bridge based on 3 D laser scanning and cloud platform
CN107178042A (en) * 2017-05-31 2017-09-19 中国二十冶集团有限公司 A kind of construction method of large span inverted-triangular CFST Arch Bridge steel arch
CN107201718A (en) * 2016-03-16 2017-09-26 中铁十五局集团有限公司 Preparation method of main longitudinal beam of steel bridge
CN207331471U (en) * 2017-10-19 2018-05-08 中国建筑土木建设有限公司 Arch Rib Segment Positioning Device of Tied Arch Bridge

Patent Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101907439A (en) * 2010-03-17 2010-12-08 中国二十二冶集团有限公司 Stimulated measurement and detection method in architectural steel structure fabrication
CN102489947A (en) * 2011-11-30 2012-06-13 攀钢集团工程技术有限公司 Bottom chord tube manufacturing process of girder of steel tube concrete truss beam bridge
CN103406733A (en) * 2013-08-21 2013-11-27 安徽鸿路钢结构(集团)股份有限公司 Method for fabricating great bridge arch rib
CN103624488A (en) * 2013-11-15 2014-03-12 南通润邦重机有限公司 Technology for manufacturing pile leg of self-elevating offshore wind power work platform
CN103628417A (en) * 2013-12-19 2014-03-12 中铁六局集团有限公司 Coordinate adjustment device for mounting arch section of steel arch pipe by supporting method
CN104715113A (en) * 2015-03-19 2015-06-17 中铁二局第五工程有限公司 Method and device for conducting construction simulation on steel truss arch bridge through BIM
CN205152802U (en) * 2015-11-22 2016-04-13 中铁十八局集团有限公司 Improve structure of arched bridge strength nature skeleton building -site preparation precision
CN105421211A (en) * 2015-12-21 2016-03-23 中铁建大桥工程局集团第五工程有限公司 Manufacturing method for large-span single-arch-rib steel box arch
CN105603881A (en) * 2016-02-24 2016-05-25 广东省交通规划设计研究院股份有限公司 Integral erecting system for large sea-crossing arch bridge and construction method thereof
CN107201718A (en) * 2016-03-16 2017-09-26 中铁十五局集团有限公司 Preparation method of main longitudinal beam of steel bridge
CN106294940A (en) * 2016-07-28 2017-01-04 浙江大学 A kind of large-scale bending in space round steel pipe multiple operation cumulative error control method
CN106354919A (en) * 2016-08-26 2017-01-25 北京星航机电装备有限公司 Digital and precise formation method for pipeline
CN106638323A (en) * 2016-12-30 2017-05-10 中铁二十三局集团第工程有限公司 Assembling construction method for arch ribs of tied arch bridge
CN106886659A (en) * 2017-03-21 2017-06-23 湖南联智监测科技有限公司 The virtual pre-splicing and detection method of steel structure bridge based on 3 D laser scanning and cloud platform
CN107178042A (en) * 2017-05-31 2017-09-19 中国二十冶集团有限公司 A kind of construction method of large span inverted-triangular CFST Arch Bridge steel arch
CN207331471U (en) * 2017-10-19 2018-05-08 中国建筑土木建设有限公司 Arch Rib Segment Positioning Device of Tied Arch Bridge

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
杨晓勇等: "钢管混凝土拱桥拱肋制作工艺", 中国公路, no. 11, pages 124 - 125 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110453602A (en) * 2018-03-30 2019-11-15 中交路桥北方工程有限公司 Catenary arch rib construction lofting system
CN109505223A (en) * 2018-11-30 2019-03-22 上海东鼎钢结构有限公司 Duplex steel arch bridge and its steel arch manufacturing method
CN109722992A (en) * 2018-12-19 2019-05-07 中铁广州工程局集团有限公司 A kind of device and method of dumbbell-shaped arch rib installation positioning
CN110130226A (en) * 2019-05-08 2019-08-16 中铁六局集团有限公司 The construction method of the positioning of bowstring arch bridge rib-hoisting and absolute altitude control
CN111395166A (en) * 2020-02-25 2020-07-10 中铁二十四局集团浙江工程有限公司 Tied arch bridge arch rib installation construction method
CN113802479A (en) * 2021-10-29 2021-12-17 合肥工业大学 Combined type unit support structure for dismantling tied arch bridge arch rib

Similar Documents

Publication Publication Date Title
CN107841932A (en) Method for manufacturing, installing and positioning tied arch bridge arch rib segment
CN108914782A (en) A kind of large size open web type highway steel box girder stayed-cable bridge manufacturing method
CN104002377B (en) A kind of prefabricated case beam reinforcing bar binding and bellows positioning device
CN103056616B (en) A kind of bending box component and manufacturing process thereof
CN103317292B (en) Novel connecting and assembling jig and method for pipe flanges
CN102011455B (en) Complex annular shed bending and twisting component and manufacturing method thereof
CN110409841B (en) Construction method of hyperbolic pipe truss structure
CN105332510A (en) Construction method of complicated beam column joint core area
CN202382696U (en) Pipe straightness detection device
CN106493526A (en) A kind of heavy hyperboloid arc steel box-girder manufacture craft
CN105317052A (en) Tower crane foundation bolt fixing method
CN103243928B (en) Inclined in two-way V-type column construction method
CN204524120U (en) The vertical loopful of large diameter pile foundation steel reinforcement cage is to location moulding bed device
CN102059520B (en) Method for manufacturing twisted case
CN104818849B (en) Construction method for space curved rib girder steel structure
CN104196245B (en) The sectional making assembling method of large-scale steel pipe truss variable cross-section curved beam
CN104989107A (en) Curved ribbed beam processing and assembling construction process
CN104196153B (en) A kind of slab L-shaped steel plate shear force wall post and preparation method thereof
CN208304264U (en) I-steel processes mould bases group
CN107881914B (en) Wire-dividing tube type cable saddle back field assembly type positioning device and assembly method
CN113146109B (en) Manufacturing method of eccentric jacket
CN205096241U (en) Long steel pipe straightness accuracy automatic measure sorting unit
CN209323691U (en) A kind of huge diagonal brace of overlength superelevation
CN201810878U (en) Bridge type bracket
CN207700489U (en) A kind of great cantilever rotating folding roof system steel platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination