CN203625785U - Coordinate adjusting device for arch sections of steel pipe arch mounted in support method - Google Patents

Coordinate adjusting device for arch sections of steel pipe arch mounted in support method Download PDF

Info

Publication number
CN203625785U
CN203625785U CN201320837280.2U CN201320837280U CN203625785U CN 203625785 U CN203625785 U CN 203625785U CN 201320837280 U CN201320837280 U CN 201320837280U CN 203625785 U CN203625785 U CN 203625785U
Authority
CN
China
Prior art keywords
arch
sliding base
slideway
jack
adjusting device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201320837280.2U
Other languages
Chinese (zh)
Inventor
姚予东
任亚杰
李平
高荣峰
王建军
黄枝花
王振
孟俊杰
刘文杰
许月香
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taiyuan Railway Construction Co., Ltd., Zhongtie 6-Bureau Group
China State Railway Group Co Ltd
China Railway Sixth Group Co Ltd
Original Assignee
TAIYUAN RAILWAY CONSTRUCTION Co Ltd ZHONGTIE 6-BUREAU GROUP
China Railway Sixth Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TAIYUAN RAILWAY CONSTRUCTION Co Ltd ZHONGTIE 6-BUREAU GROUP, China Railway Sixth Group Co Ltd filed Critical TAIYUAN RAILWAY CONSTRUCTION Co Ltd ZHONGTIE 6-BUREAU GROUP
Priority to CN201320837280.2U priority Critical patent/CN203625785U/en
Application granted granted Critical
Publication of CN203625785U publication Critical patent/CN203625785U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a coordinate adjusting device for arch sections of a steel pipe arch mounted in a support method. The coordinate adjusting device comprises a sliding base, a groove type slide way, a support beam, a slide way supporting stand column, a horizontal moving jack, a vertical moving jack and horizontal limit frames. The two horizontal limit frames are fixed at the two ends of the support beam respectively, the groove type slide way is arranged on the slide way supporting stand column and the vertical sliding jack, the sliding base is arranged in the groove type slide way, the horizontal moving jack is arranged among the sliding base and the opposite side faces of the horizontal limit frames, and a steel base plate is arranged between the slide way supporting stand column and the groove type slide way. The arch sections of the steel pipe arch are arranged on the sliding base which can horizontally slide in the groove type slide way under the acting of the horizontal moving jack, the groove type slide way can move up and down under the acting of the vertical moving jack, and therefore the arch sections of the steel pipe arch are accurately located. The coordinate adjusting device can quickly, safely and accurately adjust the arch sections of the steel pipe arch to reach the elevation.

Description

Support Method is installed tubular arch arch sections Coordinate Adjusting device
Technical field
The utility model relates to a kind of Coordinate Adjusting device, particularly a kind of Support Method when tubular arch arch sections is installed hand basket arch arch sections Coordinate Adjusting device is installed.
Background technology
Because the physical dimension of the arch sections of long-span Steel Arch is large, weight is large, need to adopt large lifting equipment lifting, when tubular arch sections is installed, mileage direction error of coordinate can be adjusted by the closure segment length of finally installing, and the coordinate laterally, highly of the arch sections mouth of pipe needs accurately location.Because hand basket arch arch sections mouth of pipe three-dimensional coordinate can interact in the time adjusting, need to repeatedly adjust and just can reach requirement, and it is very difficult to use large lifting equipment accurately to locate arch sections position.
Common way is that large lifting equipment coordinates, and manually by jack, small-size jack draws, pushing tow operates, and not only exists accurate adjustment arch pipe joint mouth coordinate to expend for a long time in construction, and the risk that exists constructor hit by object in operation.
Summary of the invention
The technical problems to be solved in the utility model is to provide a kind of Support Method that can make steel tube arch rib mouth of pipe absolute altitude reach installation requirement fast, safely, accurately tubular arch arch sections Coordinate Adjusting device is installed.
For solving above technical problem, the utility model by the following technical solutions.
A kind of Support Method is installed tubular arch arch sections Coordinate Adjusting device, comprise sliding base, grooved slideway, rack beam, slideway support post, traversing jack, vertical shift jack and cross spacing frame, two cross spacing framves are separately fixed at rack beam two ends, two slideway support posts and two vertical shift jack are individually fixed in rack beam both sides, grooved slideway is supported in slideway support post and vertical shift jack top, sliding base packs in flute profile slideway, and traversing jack is arranged between sliding base and cross spacing frame opposite flank.
Tubular arch arch sections is arranged on sliding base, and sliding base can laterally slide in grooved slideway under the effect of horizontal jack, and grooved slideway can move up and down under the effect of vertical jack, accurately locates thereby tubular arch is encircleed to sections.
As the preferred scheme of one, described sliding base comprises sliding base base plate, and vertical sliding base base plate is fixed with sliding base web, and sliding base web stiffener is fixed in sliding base web both sides.
As the preferred scheme of another kind, between slideway support post and flute profile slideway, be provided with billet.Base, in the time laterally sliding, pads the space between grooved slideway and slideway support post with billet, avoid flute profile slideway to tilt.
Adjusting device described in the utility model can regulate tubular arch arch sections to reach absolute altitude fast, safely, exactly, has reduced construction working amount, has reduced difficulty of construction, has guaranteed homework precision and construction safety.
Accompanying drawing explanation
Fig. 1 is the structural representation of tubular arch arch sections Coordinate Adjusting device described in the utility model.
Fig. 2 is the I-I schematic cross-section of Fig. 1.
Fig. 3 is sliding base composition schematic diagram.
Fig. 4 application example tubular arch arch sections structural representation.
Fig. 5 is the use state diagram of the tubular arch arch sections Coordinate Adjusting device described in utility model.
In figure, 1-sliding base, 2-grooved slideway, 3-rack beam, 4-slideway support post, the traversing jack of 5-, 6-vertical shift jack, 7-cross spacing frame, 8-sliding base base plate, 9-sliding base web, 10-sliding base web stiffener, 11-billet, 12-string pipe, 13-batten plate, 14-web.
The specific embodiment
In order to make those skilled in the art better understand the utility model, below in conjunction with accompanying drawing, the utility model is done to further clear, complete explanation.
As shown in Figure 1, a kind of Support Method described in the utility model is installed tubular arch arch sections Coordinate Adjusting device, comprise sliding base 1, grooved slideway 2, rack beam 3, slideway support post 4, traversing jack 5, vertical shift jack 6 and cross spacing frame 7, two cross spacing framves 7 are separately fixed at rack beam 3 two ends, two slideway support posts 4 and two vertical shift jack 6 are individually fixed in rack beam 3 both sides, grooved slideway 2 is supported in slideway support post 4 and vertical shift jack 6 tops, as shown in Figure 2, sliding base 1 packs in flute profile slideway 2, traversing jack 5 is arranged between sliding base 1 and cross spacing frame 7 opposite flanks.
Sliding base 1 and grooved slideway 2 adopt steel plate to make, and slideway support post 4 adopts steel pipe manufacturing, and cross spacing frame 7 use I-shaped steels are done, and jack adopts jacking thin type jack.
As shown in Figure 3, described sliding base 1 comprises sliding base base plate 8, and vertical sliding base base plate 8 is fixed with sliding base web 9, and sliding base web stiffener 10 is fixed in sliding base web 9 both sides.
Between slideway support post 4 and flute profile slideway 2, be provided with billet 10.Billet 10 adopts the steel plate of the different-thickness of 1mm ~ 30mm.When sliding base 1 does horizontal slip, the space between flute profile slideway 2 and slideway support post 4 is padded with billet 11.
An application example is below provided.Shuozhou to accurate Ge Er newly built railway Yellow River Bridge is made up of access bridge and the main bridge of concrete-filled steel tube arch, main bridge tubular arch is basket type, arch ring is made up of two arch ribs, 8 ° of the horizontal leaning angles of arch rib, on the first sections, two arch ribs save without connecting rod, need to adopt Support Method to install, arch rib width 4m, the arch rib height 12.5m of arch springing place, arch rib is made up of the string pipe 12 of 4 φ 1500mm, wall thickness 30 ~ 35mm, between string pipe 12, be connected to form dumbbell shape by batten plate 13, between upper and lower dumbbell, connect with web 14, tubular arch arch sections structure as shown in Figure 4.First segment arch rib is made time-division two parts, dumbbell shape lower chord tube is a part, and web and the pipe that winds up are for an other part, Fig. 5 lower chord tube scheme of installation, lower chord tube is arranged in sliding base, makes tubular arch arch sections reach absolute altitude by adjusting traversing jack 5 and vertical shift jack 6.
The claimed scope of the utility model is not limited to the above specific embodiment; to those skilled in the art; the utility model can have various deformation and change, all any modifications of doing within design of the present utility model and principle, improves and is equal within replacement all should be included in protection domain of the present utility model.

Claims (3)

1. a Support Method is installed tubular arch arch sections Coordinate Adjusting device, it is characterized in that: comprise sliding base (1), grooved slideway (2), rack beam (3), slideway support post (4), traversing jack (5), vertical shift jack (6) and cross spacing frame (7), two cross spacing framves (7) are separately fixed at rack beam (3) two ends, two slideway support posts (4) and two vertical shift jack (6) are individually fixed in rack beam (3) both sides, grooved slideway (2) is supported in slideway support post (4) and vertical shift jack (6) top, sliding base (1) packs in flute profile slideway (2), traversing jack (5) is arranged between sliding base (1) and cross spacing frame (7) opposite flank.
2. Support Method according to claim 1 is installed tubular arch arch sections Coordinate Adjusting device, it is characterized in that: described sliding base (1) comprises sliding base base plate (8), vertical sliding base base plate (8) is fixed with sliding base web (9), and sliding base web stiffener (10) is fixed in sliding base web (9) both sides.
3. Support Method according to claim 1 and 2 is installed tubular arch arch sections Coordinate Adjusting device, it is characterized in that: between slideway support post (4) and flute profile slideway (2), be provided with billet (11).
CN201320837280.2U 2013-12-19 2013-12-19 Coordinate adjusting device for arch sections of steel pipe arch mounted in support method Withdrawn - After Issue CN203625785U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320837280.2U CN203625785U (en) 2013-12-19 2013-12-19 Coordinate adjusting device for arch sections of steel pipe arch mounted in support method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320837280.2U CN203625785U (en) 2013-12-19 2013-12-19 Coordinate adjusting device for arch sections of steel pipe arch mounted in support method

Publications (1)

Publication Number Publication Date
CN203625785U true CN203625785U (en) 2014-06-04

Family

ID=50812277

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320837280.2U Withdrawn - After Issue CN203625785U (en) 2013-12-19 2013-12-19 Coordinate adjusting device for arch sections of steel pipe arch mounted in support method

Country Status (1)

Country Link
CN (1) CN203625785U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103628417A (en) * 2013-12-19 2014-03-12 中铁六局集团有限公司 Coordinate adjustment device for mounting arch section of steel arch pipe by supporting method
CN104652281A (en) * 2014-12-29 2015-05-27 中铁二局股份有限公司 External slanted type steel box arch installing method
CN106149563A (en) * 2016-08-26 2016-11-23 中铁四局集团第二工程有限公司 Stand alone type Sarasota built-in steel anchor beam accurate positioning device and installation method
CN113250073A (en) * 2021-02-07 2021-08-13 中铁四局集团有限公司 After-loading method adjusting tool for large-span railway steel truss girder bridge large-tonnage spherical support

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103628417A (en) * 2013-12-19 2014-03-12 中铁六局集团有限公司 Coordinate adjustment device for mounting arch section of steel arch pipe by supporting method
CN103628417B (en) * 2013-12-19 2015-11-18 中国铁路总公司 Support Method installs tubular arch arch sections Coordinate Adjusting device
CN104652281A (en) * 2014-12-29 2015-05-27 中铁二局股份有限公司 External slanted type steel box arch installing method
CN106149563A (en) * 2016-08-26 2016-11-23 中铁四局集团第二工程有限公司 Stand alone type Sarasota built-in steel anchor beam accurate positioning device and installation method
CN113250073A (en) * 2021-02-07 2021-08-13 中铁四局集团有限公司 After-loading method adjusting tool for large-span railway steel truss girder bridge large-tonnage spherical support
CN113250073B (en) * 2021-02-07 2023-03-10 中铁四局集团有限公司 Large-span railway steel truss bridge large-tonnage spherical bearing after-loading method adjustment frock

Similar Documents

Publication Publication Date Title
CN103628417B (en) Support Method installs tubular arch arch sections Coordinate Adjusting device
CN203625785U (en) Coordinate adjusting device for arch sections of steel pipe arch mounted in support method
CN201746778U (en) Installation regulating device for camber-type steel pipe arch bridge arch rib erection
CN205002774U (en) Modular suspension bridge main push -towing rope and cord clip unwrapping wire dipperstick
CN205314504U (en) Building platform for outdoor building and indoor decoration
CN203050481U (en) Engineering vehicle and telescoping mechanism thereof
CN205295963U (en) Long span steel case back pushes away construction with bearing structure that transversely rectifies
CN204570499U (en) A kind of large span vertical curve steel box-girder walking type pushing device
CN204571248U (en) A kind of construction work portable scaffold
CN102619174A (en) Large-span continuous steel truss girder arch pushing device
CN102828469A (en) Positioning mounting construction method for triangular steel constructed pillar of inclined-leg steel box
CN103451338B (en) Method for installing ascending tubes and five-way balls of blast furnace gas systems
CN202787093U (en) Hydraulic climbing formwork device universally used by skew pier and straight pier
CN103835239A (en) Floating pier with adjustable height
CN203744970U (en) Level gauge for constructional engineering
CN202787092U (en) Large-scale bearing platform pier column connection component installation accurate positioning device
CN205369043U (en) Long span steel case back pushes away construction and uses interim bearing structure
CN205223837U (en) Y shape pier of belted steel pull rod
CN204919354U (en) A construction equipment that is arranged in construction of taking one's place of cable -stay bridge cable wire
CN206537716U (en) A kind of civil construction pipeline support frame
CN203034605U (en) Jacking support for reticulated shell structure
CN207316393U (en) A kind of easy to operate wave-height gauge stent
CN204980800U (en) Portable step baffle installation structure
CN201724669U (en) Mounting inspection instrument for crash barrier formworks of bridges
CN204983583U (en) Automatic regulation formula safety traffic track construction split heads

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA RAILWAY SIXTH GROUP CO., LTD. TAIYUAN RAILWA

Free format text: FORMER OWNER: TAIYUAN RAILWAY CONSTRUCTION CO., LTD., ZHONGTIE 6-BUREAU GROUP

Effective date: 20150720

Owner name: CHINA RAILWAY CORPORATION

Free format text: FORMER OWNER: CHINA RAILWAY SIXTH GROUP CO., LTD.

Effective date: 20150720

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20150720

Address after: 100844 Fuxing Road, Beijing, Haidian District, No. 10

Patentee after: CHINA RAILWAY CORPORATION

Patentee after: The Sixth Engineering Bureau Group Co., Ltd., China Railway

Patentee after: Taiyuan Railway Construction Co., Ltd., Zhongtie 6-Bureau Group

Address before: 100036 Haidian District, Wanshou Road, No. 2,

Patentee before: The Sixth Engineering Bureau Group Co., Ltd., China Railway

Patentee before: Taiyuan Railway Construction Co., Ltd., Zhongtie 6-Bureau Group

AV01 Patent right actively abandoned

Granted publication date: 20140604

Effective date of abandoning: 20151118

C25 Abandonment of patent right or utility model to avoid double patenting