CN205002774U - Modular suspension bridge main push -towing rope and cord clip unwrapping wire dipperstick - Google Patents

Modular suspension bridge main push -towing rope and cord clip unwrapping wire dipperstick Download PDF

Info

Publication number
CN205002774U
CN205002774U CN201520784027.4U CN201520784027U CN205002774U CN 205002774 U CN205002774 U CN 205002774U CN 201520784027 U CN201520784027 U CN 201520784027U CN 205002774 U CN205002774 U CN 205002774U
Authority
CN
China
Prior art keywords
surveyor
staff
chi
suspension bridge
cord clip
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520784027.4U
Other languages
Chinese (zh)
Inventor
王灿
汪春桃
严圣友
吴明
许慧荣
朱明智
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Design Group Co Ltd
Original Assignee
Jiangsu Provincial Communication Planning and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Provincial Communication Planning and Design Institute Co Ltd filed Critical Jiangsu Provincial Communication Planning and Design Institute Co Ltd
Priority to CN201520784027.4U priority Critical patent/CN205002774U/en
Application granted granted Critical
Publication of CN205002774U publication Critical patent/CN205002774U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • A Measuring Device Byusing Mechanical Method (AREA)

Abstract

The utility model discloses a modular suspension bridge main push -towing rope and cord clip unwrapping wire dipperstick, including sail leveling ruler, perpendicular chi and lower level bar, the center of sail leveling ruler be the zero graduation position, just the zero graduation position on be provided with the prism, erect the chi and be provided with two sets ofly, all set up with the sail leveling ruler is perpendicular, and the top is with sail leveling ruler sliding connection and divide the left and right sides of locating the upper part of cunkou pulse heart of improving level, lower level bar then with sail leveling ruler parallel arrangement, the one end and a set of perpendicular chi sliding connection wherein of level bar under just. The utility model discloses simple structure, low in cost can satisfy the requirement of different engineerings laying -out measuring, but the precision measurement suspension bridge main push -towing rope benchmark cable thigh and the general cable burst discrepancy in elevation in the in -service use to and improvement cord clip coordinate setting laying -out precision.

Description

A kind of combined type main rope of suspension bridge and cord clip city's roads chi
Technical field
The utility model relates to a kind of combined type main rope of suspension bridge and cord clip city's roads chi, belongs to bridge construction survey technical field.
Background technology
Suspension bridge is a kind of type of bridge of special construction, applies comparatively extensive in recent years in China's Large Span Bridges; The main supporting member of suspension bridge is main push-towing rope and suspension rod, in suspension bridge construction, the line type control of main push-towing rope and the determination of suspension rod cord clip position become the linear impact of bridge larger on suspension bridge, therefore, in suspension bridge construction, the measurement of main push-towing rope absolute altitude and the setting-out of cord clip position are the important and difficult issues of construction survey.
In suspension bridge construction is measured, the method for line rod being installed prism is generally used to carry out setting out survey at present, due to the scrambling that main rope of suspension bridge is linear, and main push-towing rope center line is difficult to determine, there is error unavoidably in the position of artificial placement prism, great inconvenience is brought to construction survey setting-out work, is difficult to ensure oxygen evolution rate simultaneously.
Utility model content
For solving the deficiencies in the prior art, the purpose of this utility model be to provide a kind of structure simple, cheap, apply easy to carry, and combined type main rope of suspension bridge and the cord clip city's roads chi of the precision of setting out survey can be ensured.
In order to realize above-mentioned target, the utility model adopts following technical scheme:
A kind of combined type main rope of suspension bridge and cord clip city's roads chi, it is characterized in that, comprise surveyor's staff, perpendicular chi and lower surveyor's staff, the center of described upper surveyor's staff is zero graduation position, increase gradually to both sides scale, and described zero graduation position is provided with prism, described prism is detachable, perpendicular chi is provided with two groups, all vertically with upper surveyor's staff to arrange, and top and upper surveyor's staff are slidably connected and are divided into the left and right sides at surveyor's staff center, lower surveyor's staff then be arranged in parallel with upper surveyor's staff, and one end of lower surveyor's staff with wherein one group erect chi and be slidably connected.
Further, described upper surveyor's staff is also provided with horizontal bubble.And described horizontal bubble be circular, square at least one.
And the upper end of described perpendicular chi is the slide head of a hollow, described slide head is socketed on surveyor's staff.
In addition, described lower surveyor's staff and the link of perpendicular chi are the slide head of a hollow, and described slide head is socketed on perpendicular chi, and rotate by arranging rotating nut on slide head and perpendicular chi.
Usefulness of the present utility model is:
1, structure is simple, and can meet the requirement of different engineering setting out measurement;
2, the level of ruler is in use ensured, can accurately measuring basis strand and the general strand discrepancy in elevation in main push-towing rope installation process;
3, determine main rope of suspension bridge center line comparatively accurately, ensure oxygen evolution rate when cord clip coordinate setting;
4, cheap, capable of being combined with dismounting, application and easy to carry, in suspension bridge construction, popularizing application prospect is wide.
Accompanying drawing explanation
Fig. 1 is the structural representation of the utility model one embodiment;
Fig. 2 is the longitudinal profile schematic diagram of the utility model one embodiment;
Fig. 3 is the cross sectional representation of the utility model one embodiment;
Fig. 4 is the view of the utility model when measuring main rope of suspension bridge Datum Strand and general strand relative altitude;
Fig. 5 is the view of the utility model when cord clip city's roads.
The implication of Reference numeral in figure:
1, prism 2, circular horizontal bubble 3, the horizontal bubble 4-1 of bar shaped, left perpendicular chi slide head
4-2, right perpendicular chi slide head 4-3, lower surveyor's staff slide head 5, upper horizontal ruler
6-1, left perpendicular chi 6-2, right perpendicular chi 7, lower surveyor's staff 8, rotating nut.
Embodiment
Below in conjunction with the drawings and specific embodiments, concrete introduction is done to the utility model.
Fig. 1 is the structural representation of the utility model one embodiment; Fig. 2 is the longitudinal profile schematic diagram of the utility model one embodiment; Fig. 3 is the cross sectional representation of the utility model one embodiment.
As shown in Figure 1-Figure 3: combined type main rope of suspension bridge and cord clip city's roads chi, comprise surveyor's staff 5, perpendicular chi and lower surveyor's staff 7, perpendicular chi is provided with two groups, is respectively left perpendicular chi 6-1 and chi 6-2 is erected on the right side.
The center of upper surveyor's staff 5 is zero graduation position, increase gradually to both sides scale, zero graduation position is provided with detachable prism 1, upper surveyor's staff 5 is also provided with horizontal bubble, and horizontal bubble is the shape such as circular or square, in the present embodiment, be provided with circular horizontal bubble 2 and the horizontal bubble 3 of bar shaped simultaneously.
Left perpendicular chi 6-1 erects with the right side that chi 6-2 is all vertical with upper surveyor's staff 5 to be arranged, and top is the slide head of a hollow, be respectively left perpendicular chi slide head 4-1 and chi slide head 4-2 is erected on the right side, the left and right sides that chi slide head 4-2 is socketed in surveyor's staff 5 center is respectively erected on left perpendicular chi slide head 4-1 and the right side, is slidably connected with upper surveyor's staff 5.
Lower surveyor's staff 7 be arranged in parallel with upper surveyor's staff 5 in working order, and the link of lower surveyor's staff 7 is the slide head of a hollow, be lower surveyor's staff slide head 4-3, it is socketed on left perpendicular chi 6-1, and erects chi 6-1 with a left side and be slidably connected, and chi 6-1 arranges rotating nut 8 rotates by erecting at lower surveyor's staff slide head 4-3 and a left side, under not using state, lower surveyor's staff 7 erects chi 6-1 in for rotating shaft folding and unfolding on a left side with rotating nut 8, and in a state of use, after 90-degree rotation, is in horizontality.
embodiment 1:
Fig. 4 is the view of the utility model when measuring main rope of suspension bridge Datum Strand and general strand relative altitude.
As shown in Figure 4: when measuring main rope of suspension bridge Datum Strand and general strand relative altitude, the right side is erected chi 6-2 to pull down, upper horizontal ruler 5 to be placed on general strand and to adjust level, chi 6-1 is erected on a left side slide on upper surveyor's staff 5 and be adjacent to the general strand of outermost, turn rotating nut 8 by lower surveyor's staff 7 90-degree rotation, to erect chi 6-1 vertical with a left side, parallel with upper surveyor's staff 5, the lower surveyor's staff 7 of adjustment erects on a left side and chi 6-1 slides and is attached to Datum Strand downside, now, the position of erecting surveyor's staff 7 under reading on chi 6-1 on a left side is Datum Strand and the general strand discrepancy in elevation, in the present embodiment, chi 6-1 is erected with a left side parallel when lower surveyor's staff 7 does not rotate, and can take in left perpendicular chi 6-1.
embodiment 2
Fig. 5 is the view of the utility model when cord clip city's roads.
As shown in Figure 5: when carrying out main rope of suspension bridge cord clip Coordinate setting-out and measuring, upper surveyor's staff 5 to be placed on main push-towing rope and to adjust level, both sides are erected chi and on upper surveyor's staff 5, slide into identical graduation and tangent with main push-towing rope, now, the zero graduation position of upper surveyor's staff 5 is main push-towing rope center, adopts the prism 1 that ruler is installed both can carry out cord clip Coordinate setting-out with total powerstation.
More than show and describe ultimate principle of the present utility model, principal character and advantage.The technician of the industry should understand, and above-described embodiment does not limit the utility model in any form, the technical scheme that the mode that all employings are equal to replacement or equivalent transformation obtains, and all drops in protection domain of the present utility model.

Claims (5)

1. a combined type main rope of suspension bridge and cord clip city's roads chi, it is characterized in that, comprise surveyor's staff, perpendicular chi and lower surveyor's staff, the center of described upper surveyor's staff is zero graduation position, and described zero graduation position is provided with prism, perpendicular chi is provided with two groups, all vertically with upper surveyor's staff to arrange, and top and upper surveyor's staff are slidably connected and are divided into the left and right sides at surveyor's staff center, lower surveyor's staff then be arranged in parallel with upper surveyor's staff, and one end of lower surveyor's staff with wherein one group erect chi and be slidably connected.
2. a kind of combined type main rope of suspension bridge according to claim 1 and cord clip city's roads chi, is characterized in that, described upper surveyor's staff is also provided with horizontal bubble.
3. a kind of combined type main rope of suspension bridge according to claim 2 and cord clip city's roads chi, is characterized in that, described horizontal bubble be circular, square at least one.
4. a kind of combined type main rope of suspension bridge according to claim 1 and cord clip city's roads chi, is characterized in that, the upper end of described perpendicular chi is the slide head of a hollow, and described slide head is socketed on surveyor's staff.
5. a kind of combined type main rope of suspension bridge according to claim 1 and cord clip city's roads chi, it is characterized in that, described lower surveyor's staff and the link of perpendicular chi are the slide head of a hollow, and described slide head is socketed on perpendicular chi, and rotate by arranging rotating nut on slide head and perpendicular chi.
CN201520784027.4U 2015-10-12 2015-10-12 Modular suspension bridge main push -towing rope and cord clip unwrapping wire dipperstick Expired - Fee Related CN205002774U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520784027.4U CN205002774U (en) 2015-10-12 2015-10-12 Modular suspension bridge main push -towing rope and cord clip unwrapping wire dipperstick

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520784027.4U CN205002774U (en) 2015-10-12 2015-10-12 Modular suspension bridge main push -towing rope and cord clip unwrapping wire dipperstick

Publications (1)

Publication Number Publication Date
CN205002774U true CN205002774U (en) 2016-01-27

Family

ID=55159658

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520784027.4U Expired - Fee Related CN205002774U (en) 2015-10-12 2015-10-12 Modular suspension bridge main push -towing rope and cord clip unwrapping wire dipperstick

Country Status (1)

Country Link
CN (1) CN205002774U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106767520A (en) * 2017-03-13 2017-05-31 中交第四公路工程局有限公司 A kind of main rope of suspension bridge linear measurement instrument
CN107063023A (en) * 2016-07-29 2017-08-18 上海市建筑装饰工程集团有限公司 Three-dimensional lofting platform
CN109186415A (en) * 2018-09-14 2019-01-11 北京城建十六建筑工程有限责任公司 A kind of prestress pipe installation scale and its quick application method
CN109282954A (en) * 2018-10-19 2019-01-29 中铁大桥局集团有限公司 A kind of measuring device and measuring method of suspension bridge strand
CN109297451A (en) * 2018-09-20 2019-02-01 广东省长大公路工程有限公司 A kind of strand gap measuring device and system based on Internet of Things
CN109778607A (en) * 2019-03-14 2019-05-21 中铁隧道集团一处有限公司 Continuous rigid frame PC track girder precise measurement positioning device and erection localization method
CN110907152A (en) * 2019-11-15 2020-03-24 中铁大桥局第七工程有限公司 Rotary cable clamp test device and test method

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107063023A (en) * 2016-07-29 2017-08-18 上海市建筑装饰工程集团有限公司 Three-dimensional lofting platform
CN106767520A (en) * 2017-03-13 2017-05-31 中交第四公路工程局有限公司 A kind of main rope of suspension bridge linear measurement instrument
CN109186415A (en) * 2018-09-14 2019-01-11 北京城建十六建筑工程有限责任公司 A kind of prestress pipe installation scale and its quick application method
CN109297451A (en) * 2018-09-20 2019-02-01 广东省长大公路工程有限公司 A kind of strand gap measuring device and system based on Internet of Things
CN109282954A (en) * 2018-10-19 2019-01-29 中铁大桥局集团有限公司 A kind of measuring device and measuring method of suspension bridge strand
CN109778607A (en) * 2019-03-14 2019-05-21 中铁隧道集团一处有限公司 Continuous rigid frame PC track girder precise measurement positioning device and erection localization method
CN109778607B (en) * 2019-03-14 2023-08-22 中铁隧道集团一处有限公司 Accurate measurement and positioning device and erection and positioning method for continuous rigid frame PC track beam
CN110907152A (en) * 2019-11-15 2020-03-24 中铁大桥局第七工程有限公司 Rotary cable clamp test device and test method

Similar Documents

Publication Publication Date Title
CN205002774U (en) Modular suspension bridge main push -towing rope and cord clip unwrapping wire dipperstick
CN109141352A (en) A kind of subgrade settlement monitoring device
CN102967237A (en) Multifunctional measuring apparatus for erecting main cable strand of suspension bridge
CN202323905U (en) Wing-column-shaped water measuring groove of rectangular channel
CN204330804U (en) A kind of device utilizing GPS to measure water surface flow rate and direction
CN203502015U (en) Special measuring scale for horizontal displacement by collimation line method
CN205262483U (en) Hang down straightness and axis location's measuring tool of inspection wall body
CN205506037U (en) Linear control measuring device of suspension bridge main push -towing rope
CN208751541U (en) A kind of subgrade settlement monitoring device
CN111636695A (en) Laser skin number pole device of steerable brickwork roughness
CN104006798B (en) Pier stud verticality measuring instrument
CN203798348U (en) Leveling shoe capable of being reversely used
CN203323740U (en) Building settlement nondestructive measurement leveling rod bracket
CN206832237U (en) The detection means that a kind of tapered stud is spent vertically
CN201653404U (en) Telescopic multifunctional vertical guiding rule
CN204988274U (en) Building laser grade rod
CN206308568U (en) A kind of measurement apparatus of auxiliary track panel coarse adjustment
CN206095210U (en) Chi pole is held up in measurement of absorption formula
CN202614235U (en) Ruler for measuring verticality of vertical member template
CN206862235U (en) Assembly type suspension bridge strand installs shape measure device
CN208564865U (en) A kind of constructing structure of concrete tower alignment
CN203811172U (en) Building perpendicularity tester
CN203893846U (en) Pier stud perpendicularity measuring instrument
CN209243768U (en) A kind of convenient utility for building inspection shaft
CN202994055U (en) A multifunctional measuring instrument used for laying the main cable strand of a suspension bridge

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP03 Change of name, title or address

Address after: 210014 Ziyun Road, Qinhuai District, Jiangsu, No. 9, No.

Patentee after: CHINA DESIGN GROUP Co.,Ltd.

Address before: 210005 Ziyun Road, Qinhuai District, Jiangsu, No. 9, No.

Patentee before: Jiangsu Provincial Communications Planning and Design Institute Co.,Ltd.

CP01 Change in the name or title of a patent holder

Address after: 210014 No. 9, Ziyun Avenue, Qinhuai District, Jiangsu, Nanjing

Patentee after: China Design Group Co.,Ltd.

Address before: 210014 No. 9, Ziyun Avenue, Qinhuai District, Jiangsu, Nanjing

Patentee before: CHINA DESIGN GROUP Co.,Ltd.

CP01 Change in the name or title of a patent holder
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160127