CN206279790U - One kind is encorbelmented floor temporary support structure - Google Patents

One kind is encorbelmented floor temporary support structure Download PDF

Info

Publication number
CN206279790U
CN206279790U CN201621242056.9U CN201621242056U CN206279790U CN 206279790 U CN206279790 U CN 206279790U CN 201621242056 U CN201621242056 U CN 201621242056U CN 206279790 U CN206279790 U CN 206279790U
Authority
CN
China
Prior art keywords
floor
temporary structure
temporary
encorbelmenting
encorbelmented
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621242056.9U
Other languages
Chinese (zh)
Inventor
张捷
李涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 2 Group Co Ltd
Original Assignee
Shanghai Construction No 2 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction No 2 Group Co Ltd filed Critical Shanghai Construction No 2 Group Co Ltd
Priority to CN201621242056.9U priority Critical patent/CN206279790U/en
Application granted granted Critical
Publication of CN206279790U publication Critical patent/CN206279790U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

Encorbelmented floor temporary support structure the utility model discloses one kind, including temporary structure post corresponding with every layer of floor of encorbelmenting and temporary structure beam, the temporary structure beam is encorbelmented on floor described in being located at, and the temporary structure post is encorbelmented between the corresponding temporary structure beam of floor located at adjacent two layers.By setting temporary structure post corresponding with every layer of floor of encorbelmenting and temporary structure beam, floor of encorbelmenting effectively is supported in mid-board demolishing process, the floor stress that avoids encorbelmenting is excessive and damages, the temporary structure post is constructed simultaneously with temporary structure beam with floor of encorbelmenting, easy construction, effect reliability, without additionally increasing back support or shoring, construction safety in guarantee mid-board demolishing process and in building waste transportation, reduces construction cost, improves efficiency of construction.

Description

One kind is encorbelmented floor temporary support structure
Technical field
The utility model is related to foundation pit construction field, and in particular to one kind is encorbelmented floor temporary support structure.
Background technology
Urban development is maked rapid progress, and urban architecture also shows the trend of " higher, deeper, closer to ".As city is handed over The continuous popularization of logical subway, plans the whole city of circuit, and the architectural engineering on subway tunnel periphery is also increasingly common therewith.Due to Deep basal pit, for the protection to subway transit tunnel, ensures that subway can normally be runed in construction period, mesh near subway tunnel Before untill, arrangement and method for construction the safest is exactly that deep basal pit is divided into two foundation ditch scenes of carrying out of size as standard with subway to apply Work, the big foundation ditch first constructed apart from subway farther out after the completion for the treatment of the big foundation ditch basement structure, starts construction nearer apart from subway Small foundation ditch, i.e., using the construction principle of " near after first remote, first big after small ".
The scheme of " point hole " construction in view of this, excavation of foundation pit depth is deeper, and construction is caused because the time constructed staggers During the lateral earth pressure of mid-board two is unbalanced differs greatly, for the sake of security, generally using diaphram wall in Partition wall.Removed for ease of later stage mid-board, post-cast strip is set in mid-board both sides in work progress, set interim between post-cast strip Power transmission is supported.Encorbelment floor and Cantilever Beams are provided with residing for interim power transmission support.
Due to after the completion of later stage basement structure construction, it is necessary to fill a vacancy late poured band structure, before filling a vacancy must centering every Wall is removed, and floor of encorbelmenting must be reinforced before dismounting.The reinforcing mode commonly used at present shores reinforcing for floor of encorbelmenting, Mainly there are two methods:One is to carry out back support using steel pipe bent-frame bracing;Two be using steel structure girder, post carry out floor shore plus Gu.But the two methods have that construction trouble and construction cost are high.
Utility model content
The utility model is encorbelmented floor temporary support structure there is provided one kind, to solve fiber crops of being constructed present in prior art Tired and construction cost problem high.
In order to solve the above-mentioned technical problem, the technical solution of the utility model is:One kind is encorbelmented floor temporary support structure, Including temporary structure post corresponding with every layer of floor of encorbelmenting and temporary structure beam, the temporary structure beam is located at the floor of encorbelmenting On, the temporary structure post is encorbelmented between the corresponding temporary structure beam of floor located at adjacent two layers.
Further, the temporary structure post and temporary structure beam are poured using armored concrete and formed.
Further, the temporary structure post and temporary structure beam encorbelment floor near the side of mid-board positioned at described.
Further, encorbelmented described in every layer and interim horizontal support is additionally provided between floor and mid-board.
Further, the interim horizontal support is made of Steel material.
The utility model also provides a kind of construction method of floor temporary support structure of encorbelmenting, and comprises the following steps:
S1:In mid-board both sides, construction is encorbelmented floor, at the same construction temporary structure post corresponding with every layer of floor of encorbelmenting and Temporary structure beam;
S2:Remove mid-board, the late poured band structure that construction both sides are encorbelmented between floor;
S3:When the late poured band structure reaches setting intensity, the temporary structure post and temporary structure beam are removed.
Further, the temporary structure post and temporary structure beam are poured using armored concrete.
Further, in the step S1, it is additionally included in the encorbelmenting interim level branch of set between floor and mid-board Support.
Further, in the step S2, the late poured band structure is formed using concreting.
Further, in the step S2, also including being conserved to the late poured band structure.
The floor temporary support structure of encorbelmenting that the utility model is provided, including temporary structure corresponding with every layer of floor of encorbelmenting Post and temporary structure beam, the temporary structure beam are encorbelmented on floor positioned at described, and the temporary structure post is outstanding located at adjacent two layers Choose between the corresponding temporary structure beam of floor.By setting temporary structure post corresponding with every layer of floor of encorbelmenting and temporary structure Beam, is effectively supported in mid-board demolishing process to floor of encorbelmenting, it is to avoid floor stress of encorbelmenting is excessive and damages, and this is interim Structural column is constructed simultaneously with temporary structure beam with floor of encorbelmenting, easy construction, effect reliability, is supportted or is pushed up without extra increase back Support, it is ensured that the construction safety in mid-board demolishing process and in building waste transportation, reduces construction cost, improves Efficiency of construction.
Brief description of the drawings
Fig. 1 is that the utility model is encorbelmented the support schematic diagram of floor temporary support structure;
Fig. 2 is the schematic cross-section of the utility model temporary structure post;
Fig. 3 is the schematic cross-section of the utility model temporary structure beam.
Shown in figure:1st, encorbelment floor;2nd, temporary structure post;3rd, temporary structure beam;4th, interim horizontal support;5th, in every Wall;6th, reinforcing bar.
Specific embodiment
The utility model is described in detail below in conjunction with the accompanying drawings:
The floor temporary support structure as shown in figure 1, the utility model one kind is encorbelmented, including it is corresponding with every layer of floor 1 of encorbelmenting Temporary structure post 2 and temporary structure beam 3, the temporary structure beam 3 be located at it is described encorbelment on floor 1, the temporary structure post 2 The upper and lower ends corresponding temporary structure beam 3 of floor 1 of being encorbelmented with adjacent two layers respectively offset, i.e. the upper end pair of temporary structure post 2 The upper strata corresponding temporary structure beam 3 of floor 1 of encorbelmenting is supported, and lower end is supported in lower floor and encorbelments the corresponding temporary structure of floor 1 On beam 3, certain orlop corresponding temporary structure post 2 of floor 1 of encorbelmenting is supported on ground.By setting and every layer of floor of encorbelmenting 1 corresponding temporary structure post 2 and temporary structure beam 3, are effectively supported in the demolishing process of mid-board 5 to floor 1 of encorbelmenting, and are kept away The stress of floor 1 of exempting to encorbelment is excessive and damage, the temporary structure post 2 is constructed simultaneously with temporary structure beam 3 and floor 1 of encorbelmenting, construction Convenient, effect reliability is supportted or shored without extra increase back, it is ensured that in the demolishing process of mid-board 5 and building waste was transported Construction safety in journey, reduces construction cost, improves efficiency of construction.
Preferably, the temporary structure post 2 and temporary structure beam 3 are poured using armored concrete and formed, and intensity is high, branch Support is reliable, and the distribution of reinforcing bar 6 is as shown in Fig. 2 the distribution of reinforcing bar 6 such as Fig. 3 institutes in temporary structure beam 3 wherein in temporary structure post 2 Show.
Preferably, the temporary structure post 2 and temporary structure beam 3 are located at the floor 1 of encorbelmenting near the one of mid-board 5 Side, further increases support effect, it is to avoid in the demolishing process of mid-board 5 concrete drop and building waste transportation in The stress of floor 1 of encorbelmenting is excessive and damages.
Fig. 1 is continued referring to, is encorbelmented described in every layer and interim horizontal support 4 is additionally provided between floor 1 and mid-board 5, it is described Interim horizontal support 4 is made of Steel material, further ensures safety of the floor 1 in the demolishing process of mid-board 5 of encorbelmenting.
The utility model also provides a kind of construction method of above-mentioned floor temporary support structure of encorbelmenting, and comprises the following steps:
S1:In the both sides of mid-board 5, construction is encorbelmented floor 1, while construction temporary structure post corresponding with every layer of floor 1 of encorbelmenting 2 and temporary structure beam 3, the temporary structure post 2 and temporary structure beam 3 are poured using armored concrete;It is additionally included in described outstanding Choose and interim horizontal support 4 is set between floor 1 and mid-board 5, the interim horizontal support 4 is made of Steel material, further protect Demonstrate,prove safety of the floor 1 in the demolishing process of mid-board 5 of encorbelmenting.The distribution of reinforcing bar 6 is as shown in Fig. 2 face wherein in temporary structure post 2 When structural beams 3 in reinforcing bar 6 distribution it is as shown in Figure 3.
S2:Remove mid-board 5, the late poured band structure that construction both sides are encorbelmented between floor 1 encorbelments between floor 1 both sides Floor fill a vacancy completely, the late poured band structure is formed using concreting, and pour complete after need to conserve it.
S3:When the late poured band structure reaches setting intensity, the temporary structure post 2 and temporary structure beam 3 are removed.
During a Specific construction, the size of temporary structure post 2 is 400mm*400mm, and the size of temporary structure beam 3 is 450mm*300mm, size of the utility model not to temporary structure post 2 and temporary structure beam 3 is defined, the size of the rwo According to construction condition, parameter is set including the weight of floor 1 of encorbelmenting and the weight of mid-board 5 etc..
In sum, the floor temporary support structure of encorbelmenting that the utility model is provided, including it is corresponding with every layer of floor 1 of encorbelmenting Temporary structure post 2 and temporary structure beam 3, the temporary structure beam 3 be located at it is described encorbelment on floor 1, the temporary structure post 2 Between the corresponding temporary structure beam 3 of floor 1 encorbelment located at adjacent two layers.It is corresponding interim with every layer of floor 1 of encorbelmenting by setting Structural column 2 and temporary structure beam 3, are effectively supported in the demolishing process of mid-board 5 to floor 1 of encorbelmenting, it is to avoid floor 1 of encorbelmenting Stress is excessive and damage, the temporary structure post 2 and temporary structure beam 3 and floor 1 of encorbelmenting are constructed simultaneously, and easy construction, effect can Lean on, support or shore without extra increase back, it is ensured that the construction peace in the demolishing process of mid-board 5 and in building waste transportation Entirely, construction cost is reduced, efficiency of construction is improve.
Although being illustrated to implementation method of the present utility model in specification, these implementation methods are intended only as carrying Show, should not limit protection domain of the present utility model.Carried out in the range of the utility model objective various omissions, put not departing from Change and change should be included in protection domain of the present utility model.

Claims (5)

1. one kind is encorbelmented floor temporary support structure, it is characterised in that including temporary structure post corresponding with every layer of floor of encorbelmenting With temporary structure beam, the temporary structure beam be located at it is described encorbelment on floor, the temporary structure post is encorbelmented located at adjacent two layers Between the corresponding temporary structure beam of floor.
2. floor temporary support structure of encorbelmenting according to claim 1, it is characterised in that the temporary structure post and interim Structural beams are poured using armored concrete and formed.
3. floor temporary support structure of encorbelmenting according to claim 1, it is characterised in that the temporary structure post and interim Structural beams encorbelment floor near the side of mid-board described in being located at.
4. floor temporary support structure of encorbelmenting according to claim 1, it is characterised in that encorbelmented described in every layer floor and in Interim horizontal support is additionally provided between partition wall.
5. floor temporary support structure of encorbelmenting according to claim 4, it is characterised in that the interim horizontal support is used Steel material is made.
CN201621242056.9U 2016-11-21 2016-11-21 One kind is encorbelmented floor temporary support structure Active CN206279790U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621242056.9U CN206279790U (en) 2016-11-21 2016-11-21 One kind is encorbelmented floor temporary support structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621242056.9U CN206279790U (en) 2016-11-21 2016-11-21 One kind is encorbelmented floor temporary support structure

Publications (1)

Publication Number Publication Date
CN206279790U true CN206279790U (en) 2017-06-27

Family

ID=59082648

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621242056.9U Active CN206279790U (en) 2016-11-21 2016-11-21 One kind is encorbelmented floor temporary support structure

Country Status (1)

Country Link
CN (1) CN206279790U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106760621A (en) * 2016-11-21 2017-05-31 上海建工二建集团有限公司 One kind is encorbelmented floor temporary support structure and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106760621A (en) * 2016-11-21 2017-05-31 上海建工二建集团有限公司 One kind is encorbelmented floor temporary support structure and construction method

Similar Documents

Publication Publication Date Title
CN106988758B (en) Construction method for crossing large-scale vertical karst cave group tunnel
CN109723085B (en) Deep foundation pit division construction rib wall support replacing structure and construction method thereof
CN106351670A (en) Closed pre-support tunnel structure
CN107605489A (en) Three line Large span tunnel inclined shafts enter positive cavity construction method
CN103114592A (en) Method for deep excavation pit combination support construction close to subway station
CN102444130B (en) Support replacing construction method in deep foundation pit project
CN105804760A (en) Super-large section tunnel drilling and blasting method in-situ expansion construction structure and construction method
CN104947681A (en) Super large super deep basement ground pit construction method
CN107905798A (en) The method that flat top wall boring construction is carried out using central drift method
CN106499199A (en) Close on the interim support replacement of subway ultra-deep foundation pit mid-board and its construction method
CN105386779B (en) The counterfort method of large underground structure is built in shallow embedding rock stratum
CN105041348B (en) A kind of underground space tunneling construction method of use compound roof
CN206279790U (en) One kind is encorbelmented floor temporary support structure
CN204097889U (en) A kind of piling and the built bridge abutment structure of increase platform cap composite reinforcement
CN109826230B (en) Municipal road pipeline reinforcement protection structure and construction method thereof
CN107191206A (en) A kind of step construction method of Shallow-buried Large-span Tunnel Unit two six
CN106760621A (en) One kind is encorbelmented floor temporary support structure and construction method
CN203066083U (en) Supporting structure for two adjacent foundation pits
CN105178338A (en) Soil slope protecting structure and protecting method thereof
CN206873459U (en) A kind of large-span steel-reinforced concrete foundation ditch support system
CN109577998A (en) A kind of construction method that the backfill of shield section piston air duct is missed the stop
CN110792449B (en) Rapid underground excavation construction method for large-span shallow tunnel
CN103114594B (en) Supporting structure of adjacent two foundation trenches and construction method thereof
CN109653193B (en) Reverse construction method for underground continuous wall
CN106592606A (en) Foundation pit support construction method suitable for three-free-face building envelope

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant