CN206279537U - For the pre-groove of deep foundation pit reinforced concrete support beam demolition blasting - Google Patents

For the pre-groove of deep foundation pit reinforced concrete support beam demolition blasting Download PDF

Info

Publication number
CN206279537U
CN206279537U CN201621385956.9U CN201621385956U CN206279537U CN 206279537 U CN206279537 U CN 206279537U CN 201621385956 U CN201621385956 U CN 201621385956U CN 206279537 U CN206279537 U CN 206279537U
Authority
CN
China
Prior art keywords
groove
reinforced concrete
support beam
foundation pit
concrete support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201621385956.9U
Other languages
Chinese (zh)
Inventor
钟冬望
何理
李琳娜
司剑峰
涂圣武
陈晨
黄雄
卢哲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan University of Science and Engineering WUSE
Wuhan University of Science and Technology WHUST
Original Assignee
Wuhan University of Science and Engineering WUSE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan University of Science and Engineering WUSE filed Critical Wuhan University of Science and Engineering WUSE
Priority to CN201621385956.9U priority Critical patent/CN206279537U/en
Application granted granted Critical
Publication of CN206279537U publication Critical patent/CN206279537U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model is related to a kind of pre-groove for deep foundation pit reinforced concrete support beam demolition blasting.Its technical scheme is:In the deep foundation pit reinforced concrete support beam of dismounting to be blasted(1)The basement rock of underface(3)One demolition blasting pre-groove of middle excavation(2), the demolition blasting pre-groove(2)Longitudinal centre line and the dismounting to be blasted deep foundation pit reinforced concrete support beam(1)Longitudinal centre line it is parallel, the demolition blasting pre-groove(2)Longitudinal centre line and the dismounting to be blasted deep foundation pit reinforced concrete support beam(1)Longitudinal centre line be located at same vertical guide on.The demolition blasting pre-groove(2)Cross section be inverted trapezoidal, wherein:The top width of inverted trapezoidala 1=aa 1, the bottom width of inverted trapezoidala 2=aa 2, the height of inverted trapezoidalb 1b;The demolition blasting pre-groove(2)LengthL 1=LL.The utility model has the characteristics of constructing good convenient, explosion and crushing effect, low explosive specific charge and small blasting vibration intensity.

Description

For the pre-groove of deep foundation pit reinforced concrete support beam demolition blasting
Technical field
The utility model belongs to deep foundation pit reinforced concrete support beam demolition blasting preconditioning technique field.Specifically related to one Plant the pre-groove for deep foundation pit reinforced concrete support beam demolition blasting.
Background technology
With continuing to develop for Process of Urbanization Construction, various large deep foundation pits also increase therewith, Brace in Deep Footing Groove beam dismounting amount Also constantly increase.Current supporting removal method mainly has following several:Artificial pneumatic pick dismounting method, static crushing method, big machinery (pick machine) dismounting method, demolition blasting method etc..Artificial pneumatic pick remove for a large amount of, big cross section reinforced concrete member the duration compared with It is long;The static crushing concrete higher to amount containing muscle, crushing effect is poor;Big machinery (pick machine) though the broken safety of dismounting method And efficiency high, but limited by span height, it is difficult to construct, and basement bottom board and floor strength be not enough to bear machinery from Weight and powerful impulsive force.
Demolition blasting method have remove short time limit, fast, the recyclable waste steel bar and the characteristics of economize on resources of slagging tap, exist at present Reinforced concrete brace is most widely used when removing.But, when reinforced concrete brace is removed using blasting procedure, such as If without rational demolition blasting pretreatment measure, meticulous design and construction and strict safeguard procedures, it will produce stronger Explosion negative effect, jeopardize foundation ditch itself and close to buildings stabilization, or even can lead to and personal safety accident and cause huge Economic loss.
The content of the invention
The utility model is intended to overcome prior art defect, it is therefore intended that provide a kind of convenient, explosion and crushing effect of constructing The good, pre-groove for deep foundation pit reinforced concrete support beam demolition blasting that explosive specific charge is low and blasting vibration intensity is small.
To realize above-mentioned task, the technical solution adopted in the utility model is:In the deep foundation pit reinforced mixed of dismounting to be blasted Excavate a demolition blasting pre-groove in basement rock immediately below solidifying soil support beam, the demolition blasting pre-groove it is vertical , the demolition blasting parallel with the longitudinal centre line of the deep foundation pit reinforced concrete support beam of the dismounting to be blasted to center line With the longitudinal centre line position of the longitudinal centre line of pre-groove and the deep foundation pit reinforced concrete support beam of the dismounting to be blasted In on same vertical guide.
The longitudinal length of the deep foundation pit reinforced concrete support beam of the dismounting to be blasted isL, the width of cross section × a height ofa × b
The cross section of the demolition blasting pre-groove is inverted trapezoidal, wherein:
The top width of inverted trapezoidal isa 1
a 1= aa 1(1)
The bottom width of inverted trapezoidal isa 2
a 2= aa 2(2)
Inverted trapezoidal it is a height ofb 1
b 1b(3)
The length of the demolition blasting pre-groove isL 1
L 1=LL(4)
In formula (1), formula (2), formula (3) and formula (4):
LRepresent the longitudinal length of the deep foundation pit reinforced concrete support beam of dismounting to be blasted, m;
aRepresent the cross-sectional width of the deep foundation pit reinforced concrete support beam of dismounting to be blasted, m;
bRepresent the cross-sectional height of the deep foundation pit reinforced concrete support beam of dismounting to be blasted, m;
ΔLRepresent that explosion is disassembled and used the length accentuation of pre-groove, ΔL=0.1~0.5m;
Δa 1Represent that explosion is disassembled and used the top width accentuation in pre-groove inverted trapezoidal section, Δa 1=0.2~0.7m;
Δa 2Represent that explosion is disassembled and used the bottom width accentuation in pre-groove inverted trapezoidal section, Δa 2=0.1~0.4m;
ΔbRepresent that explosion is disassembled and used the height in pre-groove inverted trapezoidal section, Δb=0.15~0.35m.
Due to using above-mentioned technical proposal, the utility model has following good effect compared with prior art:
The utility model before deep foundation pit reinforced concrete support beam demolition blasting, the deep basal pit steel according to dismounting to be blasted The size of reinforced concrete support beam, the in advance basement rock immediately below the deep foundation pit reinforced concrete support beam of the dismounting to be blasted In take a demolition blasting pre-groove so that the underface of the deep foundation pit reinforced concrete support beam for dismounting to be blasted Free face is created that, the clamping action that basement rock treats the deep foundation pit reinforced concrete support beam of demolition blasting is reduced, beneficial to carrying The demolition blasting effect of the deep foundation pit reinforced concrete support beam of dismounting to be blasted high;Explosive specific charge and blasthole can be reduced simultaneously Number, reduces explosive cost, shortens the demolition blasting duration;
Demolition blasting pre-groove can take basement rock (3) and complete pretreatment work by machinery, and simple to operate, construction is just It is prompt;Demolition blasting pre-groove can cut off Explosive stress wave towards the propagation path of basement rock (3), can effectively reduce explosion earthquake Intensity, it is ensured that foundation ditch inner member and close to buildings are safe and stable.
Therefore, convenient, explosion and crushing effect is good, explosive specific charge is low and blasting vibration intensity is small with constructing for the utility model The characteristics of.
Brief description of the drawings
Fig. 1 is a kind of schematic cross-section of the utility model;
Fig. 2 is the enlarged diagram of the A-A sections of Fig. 1.
Specific embodiment
The utility model will be further described with reference to the accompanying drawings and detailed description, not to its protection domain Limitation.
Embodiment 1
A kind of pre-groove for deep foundation pit reinforced concrete support beam demolition blasting.
As shown in figure 1, excavating one in the basement rock 3 of the underface of deep foundation pit reinforced concrete support beam 1 of dismounting to be blasted Bar demolition blasting pre-groove 2, the demolition blasting longitudinal centre line of pre-groove 2 and the depth of the dismounting to be blasted The longitudinal centre line of foundation pit reinforced concrete support beam 1 is parallel, longitudinal centre line and institute of the demolition blasting with pre-groove 2 The longitudinal centre line for stating the deep foundation pit reinforced concrete support beam 1 of dismounting to be blasted is located on same vertical guide.
The longitudinal length of the deep foundation pit reinforced concrete support beam 1 of dismounting to be blasted described in the present embodiment isL,L=15m; The width of cross section × a height of a × b, a × b=0.8 × 1.0m.
As shown in Fig. 2 the cross section of the demolition blasting pre-groove 2 is inverted trapezoidal, wherein:
The top width of inverted trapezoidal isa 1
a 1=aa 1(1)
The bottom width of inverted trapezoidal isa 2
a 2=aa 2(2)
Inverted trapezoidal it is a height ofb 1
b 1b(3)
The length of the demolition blasting pre-groove 2 isL 1
L 1=LL(4)
In formula (1), formula (2), formula (3) and formula (4):
LThe longitudinal length of the deep foundation pit reinforced concrete support beam 1 of dismounting to be blasted is represented, the present embodimentL=15m;
aThe cross-sectional width of the deep foundation pit reinforced concrete support beam 1 of dismounting to be blasted is represented, the present embodimenta = 0.8m;
ΔLRepresent that explosion is disassembled and used the length accentuation of pre-groove, the Δ of the present embodimentL=0.1m;
Δa 1Represent that explosion is disassembled and used the top width accentuation in pre-groove inverted trapezoidal section, the Δ of the present embodimenta 1=0.2m;
Δa 2Represent that explosion is disassembled and used the bottom width accentuation in pre-groove inverted trapezoidal section, the Δ of the present embodimenta 2=0.1m;
ΔbRepresent that explosion is disassembled and used the height in pre-groove inverted trapezoidal section, the Δ of the present embodimentb =0.15m。
Then:
The demolition blasting inverted trapezoidal section top width of pre-groove 2a 1=aa 1=0.8+0.2=1.0;
The demolition blasting bottom width in the inverted trapezoidal section of pre-groove 2a 2=aa 2=0.8+0.1=0.9m;
The demolition blasting height in the inverted trapezoidal section of pre-groove 2b 1b=0.15m;
The demolition blasting length of pre-groove 2L 1=LL =15+0.1=15.1m。
Embodiment 2
A kind of pre-groove for deep foundation pit reinforced concrete support beam demolition blasting.
As shown in figure 1, excavating one in the basement rock 3 of the underface of deep foundation pit reinforced concrete support beam 1 of dismounting to be blasted Bar demolition blasting pre-groove 2, the demolition blasting longitudinal centre line of pre-groove 2 and the depth of the dismounting to be blasted The longitudinal centre line of foundation pit reinforced concrete support beam 1 is parallel, longitudinal centre line and institute of the demolition blasting with pre-groove 2 The longitudinal centre line for stating the deep foundation pit reinforced concrete support beam 1 of dismounting to be blasted is located on same vertical guide.
The longitudinal length of the deep foundation pit reinforced concrete support beam 1 of dismounting to be blasted described in the present embodiment isL,L=20m; The width of cross section × a height of a × b, a × b=1.0 × 1.2m.
As shown in Fig. 2 the cross section of the demolition blasting pre-groove 2 is inverted trapezoidal, wherein:
The top width of inverted trapezoidal isa 1
a 1=aa 1(1)
The bottom width of inverted trapezoidal isa 2
a 2=aa 2(2)
Inverted trapezoidal it is a height ofb 1
b 1b(3)
The length of the demolition blasting pre-groove 2 isL 1
L 1=LL(4)
In formula (1), formula (2), formula (3) and formula (4):
LThe longitudinal length of the deep foundation pit reinforced concrete support beam 1 of dismounting to be blasted is represented, the present embodimentL=20m;
aThe cross-sectional width of the deep foundation pit reinforced concrete support beam 1 of dismounting to be blasted is represented, the present embodimenta = 1.0m;
ΔLRepresent that explosion is disassembled and used the length accentuation of pre-groove, the Δ of the present embodimentL=0.3m;
Δa 1Represent that explosion is disassembled and used the top width accentuation in pre-groove inverted trapezoidal section, the Δ of the present embodimenta 1=0.4m;
Δa 2Represent that explosion is disassembled and used the bottom width accentuation in pre-groove inverted trapezoidal section, the Δ of the present embodimenta 2=0.2m;
ΔbRepresent that explosion is disassembled and used the height in pre-groove inverted trapezoidal section, the Δ of the present embodimentb =0.25m。
Then:
The demolition blasting inverted trapezoidal section top width of pre-groove 2a 1=aa 1=1.0+0.4=1.4;
The demolition blasting inverted trapezoidal section bottom width of pre-groove 2a 2=aa 2=1.0+0.2=1.2m;
The demolition blasting inverted trapezoidal depth of section of pre-groove 2b 1b=0.25m;
The demolition blasting length of pre-groove 2L 1=LL =20+0.3=20.3m。
Embodiment 3
A kind of pre-groove for deep foundation pit reinforced concrete support beam demolition blasting.
As shown in figure 1, excavating one in the basement rock 3 of the underface of deep foundation pit reinforced concrete support beam 1 of dismounting to be blasted Bar demolition blasting pre-groove 2, the demolition blasting longitudinal centre line of pre-groove 2 and the depth of the dismounting to be blasted The longitudinal centre line of foundation pit reinforced concrete support beam 1 is parallel, longitudinal centre line and institute of the demolition blasting with pre-groove 2 The longitudinal centre line for stating the deep foundation pit reinforced concrete support beam 1 of dismounting to be blasted is located on same vertical guide.
The longitudinal length of the deep foundation pit reinforced concrete support beam 1 of dismounting to be blasted described in the present embodiment isL,L=16m; The width of cross section × a height of a × b, a × b=1.4 × 1.4m.
As shown in Fig. 2 the cross section of the demolition blasting pre-groove 2 is inverted trapezoidal, wherein:
The top width of inverted trapezoidal isa 1
a 1=aa 1(1)
The bottom width of inverted trapezoidal isa 2
a 2=aa 2(2)
Inverted trapezoidal it is a height ofb 1
b 1b(3)
The length of the demolition blasting pre-groove 2 isL 1
L 1=LL(4)
In formula (1), formula (2), formula (3) and formula (4):
LThe longitudinal length of the deep foundation pit reinforced concrete support beam 1 of dismounting to be blasted is represented, the present embodimentL=16m;
aThe cross-sectional width of the deep foundation pit reinforced concrete support beam 1 of dismounting to be blasted is represented, the present embodimenta = 1.4m;
ΔLRepresent that explosion is disassembled and used the length accentuation of pre-groove, the Δ of the present embodimentL=0.5m;
Δa 1Represent that explosion is disassembled and used the top width accentuation in pre-groove inverted trapezoidal section, the Δ of the present embodimenta 1=0.7m;
Δa 2Represent that explosion is disassembled and used the bottom width accentuation in pre-groove inverted trapezoidal section, the Δ of the present embodimenta 2=0.4m;
ΔbRepresent that explosion is disassembled and used the height in pre-groove inverted trapezoidal section, the Δ of the present embodimentb =0.35m。
Then:
The demolition blasting inverted trapezoidal section top width of pre-groove 2a 1=aa 1=1.4+0.7=2.1
The demolition blasting bottom width in the inverted trapezoidal section of pre-groove 2a 2=aa 2=1.4+0.4=1.8m;
The demolition blasting height in the inverted trapezoidal section of pre-groove 2b 1b=0.35m;
The demolition blasting length of pre-groove 2L 1=LL =16+0.5=16.5m。
This specific embodiment has following good effect compared with prior art:
This specific embodiment before the demolition blasting of deep foundation pit reinforced concrete support beam 1, according to the depth of dismounting to be blasted The size of foundation pit reinforced concrete support beam 1, in advance in the underface of deep foundation pit reinforced concrete support beam 1 of dismounting to be blasted Take a demolition blasting pre-groove 2 in basement rock 3, so as to be the deep foundation pit reinforced concrete support beam 1 of dismounting to be blasted Underface be created that free face, reduce basement rock 3 treat demolition blasting deep foundation pit reinforced concrete support beam 1 clipping make With beneficial to the demolition blasting effect of the deep foundation pit reinforced concrete support beam 1 for improving dismounting to be blasted;Can reduce explosive specific charge and Blasthole number, while reducing explosive cost, shortens the demolition blasting duration.
Demolition blasting pre-groove 2 can take basement rock (3) and complete pretreatment work by machinery, simple to operate, construction It is convenient;Demolition blasting pre-groove 2 can cut off Explosive stress wave towards the propagation path of basement rock (3), can effectively reduce explosion Earthquake intensity, it is ensured that foundation ditch inner member and close to buildings are safe and stable.
Therefore, convenient, explosion and crushing effect is good, explosive specific charge is low and blasting vibration is strong with constructing for this specific embodiment The characteristics of spending small.

Claims (1)

1. a kind of pre-groove for deep foundation pit reinforced concrete support beam demolition blasting, it is characterised in that:Torn open to be blasted The deep foundation pit reinforced concrete support beam removed(1)The basement rock of underface(3)One demolition blasting pre-groove of middle excavation(2), The demolition blasting pre-groove(2)Longitudinal centre line and the dismounting to be blasted deep foundation pit reinforced concrete support beam (1)Longitudinal centre line it is parallel, the demolition blasting pre-groove(2)Longitudinal centre line and the dismounting to be blasted depth Foundation pit reinforced concrete support beam(1)Longitudinal centre line be located at same vertical guide on;
The deep foundation pit reinforced concrete support beam of the dismounting to be blasted(1)Longitudinal length be L, width × a height of a × b of cross section;
The demolition blasting pre-groove(2)Cross section be inverted trapezoidal, wherein:
The top width of inverted trapezoidal isa 1
a1=a+Δa1(1)
The bottom width of inverted trapezoidal isa 2
a2=a+Δa2(2)
Inverted trapezoidal it is a height ofb 1
b 1b(3)
The demolition blasting pre-groove(2)Length beL 1
L 1=LL(4)
In formula (1), formula (2), formula (3) and formula (4):
LRepresent the deep foundation pit reinforced concrete support beam of dismounting to be blasted(1)Longitudinal length, m;
aRepresent the deep foundation pit reinforced concrete support beam of dismounting to be blasted(1)Cross-sectional width, m;
bRepresent the deep foundation pit reinforced concrete support beam of dismounting to be blasted(1)Cross-sectional height, m;
ΔLRepresent that explosion is disassembled and used the length accentuation of pre-groove, ΔL=0.1~0.5m;
Δa 1Represent that explosion is disassembled and used the top width accentuation in pre-groove inverted trapezoidal section, Δa 1=0.2~0.7m;
Δa 2Represent that explosion is disassembled and used the bottom width accentuation in pre-groove inverted trapezoidal section, Δa 2=0.1~0.4m;
ΔbRepresent that explosion is disassembled and used the height in pre-groove inverted trapezoidal section, Δb=0.15~0.35m.
CN201621385956.9U 2016-12-16 2016-12-16 For the pre-groove of deep foundation pit reinforced concrete support beam demolition blasting Withdrawn - After Issue CN206279537U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621385956.9U CN206279537U (en) 2016-12-16 2016-12-16 For the pre-groove of deep foundation pit reinforced concrete support beam demolition blasting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621385956.9U CN206279537U (en) 2016-12-16 2016-12-16 For the pre-groove of deep foundation pit reinforced concrete support beam demolition blasting

Publications (1)

Publication Number Publication Date
CN206279537U true CN206279537U (en) 2017-06-27

Family

ID=59072483

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621385956.9U Withdrawn - After Issue CN206279537U (en) 2016-12-16 2016-12-16 For the pre-groove of deep foundation pit reinforced concrete support beam demolition blasting

Country Status (1)

Country Link
CN (1) CN206279537U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106592602A (en) * 2016-12-16 2017-04-26 武汉科技大学 Prefabricated groove for deep foundation pit reinforced concrete support beam to be subjected to blasting demolition

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106592602A (en) * 2016-12-16 2017-04-26 武汉科技大学 Prefabricated groove for deep foundation pit reinforced concrete support beam to be subjected to blasting demolition

Similar Documents

Publication Publication Date Title
CN100564802C (en) The method of crushing rock formation in the colliery
CN204041074U (en) Exempt from explosion hydraulic splitting equipment
EA201800133A1 (en) METHOD OF CONSTRUCTION OF A URBAN TUNNEL OF A LOW-DEPTH SEA IN WATER-RICH WITH A CARTO GROUND WITH THE USE OF THE CONSOLE DRILLING MACHINE
CN104314574A (en) Hard rock tunnel non-blasting digging blocking method and construction method
CN105003296A (en) Method for treating low air permeability coal seam gas discharge
CN206279537U (en) For the pre-groove of deep foundation pit reinforced concrete support beam demolition blasting
CN109139020A (en) A kind of underground chamber quiet pop in rock burst area digs branch's unloading method
JP2016094796A (en) Demolition method
CN106437712B (en) Coal mine surrounding cities Strong tremor disaster reduction method
CN205315007U (en) High -efficient detritus blade disc of TBM with ultrasonic vibrator
CN106049503B (en) The preprocess method of reinforced concrete brace demolition blasting in a kind of foundation ditch
CN204082151U (en) From intake type hydraulic splitting equipment
CN106592602B (en) For the pre-groove to be blasted for removing deep foundation pit reinforced concrete supporting beam
CN209443459U (en) Cut-pff wall assembled leads wall
CN106761800A (en) Support System in Soft Rock Tunnels excavation construction process
CN108570987B (en) Dismantling method for offshore wind turbine foundation steel pipe pile
CN103075935B (en) Rockblast stress relief water storage guide hole type blasting method for deep-buried round tunnel
CN103185491B (en) Stress relieving blasting method for side wall rock pillar type rock burst of two synchronously tunneling deeply-buried tunnels
CN202250096U (en) Bucket of tunnel excavator
CN103758171A (en) Electric transmission line iron tower excavation type rock foundation mechanical excavating method
KR20070029152A (en) Discharge crushing method for crushing object to be crushed, method of excavating horizontal tunnel using discharge crushing method, and method of excavating vertical shaft
CN202017505U (en) Pipe roof supporting device
CN203188220U (en) Deep foundation pit supporting structure
CN204344081U (en) A kind of ram pile driver denoising device
CN203559420U (en) Pile splicing construction device under quicksand geological conditions

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20170627