CN202017505U - Pipe roof supporting device - Google Patents

Pipe roof supporting device Download PDF

Info

Publication number
CN202017505U
CN202017505U CN2011200722527U CN201120072252U CN202017505U CN 202017505 U CN202017505 U CN 202017505U CN 2011200722527 U CN2011200722527 U CN 2011200722527U CN 201120072252 U CN201120072252 U CN 201120072252U CN 202017505 U CN202017505 U CN 202017505U
Authority
CN
China
Prior art keywords
supporting
ladder beam
supporting device
pipe roof
inbreak
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011200722527U
Other languages
Chinese (zh)
Inventor
王红星
李刚
王迁
郭民俭
张路平
Original Assignee
李刚
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 李刚 filed Critical 李刚
Priority to CN2011200722527U priority Critical patent/CN202017505U/en
Application granted granted Critical
Publication of CN202017505U publication Critical patent/CN202017505U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Ladders (AREA)

Abstract

The utility model belongs to equipment for supporting of underworkings of tunnels and coal mines, and particularly relates to a pipe roof supporting device, which mainly resolves the technical problems that conventional supporting methods cannot support roadways timely and effectively so as to cause large-area inbreak of the roadways, affect construction quality and construction progress and bring great safety threats to construction workers. The technical scheme includes that the pipe roof supporting device comprises a ladder beam and a plurality of iron pipes arranged in the ladder beam, and the ladder beam is fixed to an anchor rope through an anchor rod. Supporting strength and effective supporting area are increased by means of strength of the iron pipes, advancing progress is quickened, rock breaking caused by inbreak of roof plates can be effectively prevented, and thereby safety of constructors can be guaranteed.

Description

A kind of pipe shed support device
Technical field
The utility model belongs to roadway support device under tunnel and the coal mine, is specifically related to a kind of pipe shed support device.
Background technology
In tunnel and the Mine Tunnel Construction process, structural belt or top board weakness own appear in the top board condition, when loose, the at present domestic supporting method that generally adopts mainly contains leading grouting with small pipe, bassoon canopy, deep hole grouting, horizontal jet grouting stake, horizontal agitation pile and horizontal frozen etc.Because of being subjected to the restriction of conditions such as construction environment, supporting method commonly used has limitation very, can not carry out supporting to the tunnel timely and effectively, causes tunnel occurrence of large-area inbreak, directly influence workmanship and construction speed, and the constructor is caused great security threat.
Summary of the invention
The utility model is primarily aimed at supporting method commonly used can not carry out supporting to the tunnel timely and effectively, cause tunnel occurrence of large-area inbreak, influence workmanship and construction speed, and the constructor caused the technical problem of great security threat, and a kind of pipe shed support device that can effectively prevent large stretch of roof collapse fractured rock is provided.
The utility model is to address the above problem the technical scheme of taking to be:
A kind of pipe shed support device comprises ladder beam and the some iron pipes that are arranged in the ladder beam, and described ladder beam is fixed by anchor pole and anchor cable.
The utility model adopts technique scheme, utilizes the intensity and the effective area of the intensity increase supporting of iron pipe, has accelerated the progress of driving, effectively prevents large stretch of roof collapse fractured rock, has guaranteed constructor's safety.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
The specific embodiment
As shown in Figure 1, a kind of pipe shed support device comprises ladder beam 1 and the some iron pipes 2 that are arranged in the ladder beam 1, and described ladder beam 1 is fixing by anchor pole 3 and anchor cable 4.
Mounting method of the present utility model: ladder beam 1 is fixed in the tunnel, adopts a word alloy bit to join perforating on the wall of hollow hexagonal steel in two ladder beams, boring is squeezed into iron pipe 1 in the boring, and is guaranteed that the protruded length of iron pipe is at least 1mm; The outside of ladder beam 1 is fixed on the top, tunnel with anchor pole 3 and anchor cable 4, adopts the many endless form drivings of shallow eye.

Claims (1)

1. pipe shed support device is characterized in that: comprise ladder beam (1) and be arranged on some iron pipes (2) in the ladder beam (1), described ladder beam (1) is fixed by anchor pole (3) and anchor cable (4).
CN2011200722527U 2011-03-15 2011-03-15 Pipe roof supporting device Expired - Fee Related CN202017505U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011200722527U CN202017505U (en) 2011-03-15 2011-03-15 Pipe roof supporting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011200722527U CN202017505U (en) 2011-03-15 2011-03-15 Pipe roof supporting device

Publications (1)

Publication Number Publication Date
CN202017505U true CN202017505U (en) 2011-10-26

Family

ID=44811176

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011200722527U Expired - Fee Related CN202017505U (en) 2011-03-15 2011-03-15 Pipe roof supporting device

Country Status (1)

Country Link
CN (1) CN202017505U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102155247A (en) * 2011-03-15 2011-08-17 李刚 Pipe shed support device
CN102787854A (en) * 2012-08-13 2012-11-21 内蒙古鲁新能源开发有限责任公司 Forepoling method used in tunneling of weak cemented soft rock roadway

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102155247A (en) * 2011-03-15 2011-08-17 李刚 Pipe shed support device
CN102787854A (en) * 2012-08-13 2012-11-21 内蒙古鲁新能源开发有限责任公司 Forepoling method used in tunneling of weak cemented soft rock roadway

Similar Documents

Publication Publication Date Title
CN105240013B (en) Broadwall N00 engineering methods
CN105134216B (en) Anti- slump structure by the engineering method lane of breaking roof 110
CN102704965B (en) One prevents violent mining influence back to collapse method for leakage
CN104457460B (en) Tunnel large emptying aperture burn cut quick bursting method
CN101270667A (en) Surrounding rock supporting method for ultra-strong or strong or medium rock burst tunnel section deep imbedded in underground chamber
CN102777185A (en) Inclined well shaft construction technology
CN103089279B (en) The method that between crossheading lane, a kind of many lanes, bog-head coal post is reinforced
CN206071611U (en) The new pressure feedback strengthening supporting structure that allows in the unstable country rock tunnel in deep
CN204590048U (en) A kind of high slope rockmass structure
CN201121521Y (en) Opposite pull anchor wire
CN204327107U (en) The TBM of a kind of fragmented rock body hole section tunnels structure
CN102155249A (en) Method for supporting tunnel roof below mined-out area
CN202017505U (en) Pipe roof supporting device
CN108035752A (en) Coal road based on roof stability pushes up by force wall supporting anchor rod support method
CN105649091A (en) High slope support method and structure
CN104790991A (en) Mining roadway surrounding rock strong and long top anchoring technology
CN102155247A (en) Pipe shed support device
CN110080768B (en) Coal mine tunnel large-scale rock burst prevention and control method
CN101886546B (en) Method for inhibiting roof deformation of coal mine underground bolt and anchor cable roadway
CN106089210A (en) A kind of hole, environment-friendly type mine mining method
CN205969537U (en) Seam device is made in rock drilling
CN108442956A (en) A kind of adaptive compression shear formula anchor pole
CN204082206U (en) A kind of waste stone exhaust system for blind slope development shaft building
CN103185491A (en) Stress relieving blasting method for side wall rock pillar type rock burst of two synchronously tunneling deeply-buried tunnels
CN203488134U (en) Loosening blasting type drill tool sticking processing device for bored pile construction at karst areas

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111026

Termination date: 20130315