CN206267851U - A kind of novel silo development machine - Google Patents

A kind of novel silo development machine Download PDF

Info

Publication number
CN206267851U
CN206267851U CN201621332900.7U CN201621332900U CN206267851U CN 206267851 U CN206267851 U CN 206267851U CN 201621332900 U CN201621332900 U CN 201621332900U CN 206267851 U CN206267851 U CN 206267851U
Authority
CN
China
Prior art keywords
platform
slag
column
cutterhead
main drive
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201621332900.7U
Other languages
Chinese (zh)
Inventor
李建斌
肖威
杨聚辉
吕旦
周倩
史伟
闫扬义
冯琳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Engineering Equipment Group Co Ltd CREG
Original Assignee
China Railway Engineering Equipment Group Co Ltd CREG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Engineering Equipment Group Co Ltd CREG filed Critical China Railway Engineering Equipment Group Co Ltd CREG
Priority to CN201621332900.7U priority Critical patent/CN206267851U/en
Application granted granted Critical
Publication of CN206267851U publication Critical patent/CN206267851U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model is related to vertical shaft to build technical field, more particularly to a kind of novel silo development machine, including the column being coaxially disposed with vertical shaft, the cutterhead of column lower end is set, it is arranged on the main drive between cutterhead and column, multiple stabilizers around main drive lower end, one layer of platform above multiple stabilizers, it is fixedly mounted on the supporting platform around column upwards successively, two-layer platform, three layers of platform, four layers of platform and support boots propulsion plant, and it is vertically mounted on the deslagging device in the middle part of column, described cutterhead is fixedly connected with the output end of main drive.The utility model reduces disturbance of the explosion to stratum using mechanical equivalent of light excavation, mechanical equivalent of light excavation can improve borehole wall construction quality simultaneously, reduce super, deficient excavation construction amount, construction cost is saved, device height is integrated, and supporting can be closelyed follow after excavation, sky side is apart from small, borehole wall supporting is timely, it is ensured that construction safety, and equipment designs efficient deslagging device simultaneously.

Description

A kind of novel silo development machine
Technical field
The utility model is related to vertical shaft to build technical field, more particularly to a kind of novel silo development machine.
Background technology
Current blind shaft construction technology mainly has normal sinking, boring method.Normal sinking capital equipment has rock drilling, muck The equipment such as machine, hanging scaffold, shaft excavation is carried out using drilling and blasting method, and complicated construction technique, less efficient, worker safety's coefficient are low And labour intensity is larger;Boring method capital equipment is shaft drilling machine, and shaft drilling machine is crept into using pressurization, and drilling efficiency is relatively low, example Such as, some drilling tools run into the stratum such as hard rock excavate efficiency it is very low, digging excavation diameter for drilling rod bear moment of torsion have hardness will Ask, the vertical being relatively large in diameter must could be realized by excavation, reaming, it is impossible to disposable to complete to excavate, after drilling rod is broken Repair cumbersome, have a significant impact to whole construction.Again for example, it is necessary to coordinate stratum periphery before some Construction of Silo Freezing perforating explosion, workman's underground work inclement condition, safety coefficient is low, and slag discharge efficiency is low after dregs is excavated, and stratum periphery is cold Freeze relatively costly.Traditional construction equipment and engineering method are still continued to use in the construction of vertical shaft at present, with the development of society, the disadvantage of traditional engineering method First day of the lunar year benefit manifests, and limits the development of Construction Technique of Shaft.
Utility model content
The purpose of this utility model is to solve the above problems, there is provided a kind of excavation by vertical shaft, slag tap, supporting, the borehole wall are applied The construction such as work, ventilation, draining is completed using plant equipment, and each equipment is organically integrated, each operation is realized parallel operations, And excavate, slag tap, divulging information, draining can remote control, reduce underground construction personnel amount, reduce personnel labor intensity, raising applies Work efficiency rate and working security, realize the novel silo development machine of vertical shaft mechanized construction.
In order to solve the above problems, technical solution adopted in the utility model is:
A kind of novel silo development machine, including be coaxially disposed with vertical shaft column, set column lower end cutterhead, be arranged on Main drive between cutterhead and column, the multiple stabilizers around main drive lower end, installed in multiple steady Determine above device one layer of platform, the supporting platform being fixedly mounted on upwards successively around column, two-layer platform, three layers of platform, four Layer platform and support boots propulsion plant and the deslagging device being vertically mounted in the middle part of column, described cutterhead and main drive Output end be fixedly connected, around the surrounding of main drive, the lower end of described deslagging device passes through for described one layer of platform Main drive is arranged on the inside of cutterhead, and the upper end of described deslagging device is located at the lower section of support boots propulsion plant, described Borehole wall constructing device is provided between one layer of platform and three layers of platform outside, control system is installed on described two-layer platform, Hydraulic system is installed on three layers of described platform, ventilating drainage system, described cutterhead are installed on four layers of described platform Including the cutterhead body being fixedly connected with main drive output end, the cutter being fixedly mounted on below cutterhead body, uniform peace The collection of cutterhead body inside center is arranged on mounted in multiple slag cleaning devices of cutterhead body inside circumference and by swivel coupling Slag device, the center of described cutterhead body is concaved, and dregs is delivered to collection slag device, institute by described multiple slag cleaning devices The collection slag device stated is located at the positive lower end of deslagging device.
Described slag cleaning device includes having three main supports of end, is separately mounted to three drivings of end of main support The scraper chain and uniform being arranged on that wheel, expansion tightening wheel and bend wheel, matching are set on driving wheel, expansion tightening wheel and bend wheel are scraped Scraper plate on plate chain.
Described deslagging device is including being arranged on the main support of slagging tap being vertically mounted in the middle part of column, positioned at main support of slagging tap The main drive wheel of slagging tap of upper end, the expansion tightening wheel of slagging tap positioned at main support lower end of slagging tap, matching are set in slag tap and main drive wheel and go out Slag tap scraper chain and the scraper plate of slagging tap on scraper chain of slagging tap between slag expansion tightening wheel, described slags tap on main support End offers slag notch and lower end offers slag inlet, and described slag inlet is located at the surface of collection slag device, and described slags tap Mouth is connected with sludge-store cabin, and the dregs collected in slag device is delivered to sludge-store cabin by slag tap scraper chain and scraper plate of slagging tap.
Described sludge-store cabin includes warehouse, diversion mechanism, the lower end of warehouse being arranged at the charging aperture of warehouse or so two Two discharging openings one that side symmetrically opens up and the door being slidably installed at discharging opening one, described diversion mechanism include installing Driving plate that cylinder, one end on warehouse are hinged with cylinder, tilt upward the shunting being fixedly connected with the other end of driving plate The limiting plate matched with flow distribution plate set on plate and warehouse, described flow distribution plate and the fixed connection place hinge of driving plate It is connected on warehouse.
Described stabilizer includes mounting seat, the leg sleeve installed in mounting seat surrounding on main drive Cylinder, one end be arranged on supporting leg sleeve in stretching supporting leg and between the other end of supporting leg sleeve and stretching supporting leg Stretching oil cylinder.
Described supporting platform includes the platform base being arranged on column, the ring-shaped guide rail of platform base upper end installation, passes through Panoramic table, the uniform folding on panoramic table that ring-shaped guide rail and the roller matched with ring-shaped guide rail are arranged on platform base Folded platform and equipment mounting seat, the lower end of described folding platform is hinged with panoramic table.
Described borehole wall constructing device includes the mould of template loop wheel machine and template the loop wheel machine connection below the second platform Plate and for the sliding cement pipe to template delivering concrete.
Described support boots propulsion plant includes the support boots column being fixedly mounted on around column, is fixedly mounted on support boots Support boots sleeve on column, the sliding block being slidably mounted in support boots sleeve, it is arranged in support boots sleeve and drives sliding block to move left and right Adjustment oil cylinder and be uniformly arranged multiple support boots in support boots all around stems, be provided with support boots between two adjacent support boots Oil cylinder, is provided with the chute matched with sliding block on described support boots, be provided between the upper end of described support boots and sliding block and pushed away Enter oil cylinder.
Described main drive includes motor and the reductor, input and the deceleration that are connected with motor output end The driving box that the output end of machine is connected, the output end of described driving box is fixedly connected with cutterhead, pacifies on described driving box Sealed equipped with driving.
Gain effect of the present utility model is:
The utility model by the excavation of vertical shaft, slag tap, supporting, borehole wall construction, ventilation, the construction such as draining utilize plant equipment Complete, each equipment is organically integrated, each operation is realized parallel operations, and excavate, slag tap, divulging information, draining can be grasped remotely Control, reduces underground construction personnel amount, reduces personnel labor intensity, improves efficiency of construction and working security, realizes vertical shaft machine Toolization is constructed.
The utility model drives cutterhead, cutterhead to be excavated to stratum, reduced when excavating by main drive Disturbance of the explosion to stratum, while mechanical equivalent of light excavation can improve borehole wall construction quality, reduces super, deficient excavation construction amount, and saving is constructed into This, device height is integrated, and when excavating, the dregs of excavation is transported to collection slag to the utility model by the slag cleaning device of cutterhead The dregs collected in slag device is delivered to sludge-store cabin by device, slag tap scraper chain and scraper plate of slagging tap, in the warehouse for entering sludge-store cabin When, can notify to be arranged on the diversion mechanism at the charging aperture of warehouse to carry out water conservancy diversion to dregs, allow the dregs can be from the left side The discharging opening one on discharging opening one or the right is discharged, and dregs then is transported into vertical shaft outside by well-bucket again;Support boots propulsion dress Put and be mainly used in control device fltting speed, cutterhead plus-pressure, stabilizing equipment and Suspenoing apparatus, particularly when excavating, with Prevent equipment under the upward reaction force that cutterhead applies, move up;Stabilizer stabilizing equipment in work progress, while Also controllable device driving attitude and realize gesture stability;Borehole wall constructing device can closely follow supporting after excavation, mainly It is that the concrete conveyance in concrete mixer to template is carried out by concreting by sliding cement pipe, supporting is carried out to the borehole wall.
The utility model reduces disturbance of the explosion to stratum using mechanical equivalent of light excavation, while mechanical equivalent of light excavation can improve the borehole wall applying Working medium amount, reduces super, deficient excavation construction amount, saves construction cost, and device height is integrated, and supporting, sky side can be closelyed follow after excavation Apart from small, borehole wall supporting is timely, it is ensured that construction safety, and equipment designs efficient deslagging device simultaneously, changes former construction dregs straight The mode of slagging tap of well-bucket is hinged with, the sludge-store cabin of design is used for temporarily storage, still can continuously be slagged tap in well-bucket running, hangs After bucket is reached, by the fast quick-mounting slag in slag storehouse, slag discharge efficiency is greatly improved, realization is excavated, slagged tap, supporting parallel operations, can be significantly Improve the integral construction efficiency of vertical shaft.The multilayer platform of equipment design simultaneously, the safety of protection equipment interior construction personnel, equipment is big Part operation, can ground remote control, reduce personnel in the pit's quantity, improve construction environment, realize the new breakthrough of Construction of Silo.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Fig. 2 is sectional view of the present utility model.
Fig. 3 is the structural representation of sludge-store cabin of the present utility model.
Fig. 4 is the structural representation of supporting platform of the present utility model.
Fig. 5 is the structural representation of the slag cleaning device of cutterhead of the present utility model.
Specific embodiment
Specific embodiment of the present utility model is described in detail below in conjunction with accompanying drawing.
Referring to Fig. 1, Fig. 2, Fig. 3, Fig. 4 and Fig. 5, sequence number in figure:1 is cutterhead, 2 is deslagging device, 3 is stabilizer, 4 is one Layer platform, 5 be supporting platform, 6 be main drive, 7 be two-layer platform, 8 be three layers of platform, 9 be borehole wall constructing device, 10 be Four layers of platform, 11 for support boots propulsion plant, 12 be column, 13 be control system, 14 be hydraulic system, 15 be ventilating drainage system System, 16 be auxiliary construction system, 101 be cutterhead body, 102 be cutter, 103 be slag cleaning device, 104 for collection slag device, 105 are Swivel coupling, 103-1 are scraper plate, 103-2 is scraper chain, 103-3 is bend wheel, 103-4 is expansion tightening wheel, 103-5 is driving wheel, 103-6 main supports, 201 for slag tap scraper plate, 202 for slag tap scraper chain, 203 for slag tap expansion tightening wheel, 204 for slag tap main drive wheel, 205 for slag tap main support, 206 be sludge-store cabin, 206-1 be warehouse, 206-2 be discharging opening one, 206-3 be cylinder, 206-4 for drive Dynamic plate, 206-5 are flow distribution plate, 301 is stretching supporting leg, 302 is stretching oil cylinder, 303 is supporting leg sleeve, 304 is mounting seat, 501 For platform base, 502 be ring-shaped guide rail, 503 be roller, 504 be panoramic table, 505 be folding platform, 506 be equipment mounting seat, 601 be motor, 602 be reductor, 603 be driving box, 604 for drive sealing, 901 be template, 902 be template loop wheel machine, 903 be Sliding cement pipe, 1101 for support boots, 1102 for support boots oil cylinder, 1103 be propelling cylinder, 1104 for adjustment oil cylinder, 1105 be sliding block, 1106 is support boots column for support boots sleeve, 1107.
Under a kind of novel silo development machine of the utility model, including column 12, the setting column 12 being coaxially disposed with vertical shaft It is the cutterhead 1 at end, the main drive 6 being arranged between cutterhead 1 and column 12, many around the lower end of main drive 6 Individual stabilizer 3, one layer of platform 4 installed in the top of multiple stabilizers 3, the supporting being fixedly mounted on upwards successively around column 12 Platform 5,7, three layers of two-layer platform, 8, four layers of platform platform 10 and support boots propulsion plant 11 and it is vertically mounted on the middle part of column 12 Deslagging device 2, described cutterhead 1 is fixedly connected with the output end of main drive 6, and one layer of described platform 4 is around main drive The surrounding of dynamic device 6, the lower end of described deslagging device 2 is arranged on the inside of cutterhead 1 through main drive 6, and described goes out The upper end of slag device 2 is located at the lower section of support boots propulsion plant 11, is set between one layer of described platform 4 and three layers of outside of platform 8 There is borehole wall constructing device 9, control system 13 is installed on described two-layer platform 7, hydraulic pressure is installed on three layers of described platform 8 System 14, is provided with ventilating drainage system 15 on four layers of described platform 10, described cutterhead 1 includes defeated with main drive 6 Go out to hold the cutterhead body 101 being fixedly connected, be fixedly mounted on the cutter 102 of the lower section of cutterhead body 101, be uniformly arranged on cutterhead master Multiple slag cleaning devices 104 of the inside circumference of body 101 and cutterhead body 101 inside center is arranged on by swivel coupling 105 Collection slag device 104, the center of described cutterhead body 101 concaves, and be delivered to for dregs by described multiple slag cleaning devices 103 Collection slag device 104, described collection slag device 104 is located at the positive lower end of deslagging device 2.
Described slag cleaning device 103 includes having three main support 103-6 of end, is separately mounted to main support 103-6 Three the driving wheel 103-5 of end, expansion tightening wheel 103-4 and bend wheel 103-3, matchings are set in driving wheel 103-5, expansion tightening wheel Scraper chain 103-2 and the uniform scraper plate 103-1 on scraper chain 103-2 on 103-4 and bend wheel 103-3.
Described deslagging device 2 includes being arranged on the main support 205 of slagging tap for being vertically mounted on the middle part of column 12, positioned at slagging tap The main drive wheel 204 of slagging tap of the upper end of main support 205, the expansion tightening wheel 203 of slagging tap positioned at the lower end of main support 205 of slagging tap, matching are arranged In the scraper chain 202 and on scraper chain 202 of slagging tap of slagging tap between main drive wheel 204 and expansion tightening wheel 203 of slagging tap of slagging tap Scraper plate 201 of slagging tap, the described upper end of main support 205 of slagging tap offers slag notch and lower end offers slag inlet, and described enters Cinder notch is located at the surface of collection slag device 104, and described slag notch is connected with sludge-store cabin 206, and the scraper chain 202 and slagging tap of slagging tap is scraped The dregs collected in slag device 104 is delivered to sludge-store cabin 206 by plate 201.
Described sludge-store cabin 206 includes warehouse 206-1, diversion mechanism, the warehouse being arranged at the charging aperture of warehouse 206-1 The lower end left and right sides of 206-1 symmetrical two 206-2 of discharging opening one for opening up and it is slidably installed at the 206-2 of discharging opening one Door, described diversion mechanism includes the driving plate that the cylinder 206-3 being arranged on warehouse, one end and cylinder 206-3 are hinged 206-4 and tilt upward the flow distribution plate 206-5, described flow distribution plate 206- being fixedly connected with the other end of driving plate 206-4 The fixed connection place of 5 and driving plate 206-4 is hinged on warehouse 206-1.
Described stabilizer 3 is including the mounting seat 304 on main drive 6, installed in the surrounding of mounting seat 304 Supporting leg sleeve 303, one end be arranged on supporting leg sleeve 303 in stretching supporting leg 301 and installed in supporting leg sleeve 303 and stretching Stretching oil cylinder 302 between the other end of supporting leg 301.
Described supporting platform 5 includes platform base 501, the annular of the upper end of platform base 501 installation on column 12 Guide rail 502, the revolution being arranged on by ring-shaped guide rail 502 and the roller 503 matched with ring-shaped guide rail 502 on platform base 501 Platform 504, uniform folding platform 505 and equipment mounting seat 506 on panoramic table 504, under described folding platform 505 End is hinged with panoramic table 504.
Described borehole wall constructing device 9 includes the template loop wheel machine 901 and template loop wheel machine 901 below the second platform The template 902 of connection and for the sliding cement pipe 903 to the delivering concrete of template 902.
Described support boots propulsion plant 11 includes the support boots column 1107, the fixed peace that are fixedly mounted on around column 12 Mounted in the support boots sleeve 1106 supportted on boots column 1107, the sliding block 1105 being slidably mounted in support boots sleeve 1106, it is arranged on support Adjustment oil cylinder 1104 and be uniformly arranged around support boots sleeve 1106 that sliding block 1105 is moved left and right are driven in boots sleeve 1106 Multiple support boots 1101, be provided with support boots oil cylinder 1102 between two adjacent support boots 1101, set on described support boots 1101 There is a chute matched with sliding block 1105, propelling cylinder is provided between the upper end of described support boots 1101 and sliding block 1105 1103。
Described main drive 6 includes motor 601 and the reductor 602, defeated being connected with the output end of motor 601 Enter the driving box 603 that end is connected with the output end of reductor 602, the output end of described driving box 603 is fixed with cutterhead 1 and connected Connect, driving sealing 604 is installed on described driving box 603.
Construction method of the present utility model, it is characterised in that:Comprise the following steps:
(1)Start control system 13 first, restart ventilating drainage system 15, hydraulic system 14, stretching stabilizer 3, support Boots 1101, finally start cutter 102 and slag cleaning device 103, deslagging device 2, the support boots propulsion plant 11 of cutterhead 1, cutterhead propulsion Power, moment of torsion and fltting speed are controlled by the central computer of OPS, and personnel only need |input paramete;While driving, The synchronous Cleaning cutter pan of slag cleaning device 103 inside cutterhead 1 cuts the dregs after crushing, and dregs is delivered into collection slag device 104, dregs is then transported to sludge-store cabin 206 by the deslagging device 2 positioned at the top of collection slag device 104, waits hoppet, to be hoisted After well-bucket is delivered to equipment dress slag position by elevator, the door of sludge-store cabin 206 is opened, dregs is then hung by the entrance of discharging opening one Bucket, after well-bucket is filled, well is lifted out by elevator, if well-bucket is not filled once, control flow distribution plate makes dregs whole Into well-bucket, to improve dress slag speed, saving is slagged tap the time, so circulation, and shaft excavation machine is slagged tap in driving, is realized parallel Operation, improves efficiency of construction;
(2)While tunneling, slagging tap, the transport of downhole materials, such as reinforcing bar, steel mesh piece, equipment dimension are carried out using well-bucket Shield cutter etc., by material transportation to underground after, then carry out borehole wall construction.Shaft wall design is the cast-in-place borehole wall, then carry out reinforcing bar Colligation, after the completion of, the template demoulding, positioning, formwork erection, stopend bottom are carried out, carry out the borehole wall and pour, the borehole wall is poured uses concrete Can be before pouring, the concrete delivery pipe for having well-bucket or ground to underground is delivered to underground, and template is delivered to by sliding cement pipe 903 Inside 901, complete the borehole wall and pour;If Shaft wall design is gunite, after band material is delivered to underground, then stood by workman Arch, linked network, beat anchor pole, whitewashing etc. operation, complete the borehole wall construction;
(3)Completion tunnel, slagged tap, borehole wall supporting one circulate after, it is necessary to operate stretching stabilizer, while being set using ground The standby Suspenoing apparatus whole machine of stabilizing equipment, withdraws support boots oil cylinder 1102, finally retraction propelling cylinder 1103 afterwards, completes support boots 1101 Step is changed, the boots 1101 of stretching support afterwards, into next construction circulation;In caving ground, such as the borehole wall is broken easily caves in, in equipment Before driving, then need to pre-process stratum, stratum slip casting can be carried out, freezed, or using equipment to squeezing into dimension in stratum Fender pile, carries out stratum pre-support, and tunneling construction is carried out afterwards, prevents the borehole wall from the problems such as helping partially occur, while can also be used advanced Rig carries out forward probe to stratum, verify lower section geology after take corresponding measure, with ensure construction safety, efficiently.
The utility model by the excavation of vertical shaft, slag tap, supporting, borehole wall construction, ventilation, the construction such as draining utilize plant equipment Complete, each equipment is organically integrated, each operation is realized parallel operations, and excavate, slag tap, divulging information, draining can be grasped remotely Control, reduces underground construction personnel amount, reduces personnel labor intensity, improves efficiency of construction and working security, realizes vertical shaft machine Toolization is constructed.
The utility model drives cutterhead 1, cutterhead 1 to be excavated to stratum, subtracted when excavating by main drive 6 Disturbance of the explosion to stratum is lacked, while mechanical equivalent of light excavation can improve borehole wall construction quality, has reduced super, deficient excavation construction amount, saving has been applied Work cost, device height is integrated, and the utility model when excavating, by the slag cleaning device 103 of cutterhead 1 transported by the dregs of excavation Collection slag device 104 is sent to, the dregs collected in slag device 104 is delivered to sludge-store cabin by slag tap scraper chain 202 and scraper plate 201 of slagging tap 206, when in the warehouse 206-1 for entering sludge-store cabin 206, can notify to be arranged on the shunting machine at the charging aperture of warehouse 206-1 Structure carries out water conservancy diversion to dregs, allows the dregs then can again to lead to from the discharge of discharging opening one on the discharging opening one on the left side or the right Cross well-bucket and dregs is transported to vertical shaft outside;Support boots propulsion plant 11 be mainly used in control device fltting speed, cutterhead plus-pressure, Stabilizing equipment and Suspenoing apparatus, particularly when excavating, to prevent equipment under the upward reaction force that cutterhead 1 applies, Move up;The stabilizing equipment in work progress of stabilizer 3, while going back controllable device driving attitude and realizing gesture stability; Borehole wall constructing device 9 can closely follow supporting after excavation, mainly will be mixed in concrete mixer by sliding cement pipe 903 Solidifying soil is transported to template 901 and carries out concreting, and supporting is carried out to the borehole wall.
The utility model reduces disturbance of the explosion to stratum using mechanical equivalent of light excavation, while mechanical equivalent of light excavation can improve the borehole wall applying Working medium amount, reduces super, deficient excavation construction amount, saves construction cost, and device height is integrated, and supporting, sky side can be closelyed follow after excavation Apart from small, borehole wall supporting is timely, it is ensured that construction safety, and equipment designs efficient deslagging device simultaneously, changes former construction dregs straight The mode of slagging tap of well-bucket is hinged with, the sludge-store cabin 206 of design is used for temporarily storage, still can continuously go out in well-bucket running Slag, after well-bucket is reached, by the fast quick-mounting slag in slag storehouse, greatly improves slag discharge efficiency, and realization is excavated, slagged tap, supporting parallel operations, can Greatly improve the integral construction efficiency of vertical shaft.The multilayer platform of equipment design simultaneously, the safety of protection equipment interior construction personnel, if It is standby most of to operate, can ground remote control, reduce personnel in the pit's quantity, improve construction environment, realize the new prominent of Construction of Silo It is broken.
General principle of the present utility model, principal character and advantage of the present utility model has been shown and described above.One's own profession The technical staff of industry it should be appreciated that the utility model is not restricted to the described embodiments, described in above-described embodiment and specification Simply principle of the present utility model, the utility model also has respectively on the premise of the utility model spirit and scope are not departed from Changes and improvements are planted, these changes and improvements are both fallen within the range of claimed the utility model.The utility model requirement Protection domain defined by appending claims and its equivalent.

Claims (9)

1. a kind of novel silo development machine, it is characterised in that:Including the column being coaxially disposed with vertical shaft, the knife for setting column lower end Disk, the main drive being arranged between cutterhead and column, the multiple stabilizers around main drive lower end, installation One layer of platform above multiple stabilizers, the supporting platform being fixedly mounted on upwards successively around column, two-layer platform, three layers Platform, four layers of platform and support boots propulsion plant and the deslagging device being vertically mounted in the middle part of column, described cutterhead and main drive The output end of dynamic device is fixedly connected, described one layer of platform around main drive surrounding, under described deslagging device The upper end of the inside that cutterhead is arranged on through main drive, described deslagging device is held to be located at the lower section of support boots propulsion plant, Borehole wall constructing device is provided between one layer of described platform and three layers of platform outside, control is installed on described two-layer platform System, is provided with hydraulic system on three layers of described platform, ventilating drainage system is provided with four layers of described platform, described Cutterhead include be fixedly connected with main drive output end cutterhead body, be fixedly mounted on below cutterhead body cutter, It is even to be arranged on cutterhead body inside center installed in multiple slag cleaning devices of cutterhead body inside circumference and by swivel coupling Collection slag device, the center of described cutterhead body concaved, and dregs is delivered to collection slag dress by described multiple slag cleaning devices Put, described collection slag device is located at the positive lower end of deslagging device.
2. a kind of novel silo development machine according to claim 1, it is characterised in that:Described slag cleaning device includes having Three main supports of end, it is separately mounted to main support three driving wheels of end, expansion tightening wheel and bend wheels, matching and is set in drive Scraper chain and the uniform scraper plate on scraper chain on driving wheel, expansion tightening wheel and bend wheel.
3. a kind of novel silo development machine according to claim 1, it is characterised in that:Described deslagging device includes setting In the main support of slagging tap being vertically mounted in the middle part of column, the main drive wheel of slagging tap positioned at main support upper end of slagging tap, positioned at the master that slags tap The expansion tightening wheel of slagging tap of pedestal lower end, matching be set in slag tap between main drive wheel and expansion tightening wheel of slagging tap slag tap scraper chain and Scraper plate of slagging tap on scraper chain of slagging tap, described main support upper end of slagging tap offers slag notch and lower end offers slag input Mouthful, described slag inlet is located at the surface of collection slag device, and described slag notch is connected with sludge-store cabin, slags tap and scraper chain and slags tap The dregs collected in slag device is delivered to sludge-store cabin by scraper plate.
4. a kind of novel silo development machine according to claim 3, it is characterised in that:Described sludge-store cabin include warehouse, Be arranged on the diversion mechanism at the charging aperture of warehouse, symmetrical two discharging openings one for opening up in the lower end left and right sides of warehouse and The door being slidably installed at discharging opening one, described diversion mechanism includes that the cylinder being arranged on warehouse, one end and cylinder are hinged Driving plate, tilt upward on the flow distribution plate and warehouse being fixedly connected with the other end of driving plate set with flow distribution plate phase The limiting plate of matching, described flow distribution plate and the fixed connection place of driving plate are hinged on warehouse.
5. a kind of novel silo development machine according to claim 1, it is characterised in that:Described stabilizer includes being arranged on The stretching branch of mounting seat on main drive, the supporting leg sleeve installed in mounting seat surrounding, one end in supporting leg sleeve Leg and the stretching oil cylinder between the other end of supporting leg sleeve and stretching supporting leg.
6. a kind of novel silo development machine according to claim 1, it is characterised in that:Described supporting platform includes installing Ring-shaped guide rail that platform base on column, platform base upper end are installed, by ring-shaped guide rail and the rolling matched with ring-shaped guide rail Panoramic table, uniform folding platform and equipment mounting seat installed in panoramic table on of the wheel on platform base, described folding The lower end of platform is hinged with panoramic table.
7. a kind of novel silo development machine according to claim 1, it is characterised in that:Described borehole wall constructing device includes The template of template loop wheel machine below the second platform and the connection of template loop wheel machine and for template delivering concrete Sliding cement pipe.
8. a kind of novel silo development machine according to claim 1, it is characterised in that:Described support boots propulsion plant includes The support boots column that is fixedly mounted on around column, the support boots sleeve being fixedly mounted on support boots column, it is slidably mounted on support Sliding block in boots sleeve, it is arranged in support boots sleeve the adjustment oil cylinder that drives sliding block to move left and right and is uniformly arranged in support boots Multiple support boots of all around stems, support boots oil cylinder is provided between two adjacent support boots, is provided with and sliding block on described support boots The chute for matching, propelling cylinder is provided between the upper end of described support boots and sliding block.
9. a kind of novel silo development machine according to claim 1, it is characterised in that:Described main drive includes electricity The driving box that machine and the reductor being connected with motor output end, input are connected with the output end of reductor, it is described The output end of driving box is fixedly connected with cutterhead, and driving sealing is provided with described driving box.
CN201621332900.7U 2016-12-07 2016-12-07 A kind of novel silo development machine Withdrawn - After Issue CN206267851U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621332900.7U CN206267851U (en) 2016-12-07 2016-12-07 A kind of novel silo development machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621332900.7U CN206267851U (en) 2016-12-07 2016-12-07 A kind of novel silo development machine

Publications (1)

Publication Number Publication Date
CN206267851U true CN206267851U (en) 2017-06-20

Family

ID=59044584

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621332900.7U Withdrawn - After Issue CN206267851U (en) 2016-12-07 2016-12-07 A kind of novel silo development machine

Country Status (1)

Country Link
CN (1) CN206267851U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106761763A (en) * 2016-12-07 2017-05-31 中铁工程装备集团有限公司 A kind of novel silo development machine and its construction method
CN109025993A (en) * 2018-10-24 2018-12-18 湖南创远高新机械有限责任公司 Drilling machine dregs flow-guiding structure
WO2019128920A1 (en) * 2017-12-25 2019-07-04 中铁工程装备集团有限公司 New split-type shaft boring machine
CN110206546A (en) * 2019-07-12 2019-09-06 中国铁建重工集团股份有限公司 A kind of vertical shaft cutterhead, shaft excavation machine and shaft drilling machine
CN112253125A (en) * 2020-09-07 2021-01-22 辽宁三三工业有限公司 Supporting, propelling and stepping lifting device of shaft heading machine
CN113153328A (en) * 2021-04-08 2021-07-23 江苏锐成机械有限公司 Axial vacuum slag-discharging type vertical tunneling head
CN114607385A (en) * 2022-04-18 2022-06-10 中国矿业大学 Construction method for drilling and sinking under protection of frozen wall

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106761763A (en) * 2016-12-07 2017-05-31 中铁工程装备集团有限公司 A kind of novel silo development machine and its construction method
CN106761763B (en) * 2016-12-07 2018-12-28 中铁工程装备集团有限公司 A kind of shaft excavation machine and its construction method
WO2019128920A1 (en) * 2017-12-25 2019-07-04 中铁工程装备集团有限公司 New split-type shaft boring machine
CN109025993A (en) * 2018-10-24 2018-12-18 湖南创远高新机械有限责任公司 Drilling machine dregs flow-guiding structure
CN109025993B (en) * 2018-10-24 2023-12-12 湖南创远高新机械有限责任公司 Slag soil flow guiding structure of drilling machine
CN110206546A (en) * 2019-07-12 2019-09-06 中国铁建重工集团股份有限公司 A kind of vertical shaft cutterhead, shaft excavation machine and shaft drilling machine
CN110206546B (en) * 2019-07-12 2021-08-10 中国铁建重工集团股份有限公司 Shaft cutter head, shaft heading machine and shaft drilling machine
CN112253125A (en) * 2020-09-07 2021-01-22 辽宁三三工业有限公司 Supporting, propelling and stepping lifting device of shaft heading machine
CN112253125B (en) * 2020-09-07 2021-08-10 辽宁三三工业有限公司 Supporting, propelling and stepping lifting device of shaft heading machine
CN113153328A (en) * 2021-04-08 2021-07-23 江苏锐成机械有限公司 Axial vacuum slag-discharging type vertical tunneling head
CN114607385A (en) * 2022-04-18 2022-06-10 中国矿业大学 Construction method for drilling and sinking under protection of frozen wall

Similar Documents

Publication Publication Date Title
CN106761763B (en) A kind of shaft excavation machine and its construction method
CN206267851U (en) A kind of novel silo development machine
CN103835661B (en) A kind of local excavation pre support mine shaft rising boring technique
CN108412501A (en) Under wear oil pipeline shallow depth loess tunnels construction method
CN103670420A (en) Full-fracture-surface vertical shaft drilling machine
CN111119898B (en) Shaft expanding excavation tunneling machine and construction method thereof
CN106223967A (en) A kind of great burying rectangle or class Rectangular Tunnel shield-tunneling construction device and method
CN2926319Y (en) Rooted foundation and anchored topped-push construction set apparatus
CN105201518A (en) Method for receiving and disassembly of large-diameter slurry balance shield in hole
CN112502777A (en) Method for treating tunnel inrush roof fall and door closing
CN106761474A (en) A kind of the full-sleeve engineering method steel sleeve and its construction method of the soil that can actively muck haulage
CN106869788A (en) To anti-well rig in movable type
CN109488347A (en) A kind of excavation construction method for special formation chamber
CN207453985U (en) A kind of high crag tunnel for the first time lining trolley one lining trolley device
CN114033387A (en) Ultra-large-diameter deep well tunneling system with water operation and construction method
CN108952728B (en) A kind of headframe main body construction and self well digging freeze parallel construction system and method
CN206844193U (en) Bore support integral type pile hole forming device
RU2141030C1 (en) Device for construction of mine shafts
CN101555798B (en) Reverse puncher and method for using the puncher for implementing PBA side pile construction
CN109268042A (en) A kind of small pilot tunnel leading support equipment and construction method
CN110331936B (en) Combined drilling bottom-expanding pile-planting construction method
CN108018856A (en) A kind of Novel spiral pile-driving machine and its construction method
CN203603910U (en) Full-face vertical shaft drill
CN211549698U (en) Jacking working pit
RU2502873C1 (en) Shaft lining, complex for its erection and method of its erection

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20170620

Effective date of abandoning: 20181228

AV01 Patent right actively abandoned