CN106869788A - To anti-well rig in movable type - Google Patents

To anti-well rig in movable type Download PDF

Info

Publication number
CN106869788A
CN106869788A CN201710097428.6A CN201710097428A CN106869788A CN 106869788 A CN106869788 A CN 106869788A CN 201710097428 A CN201710097428 A CN 201710097428A CN 106869788 A CN106869788 A CN 106869788A
Authority
CN
China
Prior art keywords
drilling
rig
oil cylinder
load table
lead column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710097428.6A
Other languages
Chinese (zh)
Other versions
CN106869788B (en
Inventor
刘志强
王强
谭杰
王桦
左永江
宁方波
韩博
邵方圆
郭鲁川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing China Coal Mine Engineering Co ltd
Original Assignee
Beijing China Coal Mine Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing China Coal Mine Engineering Co ltd filed Critical Beijing China Coal Mine Engineering Co ltd
Priority to CN201710097428.6A priority Critical patent/CN106869788B/en
Publication of CN106869788A publication Critical patent/CN106869788A/en
Application granted granted Critical
Publication of CN106869788B publication Critical patent/CN106869788B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/02Drilling rigs characterised by means for land transport with their own drive, e.g. skid mounting or wheel mounting
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B15/00Supports for the drilling machine, e.g. derricks or masts
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/10Wear protectors; Centralising devices, e.g. stabilisers
    • E21B17/1078Stabilisers or centralisers for casing, tubing or drill pipes
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/10Slips; Spiders ; Catching devices
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B6/00Drives for drilling with combined rotary and percussive action
    • E21B6/02Drives for drilling with combined rotary and percussive action the rotation being continuous
    • E21B6/04Separate drives for percussion and rotation
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/28Enlarging drilled holes, e.g. by counterboring

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Mechanical Engineering (AREA)
  • Earth Drilling (AREA)

Abstract

The present invention disclose movable type in anti-well rig, it is described on to anti-well rig on portable to anti-well rig, it is described it is portable on include drilling rig and mobile device to anti-well rig;The drilling rig includes rig supporting mechanism, promotes mainly oil cylinder, unit head and drilling tool, and the mobile device includes load table, and creeper undercarriage is provided with the relative side in two positions in the load table.Using the present invention in mine shaft rising boring technique, the use of drilling fluid can be saved, save drilling time, while meet carrying out the requirement of drilling well to stratum above tunnel in single tunnel, reduce difficulty of construction, be conducive to using manpower and material resources sparingly, improve production efficiency.

Description

To anti-well rig in movable type
The application is invention and created name for " upper to mine shaft rising boring technique ", the applying date are " on June 4th, 2015 ", apply Number for " 201510302988.1 " divisional application.
Technical field
The present invention relates to mining machinery field, to anti-well rig in more particularly to a kind of movable type.
Background technology
Anti- well rig technological principle is, by the motor belt motor hydrodynamic press pump of rig, hydraulic pump drive hydraulic motor, and to drive Unit head, drilling system is delivered torque to using hydraulic power, drives drilling rod and bit, guide hole drill bit or reaming bit On hobboing cutter in the presence of the pressure of the drill, do pure rolling or micro sliding along bottom rock working face.Main frame oil cylinder is produced simultaneously Axially drawing, pressure, act on guide hole drill bit or reaming bit also by unit head, drilling rod, are boring the hobboing cutter of guide hole drill bit Pressure effect is lower to be rolled, and produces impact load, makes hob teeth that impact, extruding and shear action, fractured rock are produced to rock.Using Anti- well rig carries out drilling well, has the advantages that process is simple, bit speed be fast, strong adaptability.But existing mine shaft rising boring technique Wellbore construction cannot be carried out to the stratum above tunnel in existing tunnel, if necessary to be carried out to the stratum above existing tunnel A tunnel is newly excavated in wellbore construction, that top for being accomplished by putting in pre- well drilling positions, or is directly bored using other technique Well construction, not only expends substantial amounts of man-hour, but also expend substantial amounts of man power and material, it is impossible to embody anti-well rig single The advantage of wellbore construction is carried out in tunnel to tunnel top stratum.
The content of the invention
In view of this, the invention reside in a kind of shifting for carrying out pit shaft drilling to stratum above tunnel in existing tunnel of offer To anti-well rig on dynamic formula, removing existing mine shaft rising boring technique from needs to excavate two troubles in tunnel, is conducive to saving pit shaft brill Engineering takes during entering, and is conducive to using manpower and material resources sparingly, and reduces pit shaft drilling cost.
To solve the above problems, the present invention is adopted the following technical scheme that:On to mine shaft rising boring technique, comprise the following steps:
(1) stratum to be drilled is conducted a geological survey, determines the inclination angle size on the stratum;
(2) install to anti-well rig;
(3) pit shaft drilling;
(4) borehole wall supporting.
To mine shaft rising boring technique on above-mentioned, step (1) comprises the following steps:
A () determines shaft location to be drilled
B () is investigated to the geologic information that geology, design department provide, and according to finding, judge pit shaft to be drilled Position nearby in stratum stratigraphic dip size, so as in pit shaft position top to be drilled stratum in judging rock can Boring property.
To mine shaft rising boring technique on above-mentioned, step (2) comprises the following steps:
(A) it is transported to the lower section of pit shaft position to be drilled to anti-well rig by along tunnel;
(B) holded up to anti-well borer frame by, then installed to anti-well rig.
To mine shaft rising boring technique on above-mentioned, step (3) comprises the following steps:
I () treats tunnel section where drilling well cylinder and carries out supporting;
(ii) treating drilling well cylinder well head surrounding formation carries out precuring treatment;
(iii) pit shaft drilling.
Drilling well cylinder well head surrounding formation is treated to mine shaft rising boring technique on above-mentioned, in step (ii) using Fast Setting Cement Slurry to enter Row precuring is processed.
To mine shaft rising boring technique on above-mentioned, in step (4):Mine shaft rising boring Cheng Jinghou, on to anti-well borer frame and Jacking equipment, sets hanging scaffold in pit shaft, the function of transporting material and personnel is undertaken by being equipped with a set of lifting system, for knot The unstable stratum of structure, wall is built with monoblock type metal form, and seamless steel pipe pours inner layer well wall;For constitutionally stable stratum, Using anchor pole gunite, pit shaft whole operation is completed.
To mine shaft rising boring technique on above-mentioned, it is described on to anti-well rig for movable type on to anti-well rig, the movable type On to anti-well rig include drilling rig and mobile device;
The drilling rig includes rig supporting mechanism, promotes mainly oil cylinder, unit head and drilling tool, the rig supporting mechanism bag Include lower support, base, lead column, back timber and upper support;The upper end of the lower support is fixedly connected with the lower end of the lead column, The upper end of the lead column is fixedly connected with the lower end of the upper support;The floor installation is closing on the lower end of the lead column The lead column on, the back timber is mounted adjacent in the lead column of the upper end of the lead column, described to promote mainly oil cylinder It is mounted in the lead column between the base and the back timber, the oil cylinder of promoting mainly can be slided along the lead column It is dynamic;The pars contractilis for promoting mainly oil cylinder is fixedly connected with the base, and the oil cylinder of promoting mainly is fixedly connected with the unit head, institute Unit head is stated to be connected with the drilling tool;
The mobile device includes load table, and crawler travel is provided with the relative side in two positions in the load table Mechanism;The base is hinged with the first end of the load table;The oil cylinder of promoting mainly is by undercarriage pull bar and the load table Connection, one end of the undercarriage pull bar is hinged with the oil cylinder of promoting mainly, the other end and the load-carrying of the undercarriage pull bar The first end of platform is hinged;The load table upper table surface is provided with supporting mechanism, and the load table is loaded in the drilling rig When upper, the back timber is placed on the supporting mechanism;It is provided with the load table more than or equal to 2N leg, N is more than 2 Natural number.
To mine shaft rising boring technique on above-mentioned, the drilling tool includes that drilling rod and drill bit described in drill bit include pilot drill bit and reaming Drill bit, the pilot drill bit lower end is connected with the threaded upper ends of the reaming bit, the lower end of the reaming bit and the brill The threaded upper ends connection of bar, the lower end of the drilling rod is connected by shackle device with the unit head;The mobile device Also include pumping plant, the pumping plant is arranged in the load table, and the pumping plant is connected with the oil cylinder fluid communication of promoting mainly.
To mine shaft rising boring technique on above-mentioned, be provided with the back timber can free-open-close clamp and holding card device, it is described Clamp is located at the top of the holding card device;When the clamp and the holding card device are closed, the clamp and the holding card are filled Put respectively with the drilling rod clamping;Upper activity is installed in the lead column between the back timber and the upper support Beam, is provided with rock slag collecting mechanism on the upper walking beam, the rock slag collecting mechanism can free-open-close;The rock slag collects machine When structure is closed, the rock slag collecting mechanism is connected with the drilling steel slip.
To mine shaft rising boring technique on above-mentioned, stabilizer is installed on the drilling rod between well head and the drill bit; The stabilizer includes retractable mounting ring, and the support arm more than or equal to 3 equal lengths is provided with the mounting ring, described One end of support arm is fixedly connected with the mounting ring, and the other end of the support arm is provided with roller, the roller and shaft in wall Contact;When the mounting ring is closed, the mounting ring is fixedly connected with the drilling rod;Two adjacent spacing of the stabilizer From more than or equal to 8m and less than or equal to 10m;The distance between the stabilizer and described drill bit are more than or equal to 8m and small In or equal to 10m.
The beneficial effects of the invention are as follows:
1. can realize carrying out pit shaft drilling to the stratum above tunnel in existing tunnel using the present invention, without being satisfaction Existing mine shaft rising boring technique and excavate a new tunnel again, so as to reduce the cost of Shaft Excavation, also reduce such pit shaft In man-hour needed for excavating, be that subsequent construction has saved the plenty of time so as to accelerate project progress.
2. the drilling of tunnel top stratum pit shaft is carried out using the present invention, without drilling fluid or needs in pit shaft drilling process A small amount of drilling fluid, wherein drilling fluid are used to reduce the temperature of drill bit, improve drilling life of bit and pit shaft rate of penetration, it is ensured that Drill bit can carry out continuous construction operating.
3. drilling well is carried out to the stratum higher than construction location using the present invention, due to without heavy mechanical equipment is transported to Eminence, so as to solve the problems, such as big machinery difficult.
Brief description of the drawings
Fig. 1 is to the structural representation under anti-well rig working condition in movable type of the invention;
Fig. 2 is structural representation when being erect completely to the drilling rig of anti-well rig in movable type of the invention;
Fig. 3 is that the structure during being recovered in mobile device to the drilling rig of anti-well rig in movable type of the invention is shown It is intended to;
Fig. 4 is to be completely retracted into structure when in mobile device in movable type of the invention to the drilling rig of anti-well rig Schematic diagram.
In figure:Supported under 1-, 2- bases, 3- lead columns, 4- back timbers, supported on 5-, 6- promotes mainly oil cylinder, 7- unit heads, 8- Shackle device, 9- drilling rods, 10- reaming bits, 11- pilot drill bits, 12- pumping plants, 13- stabilizers, 14- pars contractilis, the upper activities of 15- Beam, 16- rock slag collecting mechanisms, 17- clamps, 18- holding card devices, 19- creepers undercarriage, 20- legs, 21- load tables, 22- Supporting mechanism, 23- rocks slag outward transport station, 24- support arms, 25- rollers, 26- undercarriage pull bars.
Specific embodiment
It is the scheme in the clear explanation present invention, preferred embodiment is given below and is described with reference to the accompanying drawings.
Embodiment 1
The unstable area in stratum carries out sap excavating and Shaft Excavation is required to carry out advance supporting, is collapsed with preventing Side causes the accident, and this is the basic demand that stratum unstable region carries out underground construction.
In the present invention it is used on to anti-well rig in movable type to anti-well rig, as shown in figures 1-4, the movement Include drilling rig and mobile device to anti-well rig in formula.
Wherein, the drilling rig includes rig supporting mechanism, promotes mainly oil cylinder 6, unit head 7 and drilling tool, the rig branch Support mechanism includes lower support 1, base 2, lead column 3, back timber 4 and upper support 5;The upper end of the lower support 1 and the lead column 3 Lower end be fixedly connected, the upper end of the lead column 3 with it is described it is upper support 5 lower end be fixedly connected;The base 2 is arranged on and faces In the lead column 3 of the lower end of the nearly lead column 3, the back timber 4 is mounted adjacent to the described of the upper end of the lead column 3 In lead column 3, the oil cylinder 6 of promoting mainly is mounted in the lead column 3 between the base 2 and the back timber 4, described Promoting mainly oil cylinder 6 can slide along the lead column 3;The pars contractilis 14 for promoting mainly oil cylinder 6 is fixedly connected with the base 2, institute State and promote mainly oil cylinder 6 and be fixedly connected with the unit head 7, the unit head 7 and the drilling tool are connected.Wherein, the drilling tool Include pilot drill bit 11 and reaming bit 10, the lower end of the pilot drill bit 11 and the expansion including drill bit described in drilling rod 9 and drill bit The threaded upper ends connection of drill 10, the lower end of the reaming bit 10 is connected with the threaded upper ends of the drilling rod 9, the drilling rod 9 lower end is connected by shackle device 8 with the unit head 7;The mobile device also includes pumping plant 12, the pumping plant 12 In the load table 21, the pumping plant 12 is connected with the fluid communication of oil cylinder 6 of promoting mainly.
The mobile device includes load table 21, and crawler belt is provided with the relative side in two positions in the load table 21 Walking mechanism 19;The base 2 is hinged with the first end of the load table 21;The oil cylinder 6 of promoting mainly is by undercarriage pull bar 26 It is connected with the load table 21, one end of the undercarriage pull bar 26 is hinged with the oil cylinder 6 of promoting mainly, the undercarriage pull bar 26 The other end be hinged with the first end of the load table 21;The upper table surface of the load table 21 is provided with supporting mechanism 22, described Drilling rig is loaded in when in the load table 21, and the back timber 4 is placed on the supporting mechanism 22;Pacify in the load table 21 Equipped with more than or equal to 2N leg 20, N is the natural number more than 2.
Be provided with the back timber 4 can free-open-close clamp 17 and holding card device 18, the clamp 17 is located at described embracing The top of card device 18;When the clamp 17 and the holding card device 18 are closed, 18 points of the clamp 17 and the holding card device Not with the clamping of the drilling rod 9;Upper walking beam is installed in the guiding 3 between the back timber 4 and the upper support 5 15, rock slag collecting mechanism 16 is installed on the upper walking beam 15, the rock slag collecting mechanism 16 can free-open-close;The rock slag When collecting mechanism 16 is closed, the rock slag collecting mechanism 16 is slidably connected with the drilling rod 9.
And in pit shaft drilling process, as mine shaft depth increases, the drilling rod 9 between well head and the drill bit Upper increase is provided with stabilizer 13;The stabilizer 13 includes retractable mounting ring, is provided with the mounting ring more than or waited In 3 support arms of equal length 24, one end of the support arm 24 is fixedly connected with the mounting ring, the other end of the support arm 24 Roller 25 is installed, the roller 25 is contacted with shaft in wall;When the mounting ring is closed, the mounting ring and the drilling rod 9 It is fixedly connected;Distance is more than or equal to 8m and less than or equal to 10m between two adjacent stabilizers 13;The stabilizer 13 with the distance between the drill bit more than or equal to 8m and less than or equal to 10m.
Before carrying out wellbore construction to stratum above tunnel in the existing tunnel in stratum unstable region, drilling stratum should be treated Geological condition researched and analysed.Investigated according to the geologic information that geology, design department provide, analysis is judged The stratigraphic dip size of drilling stratum is treated, so as to rock drillability in pit shaft position top to be drilled stratum in judging.
After judging that rock drillability meets construction requirement in stratum above pit shaft position to be drilled, by crawler belt Car will be transported to the underface of shaft location to be drilled to anti-well rig in the movable type, then start the pumping plant 12, then open Oil cylinder 6 is promoted mainly described in dynamic, and is shunk the pars contractilis for promoting mainly oil cylinder 6, now due to the undercarriage connecting rod 26 one end is fixedly connected with the first end of the load table, and the other end of the undercarriage connecting rod 26 promotes mainly oil cylinder 6 with described It is fixedly connected, because when the pars contractilis 14 for promoting mainly oil cylinder 6 is gradually tapered up, making on the upper top of the undercarriage pull bar 26 Under, the upper end of the drilling rig can little by little be drawn high, and the lower end of the drilling rig can then be gradually reduced until with Ground is fully contacted or the pars contractilis 14 shrinks completely, and the lower end of now described lower support 1 completely attaches to ground, and is Holding construction safety, construction site requires smooth, meets the requirement that the drilling rig is laid vertically.Treat drilling well cylinder place Tunnel section carry out supporting, with avoid treat drilling well cylinder carry out wellbore construction during, tunnel wall occurs bursting apart or caves in.Right After tunnel lining system is completed, for bursting apart occurs in the ground city for avoiding pit shaft well head periphery to be drilled or/and comes off, using Fast Setting Cement Slurry Treating drilling well cylinder well head surrounding formation carries out precuring treatment, and in order to strengthen solidification effect, can be in pit shaft well head to be drilled Anchor hole is beaten in surrounding formation, and Fast Setting Cement Slurry is injected in anchor hole, so as to avoid tunnel top stratum occur rock stratum or Soil layer is burst apart or/the influence that comes off is constructed.
During the Fast Setting Cement Slurry solidification for being used to solidify pit shaft well head surrounding formation to be drilled, the shifting can be completed To the installation of anti-well rig on dynamic formula.Due in the protection to the grade part of the drilling rod 9, transporting in the movable type to anti-well During rig, the part such as the drilling rod 9 and the drill bit can typically be disassembled from the rig supporting mechanism.Thus exist The drilling rig is erect after ground at the construction field (site), is now coaxially filled the pilot drill bit 11 and the reaming bit 10 Match somebody with somebody, then the pilot drill bit 11 and the reaming bit 10 and the coaxial assembling of the drilling rod 9 are then retell into the drilling rod again 9 are fixedly connected with the unit head 7 by the shackle device 8.When the length of the drilling rod 9 meets first stage pit shaft drilling Demand, then the clamp 17 and the holding card device 18 and the rock slag collecting mechanism 16 can be made to open completely, so as to The height with stratum joint above tunnel is increased under the driving for promoting mainly oil cylinder 6 in the drill bit, in the drill bit After rising to predetermined altitude, the rock slag collecting mechanism 16 is closed.Because the pilot drill bit 11 is in the reaming bit 10 Top and the two belongs to coaxial assembling, thus can realize that guide hole and pit shaft creep into simultaneously using the combination of this drill bit.
After Fast Setting Cement Slurry is fully cured, to start and carry out pit shaft drilling to anti-well rig in the movable type.Pit shaft is bored The rock slag and native slag produced during entering can directly drop from pit shaft, fall on the rock slag collecting mechanism 16, and by described Rock slag collecting mechanism 16 delivers to rock slag outward transport station 23, then transports tunnel by slag-soil truck.
When single drill pipe length can not meet pit shaft drilling demand, it is often necessary to which two drilling rods 9 are coaxially connected Get up.When the oil cylinder 6 of promoting mainly rises to its peak that can move up, then the clamp 17 and the holding card device 18 are closed Close, now the clamp 17 and it is described guarantor card device 18 respectively with the clamping of the drilling rod 9, then solved by the shackle device 8 Except the connection between the drilling rod 9 and the unit head 7, oil cylinder 6 then is promoted mainly described in startup, the pars contractilis 14 is shunk band Oil cylinder 6 is promoted mainly described in dynamic to move down, when the oil cylinder 6 of promoting mainly is displaced downwardly to its minimum point that can be moved down, then will be used to increase described The drilling rod of the length of drilling rod 9 is fixedly connected with the unit head 7 by the shackle device, and then promoting mainly oil cylinder 6 described in startup makes Obtain the pars contractilis 14 to stretch so that be used to increase the lower end of the drilling rod upper end near the drilling rod 9 of the length of the drilling rod 9, so By original drilling rod 9 and it is used to increase the new drilling rod of original length of the drilling rod 9 and coaxially assembles afterwards, you can completes institute The length for stating drilling rod 9 increases.The replacing of the drilling rod 9, increased with the length of the drilling rod 9 differs only in original brill Bar 9 needs to disassemble.
And crept into for a long time due to drill bit, the temperature of drill bit can be raised constantly, in order to avoid drill bit because temperature is too high, can be To drilling bit high-speed injection condensing liquid during drill bit drilling, to reduce temperature of diamond bit, extend the service life of drill bit, in raising To the stream time of anti-well rig.
Mine shaft rising boring Cheng Jinghou, first by the drill bit and the drilling rod 9 according to the reverse operating of its assemble sequence from described Disassembled on unit head 7, then utilize and (gone up to anti-well rig machine to the remainder of anti-well rig in the movable type Frame) and jacking equipment, hanging scaffold is set in pit shaft, the function of transporting material and personnel is undertaken by being equipped with a set of lifting system, Wall is built with monoblock type metal form, seamless steel pipe pours inner layer well wall.
After the completion of shaft in wall supporting, the upper end of the undercarriage pull bar 26 is hinged with the oil cylinder 6 of promoting mainly, then Extend the pars contractilis 14, the upper end of the drilling rig then can gradually incline under the traction action of the undercarriage pull bar 26 Draw close tiltedly and to the load table 21, until the upper end of the drilling rig falls on the supporting mechanism 22.
Embodiment 2
In the present embodiment it is used it is portable upper in anti-well rig and embodiment 1 it is used it is portable on to anti-well rig phase Together.
For the area of stratum stabilization, wellbore construction is carried out to the stratum above tunnel in existing tunnel, can be with Simple protective treatment is carried out, such as protection network is installed on the stratum around pit shaft well head to be drilled, and protection network can be in well Cylinder is disassembled after being drilled to and is continuing with the construction of next pit shaft drilling.
As carrying out wellbore construction to stratum above tunnel in existing tunnel with stratum unstable region, in stratum stabilization Area, carrying out wellbore construction to existing tunnel top stratum also needs the geological condition for treating drilling stratum to research and analyse.Root The geologic information provided according to geology, design department is investigated, and analysis is judged to treat the stratigraphic dip size of drilling stratum, So as to rock drillability in pit shaft position top to be drilled stratum in judging.
After judging that rock drillability meets construction requirement in stratum above pit shaft position to be drilled, to anti-by Well rig is transported to the underface of shaft location to be drilled, then holds up and is carried out to anti-well rig on to anti-well borer frame by Just fill.It is upper at the beginning of anti-well rig fill after the completion of, it is only necessary to protection network is installed in pit shaft well head surrounding formation to be drilled, with avoid compared with Big crushed stone is fallen and injures workmen by a crashing object or smash drilling equipment.
After protection network is installed, complete to lay and assemble to anti-well rig in the movable type, in the present embodiment Laying with the operation for assembling as in embodiment 1 to anti-well rig in the movable type.Produced in pit shaft drilling process Rock slag etc. be also there is the rock slag collecting mechanism 16 to collect and be transported to the rock slag outward transport station, and tunnel is transported to by slag-soil truck Outward.
And crept into for a long time due to drill bit, the temperature of drill bit can be raised constantly, in order to avoid drill bit because temperature is too high, can be To drilling bit high-speed injection condensing liquid during drill bit drilling, to reduce temperature of diamond bit, extend the service life of drill bit, in raising To the stream time of anti-well rig.
Due to earth formation stabilization, the pit shaft wellbore stability being drilled to, the supporting construction without carrying out complexity only need to utilize anchor Bar gunite, completes pit shaft whole operation.
After the completion of shaft in wall supporting, to the operation in the dismounting and transhipment and embodiment of anti-well rig in the movable type It is identical.
In embodiment 1 and 2, the rock slag produced in pit shaft drilling process and native slag are under gravity automatically along pit shaft Fall, be carried out without using drilling fluid, and existing mine shaft rising boring technique is in guide hole drilling process is carried out The rock slag produced in guide hole drilling process and native slag are discharged from guide hole, it need to be carried out from guide hole with drilling fluid Come, the infringement this reduces drilling fluid to drilling rod and drill bit.And in embodiment 1 and 2, existing tunnel top stratum is entered It is to be carried out in existing single tunnel, it is not necessary to excavate out new tunnel in the top in existing tunnel during row wellbore construction, section About substantial amounts of manpower and materials, also save the substantial amounts of time, are easy to enterprise to improve efficiency of construction, reduce Shaft Excavation cost.
Above-described embodiment is only intended to clearly illustrate the invention example, and not has to the invention The restriction of body implementation method.For those of ordinary skill in the field, can also make on the basis of the above description The change or variation of other multi-forms.There is no need and unable to be exhaustive to all of implementation method.It is all of the invention Spirit and principle within extend out it is any obvious change or variation still in the invention claim guarantor Among shield scope.

Claims (4)

1. to anti-well rig in movable type, it is characterised in that including drilling rig and mobile device;
The drilling rig includes rig supporting mechanism, promotes mainly oil cylinder (6), unit head (7) and drilling tool, the rig supporting mechanism Including lower support (1), base (2), lead column (3), back timber (4) and upper support (5);The upper end of the lower support (1) with it is described The lower end of lead column (3) is fixedly connected, and the upper end of the lead column (3) is fixedly connected with the lower end of the upper support (5);It is described Base (2) is mounted adjacent in the lead column (3) of the lower end of the lead column (3), and the back timber (4) is mounted adjacent to institute In the lead column (3) of the upper end for stating lead column (3), it is described promote mainly oil cylinder (6) be mounted on the base (2) with it is described In the lead column (3) between back timber (4), the oil cylinder (6) of promoting mainly can be slided along the lead column (3);It is described to promote mainly The pars contractilis (14) of oil cylinder (6) is fixedly connected with the base (2), and the oil cylinder (6) of promoting mainly is with the fixed company of the unit head (7) Connect, the unit head (7) is connected with the drilling tool;
The mobile device includes load table (21), and upper two positions of load table (21) are provided with crawler belt on relative side Walking mechanism (19);The base (2) is hinged with the first end of the load table (21);The oil cylinder (6) of promoting mainly is by rising and falling Frame pull bar (26) is connected with the load table (21), and one end of the undercarriage pull bar (26) is hinged with the oil cylinder (6) of promoting mainly, The other end of the undercarriage pull bar (26) is hinged with the first end of the load table (21);On load table (21) upper table surface Supporting mechanism (22) is provided with, when the drilling rig is loaded in the load table (21), the back timber (4) is placed on the branch On support mechanism (22);It is provided with the load table (21) more than or equal to 2N leg (20), N is the natural number more than 2.
2. to mine shaft rising boring technique on according to claim 1, it is characterised in that the drilling tool includes drilling rod (9) and bores The drill bit includes pilot drill bit (11) and reaming bit (10), pilot drill bit (11) lower end and the reaming bit (10) threaded upper ends connection, the lower end of the reaming bit (10) is connected with the threaded upper ends of the drilling rod (9), the drilling rod (9) lower end is connected by shackle device (8) with the unit head (7);The mobile device also includes pumping plant (12), institute Pumping plant (12) is stated in the load table (21), the pumping plant (12) is connected with described oil cylinder (6) fluid communication of promoting mainly.
3. to mine shaft rising boring technique on according to claim 2, it is characterised in that be provided with the back timber (4) can from By the clamp (17) and holding card device (18) of folding, the clamp (17) is positioned at the top of the holding card device (18);The card When plate (17) and the holding card device (18) are closed, the clamp (17) and the holding card device (18) respectively with the drilling rod (9) clamping;Upper walking beam is installed in the lead column (3) between the back timber (4) and the upper support (5) (15) rock slag collecting mechanism (16), is installed, the rock slag collecting mechanism (16) can free-open-close on the upper walking beam (15); When the rock slag collecting mechanism (16) closes, the rock slag collecting mechanism (16) is slidably connected with the drilling rod (9).
4. according to Claims 2 or 3 on to mine shaft rising boring technique, it is characterised in that positioned at well head and the drill bit it Between the drilling rod (9) on stabilizer (13) is installed;The stabilizer (13) includes retractable mounting ring, in the mounting ring Support arm (24) more than or equal to 3 equal lengths is installed, one end of the support arm (24) is fixedly connected with the mounting ring, The other end of the support arm (24) is provided with roller (25), and the roller (25) contacts with shaft in wall;The mounting ring closure When, the mounting ring is fixedly connected with the drilling rod (9);Distance is more than or equal between two adjacent stabilizers (13) 8m and less than or equal to 10m;The distance between the stabilizer (13) and described drill bit are more than or equal to 8m and are less than or equal to 10m。
CN201710097428.6A 2015-06-04 2015-06-04 To anti-well drilling machine in movable type Active CN106869788B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710097428.6A CN106869788B (en) 2015-06-04 2015-06-04 To anti-well drilling machine in movable type

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201710097428.6A CN106869788B (en) 2015-06-04 2015-06-04 To anti-well drilling machine in movable type
CN201510302988.1A CN104989272B (en) 2015-06-04 2015-06-04 Upward inverse well drilling process

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201510302988.1A Division CN104989272B (en) 2015-06-04 2015-06-04 Upward inverse well drilling process

Publications (2)

Publication Number Publication Date
CN106869788A true CN106869788A (en) 2017-06-20
CN106869788B CN106869788B (en) 2018-11-06

Family

ID=54301141

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201510302988.1A Active CN104989272B (en) 2015-06-04 2015-06-04 Upward inverse well drilling process
CN201710097428.6A Active CN106869788B (en) 2015-06-04 2015-06-04 To anti-well drilling machine in movable type

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201510302988.1A Active CN104989272B (en) 2015-06-04 2015-06-04 Upward inverse well drilling process

Country Status (1)

Country Link
CN (2) CN104989272B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113914777A (en) * 2021-10-14 2022-01-11 中铁工程装备集团有限公司 Raise boring machine with synchronous digging and supporting and construction method thereof
CN114263434A (en) * 2021-12-23 2022-04-01 江苏和信石油机械有限公司 Intelligent movable upward raise boring machine equipment
CN114991663A (en) * 2022-05-30 2022-09-02 北京中煤矿山工程有限公司 Directional pilot hole sweeping equipment and process for reverse well screw drilling tool
CN115095285A (en) * 2022-08-26 2022-09-23 桥封科技(成都)有限公司 Pipe column clamping tile

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105041204A (en) * 2015-06-05 2015-11-11 北京中煤矿山工程有限公司 Movable upward raise boring machine
CN106499342B (en) * 2016-12-20 2019-04-05 宁夏天地奔牛实业集团有限公司 On to anti-well drilling machine reaming bit and starter mounting device and method
CN108775225B (en) * 2018-06-08 2019-08-30 北京中煤矿山工程有限公司 Anti- well drilling machine reaming construction broken formation gib equipment and its mounting process
CN109252811B (en) * 2018-11-06 2020-11-24 江苏和信石油机械有限公司 Floating interval adjusting type raise boring machine
CN110295857B (en) * 2019-07-02 2020-10-16 北京中煤矿山工程有限公司 Quick lifting device of raise boring machine

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1388562A1 (en) * 1985-11-22 1988-04-15 Всесоюзный Научно-Исследовательский И Проектно-Конструкторский Институт Горнорудного Машиностроения Arrangement for driving ascending workings
CN2232069Y (en) * 1994-09-09 1996-07-31 山东矿山机械厂 Short drilling rig
CN201184126Y (en) * 2008-03-19 2009-01-21 煤炭科学研究总院 Mining large-scale inverse well drill
CN101571031A (en) * 2009-06-17 2009-11-04 北京中煤矿山工程有限公司 Split type reaming bit for large-diameter raising-boring and assembly method thereof
CN204782750U (en) * 2015-06-05 2015-11-18 北京中煤矿山工程有限公司 To raise boring machine in movable type

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3247632C1 (en) * 1982-12-23 1983-11-17 Wirth Co Kg Masch Bohr Device for producing an upward borehole
CN101349064B (en) * 2008-08-26 2010-04-07 中国水利水电第五工程局 Construction method of hydroelectric power station surge chamber vertical shaft under soft rock geological condition
CN201306124Y (en) * 2008-12-10 2009-09-09 北京中煤矿山工程有限公司 A forward-drilling hole dilating drill for raise boring machine

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1388562A1 (en) * 1985-11-22 1988-04-15 Всесоюзный Научно-Исследовательский И Проектно-Конструкторский Институт Горнорудного Машиностроения Arrangement for driving ascending workings
CN2232069Y (en) * 1994-09-09 1996-07-31 山东矿山机械厂 Short drilling rig
CN201184126Y (en) * 2008-03-19 2009-01-21 煤炭科学研究总院 Mining large-scale inverse well drill
CN101571031A (en) * 2009-06-17 2009-11-04 北京中煤矿山工程有限公司 Split type reaming bit for large-diameter raising-boring and assembly method thereof
CN204782750U (en) * 2015-06-05 2015-11-18 北京中煤矿山工程有限公司 To raise boring machine in movable type

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113914777A (en) * 2021-10-14 2022-01-11 中铁工程装备集团有限公司 Raise boring machine with synchronous digging and supporting and construction method thereof
CN113914777B (en) * 2021-10-14 2024-02-06 中铁工程装备集团有限公司 Drilling and supporting synchronous well reversing drilling machine and construction method thereof
CN114263434A (en) * 2021-12-23 2022-04-01 江苏和信石油机械有限公司 Intelligent movable upward raise boring machine equipment
CN114991663A (en) * 2022-05-30 2022-09-02 北京中煤矿山工程有限公司 Directional pilot hole sweeping equipment and process for reverse well screw drilling tool
CN115095285A (en) * 2022-08-26 2022-09-23 桥封科技(成都)有限公司 Pipe column clamping tile

Also Published As

Publication number Publication date
CN106869788B (en) 2018-11-06
CN104989272A (en) 2015-10-21
CN104989272B (en) 2017-05-24

Similar Documents

Publication Publication Date Title
CN104989272B (en) Upward inverse well drilling process
CN103850684B (en) A kind of shaft excavation machine expands the sinking shaft technique of anti-well rig pilot shaft
CN103835661B (en) A kind of local excavation pre support mine shaft rising boring technique
CN104929517B (en) Full-hydraulic drill type pressure relieving equipment with double drill bits and pressure relieving method
CN106593437A (en) Digging, supporting, anchoring and drilling all-in-one fully-mechanized excavating machine
CN105041204A (en) Movable upward raise boring machine
CN106761763A (en) A kind of novel silo development machine and its construction method
CN204782750U (en) To raise boring machine in movable type
CN103850685B (en) A kind of be applicable to having lead the development machine that well creeps into vertical shaft
CN103899319B (en) Pick anchor continuous and automatic fast digging technique
CN203626843U (en) Heading machine suitable for drilling shaft with pilot shaft
CN101302933B (en) Method for developing rock lane comprehensive mechanization developing operation
CN105697018A (en) Shaft excavation construction technology
CN110273413A (en) A kind of efficient construction method of prefabricated pile
CN207453985U (en) A kind of high crag tunnel for the first time lining trolley one lining trolley device
CN216922116U (en) Shaft tunneling cutter head and shaft tunneling equipment
CN104196072A (en) Plateau mountain foundation pit excavation construction device
CN211115999U (en) Rock mining device for penetrating through surrounding rock of broken zone
RU2358107C2 (en) Drilling facility for shaft deepening and method of shaft deepening
CN110821508A (en) Rock mining device and method for penetrating through surrounding rock of broken zone
CN217712553U (en) Shaft drilling machine
CN206448809U (en) Pick, branch, anchor, drill integrated fully-mechanized digging machine
CN106368619A (en) Novel gas drainage drilling rig with self-moving and stabilizing device
CN103016019A (en) Heading and anchoring integrated machine
CN216008502U (en) Hydraulic tunnel drilling trolley excavation construction device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Wang Qiang

Inventor after: Liu Zhiqiang

Inventor after: Tan Jie

Inventor after: Zuo Yongjiang

Inventor after: Wang Hua

Inventor after: Ning Fangbo

Inventor after: Han Bo

Inventor after: Shao Fangyuan

Inventor after: Guo Luchuan

Inventor before: Liu Zhiqiang

Inventor before: Wang Qiang

Inventor before: Tan Jie

Inventor before: Wang Hua

Inventor before: Zuo Yongjiang

Inventor before: Ning Fangbo

Inventor before: Han Bo

Inventor before: Shao Fangyuan

Inventor before: Guo Luchuan

CB03 Change of inventor or designer information