CN206267363U - A kind of pin-connected panel lightweight concrete integral wall - Google Patents

A kind of pin-connected panel lightweight concrete integral wall Download PDF

Info

Publication number
CN206267363U
CN206267363U CN201621360991.5U CN201621360991U CN206267363U CN 206267363 U CN206267363 U CN 206267363U CN 201621360991 U CN201621360991 U CN 201621360991U CN 206267363 U CN206267363 U CN 206267363U
Authority
CN
China
Prior art keywords
keel
precast slab
wall
pin
lightweight concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621360991.5U
Other languages
Chinese (zh)
Inventor
马小平
马庆云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201621360991.5U priority Critical patent/CN206267363U/en
Application granted granted Critical
Publication of CN206267363U publication Critical patent/CN206267363U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of pin-connected panel lightweight concrete integral wall.The utility model belongs to a kind of construction material, is in particular a kind of pin-connected panel lightweight concrete integral wall by assembling steel keel and precast slab.A series of transoms and centre keel are disposed between connection top/ground joist, connect and compose a series of sphere of movements for the elephants frames, the cross section of each keel is all U-shaped, the recessed grain of the side band of precast slab and relative opposite side band tenon, the keel clamping simultaneously with correspondence position of the tenon of adjacent two pieces precast slab and recessed grain, leaves expansion joint between precast slab.The utility model simple structure, construction is simple, and batch production makes, Assembling, is greatly improved operating efficiency, and wall is the characteristics of have insulation, heat-insulated, sound insulation, fire prevention, globality, durability, protection against and mitigation of earthquake disasters, energy-conserving and environment-protective, high-strength light.

Description

A kind of pin-connected panel lightweight concrete integral wall
Technical field
The utility model belongs to a kind of construction material, be in particular one kind by assembling steel keel and precast concrete The pin-connected panel lightweight concrete integral wall of plate.
Background technology
Assembled architecture is the building being assembled in real time in building site with pre-constructed unit.Development assembled architecture is construction side The major transformation of formula, is the important measure for advancing supply side structural reform and new Urbanization Progress, is conducive to economizing on resources The energy, reduction construction pollution, lifting labor productivity and quality safety level, may advantageously facilitate construction industry and information chemical industry Change depth integration, cultivate the new kinetic energy of NPD projects, promote neutralizing superfluous production capacity.In recent years, China try to explore development assembled build Build, but construction method is most, and assembled architecture ratio and large-scale degree are relatively low still based on live one-piece casting, it is green with developing The relevant requirement of color building and advanced mode of construction are compared to also there is a big difference.
Meet the wall of construction at present, they are all made using batch production, and field-installed construction technology is greatly reduced Construction pollution, improve labor productivity and quality safety level.But existing assembling wall is in the wall position of large area Integral wall from top to bottom is all taken, only just has to use split wallboard in specific positions such as door and windows.Integral wall is in itself Structure is excessively single and size is big, and wall fails to be combined as a whole with agent structure, and the longitudinal direction of wall and transverse strength are poor, very Easy cracking damage, metope can not bear heavier suspension member, by disaster(Earthquake, fire, big flood)Destructiveness afterwards is very tight Weight, it is impossible to ensure personal safety as well as the property safety.Up to standard for ease of construction and wall performance in addition, materials for wall uses organic material, wall Internal portion is set to hollow, and poisonous and harmful substance is discharged when can cause fire using organic material, and wall boring is then caused User cannot on the wall hang object.
The content of the invention
The purpose of this utility model is to provide a kind of pin-connected panel lightweight concrete integral wall, and its simple structure, construction is simple, Batch production makes, and Assembling is greatly improved operating efficiency, and wall have insulation, heat-insulated, sound insulation, fire prevention, globality, The characteristics of durability, protection against and mitigation of earthquake disasters, energy-conserving and environment-protective, high-strength light.
The technical solution of the utility model:A series of transoms and centre keel are disposed between connection top/ground joist, are connected Constitute a series of sphere of movements for the elephants frames, the cross section of each keel be all it is U-shaped, the recessed grain of side band of precast slab and it is relative another Side band tenon, the keel clamping simultaneously with correspondence position of the tenon of adjacent two pieces precast slab and recessed grain, concrete Expansion joint is left between native plate.The keel of frame edge anyhow to being individually fixed in above beam slab and wall column, horizontal steel keel Strengthen, the assembled precast slab among U-shaped keel shoe, the steel keel among framework are anyhow to reinforcement precast concrete The overall structure of plate.Wall transversal vertically adds keel, it is ensured that security reliability during wall superelevation overlength.
Later stage filling building is provided between keel frame and the assembled integral wall of precast slab and building body With the post-cast strip of flexible water bonding material.This post-cast strip processes again after wall all assembled completion, and post-cast strip uses tool There is good water proofing property and with flexible adhesives, compensate for the deficiency of wall seam crossing cracking and water proofing property difference.
The card access surface of the recessed grain of adjacent precast slab, tenon and keel is filled with flexible splicing material for building, makes coagulation The recessed grain of native plate, perfect adaptation is reached between tenon and keel.
Fireproof mortar is filled with expansion joint between adjacent precast slab.Wall itself is allowed to have flexible, rear Under the stressing conditions of phase, power is alleviated between seam, does not produce crack.
The outermost layer keel of one-piece keel sphere of movements for the elephants frame are connected to building for correspondence contact by welding, riveting or expansion bolt Build on thing, improve the bulk strength of assembled wall.
The position of precast slab correspondence hydroelectric line, box is provided with embedded hole, is carried out according to hydropower producer figure Assembly, solves the water power fluting of current building and destroys wall performance, and it also avoid indulging in for the duration of live hydropower installation Miss and cost issues.
Technique effect of the present utility model:Spot welding, nailing or expansion are used in concrete structure or steel structure frame By the keel of steel, four-way multiple spot is fixed in main structure bolt anyhow respectively, forms steel framework, and horizontal interlude adds steel Keel processed, it is to avoid the structure of current construction wall is single, globality poor, by disaster(Earthquake, fire, big flood)Destruction afterwards Property is extremely serious.Steel framework carries out the assembly of precast slab between framework after being formed, in the concavo-convex of plate when assembled Face is uniformly coated with adhesives, plate is firmly connected as one with keel;Often fill one block of plate and be all provided with a centre keel, form dragon Onboard, plate is attached to the steel keel rack concrete walls on keel to bone card, has so both reached quick Fabrication wall Efficiency of construction, and the high-strength performance of wall itself is ensure that, wall is accomplished master under the impact for undergoing various external forces Wall is maintained for fall body.Expansion joint is left between precast slab and plate, fire resisting sand is used after deformation of wall is excessive Slurry is filled up, and allows wall itself to have flexibility, and under the stressing conditions in later stage, active force is alleviated between seam, does not produce crack.Simultaneously The wall and beam of this integral wall(Plate)Post (wall)The place for connecting is equipped with post-cast strip, and this post-cast strip is in wall all assembled completions Process again afterwards, filled using with good water proofing property and with flexible adhesives, compensate for wall seam crossing and open Split and the poor deficiency of water proofing property.The precast slab of wall assembly is required according to user(Shiny surface, mat surface, band color, Pattern, lines etc.)And the specific use of wall(Hospital, warehouse etc.)Difference takes personalized customization, wall is reached overlength and prevents The particular/special requirements such as fire, antistatic, extreme heat-insulating sound-insulating, and can be without direct wallpaper of wiping one's face in the decorations in later stage Or swabbing, while solve meet the energy-saving wall of construction more than the unsuitable patch block of 24 meters of height, the problem hurted sb.'s feelings with anti-dropout, And the pattern of grace and the problem of lines can not be made;The size of plate is prefabricated according to scene needs in advance, during this The substantial amounts of waste for reducing situ wet operation material, the later stage is directly according to size buck plate, it is ensured that material makes full use of, also bright Aobvious shortens construction period, saves building cost.In precast slab just according to hydropower producer figure by hydroelectric line, box Son carries out pre-buried, and assembly is carried out further according to hydropower producer figure, solves the water power fluting of current building and destroys wall performance, and The duration that it also avoid live hydropower installation is delayed and cost issues.Precast slab employs insulation, heat-insulated, sound-proofing Inorganic matter that is fabulous and will not burning is made, and allows wall thermal insulating, heat-insulated, sound insulation, fire prevention, energy-conservation to be above traditional structure Make wall and meet the energy-saving wall of construction.Steel largely are used in this wall, while also having dissolved steel product in addition to intensity is strengthened Situation that can be superfluous, when later stage wall need to be removed, steel can also continue to utilize, also alleviate mineral resources exhaustive exploitation and band The crisis of the offspring's resource scarcity for coming.
Brief description of the drawings
Fig. 1 is the utility model overall structure diagram.
Fig. 2 is the utility model precast concrete plate structure schematic diagram.
Fig. 3 is the utility model side cross section structure diagram.
Fig. 4 is the utility model vertical view cutaway drawing.
In figure:Connection top/ground joist 1, transom 2, centre keel 3, agent structure 4, attached column/wall keel 5, precast concrete Plate 6, post-cast strip 7, expansion joint 8, recessed poor 9, tenon 10, swell fixture 11.
Specific embodiment
With reference to each figure, the connection top/ground joist 1 of level is fixed on building top board and floor by swell fixture 11 respectively On, attached column/wall keel 5 are fixed on agent structure 4 by swell fixture 11, form the housing of keel frame, outer framework Anyhow to transom 2 and centre keel 3 is added, sphere of movements for the elephants frame is formd, the cross section of each keel is all U-shaped, the spelling between framework The precast slab 6 of prefabrication is filled, a centre keel 3 is just added therebetween per one piece of precast slab 6 of assembly, Tenon 10 and recessed poor 9 is connected together with the U-shaped three of keel card of correspondence position, be connected as an entirety, the groove 9 of plate and Smear high tensile flexible adhesives on tongue 10 to be perfectly bonded together with keel tongue and groove, so as to reach real entirety Wall construction requirement.The expansion joint 8 set between the plate and plate of precast slab 6 uses fireproof mortar after deformation of wall is excessive Fill up, allow wall itself that there is flexibility, it is effective to alleviate the wall that wall causes under the situation of the effect of various external force Problem of Cracking;The line of rabbet joint can be formed between the keel outer frame side of wall surrounding and precast slab and building body, in the line of rabbet joint Place makes post-cast strip 7, all wall assemblies completely after using with good water proofing property and with the adhesives of flexibility Filled up, compensate for the deficiency of wall seam crossing cracking and water proofing property difference.

Claims (6)

1. a kind of pin-connected panel lightweight concrete integral wall, it is characterized in that:A series of transoms are disposed between connection top/ground joist And centre keel, connecting and composing a series of sphere of movements for the elephants frames, the cross section of each keel is all U-shaped, and the side band of precast slab is recessed Grain and relative opposite side band tenon, the tenon and recessed grain of adjacent two pieces precast slab keel simultaneously with correspondence position Clamping, leaves expansion joint between precast slab.
2. the pin-connected panel lightweight concrete integral wall as described in claim 1, it is characterized in that:Keel frame and precast slab are spelled The post-cast strip of later stage filling flexible water bonding material for building is provided between the integral wall and building body of dress.
3. the pin-connected panel lightweight concrete integral wall as described in claim 2, it is characterized in that:Adjacent precast slab is recessed The card access surface of grain, tenon and keel is filled with flexible splicing material for building.
4. the pin-connected panel lightweight concrete integral wall as described in claim 2, it is characterized in that:Between adjacent precast slab Expansion joint in be filled with fireproof mortar.
5. the pin-connected panel lightweight concrete integral wall as described in claim 2, it is characterized in that:The outermost of one-piece keel sphere of movements for the elephants frame Layer keel are connected on the building of correspondence contact by welding, riveting or expansion bolt.
6. the pin-connected panel lightweight concrete integral wall as described in claim 2, it is characterized in that:In precast slab correspondence water power Pipeline, the position of box are provided with embedded hole.
CN201621360991.5U 2016-12-13 2016-12-13 A kind of pin-connected panel lightweight concrete integral wall Expired - Fee Related CN206267363U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621360991.5U CN206267363U (en) 2016-12-13 2016-12-13 A kind of pin-connected panel lightweight concrete integral wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621360991.5U CN206267363U (en) 2016-12-13 2016-12-13 A kind of pin-connected panel lightweight concrete integral wall

Publications (1)

Publication Number Publication Date
CN206267363U true CN206267363U (en) 2017-06-20

Family

ID=59043908

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621360991.5U Expired - Fee Related CN206267363U (en) 2016-12-13 2016-12-13 A kind of pin-connected panel lightweight concrete integral wall

Country Status (1)

Country Link
CN (1) CN206267363U (en)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107269038A (en) * 2017-07-13 2017-10-20 潘坚萍 One kind carves groove magic square building block system clean operating room and its installation method
CN107859187A (en) * 2017-10-11 2018-03-30 中铁第四勘察设计院集团有限公司 The protection device and waterstop installation method of a kind of expansion joint water stop
CN109440814A (en) * 2018-11-29 2019-03-08 上海市城市建设设计研究总院(集团)有限公司 L-type is bolted prefabricated retaining wall
CN109779098A (en) * 2019-03-23 2019-05-21 厦门大学嘉庚学院 Multi-functional quick assembling menu mode raw-soil board wall system and its installation method
CN110258861A (en) * 2019-06-21 2019-09-20 天津天大建设工程科技有限公司 The prefabricated partition wall of assembled lightgage steel joist sand aerating plate and its construction method
CN110453819A (en) * 2019-08-15 2019-11-15 金螳螂精装科技(苏州)有限公司 A kind of partition wall floor leveling mounting structure of assembled lightgage steel joist
CN110761445A (en) * 2018-07-25 2020-02-07 北新集团建材股份有限公司 Rigid splicing structure, assembled wall body and manufacturing and mounting method
CN110792202A (en) * 2019-11-01 2020-02-14 江苏省华建建设股份有限公司 Surface crack prevention and control process for assembly type partition plate joint
CN110820938A (en) * 2019-11-15 2020-02-21 陕西神州实业有限公司 Steel structure and construction method thereof
CN110984425A (en) * 2019-12-21 2020-04-10 深圳全景空间工业有限公司 Method for composing picture by utilizing staggered wall and staggered wall
CN111502078A (en) * 2020-04-22 2020-08-07 任士猛 Assembled concrete composite wall and construction method thereof
CN111749509A (en) * 2020-06-25 2020-10-09 杭州市电力设计院有限公司 Wrapping type enclosure structure system suitable for assembly type transformer substation
CN111794413A (en) * 2020-07-24 2020-10-20 温州泰乐维工程设计有限公司 Concrete heat-insulation external wall
CN112922193A (en) * 2021-01-26 2021-06-08 昆明吉奥金属容器制造有限公司 Composite partition wall with steel mesh outer mold structure of light steel combined frame and manufacturing method thereof
CN113073750A (en) * 2021-02-23 2021-07-06 广州市创搏装饰工程有限公司 Prefabricated formula combination wall body of commercial building
CN114351894A (en) * 2022-02-22 2022-04-15 江苏兴厦建设工程集团有限公司 BGL heat preservation and sound insulation structure suitable for indoor wall foot wall

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107269038A (en) * 2017-07-13 2017-10-20 潘坚萍 One kind carves groove magic square building block system clean operating room and its installation method
CN107859187A (en) * 2017-10-11 2018-03-30 中铁第四勘察设计院集团有限公司 The protection device and waterstop installation method of a kind of expansion joint water stop
CN110761445A (en) * 2018-07-25 2020-02-07 北新集团建材股份有限公司 Rigid splicing structure, assembled wall body and manufacturing and mounting method
CN109440814A (en) * 2018-11-29 2019-03-08 上海市城市建设设计研究总院(集团)有限公司 L-type is bolted prefabricated retaining wall
CN109779098A (en) * 2019-03-23 2019-05-21 厦门大学嘉庚学院 Multi-functional quick assembling menu mode raw-soil board wall system and its installation method
CN109779098B (en) * 2019-03-23 2024-04-12 厦门大学嘉庚学院 Multifunctional rapid assembled menu type raw soil wallboard system and installation method thereof
CN110258861A (en) * 2019-06-21 2019-09-20 天津天大建设工程科技有限公司 The prefabricated partition wall of assembled lightgage steel joist sand aerating plate and its construction method
CN110453819A (en) * 2019-08-15 2019-11-15 金螳螂精装科技(苏州)有限公司 A kind of partition wall floor leveling mounting structure of assembled lightgage steel joist
CN110792202B (en) * 2019-11-01 2022-05-03 江苏省华建建设股份有限公司 Surface crack prevention and control process for assembly type partition plate joint
CN110792202A (en) * 2019-11-01 2020-02-14 江苏省华建建设股份有限公司 Surface crack prevention and control process for assembly type partition plate joint
CN110820938A (en) * 2019-11-15 2020-02-21 陕西神州实业有限公司 Steel structure and construction method thereof
CN110984425A (en) * 2019-12-21 2020-04-10 深圳全景空间工业有限公司 Method for composing picture by utilizing staggered wall and staggered wall
CN111502078A (en) * 2020-04-22 2020-08-07 任士猛 Assembled concrete composite wall and construction method thereof
CN111749509A (en) * 2020-06-25 2020-10-09 杭州市电力设计院有限公司 Wrapping type enclosure structure system suitable for assembly type transformer substation
CN111794413A (en) * 2020-07-24 2020-10-20 温州泰乐维工程设计有限公司 Concrete heat-insulation external wall
CN112922193A (en) * 2021-01-26 2021-06-08 昆明吉奥金属容器制造有限公司 Composite partition wall with steel mesh outer mold structure of light steel combined frame and manufacturing method thereof
CN113073750A (en) * 2021-02-23 2021-07-06 广州市创搏装饰工程有限公司 Prefabricated formula combination wall body of commercial building
CN114351894A (en) * 2022-02-22 2022-04-15 江苏兴厦建设工程集团有限公司 BGL heat preservation and sound insulation structure suitable for indoor wall foot wall

Similar Documents

Publication Publication Date Title
CN206267363U (en) A kind of pin-connected panel lightweight concrete integral wall
CN103821276B (en) A kind of assembled, modular architectural system
CN104947803B (en) A kind of prefabricated sheet-pile mortise and tenon type connecting node and installation method
CN108049527A (en) Heat insulation prefabricated wall
CN106436893A (en) Fully-prefabricated structure and construction method thereof
CN101368428B (en) Prefabricated component house and its construction method
CN209397804U (en) A kind of assembled steel frame-composite slim floor
CN205475682U (en) Prefabricated light board building structure system of light steel of assembled
CN205153114U (en) Lightweight steel structure modularized residential building
CN104727476B (en) The light body 3D steel bar girders floor plates of assembled and its manufacture method
CN206289884U (en) A kind of heat insulation integrated light roof board of fabricated construction
CN106088459B (en) A kind of prefabricated assembled composite heat preserving external wall wall and preparation method thereof, design method and the steel building comprising the wall
CN103352569A (en) Construction method of integrally-poured architecture building
CN204385959U (en) A kind of light steel-framed composite wall
CN111535488A (en) Prefabricated steel bar truss of assembled exempts from to tear open building carrier plate and cast-in-place and exempt from to strut truss floor
CN205875394U (en) Antidetonation concrete beam column that dry process is connected
CN105421816A (en) Heat-preservation energy-saving assembly type house and construction method
CN205475877U (en) Compound outer thermal insulation walling system of assembled self preservation temperature wallboard
CN101435237A (en) Novel hollow combined board
CN108590025A (en) A kind of bamboo matter green prefabricated buildings and its method of construction
CN209384432U (en) A kind of prefabricated gable and its connecting structure that can be recycled
CN203412312U (en) Thermal-insulating integrated template wallboard construction building
CN103362307A (en) Construction method for modularizing insulation wall boards and pouring integrated house building
CN106759933A (en) Prefabricated post composite beam intermediate layer interior joint connection method in assembled RC frame-shear structures
CN203412143U (en) Wall body structure of integrally poured building house

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170620

Termination date: 20201213

CF01 Termination of patent right due to non-payment of annual fee