CN206220499U - Integrated die for reserved holes of water heating system - Google Patents

Integrated die for reserved holes of water heating system Download PDF

Info

Publication number
CN206220499U
CN206220499U CN201621111227.4U CN201621111227U CN206220499U CN 206220499 U CN206220499 U CN 206220499U CN 201621111227 U CN201621111227 U CN 201621111227U CN 206220499 U CN206220499 U CN 206220499U
Authority
CN
China
Prior art keywords
hole
positioning strip
sleeve
connecting rod
cover plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621111227.4U
Other languages
Chinese (zh)
Inventor
刘春利
李驰
庞东
马国春
汤珅
丁磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Corp Ltd
China Construction First Group the Fifth Construction Co Ltd
Original Assignee
China Construction First Group Corp Ltd
China Construction First Group the Fifth Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Corp Ltd, China Construction First Group the Fifth Construction Co Ltd filed Critical China Construction First Group Corp Ltd
Priority to CN201621111227.4U priority Critical patent/CN206220499U/en
Application granted granted Critical
Publication of CN206220499U publication Critical patent/CN206220499U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model relates to a building engineering field discloses an integrated mould of hole is reserved to hot-water heating. The sleeve of the utility model is a hollow cylinder with an upper opening and a lower opening; the positioning structure comprises an upper positioning strip and a lower positioning strip, the upper positioning strip and the lower positioning strip are positioned in the sleeve and horizontally arranged at positions penetrating through the axis of the sleeve, and the axis positions of the upper positioning strip and the lower positioning strip are respectively provided with a first through hole and a second through hole; the top end of the sleeve is provided with a cover plate, the center of the cover plate is provided with a third through hole, and the third through hole vertically corresponds to the first through hole and the second through hole; the fastening device comprises a connecting rod, the connecting rod sequentially penetrates through the third through hole, the first through hole and the second through hole, a lifting handle is arranged at the top end of the connecting rod, a horizontal upper stop lever and a horizontal lower stop lever are arranged in the middle of the connecting rod, the upper stop lever is located above the cover plate, the lower stop lever is located at the lower portion of the connecting rod, and the bottom end of the connecting rod is self-tapping. The utility model discloses convenient and fast is fixed in the installation, and is little to the template damage, and processing is simple, and construction cost is low.

Description

The integrated mould of water-heating preformed hole
Technical field
The utility model is related to building engineering field, more particularly to a kind of integrated mould of water-heating preformed hole.
Background technology
The sleeve pipe of civil buildings plumbing construction, sleeve pipe is not mounted directly typically, because hanging down between floor when sleeve pipe is installed Straight degree requires that accurately positional accuracy also requires that height, and difficulty of construction is big, and the engineering time is long.According to job site situation, hot-water heating set Uneasy tubing during pipe construction, and the hole for pipeline turnover is opened up on the wall of building in advance, the hole of pipeline is peace The important step in tubulature road, the quality of hole directly influences the installation quality and service life of pipeline.
At present, the method for the reserving hole commonly used in building trade is set in reserved location before concreting Hole mould, conventional mould has following several, and one kind is foam mold, easy to install, low cost, but foam matter is crisp, mixed Solidifying soil is susceptible to skew during pouring, produce error, in later stage form removal, foam is directly smashed to pieces, gone out, easily right Wall is impacted and damaged;One kind is wood mold coupled, long construction period, and not reproducible utilization is easily shifted when pouring, deformed, Using material not environmentally;One kind is bellow mold, easy to use, but single use, not reproducible utilization;One kind is steel Iron class straight barrel type mould, it is reusable, but current such mould needs special device to realize consolidating for mould mostly It is fixed, concrete-pouring template is pierced through using reinforcing bar or this iron wire, not only reinforce loosely, and after form removal, can be left in template Hole, easily causes the side leakage of concrete, causes the consumption of template, reduces the service life of template, reduces construction quality, while The problems such as being unfavorable for the taking-up of mould or can cause structural damage when taking out.
Utility model content
The technical problems to be solved in the utility model is to provide one kind and is arranged and fixed conveniently fast, damages small to template, plus Work is simple, the integrated mould of the low water-heating preformed hole of construction cost.
In order to solve the above technical problems, the utility model is adopted the following technical scheme that:
The integrated mould of the utility model water-heating preformed hole, including sleeve, cover plate, location structure and fastener, The sleeve is the hollow cylinder of a upper and lower opening;The location structure includes upper positioning strip and lower positioning strip, upper positioning strip Horizontally disposed through sleeve shaft core position in sleeve, the shaft core position difference of upper positioning strip and lower positioning strip is located at lower positioning strip Offer first through hole and the second through hole;The sleeve top sets cover plate, and cover plate central offers third through-hole, third through-hole with First through hole and the second through hole are vertically corresponded to;The fastener includes connecting rod, and connecting rod sequentially passes through third through-hole, first Through hole and the second through hole, connecting rod top are provided with handle, and connecting rod center section is provided with horizontal upper lever and the next lever, Upper lever is located at cover plate top, and the next lever is located at connecting rod bottom, and connecting rod bottom is thread tapping.
The integrated mould of the utility model water-heating preformed hole, further, the upper positioning strip and lower positioning strip Two ends are welded and fixed with sleeve lining respectively.
The integrated mould of the utility model water-heating preformed hole, further, the upper positioning strip and lower positioning strip are equal It is band iron.
The integrated mould of the utility model water-heating preformed hole, further, the upper lever and the next lever Spacing distance is the height of sleeve.
The integrated mould of the utility model water-heating preformed hole has the advantages that compared with prior art:
The function such as the fixation of the integrated mould collection sleeve of the utility model water-heating preformed hole, sealing, positioning, spacing with Integrally, thread tapping is located at sleeve shaft core position, stretches out sleeve, can be accurately positioned, it is to avoid the skew of sleeve portion;Prevention rotary lifting handle, Thread tapping enters in template to a certain degree, and the next lever compresses template, stops the rotation, it is to avoid thread tapping enters template deficiency or mistake It is deep, realize that structure is spacing, it is to avoid human error so that operation is easier;After screwing thread tapping, upper lever is pressed on lid On plate, sealing of the cover plate to sleeve is not only realized, it is therefore prevented that concrete may enter in sleeve during concreting, and The fixation of sleeve is realized, mould is fixed without extra equipment, it is easier for installation;After concreting, screw out Thread tapping, holds handle and takes out integrated mould, and convenient disassembly, mould is reusable;Thread tapping institute mark is not solid Determine the left straight-through hole such as reinforcing bar, smaller is damaged to template, do not interfere with reusing for template.
The integrated mould to water-heating preformed hole of the present utility model is described further below in conjunction with the accompanying drawings.
Brief description of the drawings
Fig. 1 is the structural representation of the integrated mould of the utility model water-heating preformed hole.
Reference:
1- sleeves;2- cover plates;The upper positioning strips of 31-;Positioning strip under 32-;The through holes of 41- second;42- third through-holes;5- handles; 6- connecting rods;The upper levers of 71-;72- bottoms lever;8- thread tappings.
Specific embodiment
As shown in figure 1, the integrated mould of the utility model water-heating preformed hole includes sleeve 1, cover plate 2, location structure And fastener, sleeve 1 is the hollow cylinder of a upper and lower opening;Location structure includes upper positioning strip 31 and lower positioning strip 32, Upper positioning strip 31 is located in sleeve 1 with lower positioning strip 32, horizontally disposed through the shaft core position of sleeve 1, and upper positioning strip 31 is located at set 1 top surface of cylinder, positioned at the bottom of sleeve 1, higher than the bottom surface of sleeve 1, upper positioning strip 31 divides lower positioning strip 32 with the two ends of lower positioning strip 32 It is not welded and fixed with the inwall of sleeve 1, the shaft core position of upper positioning strip 31 and lower positioning strip 32 offers first through hole and respectively Two through holes 41, upper positioning strip 31 and lower positioning strip 32 are band iron;The top of sleeve 1 sets cover plate 2, and the center of cover plate 2 offers the 3rd Through hole 42, third through-hole 42 is vertical corresponding with first through hole and the second through hole 41, fastener include connecting rod 6, connecting rod 6 according to It is secondary through third through-hole 42, first through hole and the second through hole 41, the top of connecting rod 6 is provided with handle 5, and the pars intermedia of connecting rod 6 sets up separately There are horizontal upper lever 71 and the next lever 72, upper lever 71 is located at the top of cover plate 2, and the next lever 72 is located at connecting rod 6 The spacing distance of bottom, upper lever 71 and the next lever 72 is the height of sleeve 1, and the bottom of connecting rod 6 is thread tapping 8.
The application method of the integrated mould of the utility model water-heating preformed hole is specific as follows:
Before concreting, integrated mould is placed on the position of the reserving hole of template, prevention rotary lifting handle 5 so that Thread tapping 8 enters template, is submerged by rotation, and the next lever 72 compresses template, stops the rotation, the holddown plate 2 of upper lever 71 And sleeve pipe, the fixation of integrated mould is realized, concreting is then carried out, completion is poured, when concrete reaches some strength Afterwards, prevention rotary lifting handle 5, unclamp thread tapping 8, above handle 5, take out integrated mould, realize that mould is separated with concrete structure, It is reusable after cleaning die surface.
Embodiment described above is only that preferred embodiment of the present utility model is described, not to this practicality New scope is defined, and on the premise of the utility model design spirit is not departed from, those of ordinary skill in the art are to this Various modifications and improvement that the technical scheme of utility model is made, all should fall into the protection of the utility model claims determination In the range of.

Claims (4)

1. the integrated mould of water-heating preformed hole, it is characterised in that:Including sleeve(1), cover plate(2), location structure and fastening Device, the sleeve(1)It is the hollow cylinder of a upper and lower opening;The location structure includes upper positioning strip(31)With lower positioning Bar(32), upper positioning strip(31)With lower positioning strip(32)Positioned at sleeve(1)It is interior through sleeve(1)Shaft core position is horizontally disposed with, on Positioning strip(31)With lower positioning strip(32)Center offer first through hole and the second through hole respectively(41);The sleeve(1)Top End sets cover plate(2), cover plate(2)Center offers third through-hole(42), third through-hole(42)With first through hole and the second through hole (41)Vertical correspondence;The fastener includes connecting rod(6), connecting rod(6)Sequentially pass through third through-hole(42), first through hole With the second through hole(41), connecting rod(6)Top is provided with handle(5), connecting rod(6)Center section is provided with horizontal upper lever (71)With the next lever(72), upper lever(71)Positioned at cover plate(2)Top, the next lever(72)Positioned at connecting rod(6)Bottom, Connecting rod(6)Bottom is thread tapping(8).
2. the integrated mould of water-heating preformed hole according to claim 1, it is characterised in that:The upper positioning strip(31) With lower positioning strip(32)Two ends respectively with sleeve(1)Inwall is welded and fixed.
3. the integrated mould of water-heating preformed hole according to claim 2, it is characterised in that:The upper positioning strip(31) With lower positioning strip(32)It is band iron.
4. the integrated mould of water-heating preformed hole according to claim 3, it is characterised in that:The upper lever(71) With the next lever(72)Spacing distance be sleeve(1)Height.
CN201621111227.4U 2016-10-11 2016-10-11 Integrated die for reserved holes of water heating system Expired - Fee Related CN206220499U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621111227.4U CN206220499U (en) 2016-10-11 2016-10-11 Integrated die for reserved holes of water heating system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621111227.4U CN206220499U (en) 2016-10-11 2016-10-11 Integrated die for reserved holes of water heating system

Publications (1)

Publication Number Publication Date
CN206220499U true CN206220499U (en) 2017-06-06

Family

ID=58783344

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621111227.4U Expired - Fee Related CN206220499U (en) 2016-10-11 2016-10-11 Integrated die for reserved holes of water heating system

Country Status (1)

Country Link
CN (1) CN206220499U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108385971A (en) * 2018-02-11 2018-08-10 中国建筑局(集团)有限公司 Turnover type pipeline sleeve fixing tool on aluminum alloy template and construction method thereof
CN110900797A (en) * 2019-11-22 2020-03-24 湖南建工五建建筑工业化有限公司 Manufacturing process of reserved PC wire pipe wiring hole of PC prefabricated part
CN111502269A (en) * 2020-04-28 2020-08-07 中建三局第三建设工程有限责任公司 Fixing device and fixing method for pipe penetrating of wall pouring mold preformed hole

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108385971A (en) * 2018-02-11 2018-08-10 中国建筑局(集团)有限公司 Turnover type pipeline sleeve fixing tool on aluminum alloy template and construction method thereof
CN110900797A (en) * 2019-11-22 2020-03-24 湖南建工五建建筑工业化有限公司 Manufacturing process of reserved PC wire pipe wiring hole of PC prefabricated part
CN110900797B (en) * 2019-11-22 2021-11-30 湖南建工五建建筑工业化有限公司 Manufacturing process of reserved PC wire pipe wiring hole of PC prefabricated part
CN111502269A (en) * 2020-04-28 2020-08-07 中建三局第三建设工程有限责任公司 Fixing device and fixing method for pipe penetrating of wall pouring mold preformed hole

Similar Documents

Publication Publication Date Title
CN105804283B (en) Full assembly concrete-filled steel tube frame combined shear wall construction
CN103061504B (en) Concrete slab Pipe installing hole to be provided construction mould and construction method
CN206220499U (en) Integrated die for reserved holes of water heating system
CN206784951U (en) Concrete placement floor thickness control device
CN103161313B (en) Connection method of main reinforcement of constructional column of infilled wall and framed girder
CN210289132U (en) Cross-shaped constructional column combined type aluminum alloy template assembly
CN108547383B (en) Hoisting and inclined strut integrated embedded part and using method
CN207177286U (en) Add region mould after fabricated shear wall is reserved
CN210658959U (en) Constructional column concrete placement construction structures of smashing
CN207934446U (en) The branch die clamper of through-flooring pipeline hole concreting
CN110629787A (en) Core mold for pipe gallery pouring and construction method
CN212224611U (en) Shear force wall pouring template reinforcing apparatus
CN206319632U (en) A kind of assembled architecture foundation pole rib precise positioning instrument
CN201268945Y (en) Casing tube reserved pre-burying system
CN207813015U (en) Floor slab preformed hole tool-typed formwork support construction
CN201321721Y (en) Constructional column no-putlog-hole template fixing device in brick and concrete structure construction
CN210316545U (en) Novel cast-in-place area of prefabricated wallboard of assembled is consolidated device
CN207525964U (en) A kind of prefabricated composite wallboard pitched roof system
CN209339334U (en) A kind of Architectural Structure Design wall column foot Quick Connect Kit
CN209353705U (en) What a kind of quick peace was torn open blocks up hole device to pull-type exterior wall
CN219365536U (en) Plugging device for template hole at embedded part of sleeve of basement outer wall
CN108331333B (en) Aluminum alloy formwork inner wall column root plug seam optimization device and construction method thereof
CN206769245U (en) A kind of combination construction component for strengthening Sloping roof construction quality
CN206737420U (en) A kind of concrete collar tie beam or the place's fixing templates that bear down on one
CN214117560U (en) Combined plugging pipe penetrating tool on prefabricated laminated slab and mounting structure thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170606

Termination date: 20201011

CF01 Termination of patent right due to non-payment of annual fee