Turnover type pipeline sleeve fixing tool on aluminum alloy template and construction method thereof Download PDF

Info

Publication number
CN108385971A
CN108385971A CN201810140473.XA CN201810140473A CN108385971A CN 108385971 A CN108385971 A CN 108385971A CN 201810140473 A CN201810140473 A CN 201810140473A CN 108385971 A CN108385971 A CN 108385971A
Authority
CN
China
Prior art keywords
baffle
aluminum alloy
nut
harness cord
alloy mould
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810140473.XA
Other languages
Chinese (zh)
Inventor
王满江
程计武
周梦
王彦辉
毕志刚
胡鹏
刘勇
王瑞珏
严璟
袁宏伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Corp Ltd
Original Assignee
China Construction First Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Corp Ltd filed Critical China Construction First Group Corp Ltd
Priority to CN201810140473.XA priority Critical patent/CN108385971A/en
Publication of CN108385971A publication Critical patent/CN108385971A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G15/00Forms or shutterings for making openings, cavities, slits, or channels
    • E04G15/06Forms or shutterings for making openings, cavities, slits, or channels for cavities or channels in walls of floors, e.g. for making chimneys

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention discloses a rotatable pipeline sleeve fixing tool on an aluminum alloy template and a construction method thereof, wherein the pipeline sleeve fixing tool comprises an embedded sleeve arranged on the template and a fixing part arranged in the embedded sleeve, the fixing part comprises a reinforcing plate, a first nut, a rotating handle, a harness screw, a second nut and a baffle plate, the reinforcing plate is connected with the template through connecting pieces arranged at four corners of the reinforcing plate, and the first nut and the reinforcing plate are welded and fixed; the top of the harness cord screw is fixed with the rotating handle, and the bottom of the harness cord screw is movably connected with the first nut; the baffle is movably arranged on the harness cord screw and is positioned and fixed through second nuts symmetrically arranged on two sides of the baffle. The invention has simple manufacture, low cost, turnover, economy and environmental protection. The worker can conveniently and quickly operate the pipeline sleeve, the concrete defect caused by the fact that the pipeline sleeve is not firmly fixed and the sleeve is repeatedly removed is overcome, meanwhile, the leakage hidden danger caused by the fact that the periphery of the sleeve is blocked is avoided, and the dual effects of quality reduction and efficiency improvement are achieved.

Description

It can turnover type pipe sleeve setting tool and its construction method on aluminum alloy mould plate
Technical field
The present invention relates to can turnover type pipe sleeve setting tool on construction auxiliary equipment field, especially aluminum alloy mould plate And its construction method.
Background technology
Aluminum alloy mould plate applies to the various aspects such as house, industrial premises on a large scale at this stage, in previous work progress In, the preserved pipelines hole part such as toilet, kitchen, piping shaft adds reinforcing bar to be opened in template before concreting using iron wire Hole is fixed, and again removes casing after the completion of concreting.
On the one hand such way be easy to cause the damage of hole part concrete, and installation is complete that rear sleeve adds in subsequent pipeline Gu loosely displacement causes hole to deviate, reaming again is needed to be corrected;On the other hand it is needed during follow-up ground construction pair Casing is fixed and blocks, and easy tos produce risk of leakage herein.
Invention content
The object of the present invention is to provide on aluminum alloy mould plate can turnover type pipe sleeve setting tool and its construction method, The technical issues of solving leakage caused by the inaccurate and follow-up sealing hole of reserved opening position.
To achieve the above object, the present invention adopts the following technical scheme that:
One aspect of the present invention provide aluminum alloy mould plate on can turnover type pipe sleeve setting tool, including be arranged in template 1 On service sleeve 2 and the fixing piece 3 that is arranged in service sleeve 2,
The fixing piece 3 includes securing plate 31, the first nut 32, handle 33, harness cord screw rod 34, the second nut 35 and baffle 36, securing plate 31 is connect by the connector for being arranged in its four corners with template 1, and the first nut 32 and the welding of securing plate 31 are solid It is fixed;
34 top of the harness cord screw rod is fixed with handle 33, and 34 bottom of harness cord screw rod is flexibly connected with the first nut 32;
The baffle 36 is movably arranged on harness cord screw rod 34 and the second nut by being symmetricly set on 36 both sides of baffle 35 positioning are fixed.
Further, it is welded and fixed or is integrally formed between handle 33 and harness cord screw rod 34.
Further, handle 33 is joined end to end by three steel pipes and is welded into triangle.
Further, 34 a diameter of 10mm of harness cord screw rod.
Further, 34 length of harness cord screw rod is more than 2 length of service sleeve at least 200mm.
Further, baffle 36 is band iron;36 length of baffle is more than 2 diameter of service sleeve at least 100mm.
Further, 35 model M12 of the first nut 32 and the second nut.
Further, securing plate 31 is the band iron of size 40mm*40mm*4mm;First nut 32 is centrally positioned in securing plate 31 On.
Further, connector is dovetail nail or rivet.
Another aspect of the present invention provide on a kind of above-mentioned aluminum alloy mould plate can turnover type pipe sleeve setting tool construction Method is as follows:
Step 1:Pre-buried pipeline location is determined according to site operation drawing, and draws pipeline center's point;
Step 2:The processing of fixing piece 3;
S1:The processing of securing plate 31;Securing plate 31 using 40mm*40mm*4mm band iron and position welds the in its center One nut 32;
S2:The processing of baffle 36;The diameter for measuring service sleeve 2 cuts baffle 36, and in 36 center perforating of baffle, Second nut 35 is respectively arranged in 36 both sides of baffle, and baffle 36 is fixed on harness cord screw rod 34 by two the second nuts 35 On, become an entirety;
S3:Assembling;It makes handle 33 to be welded and fixed 34 top of itself and harness cord screw rod, 34 bottom of harness cord screw rod screws in the In one nut 32;
Step 3:The installation of service sleeve 2, fixing piece 3 and aluminum alloy mould plate 1 is fixed;
Step 4:Casting concrete, after its solidification, rotating handle 33 by baffle 36 attached on harness cord screw rod 34 and Second nut 35 takes out, and securing plate 31 is stayed on aluminum alloy mould plate 1, had enough to meet the need with aluminum alloy mould plate 1.
Beneficial effects of the present invention are embodied in:
(1) on aluminum alloy mould plate of the present invention can turnover type pipe sleeve setting tool and its construction method, provide one kind Hole pipe sleeve specific purpose tool makes simply, of low cost, easy to use, and can have enough to meet the need, economic and environment-friendly.By pipeline Casing is once fixed, primary to construct, and avoids later-stage secondary from modifying and block, and setting tool can be used in turn, recycling rate of waterused Height reaches the double effects of quality and cost efficiency.
(2) on aluminum alloy mould plate of the present invention can turnover type pipe sleeve setting tool and its construction method, operation rise It is next convenient and efficient, solve pipe sleeve because of fixed concrete defect loosely and caused by repetition dismounting casing, while also keeping away Exempt from the hidden leakage defect caused by casing surrounding blocks, reaches the double effects of quality and cost efficiency.In use, only needing Once construct when structure construction, casing one-pass molding after the completion of concreting, avoid later stage hole displacement reaming finishing and Casing surrounding blocks caused hidden danger of quality.
The present invention has stronger universality, can be widely applied in entrance construction.
Other features and advantages of the present invention will be illustrated in the following description, and partly becomes from specification It is clear that understand through the implementation of the invention.The main object of the present invention and further advantage can be by specification, power Specifically noted scheme is realized and is obtained in sharp claim.
Description of the drawings
The present invention will be further described in detail below in conjunction with the accompanying drawings.
Fig. 1 is rotating handle structural schematic diagram of the present invention.
Fig. 2 is vertical section structure schematic diagram of the present invention.
Fig. 3 is securing plate schematic diagram of the present invention.
Fig. 4 is baffle schematic diagram of the present invention.
Fig. 5 is usage state diagram of the present invention.
Reference numeral:1- templates, 2- service sleeves, 3- fixing pieces, 31- securing plates, the first nuts of 32-, 33- hands Handle, 34- harness cord screw rods, the second nuts of 35-, 36- baffles.
Specific implementation mode
As shown in Fig. 2, one aspect of the present invention provide on aluminum alloy mould plate can turnover type pipe sleeve setting tool, including set The fixing piece 3 set the service sleeve 2 in template 1 and be arranged in service sleeve 2, the fixing piece 3 include securing plate 31, First nut 32, handle 33, harness cord screw rod 34, the second nut 35 and baffle 36, securing plate 31 is by being arranged in its four corners Connector (connector can be dovetail nail or rivet) connect with template 1, the first nut 32 is welded and fixed with securing plate 31.The One nut 32 and 35 model of the second nut can be M12.As shown in figure 3, securing plate 31 can be for size 40mm*40mm*4mm's Band iron.
As shown in Figure 1, the top of harness cord screw rod 34 is fixed with handle 33, be welded and fixed between handle 33 and harness cord screw rod 34 or Person is integrally formed.Handle 33 can be joined end to end by three steel pipes and be welded into triangle.34 bottom of harness cord screw rod and the first nut 32 flexible connections, 34 a diameter of 10mm of harness cord screw rod, 34 length of harness cord screw rod have to be larger than 2 length of service sleeve at least 200mm. As shown in figure 4, the baffle 36 is movably arranged on harness cord screw rod 34 and the second spiral shell by being symmetricly set on 36 both sides of baffle 35 positioning of mother is fixed, and baffle 36 can be band iron;36 length of baffle is more than 2 diameter of service sleeve at least 100mm.
As shown in figure 5, can turnover type pipe sleeve setting tool on the above-mentioned aluminum alloy mould plate of another aspect of the present invention offer Construction method, be as follows:
Step 1:Pre-buried pipeline location is determined according to site operation drawing, and draws pipeline center's point;
Step 2:The processing of fixing piece 3;
S1:The processing of securing plate 31;Securing plate 31 uses the band iron baffle 36 of 40mm*40mm*4mm and in its center position Weld first nut of M12 32;
S2:The processing of baffle 36;The diameter for measuring service sleeve 2 cuts baffle 36, and in 36 center perforating of baffle, Second nut 35 is respectively arranged in 36 both sides of baffle, and baffle 36 is fixed on harness cord screw rod 34 by two the second nuts 35 On;
S3:Assembling;It makes handle 33 to be welded and fixed it in the top of harness cord screw rod 34,34 bottom of harness cord screw rod screws in the In one nut 32;
Step 3:The installation of service sleeve 2, fixing piece 3 and aluminum alloy mould plate 1 is fixed;
Step 4:Casting concrete, after its solidification, handle 33 is by baffle 36 attached on harness cord screw rod 34, the second spiral shell Mother 35 takes out, and securing plate 31 is stayed on aluminum alloy mould plate 1, had enough to meet the need with template 1.
Embodiment 1:
1, prepare according to above-mentioned stepsHarness cord screw rod 34, M12 nuts, 40 × 4 band irons,The materials such as dovetail screw;
2, it is processed, is installed according to the specific size of each component;
3, by the band iron of 40mm*40mm*4mm and M12 nut one side border spot welding, cut into after the completion of welding 40mm × 40mm squares securing plate 31 is used according to pipeline center position in band iron quadrangleDrill bit band iron and aluminium film plate are beaten simultaneously Eye, and useSecuring plate 31 and aluminum alloy pattern plate 1 are fixed dovetail screw;
4, according to 2 diameter of service sleeve in the 36 center perforating of 40mm*4mm band irons baffle, and on band iron baffle 36 Under one M12 nut of each installation and withHarness cord screw rod 34 is fixed that (34 length of harness cord screw rod has to be larger than service sleeve 2 At least 200mm, 36 length of baffle have to be larger than the position of band iron baffle 36 on 2 diameter 100mm of service sleeve and harness cord screw rod 34 The second nut 35 installed by about 36 band iron baffle is adjusted).It is welded using same material at 34 top of harness cord screw rod Inverted triangle, in order to construct.Entire harness cord screw rod 34 is twisted with 1 fixing piece 3 of aluminum alloy pattern plate with service sleeve 2 together after processing is completed Tightly.
5, the length of the length of harness cord screw rod 34, band iron baffle 36 can be according to 2 height of 2 diameter of service sleeve and service sleeve It is determined, in order to construct.For the present invention to toilet, the installation of air-conditioning plate seal ring is equally effective.
Present invention is generally directed to pipe built-in casing type have but be not limited to:
Cast iron pipe:DN100, DN125, DN150, DN200;
Seal ring:
The foregoing is merely the preferable specific implementation modes of the present invention, but scope of protection of the present invention is not limited thereto, The change or replacement that any one skilled in the art is expected in the technical scope disclosed by the present invention should all be contained Lid is within protection scope of the present invention.

Claims (10)

1. can turnover type pipe sleeve setting tool on aluminum alloy mould plate, it is characterised in that:It is pre- in template (1) including being arranged Bushing burying (2) and the fixing piece (3) being arranged in service sleeve (2),
The fixing piece (3) includes securing plate (31), the first nut (32), handle (33), harness cord screw rod (34), the second nut (35) and baffle (36), securing plate (31) is connect by the connector for being arranged in its four corners with template (1), the first nut (32) it is welded and fixed with securing plate (31);
Fixed with handle (33) at the top of the harness cord screw rod (34), harness cord screw rod (34) bottom is movable even with the first nut (32) It connects;
The baffle (36) is movably arranged on harness cord screw rod (34) and the second spiral shell by being symmetricly set on baffle (36) both sides Female (35) positioning is fixed.
2. can turnover type pipe sleeve setting tool on aluminum alloy mould plate as described in claim 1, which is characterized in that handle (33) it is welded and fixed or is integrally formed between harness cord screw rod (34).
3. can turnover type pipe sleeve setting tool on aluminum alloy mould plate as described in claim 1, which is characterized in that handle (33) it is joined end to end by three steel pipes and is welded into triangle.
4. can turnover type pipe sleeve setting tool on aluminum alloy mould plate as described in claim 1, which is characterized in that harness cord spiral shell Bar (34) a diameter of 10mm.
5. can turnover type pipe sleeve setting tool on aluminum alloy mould plate as described in claim 1, which is characterized in that harness cord spiral shell Bar (34) length is more than service sleeve (2) length at least 200mm.
6. can turnover type pipe sleeve setting tool on aluminum alloy mould plate as described in claim 1, which is characterized in that baffle (36) it is band iron;Baffle (36) length is more than service sleeve (2) diameter at least 100mm.
7. can turnover type pipe sleeve setting tool on aluminum alloy mould plate as described in claim 1, which is characterized in that the first spiral shell Mother (32) and the second nut (35) model M12.
8. can turnover type pipe sleeve setting tool on aluminum alloy mould plate as described in claim 1, which is characterized in that securing plate (31) band iron for being size 40mm*40mm*4mm;First nut (32) is centrally positioned in securing plate (31).
9. can turnover type pipe sleeve setting tool on aluminum alloy mould plate as described in claim 1, which is characterized in that connector For dovetail nail or rivet.
10. on the aluminum alloy mould plate as described in any one of claim 1-9 can turnover type pipe sleeve setting tool apply Work method, which is characterized in that be as follows:
Step 1:Pre-buried pipeline location is determined according to site operation drawing, and draws pipeline center's point;
Step 2:The processing of fixing piece (3);
S1:The processing of securing plate (31);Securing plate (31) using 40mm*40mm*4mm band iron and position welds the in its center One nut (32);
S2:The processing of baffle (36);The diameter for measuring service sleeve (2) cuts baffle (36), and in baffle (36) center Second nut (35) is respectively arranged in perforating, baffle (36) both sides, and by two the second nuts (35) that baffle (36) are fixed On harness cord screw rod (34), an entirety is become;
S3:Assembling;It makes handle (33) to be welded and fixed itself and harness cord screw rod (34) top, harness cord screw rod (34) bottom screws in In first nut (32);
Step 3:The installation of service sleeve (2), fixing piece (3) and aluminum alloy mould plate (1) is fixed;
Step 4:Casting concrete, after its solidification after, rotating handle (33) by baffle (36) attached on harness cord screw rod (34) with And second nut (35) take out, securing plate (31) stays on aluminum alloy mould plate (1), had enough to meet the need with aluminum alloy mould plate (1).
CN201810140473.XA 2018-02-11 2018-02-11 Turnover type pipeline sleeve fixing tool on aluminum alloy template and construction method thereof Pending CN108385971A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810140473.XA CN108385971A (en) 2018-02-11 2018-02-11 Turnover type pipeline sleeve fixing tool on aluminum alloy template and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810140473.XA CN108385971A (en) 2018-02-11 2018-02-11 Turnover type pipeline sleeve fixing tool on aluminum alloy template and construction method thereof

Publications (1)

Publication Number Publication Date
CN108385971A true CN108385971A (en) 2018-08-10

Family

ID=63068671

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810140473.XA Pending CN108385971A (en) 2018-02-11 2018-02-11 Turnover type pipeline sleeve fixing tool on aluminum alloy template and construction method thereof

Country Status (1)

Country Link
CN (1) CN108385971A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090037721A (en) * 2007-10-12 2009-04-16 고동욱 Device for fixing the sleeve for building
KR20100009320U (en) * 2009-03-13 2010-09-27 홍의삼 Penetration sleeve for piping
CN202202561U (en) * 2011-07-13 2012-04-25 中建一局集团第三建筑有限公司 Construction sleeve for reserved hole of floor slab
CN205669314U (en) * 2016-05-04 2016-11-02 北京住总第三开发建设有限公司 A kind of top board preformed hole construction mould
CN106468075A (en) * 2015-08-18 2017-03-01 五冶集团上海有限公司 A kind of toilet pipe sleeve fixing meanss
CN106760514A (en) * 2017-01-23 2017-05-31 中国华冶科工集团有限公司 Downcomer hole to be provided service sleeve and built-in process
CN206220499U (en) * 2016-10-11 2017-06-06 中建一局集团第五建筑有限公司 Integrated die for reserved holes of water heating system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090037721A (en) * 2007-10-12 2009-04-16 고동욱 Device for fixing the sleeve for building
KR20100009320U (en) * 2009-03-13 2010-09-27 홍의삼 Penetration sleeve for piping
CN202202561U (en) * 2011-07-13 2012-04-25 中建一局集团第三建筑有限公司 Construction sleeve for reserved hole of floor slab
CN106468075A (en) * 2015-08-18 2017-03-01 五冶集团上海有限公司 A kind of toilet pipe sleeve fixing meanss
CN205669314U (en) * 2016-05-04 2016-11-02 北京住总第三开发建设有限公司 A kind of top board preformed hole construction mould
CN206220499U (en) * 2016-10-11 2017-06-06 中建一局集团第五建筑有限公司 Integrated die for reserved holes of water heating system
CN106760514A (en) * 2017-01-23 2017-05-31 中国华冶科工集团有限公司 Downcomer hole to be provided service sleeve and built-in process

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王宗昌 等: "实用建筑施工技术", vol. 2, 29 February 2004, 中国计划出版社, pages: 419 *

Similar Documents

Publication Publication Date Title
CN208438549U (en) A kind of beam molding die
CN205875736U (en) Sectional type shear force wall is to drawing sealing screw
CN108385971A (en) Turnover type pipeline sleeve fixing tool on aluminum alloy template and construction method thereof
CN106013763A (en) Flat iron fastener type external scaffold wall connecting piece
CN207333976U (en) Novel flexible water-proof sleeve pipe
CN202209046U (en) Wall connecting rod for external scaffold
CN201581640U (en) Efficient waterproof opposite-pulling screw
CN206942120U (en) A kind of pre-embedded device of builder's jack
CN106677529A (en) Structure and construction method of reserved hole PVC sleeve mould
CN206765041U (en) A kind of mounting structure of the reserving hole in prefabricated concrete elements
CN204983655U (en) Reserved pipe cover of floor poling hole
CN205077874U (en) Unrestrained controlling means of control cloth pump pipe concrete
CN103866770B (en) A kind of combined steel formwork and mounting method thereof
CN206693618U (en) A kind of simple lintel cast-in-place mould
CN204034406U (en) A kind of piping filter
CN208067606U (en) Boiler's tube-plate anti-deformation tool
CN207027325U (en) A kind of special dismantling device of concrete pipe sheet die end mould location lug
CN206220466U (en) A kind of new type scaffold wall-connecting piece structure
CN205777444U (en) A kind of wall-connecting piece
CN207343958U (en) A kind of die assembly for grounded screen aluminum weld
CN203022346U (en) Three-section-head type water stop threaded rod
CN208280577U (en) A kind of adjustable built-in fitting
CN206554514U (en) A kind of building iron template fixator
CN207119643U (en) A kind of stainless steel tube threeway makes practical pipe extractor
CN207110474U (en) Repeatedly usable's built-in box supporting tool of shear force wall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination