CN206205797U - Oil and gas reservoir type gas storage injection and production well completion pipe string - Google Patents

Oil and gas reservoir type gas storage injection and production well completion pipe string Download PDF

Info

Publication number
CN206205797U
CN206205797U CN201621057852.5U CN201621057852U CN206205797U CN 206205797 U CN206205797 U CN 206205797U CN 201621057852 U CN201621057852 U CN 201621057852U CN 206205797 U CN206205797 U CN 206205797U
Authority
CN
China
Prior art keywords
ball
packer
casing
production
well
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621057852.5U
Other languages
Chinese (zh)
Inventor
张强
曾晓辉
朱广海
宋桂华
王育新
刘在同
李国韬
刘长军
李怀文
葛党科
杨希军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Petrochina Co Ltd
Original Assignee
Petrochina Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Petrochina Co Ltd filed Critical Petrochina Co Ltd
Priority to CN201621057852.5U priority Critical patent/CN206205797U/en
Application granted granted Critical
Publication of CN206205797U publication Critical patent/CN206205797U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The utility model discloses an oil gas reservoir type gas storage annotates and adopts well completion tubular column belongs to the well completion equipment field. The completion string includes: the device comprises an oil pipe, a downhole safety valve, a sliding sleeve, a packer, a production casing, a technical casing, a surface casing, a soluble ball and a ball seat. The underground safety valve, the sliding sleeve, the packer and the ball seat are communicated in sequence from top to bottom through oil pipes to form a tubular column main body. And the top of the underground safety valve is provided with an oil pipe, and the oil pipe is connected to a wellhead of the injection and production well. The pipe column main body is suspended on the inner wall of the production casing through the packer, the technical casing is sleeved on the outer side of the production casing, and the surface casing is sleeved on the outer side of the technical casing. The ball seat middle part is provided with soluble ball looks adaptation to the ball groove of upper and lower intercommunication, soluble ball gets into the tubular column main part from the oil pipe of well head, and falls into ball seat interior shutoff ball groove. The well completion pipe column can avoid mechanical abrasion of a production casing pipe, prevent packer packing failure, is convenient to use, and is suitable for large-scale popularization and application.

Description

A kind of oil-gas reservoir type gas storage production-injection well completion tubing string
Technical field
The utility model is related to completion equipment field, more particularly to a kind of oil-gas reservoir type gas storage production-injection well completion tubing string.
Background technology
Natural gas from underground mining out after, it is necessary to be delivered to ground spherical tank or underground natural gas storage tank carry out it is centrally stored, with Just taken when needed.Oil-gas reservoir type gas storage, because the permeability and porosity of its gas-bearing reservoir are moderate, is difficult gas leakage, fortune It is reliable and stable during row and cheap, so being widely used.And in order to injecting gas in gas-bearing reservoir, or Natural gas is produced and utilized from gas-bearing reservoir, there is provided a kind of completion tubular column for being easy to gas injection and gas production is very necessary 's.
Prior art provides a kind of oil-gas reservoir type gas storage completion tubular column, and the completion tubular column includes:Surface pipe, technology Sleeve pipe, production casing, safety valve, sliding sleeve, packer, ball sealer, shearing ball seat, oil pipe.Safety valve, sliding sleeve, packer, shearing Ball seat is sequentially connected by oil pipe, forms tubular body.Shearing ring is provided with shearing ball seat, shearing ring is fixed by a pin to Shear on the inwall of ball seat.Slips is provided with the side wall of packer, packer is fixed in production casing by slips On wall, protective casing, surface pipe are successively sleeved on the outside of production casing successively, form completion tubular column.It is when using, this is complete Enter under well casing post in injection-production well, safety valve is connected to injection-production well mouthful by oil pipe, and shear balls seat is located at the upper of gas-bearing reservoir Side.To pressure fluid is injected in oil pipe, packer is set to carry out packing operation to oil jacket annular space.After packing operation is finished, to tubing string master Ball sealer is put into body to suppress shearing ball seat, now the pin in shearing ball seat is cut, and ball sealer falls into note with shearing ring Adopt the shaft bottom of well.Completion tubular column is in unimpeded normality, so that natural gas can smoothly inject or discharge gas-bearing reservoir, realizes natural The storage of gas and take.
Designer has found that prior art at least has following technical problem:
The completion tubular column that prior art is provided, when the sealing of shearing ball seat and ball sealer is released, shears ball seat and sealing Ball directly drops and enters shaft bottom, and unexpected pressure release, easily makes the slips of packer along production casing in the moment completion tubular column for dropping Move up, so as to cause mechanical damage to the inwall of production casing, and the packing failure of packer is easily caused, after being unfavorable for Continuous gas injection and the carrying out of gas production process.
Utility model content
The utility model embodiment technical problem to be solved is, there is provided one kind can avoid production casing machinery Wear and tear, prevent packer packing every the oil-gas reservoir type gas storage production-injection well completion tubing string of failure, concrete technical scheme is as follows:
The utility model embodiment provides a kind of oil-gas reservoir type gas storage production-injection well completion tubing string, the completion tubular column bag Include:Multiple-tubing string, storm valve, sliding sleeve, packer, production casing, protective casing, surface pipe, solvable ball and ball seat.Institute State storm valve, the sliding sleeve, the packer, the ball seat from top to bottom sequentially to be connected by the oil pipe, and formed Tubular body, and storm valve top is provided with the oil pipe, the oil pipe is connected to the well head of injection-production well.By institute State packer the tubular body is suspended on the inwall of the production casing, and the protective casing is sleeved on the life Is produced from the outside of sleeve pipe, the surface pipe is sleeved on the outside of the protective casing.Ball seat middle part be provided with it is described can Molten ball is adapted, and the ball groove for connecting up and down.The solvable ball enters the tubular body from the oil pipe of the well head, and falls Enter the closure ball groove in the ball seat.
Specifically, preferably, the completion tubular column also includes upper flowing pipe nipple and lower flowing pipe nipple, the upper flowing is short The top of section is connected and turns on the oil pipe, and bottom is connected and turns on the top of the storm valve, the lower flowing The top of pipe nipple is connected and turns on the bottom of the storm valve, and bottom is connected and turns on another oil pipe.Specifically Ground, preferably, the sidewall thickness of the flowing pipe nipple is 14.5-17.5mm.
Specifically, preferably, the coboundary 50-60m of the distance from bottom gas-bearing reservoir of the ball seat.
Specifically, preferably, the bottom of the production casing is located at below the gas-bearing reservoir lower boundary at 80-100m.
Specifically, preferably, the packer is permanent packer.
The beneficial effect brought of technical scheme that the utility model embodiment is provided is:
The oil-gas reservoir type gas storage production-injection well completion tubing string that the utility model embodiment is provided, by will be of the prior art Conventional seals ball replaces with solvable ball, and shearing ball seat is replaced with into the ball seat being engaged with solvable ball, is noted by oil pipe Enter well killing fluid, solvable ball is dissolved in the presence of the monovalence such as KCl, NaCl or divalent metal salt in the well killing fluid, so that without beat Make tubular body gradually depressurization by falling ball seat, tubular body is connected with gas-bearing reservoir by the ball groove of ball seat, with reality Existing gas injection and gas production process are smoothed out.After solvable ball, tubular body gradually pressure release will not make the slips of packer dash forward So move up so that damage of the tube wall of production casing from packer slip, and ensure that packer set effect, Being easy to the safety of follow-up gas injection and gas production process is carried out.Meanwhile, with solvable ball coordinate ball seat set packer when without using The implements such as steel wire, so as to reduce operating risk, improve safety in production coefficient.It can be seen that, the utility model embodiment is carried The oil-gas reservoir type gas storage production-injection well completion tubing string of confession, the mechanical wear that can avoid production casing are, the packing for preventing packer Failure, and it is easy to use, it is suitable to large-scale promotion application.
Brief description of the drawings
In order to illustrate more clearly of the technical scheme in the utility model embodiment, below will be to needed for embodiment description The accompanying drawing to be used is briefly described, it should be apparent that, drawings in the following description are only some realities of the present utility model Example is applied, for those of ordinary skill in the art, on the premise of not paying creative work, can also be according to these accompanying drawings Obtain other accompanying drawings.
Fig. 1 is the structural representation of the oil-gas reservoir type gas storage production-injection well completion tubing string that the utility model embodiment is provided.
Reference is represented respectively:
1 oil pipe,
2 storm valves,
3 sliding sleeves,
4 packers,
5 production casings,
6 protective casings,
7 surface pipes,
8 solvable balls,
9 ball seats,
Pipe nipple is flowed on 10,
11 times flowing pipe nipples,
12 gas-bearing reservoirs.
Specific embodiment
To make the purpose of this utility model, technical scheme and advantage clearer, below will be to the utility model embodiment party Formula is described in further detail.
The utility model embodiment provides a kind of oil-gas reservoir type gas storage production-injection well completion tubing string, as shown in Figure 1, should Completion tubular column includes:Multiple-tubing string 1, storm valve 2, sliding sleeve 3, packer 4, production casing 5, protective casing 6, surface pipe 7th, solvable ball 8, ball seat 9.Wherein, storm valve 2, sliding sleeve 3, packer 4, ball seat 9 are sequentially connected by oil pipe 1, and are formed Tubular body, and the top of storm valve 2 is provided with oil pipe 1, oil pipe 1 is connected to the well head of injection-production well.To be managed by packer 4 Post main body is suspended on the inwall of production casing 5, and protective casing 6 is sleeved on the outside of production casing 5,7 sets of surface pipe Mounted in the outside of protective casing 6.The middle part of ball seat 9 is provided with and is adapted with solvable ball 8, and the ball groove for connecting up and down, solvable ball 8 Enter tubular body from the oil pipe 1 of well head, and fall into closure ball groove in ball seat 9.
The oil-gas reservoir type gas storage production-injection well completion tubing string that the utility model embodiment is provided, by will be of the prior art Conventional seals ball replaces with solvable ball 8, and shearing ball seat 9 is replaced with into the ball seat 9 being engaged with solvable ball 8, by oil pipe 1 Middle injection well killing fluid, makes solvable ball 8 be dissolved in the presence of the monovalence such as KCl, NaCl or divalent metal salt in the well killing fluid, so that nothing Make tubular body gradually depressurization by ball seat 9 need to be destroyed, tubular body is connected with gas-bearing reservoir 12, with realize gas injection and Gas production process is smoothed out.After solvable ball 8, tubular body gradually pressure release will not make the slips of packer 4 upward suddenly It is mobile, so that damage of the tube wall of production casing 5 from the slips of packer 4, and the effect that sets of packer 4 is ensure that, just Carried out in the safety of follow-up gas injection and gas production process.Meanwhile, with solvable ball 8 coordinate 9 set packer 4 of ball seat when without using The implements such as steel wire, so as to reduce operating risk, improve safety in production coefficient.It can be seen that, the utility model embodiment is carried The oil-gas reservoir type gas storage production-injection well completion tubing string of confession, the mechanical wear that can avoid production casing 5 are, the envelope for preventing packer 4 It is every failure and easy to use, it is suitable to large-scale promotion application.
Wherein, storm valve 2, sliding sleeve 3, packer 4, ball seat 9 are sequentially connected by oil pipe 1, and are led between each part Air-tight seal screw joint connection is crossed, tubular body is formed, storm valve 2 is connected to the well head of injection-production well by oil pipe 1.Underground Safety valve 2 is near the position of well head, so that being closed in time during unsafe condition occurs in injection-production well in storm valve 2, is protected Demonstrate,prove the safety of injection-production well.And packer 4, sliding sleeve 3 and the ball seat 9 then middle and lower part in injection-production well, and near the position of reservoir, with It is easy to inject natural gas and gathered.Meanwhile, be successively set with tubular body outer wall production casing 5, protective casing 6, Surface pipe 7, is protected by each layer sleeve pipe to tubular body, it is ensured that tubular body gas injection and gas production process smoothly enter OK.
Swiftly flowing gas causes erosion, this practicality to storm valve 2 in tubing string during in order to avoid gas production and gas injection The oil-gas reservoir type gas storage production-injection well completion tubing string that new embodiment is provided also includes upper flowing pipe nipple 10 and lower flowing pipe nipple 11, The top of upper flowing pipe nipple 10 is connected and turns on the oil pipe 1 on top, and bottom is connected and turns on the top of storm valve 2, The top of lower flowing pipe nipple 11 is connected and turns on the bottom of storm valve 2, and bottom is connected and turns on another oil pipe 1, with Top and bottom to storm valve 2 are protected, and prevent the erosion of gas from including causing to damage to storm valve 2.On Flowing pipe nipple 10 and lower flowing pipe nipple 11 are actually tubing nipple, but its side wall is thicker, generally 14.5-17.5mm, example Such as it is 14.5mm, 15mm, 16mm, 17.5mm.Therefore, the gas for flowing up and down erosion first is to upper flowing pipe nipple 10 or flows down Dynamic pipe nipple 11, it is to avoid coup injuries of the flowing gas to storm valve 2, extends the service life of storm valve 2.
Specifically, for the ease of gas injection and the carrying out of gas production process, production casing 5 is longitudinally through gas-bearing reservoir 12, and production The bottom of sleeve pipe 5 is located at below the lower boundary of gas-bearing reservoir 12 at 80-100m, i.e., the depth ratio gas-bearing reservoir 12 where the bottom of production casing 5 Lower boundary it is deeper, think that enough spaces are reserved in shaft bottom operation.Meanwhile, the bottom of tubular body, i.e. position where ball seat 9 Put, apart from the coboundary 50-60m of gas-bearing reservoir 12, in order to setting for packer 4, it is to avoid packer 4 is to gas injection and gas production process Produce obstruction.
Specifically, the packing used in the oil-gas reservoir type gas storage production-injection well completion tubing string that the utility model embodiment is provided Device 4 is permanent packer, and slips is provided with the side wall of the packer 4, and when setting, slips firmly grasps the inwall of production casing 5, Annular space between tubular body and production casing 5 is divided into by two parts separate up and down by packer 4, in upper part Injection annular protective liquid, to avoid the corrosion of each part in production casing 5 and tubular body.If cut using of the prior art Cut seat sets to packer 4, and when needing to unload shearing ball seat, shearing ball seat drops suddenly, and tubular body inside is prominent Right pressure release, forms a upward reaction force, easily moves up slips, causes the packing of packer 4 to fail, while card Watt can also scratch the inwall of production casing 5.And after using solvable ball 8, ball seat 9 enters injection-production well with completion tubular column, solvable ball 8 with Ball seat 9 is engaged, and the ball groove of ball seat 9 is divided into interconnected upper and lower part, and top is in concave shape, is mutually fitted with solvable ball 8 Match somebody with somebody, after solvable ball 8 falls into the top of ball groove, the closure of oil pipe can be realized, in order to setting for packer 4.Ball groove bottom is Cylinder, and middle part is provided with through hole, the diameter of through hole is less than the diameter of solvable ball 8, during so that solvable ball 8 just falling into ball groove, Ball groove can be blocked.And the monovalence such as KCl, NaCl or divalent metal salt can gradually dissolve solvable ball 8 in well killing fluid, so that The upper and lower part of ball groove is connected, oil pipe 1 is connected with injection-production well bottom.The process is more gentle so that tubing string master Pressure in body can gradually release, and so as to avoid the movement of slips, it is therefore prevented that the mechanical damage of production casing 5, make packing The packing effect of device 4 is ensured.
Wherein, the solvable ball 8 that the utility model embodiment is used is the medicine ball being made up of metallic composite, its density It is smaller than aluminium, but intensity is suitable with steel, therefore with relatively low proportion and shear strength higher.The size of solvable ball 8 Can be adjusted according to the type of the operating mode of injection-production well and completion fluid with dissolution velocity, the highest of general solvable ball 8 and ball seat 9 is held Pressure energy power is 70MPa, 177 DEG C of heatproof.The solvable ball 8 is dissolvable in water in the aqueous solution of slaine, and its dissolution velocity receives the aqueous solution The influence of type, the solution temperature of middle metal cation etc., 3% Klorvess Liquid is can obtain most preferable rate of dissolution molten Liquid.Meanwhile, solution temperature is higher, and the rate of dissolution of solvable ball 8 is bigger.Before Specific construction operation is carried out using solvable ball 8, Dissolution experiment can be carried out using well killing fluid, to determine the ginseng such as the injection rate of dissolution velocity, time and well killing fluid of solvable ball 8 Number, then carries out practice of construction operation again.Solvable ball 8 enables the pressure in tubular body gradually to release, it is to avoid the shifting of slips It is dynamic, so as to prevent the mechanical damage of production casing 5, it is ensured that the packing effect of packer 4.
Specifically, in order to ensure the safety work of injection-production well, storm valve 2 is that ground controls self-balancing type safety valve. The switches that this storm valve 2 passes through two piston control system co- controlling pistons, two piston control systems individually with Control pipeline is connected, and it can still be such that valve fully completes compared with the design of traditional valve under the relatively low environment of fluid pressure Switching manipulation.When using, from ground to storm valve 2 in inject highly pressurised liquid, highly pressurised liquid enters piston through controlling pipeline Chamber, promotes descent of piston, compression spring, and pushes up valve opening plate, realizes the opening of storm valve 2.The control pressure on ground is kept, Storm valve 2 is set to keep it turned in normal state.When the abnormal conditions such as earthquake, ice condition, violent typhoon are run into, ground control Pressing pressure is released, and valve plate resets under the action of the spring, realizes the emergency cut-off of storm valve 2, so as to prevent gas blowout accident, protect Demonstrate,prove the job safety of injection-production well.It is state of the art that the ground controls self-balancing type safety valve, for example,《From flat The reliability of SCSSV that weighs and the development of simplified design》Description, the utility model are also gived in one text Embodiment does not make specific restriction to it herein.
Specifically, for the connection of control oil pipe 1 and production casing 5, steel wire operation switching regulator is provided with completion tubular column Sliding sleeve 3.Through hole is provided with the cylinder of sliding sleeve 3, connected state is between oil pipe 1 and production casing 5 when through hole is opened, this When can along oil pipe 1 inject annular protective liquid, or in annular space it is existing protection liquid be replaced.When through hole is closed, oil pipe 1 In state is separated between production casing 5, gas injection and gas production process can be carried out by oil pipe 1.By steel wire in oil pipe 1 Under enter or act blanking plug, the switch of through hole in sliding sleeve 3 can be controlled, realize the opening of sliding sleeve 3 and close, to carry out annular space guarantor Protect replacement or the note gas production process of liquid.
The oil-gas reservoir type gas storage production-injection well completion tubing string that the utility model embodiment is provided is when in use, it is necessary to first by original Tubing string takes out in well, in then entering injection-production well under oil-gas reservoir type gas storage production-injection well completion tubing string again.Detailed process is first to lead to Cross oil pipe and pump into the KCl aqueous solution and degradable well killing fluid, while observing pump pressure, i.e. stopping pumps into process after pump pressure is significantly raised. Sliding sleeve in former well on tubing string is opened by steel wire operation, the degradable well killing fluid of direct circulation is temporarily blocked up to injection-production well.Then, Remove christmas tree, load onto preventer and pressure testing to qualified.Slowly above carry tubing string in former well, the packing in former well to be determined on tubing string Device solution is honored as a queen, and acts tubing string in former well.Enter gauguste cutter under in injection-production well, tube wall is cleaned.Then, successively by ball seat 9, Permanent packer 4, sliding sleeve 3 (being closed), lower flowing joint 11, storm valve 2, upper flowing joint 10 are sequentially passed through Hermetic seal screw thread oil pipe 1 connect and under enter injection-production well.The depth of setting of tubular body is proofreaded, oil pipe 1 is then suspended on note Adopt the well head of well.Preventer is unloaded, christmas tree is installed, drifting operation is carried out again with gauguste cutter is entered under steel wire.Then, enter under stifled Plug device, makes blanking plug be seated at sliding sleeve 3 and closes the bottom of oil pipe 1, and integrally carry out pressure testing to oil pipe 1 and christmas tree.Examination After pressing lattice, act blanking plug with steel wire, then put into solvable ball 8, slowly suppress set packer 4.With entering sliding sleeve under steel wire Shifting tool, opens sliding sleeve 3, then sliding sleeve shifting tool is taken out, and now sliding sleeve 3 is connected with oil pipe 1.Then just protected for annular space Shield liquid, then emptied with nitrogen, specifically emptying depth can be adjusted according to stratum observed pressure when constructing.Enter sliding sleeve shifting down again Position instrument, closedown sliding sleeve 3.Now, solvable ball 8 has dissolved in the presence of the KCl aqueous solution, makes the bottom of tubular body gradually Depressurization.During depressurization, the pressure in tubular body is gradually released, so will not be to the card of packer 4 Watt larger active force is produced, move up the damage caused to the inwall of production casing 5 so as to avoid slips, it is ensured that packing Device 4 sets effect, gas injection and the gas production process is smoothed out.Christmas tree gate open flow is opened, waits to spray and injection well After interior isometric well killing fluid, christmas tree gate is closed, tidy up well site, you can carry out gas production operation or gas injection operation, realize day The storage of right gas and take.
Preferred embodiment of the present utility model is the foregoing is only, is not used to limit protection domain of the present utility model, It is all it is of the present utility model spirit and principle within, any modification, equivalent substitution and improvements made etc. should be included in this reality Within new protection domain.

Claims (6)

1. a kind of oil-gas reservoir type gas storage production-injection well completion tubing string, the completion tubular column includes:Multiple-tubing string (1), downhole safety Valve (2), sliding sleeve (3), packer (4), production casing (5), protective casing (6), surface pipe (7), it is characterised in that described complete Well casing post also includes solvable ball (8) and ball seat (9);
The storm valve (2), the sliding sleeve (3), the packer (4), the ball seat (9) by the oil pipe (1) by Sequentially connected under up to, and form tubular body, and the storm valve (2) top is provided with the oil pipe (1), the oil Pipe (1) is connected to the well head of injection-production well;The tubular body is suspended at by the production casing (5) by the packer (4) Inwall on, and the protective casing (6) is sleeved on the outside of the production casing (5), and the surface pipe (7) is sleeved on The outside of the protective casing (6);
Ball seat (9) middle part is provided with and is adapted with the solvable ball (8), and the ball groove for connecting up and down;The solvable ball (8) enter the tubular body from the oil pipe (1) of the well head, and fall into the closure ball groove in the ball seat (9).
2. completion tubular column according to claim 1, it is characterised in that the completion tubular column also includes upper flowing pipe nipple (10) With lower flowing pipe nipple (11), the top of upper flowing pipe nipple (10) is connected and turns on the oil pipe (1), bottom and the well The top of lower safety valve (2) connects and turns on, the bottom at the lower top and the storm valve (2) for flowing pipe nipple (11) Connect and turn on, bottom is connected and turns on another oil pipe (1).
3. completion tubular column according to claim 1, it is characterised in that the sidewall thickness of the flowing pipe nipple (10) is 14.5-17.5mm。
4. completion tubular column according to claim 1, it is characterised in that the distance from bottom gas-bearing reservoir (12) of the ball seat (9) Coboundary 50-60m.
5. completion tubular column according to claim 4, it is characterised in that the bottom of the production casing (5) is located at the storage Below gas-bearing formation (12) lower boundary at 80-100m.
6. completion tubular column according to claim 1, it is characterised in that the packer (4) is permanent packer.
CN201621057852.5U 2016-09-14 2016-09-14 Oil and gas reservoir type gas storage injection and production well completion pipe string Active CN206205797U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621057852.5U CN206205797U (en) 2016-09-14 2016-09-14 Oil and gas reservoir type gas storage injection and production well completion pipe string

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621057852.5U CN206205797U (en) 2016-09-14 2016-09-14 Oil and gas reservoir type gas storage injection and production well completion pipe string

Publications (1)

Publication Number Publication Date
CN206205797U true CN206205797U (en) 2017-05-31

Family

ID=58760433

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621057852.5U Active CN206205797U (en) 2016-09-14 2016-09-14 Oil and gas reservoir type gas storage injection and production well completion pipe string

Country Status (1)

Country Link
CN (1) CN206205797U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112081534A (en) * 2019-06-14 2020-12-15 中国石油化工股份有限公司 Anti-erosion injection-production pipe column structure
CN112647857A (en) * 2019-10-12 2021-04-13 中国石油化工股份有限公司 Injection-production string and well completion method using same
CN114427390A (en) * 2020-09-02 2022-05-03 中国石油化工股份有限公司 Salt-removing and salt-preventing injection-production integrated pipe column

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112081534A (en) * 2019-06-14 2020-12-15 中国石油化工股份有限公司 Anti-erosion injection-production pipe column structure
CN112081534B (en) * 2019-06-14 2022-06-28 中国石油化工股份有限公司 Anti-erosion injection-production pipe column structure
CN112647857A (en) * 2019-10-12 2021-04-13 中国石油化工股份有限公司 Injection-production string and well completion method using same
CN112647857B (en) * 2019-10-12 2022-11-25 中国石油化工股份有限公司 Injection-production string and well completion method using same
CN114427390A (en) * 2020-09-02 2022-05-03 中国石油化工股份有限公司 Salt-removing and salt-preventing injection-production integrated pipe column

Similar Documents

Publication Publication Date Title
CN105064940B (en) A kind of built-in coiled tubing completion tubular column and construction method
CA2611101A1 (en) Method and apparatus for continuously injecting fluid in a wellbore while maintaining safety valve operation
CN109736737B (en) Method for snubbing tripping of reservoir gas drilling well
CN104343400B (en) The controllable workover treatment equipment of no killing well and its operational method
CN206205797U (en) Oil and gas reservoir type gas storage injection and production well completion pipe string
CN104153753A (en) Horizontal well volume fracturing tubular column and method based on conventional oil tube pressure dragging
CN101775977B (en) Dual-tube injection well safety production string
CN204402451U (en) A kind of hydraulic control single flow device for the protection of underground double-pipe annular space
BRPI1105408B1 (en) wellhead assembly and flow control method through a wellhead assembly
CN103912257B (en) A kind of dragging multiple fracturing device with pressure
CN104963634B (en) Method for tripping sucker rod
CN202900175U (en) Pressure measuring well completion pipe string for suspension pressure gauge of gas storage
CN104563872B (en) Blockage resisting self-filling-type float collar
CN205858311U (en) A kind of bore hole staged fracturing completion tubular column
CN204754881U (en) Double -barrelled gas well flow string parallels
CN205000922U (en) Built -in coiled tubing completion pipe string
CN104879098B (en) A kind of concentric double pipe gas well liquid loading tubing string
CN205117297U (en) Concentric double -barrelled gas well flow string
CN204082115U (en) Based on the horizontal well volume fracturing tubing string of conventional oil pipe dragging with pressure
CN102444390A (en) Blowout out-of-control emergency device
CN106761530A (en) A kind of emergent well-sealing device and method for deepwater drilling blowout out of control
CN110778284A (en) Suitable for CO 2Huff-puff injection-production integrated wellhead device and using method thereof
CN207598221U (en) A kind of layering squeezes sand preventing tool
CN213980766U (en) Non-metal composite coiled tubing oil production system for offshore platform
CN211448593U (en) Suitable for CO2Huff-puff injection-production integrated wellhead device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant