CN204754881U - Double -barrelled gas well flow string parallels - Google Patents
Double -barrelled gas well flow string parallels Download PDFInfo
- Publication number
- CN204754881U CN204754881U CN201520404517.7U CN201520404517U CN204754881U CN 204754881 U CN204754881 U CN 204754881U CN 201520404517 U CN201520404517 U CN 201520404517U CN 204754881 U CN204754881 U CN 204754881U
- Authority
- CN
- China
- Prior art keywords
- tubing
- pipe
- oil pipe
- double
- gas well
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Earth Drilling (AREA)
Abstract
本实用新型公开了一种并列双管气井生产管柱,包括有套管、双管油管挂、大油管、小油管、双管封隔器,所述大油管和小油管通过双管油管挂吊挂在套管中,所述双管封隔器对套管进行封隔,并对大油管和小油管进行固定;大油管上装有第一井下安全阀和第一工作筒;小油管上装有第二井下安全阀和第二工作筒。该管柱在初期产能较高时,大小油管同时生产;中期产能下降时大油管单独生产;气井见水后,小油管携液能力较强,可单独携液生产;如积液较多,无法自喷则采用气举排水采气。实现了气井在整个生产过程中无需动管柱作业,具有采气速度快,环境污染小的特点,后期无需修井,减少储层污染,降低作业成本,对高产气田开发具有良好的适用性。
The utility model discloses a parallel double-pipe gas well production pipe string, which includes a casing pipe, a double-pipe oil pipe hanger, a large oil pipe, a small oil pipe and a double-pipe packer. The large oil pipe and the small oil pipe are hung by the double pipe oil pipe hanger Hanging in the casing, the double-pipe packer packs the casing and fixes the large tubing and the small tubing; the large tubing is equipped with the first downhole safety valve and the first working cylinder; the small tubing is equipped with the first Two downhole safety valves and a second working cylinder. When the initial production capacity of the tubing string is high, the large and small oil pipes are produced at the same time; when the medium-term production capacity drops, the large oil pipes are produced separately; Self-sprinkling uses gas lift drainage to collect gas. It realizes that the gas well does not need to operate the moving string during the whole production process. It has the characteristics of fast gas production speed and low environmental pollution. It does not require well workover in the later stage, reduces reservoir pollution, and reduces operating costs. It has good applicability to the development of high-yield gas fields.
Description
技术领域 technical field
本实用新型涉及油气开采设备,具体一种气井生产管柱。 The utility model relates to oil and gas exploitation equipment, in particular to a gas well production string.
背景技术 Background technique
国家知识产权局于2014年2月26日公开了公开号为CN203452734U,专利名称为一种高压气井生产及清防蜡一体化管柱的专利,本专利公开了一种高压气井生产及清防蜡一体化管柱结构,包括在油管上设置化学剂注入阀,该化学剂注入阀为单向阀;另外在油管与套管之间环空设置毛细管线,毛细管线的一端连通到化学剂注入阀中,另一端伸出到地面,能够满足高压气井环空带保护液和封隔器条件,达到清防蜡目的;另外在化学剂注入阀上方油管安装井下安全阀,由控制管线实现井下安全阀开启或关闭,该控制管线一端连接在井下控制阀,另一端连接到地面设备。该新型管柱结构一方面降低高含蜡、高压气井蜡堵情况;另一方面保证了高压气井安全生产。 The State Intellectual Property Office published the publication number CN203452734U on February 26, 2014, and the patent name is a patent for a high-pressure gas well production and wax removal and prevention integrated pipe string. This patent discloses a high-pressure gas well production and wax removal and prevention. The integrated string structure includes setting a chemical agent injection valve on the oil pipe, which is a one-way valve; in addition, a capillary line is set in the annular space between the oil pipe and the casing, and one end of the capillary line is connected to the chemical agent injection valve The other end protrudes to the ground, which can meet the conditions of protective fluid and packer in the annulus of high-pressure gas wells, and achieve the purpose of wax removal and anti-wax; in addition, a downhole safety valve is installed on the oil pipe above the chemical agent injection valve, and the downhole safety valve is realized by the control pipeline. To open or close, one end of the control pipeline is connected to the downhole control valve, and the other end is connected to the surface equipment. On the one hand, the new string structure reduces the wax plugging of high-wax and high-pressure gas wells; on the other hand, it ensures the safe production of high-pressure gas wells.
上述专利的技术方案与本专利的技术方案明显不同,所解决的问题也不同,上述专利由于采用传统的单管柱作业的结构形式,故存在以下缺陷:在完井阶段,根据气井产能及配产要求进行生产管柱优选,管柱尺寸仅适合投产初期产能较高时的生产要求。气井生产中后期,随着地层压力的下降、产层污染、出水等问题的产生,原有生产管柱将无法满足携液生产需求,导致气井积液甚至水淹停产。这时,则需要通过修井作业来实施排水采气工艺来恢复气井的正常生产,气井的修井作业投资大、风险高、难度大,而且往往由于压力系数低、作业条件限制等因素,修井后也无法达到预期目标,不但造成经济损失,而且存在环境污染。 The technical solution of the above-mentioned patent is obviously different from that of this patent, and the problems to be solved are also different. Because the above-mentioned patent adopts the traditional single string The production string is optimized according to the production requirements, and the string size is only suitable for the production requirements when the production capacity is high in the initial stage of production. In the middle and later stages of gas well production, with the formation pressure drop, production layer pollution, water discharge and other problems, the original production string will not be able to meet the demand for liquid-carrying production, resulting in liquid accumulation or even water flooding and shutdown of gas wells. At this time, it is necessary to implement the drainage and gas recovery process through workover operations to restore the normal production of the gas well. The workover operation of the gas well requires a large investment, high risk, and great difficulty. The expected goal cannot be achieved after the well, which not only causes economic losses, but also causes environmental pollution.
实用新型内容 Utility model content
本实用新型的目的是克服现有技术中的不足,提供一种能满足气井生产全生命周期的并列双管气井生产管柱,该生产管柱既能满足气井投产初期时的生产需求,又能满足中后期压力下降、气井出水后连续携液生产的需要,无需动管柱修井作业。 The purpose of the utility model is to overcome the deficiencies in the prior art and provide a parallel double-pipe gas well production string that can meet the entire life cycle of gas well production. It meets the needs of pressure drop in the middle and late stages and continuous liquid-carrying production after the gas well produces water, without moving string workover operations.
本实用新型解决上述技术问题所采取的技术方案如下: The technical scheme that the utility model solves the problems of the technologies described above is as follows:
一种并列双管气井生产管柱,它包括有套管、双管油管挂、大油管、小油管、第一井下安全阀、第二井下安全阀、双管封隔器、第一工作筒和第二工作筒,所述大油管和小油管通过双管油管挂吊挂在套管中,所述双管封隔器对套管进行封隔,并对大油管和小油管进行固定;所述大油管上且位于双管封隔器的上方装有第一井下安全阀,大油管上且位于双管封隔器的下方装有第一工作筒;所述小油管上且位于双管封隔器的上方装有第二井下安全阀,小油管上且位于双管封隔器的下方装有第二工作筒;所述第一工作筒和第二工作筒用于双管封隔器的坐封,以及对大油管和小油管的封堵。 A parallel double-pipe gas well production string, which includes a casing, a double-pipe tubing hanger, a large oil pipe, a small oil pipe, a first downhole safety valve, a second downhole safety valve, a double-pipe packer, a first working cylinder and The second working cylinder, the large oil pipe and the small oil pipe are suspended in the casing through the double-pipe oil pipe hanger, and the double-pipe packer packs the casing and fixes the large oil pipe and the small oil pipe; The first downhole safety valve is installed on the large tubing and above the double-pipe packer, and the first working cylinder is installed on the large tubing and below the double-pipe packer; the small tubing is located on the double-pipe packer The second downhole safety valve is installed above the device, and the second working cylinder is installed on the small tubing and below the double-tube packer; the first working cylinder and the second working cylinder are used for the seat of the double-tube packer. Sealing, as well as the plugging of large oil pipes and small oil pipes.
进一步地,所述大油管的下端装有第一钢丝引鞋,所述小油管的下端设有第二钢丝引鞋。 Further, the lower end of the large oil pipe is provided with a first wire guide shoe, and the lower end of the small oil pipe is provided with a second wire guide shoe.
进一步地,所述小油管上且位于双管封隔器的上方装有气举阀。 Further, a gas lift valve is installed on the small oil pipe and above the double pipe packer.
进一步地,所述大油管是由多根油管对接而成,所述第一井下安全阀的两端和第一工作筒的两端与油管螺纹连接;所述第一钢丝引鞋的上端部与最低部的油管螺纹连接。 Further, the large oil pipe is formed by butting a plurality of oil pipes, and the two ends of the first downhole safety valve and the two ends of the first working barrel are screwed to the oil pipe; the upper end of the first wire guide shoe is connected to the The lowest part of the oil pipe threaded connection.
进一步地,第一工作筒位于双管封隔器下方的第1~2根油管处。 Further, the first working cylinder is located at the first to second oil pipes below the double-pipe packer.
进一步地,所述小油管是由多根油管对接而成,所述第二井下安全阀的两端、第二工作筒的两端以及气举阀的两端都与油管螺纹连接;所述第二钢丝引鞋的上端部与最低部的油管螺纹连接。 Further, the small oil pipe is formed by butting a plurality of oil pipes, and the two ends of the second downhole safety valve, the two ends of the second working cylinder and the two ends of the gas lift valve are all threadedly connected with the oil pipe; The upper end of the two steel wire guide shoes is threadedly connected with the oil pipe at the lowest part.
进一步地,所述气举阀连接在小油管上且位于双管封隔器的上方第1~2根油管处。 Further, the gas lift valve is connected to the small oil pipe and is located at the first to second oil pipe above the double-pipe packer.
进一步地,所述第二工作筒位于双管封隔器下方的第1~2根油管处。 Further, the second working cylinder is located at the first to second oil pipes below the double-pipe packer.
本实用新型的有益效果:该管柱结构可满足气井全生命周期生产需求,初期产能较高时大小油管同时生产;中期产能下降时大油管单独生产;气井见水后,小油管携液能力较强,可单独携液生产;如积液较多,无法自喷则采用气举排水采气。该管柱充分考虑了气井生产中后期的排水采气工艺,实现了气井在整个生产过程中无需动管柱作业,具有采气速度快,环境污染小的特点,后期无需修井,减少储层污染,降低作业成本,对高产气田开发具有良好的适用性。 Beneficial effects of the utility model: the string structure can meet the production needs of the gas well in its entire life cycle. When the initial production capacity is high, the large and small oil pipes are produced simultaneously; when the mid-term production capacity declines, the large oil pipes are produced separately; Strong, it can carry liquid alone for production; if there is a lot of liquid and it cannot be self-sprayed, gas extraction will be carried out by gas lift drainage. The pipe string fully considers the water drainage and gas recovery process in the middle and later stages of gas well production, and realizes that the gas well does not need to operate the pipe string during the entire production process. It has the characteristics of fast gas production speed and low environmental pollution. pollution, reduce operating costs, and have good applicability to the development of high-yield gas fields.
附图说明 Description of drawings
图1是本实用新型的一种并列双管气井生产管柱的示意图。 Fig. 1 is a schematic diagram of a parallel double-pipe gas well production string of the present invention.
图中:1、双管油管挂;2、大油管;3、小油管;4、第一井下安全阀;5、第二井下安全阀;6、气举阀;7、双管封隔器;8、第一工作筒;9、第二工作筒;10、第一钢丝引鞋;11、第二钢丝引鞋;12、套管。 In the figure: 1. Double tubing hanger; 2. Large tubing; 3. Small tubing; 4. First downhole safety valve; 5. Second downhole safety valve; 6. Gas lift valve; 7. Double tubing packer; 8. The first working cylinder; 9. The second working cylinder; 10. The first steel wire guide shoe; 11. The second steel wire guide shoe; 12. Sleeve.
具体实施方式 Detailed ways
如图1所示,一种并列双管气井生产管柱,它包括有套管12、双管油管挂1、大油管2、小油管3、第一井下安全阀4、第二井下安全阀5、气举阀6、双管封隔器7、第一工作筒8和第二工作筒9,所述大油管2和小油管3通过双管油管挂1吊挂在套管12中,所述双管封隔器7对套管12进行封隔,并对大油管2和小油管3进行固定。 As shown in Figure 1, a parallel double-pipe gas well production string includes casing 12, double-pipe tubing hanger 1, large tubing 2, small tubing 3, first downhole safety valve 4, and second downhole safety valve 5 , a gas lift valve 6, a double-pipe packer 7, a first mandrel 8 and a second mandrel 9, the large oil pipe 2 and the small oil pipe 3 are suspended in the casing 12 through the double-pipe oil pipe hanger 1, and the The double-pipe packer 7 packs off the casing 12 and fixes the large tubing 2 and the small tubing 3 .
大油管2上且位于双管封隔器7的上方装有第一井下安全阀4,大油管2上且位于双管封隔器7的下方装有第一工作筒8,所述大油管2的下端装有第一钢丝引鞋10。具体而言,所述大油管2是由多根油管对接而成,所述第一井下安全阀4的两端和第一工作筒8的两端与油管螺纹连接,第一工作筒8位于双管封隔器下方的第1~2根油管处;所述第一钢丝引鞋10的上端部与最低部的油管螺纹连接。 The first downhole safety valve 4 is installed on the large oil pipe 2 and above the double pipe packer 7, and the first working cylinder 8 is installed on the large oil pipe 2 and below the double pipe packer 7. The large oil pipe 2 The lower end of the first wire guide shoe 10 is equipped with. Specifically, the large oil pipe 2 is formed by butt jointing of multiple oil pipes, both ends of the first downhole safety valve 4 and both ends of the first working cylinder 8 are threadedly connected with the oil pipes, and the first working cylinder 8 is located on the double At the first to second oil pipes below the pipe packer; the upper end of the first wire guide shoe 10 is screwed to the lowest oil pipe.
小油管3上且位于双管封隔器7的上方装有第二井下安全阀5,小油管3上且位于双管封隔器7的下方装有第二工作筒9,第二工作筒9用于双管封隔器7的坐封。小油管3的下端设有第二钢丝引鞋11。所述小油管3上且位于双管封隔器7的上方装有气举阀6。具体而言,小油管3是由多根油管对接而成,所述第二井下安全阀5的两端、第二工作筒9的两端以及气举阀6的两端都与油管螺纹连接;所述第二钢丝引鞋11的上端部与最低部的油管螺纹连接,所述气举阀6连接在小油管3上且位于双管封隔器7的上方第1~2根油管处。所述第二工作筒9位于双管封隔器7下方的第1~2根油管处。 The second downhole safety valve 5 is installed on the small tubing 3 and above the double-tube packer 7, and the second working cylinder 9 is installed on the small tubing 3 and below the double-tube packer 7, and the second working cylinder 9 It is used for setting the double-tube packer 7. The lower end of the small oil pipe 3 is provided with a second steel wire guide shoe 11 . A gas lift valve 6 is installed on the small oil pipe 3 and above the double pipe packer 7 . Specifically, the small oil pipe 3 is formed by butt jointing of multiple oil pipes, and the two ends of the second downhole safety valve 5, the two ends of the second working cylinder 9, and the two ends of the gas lift valve 6 are all threadedly connected to the oil pipes; The upper end of the second wire guide shoe 11 is threadedly connected to the oil pipe at the lowest part, and the gas lift valve 6 is connected to the small oil pipe 3 and located at the first to second oil pipes above the double pipe packer 7 . The second working cylinder 9 is located at the first to second oil pipes below the double pipe packer 7 .
本专利的应用,需要对气井井口装置进行改造,井口采气树需要更换为满足条件的双管气井采气树,同时油管挂更换为双管气密封油管挂。为满足气井连续携液生产的要求,要对油管尺寸进行优选,根据气井配产及生产指标预测数据,分析优选满足连续携液生产的油管内径,分析设计气举阀参数,同时根据气体成分,分析优选满足生产要求的油管材质。 The application of this patent requires the modification of the wellhead device of the gas well. The wellhead gas tree needs to be replaced with a qualified double-tube gas well gas tree, and the tubing hanger is replaced with a double-pipe gas-sealed tubing hanger. In order to meet the requirements of continuous liquid-carrying production in gas wells, the size of the tubing should be optimized. According to the gas well production allocation and production index prediction data, the inner diameter of the tubing that meets the continuous liquid-carrying production should be analyzed and optimized, and the gas lift valve parameters should be analyzed and designed. At the same time, according to the gas composition, Analyze and optimize the oil pipe material that meets the production requirements.
工作原理:在气井生产初期,采用大小双油管同时生产,第一工作筒和第二工作筒中均不投放堵塞器,大小双油管同时工作;中期在第二工作筒中投放堵塞器封堵油管,利用大油管单独生产;后期在第一工作筒中投放堵塞器封堵油管,利用小油管单独生产;当地层压力下降,气井积液,小油管也无法满足携液生产要求时,环空注气,所注气体由环空通过气举阀6进入小油管内,采用气举排水方式进行采气作业。 Working principle: In the early stage of gas well production, large and small double oil pipes are used for simultaneous production, no plugs are placed in the first working cylinder and the second working cylinder, and the large and small double oil pipes work at the same time; in the middle stage, pluggers are put in the second working cylinder to block the oil pipes, and use The large tubing is produced separately; in the later stage, a plug is put in the first working cylinder to block the tubing, and the small tubing is used for independent production; when the formation pressure drops, the gas well accumulates liquid, and the small tubing cannot meet the liquid-carrying production requirements, the annulus is injected with gas, so The injection gas enters the small tubing from the annular space through the gas lift valve 6, and the gas recovery operation is carried out by means of gas lift drainage.
综上所述,本领域的普通技术人员阅读本实用新型文件后,根据本实用新型的技术方案和技术构思无需创造性脑力劳动而做出其它各种相应的变换方案,均属于本实用新型所保护的范围。 In summary, after reading the document of the utility model, those of ordinary skill in the art can make other corresponding conversion schemes according to the technical scheme and technical concept of the utility model without creative mental work, all of which belong to the protection of the utility model. range.
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520404517.7U CN204754881U (en) | 2015-06-12 | 2015-06-12 | Double -barrelled gas well flow string parallels |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520404517.7U CN204754881U (en) | 2015-06-12 | 2015-06-12 | Double -barrelled gas well flow string parallels |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN204754881U true CN204754881U (en) | 2015-11-11 |
Family
ID=54469600
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201520404517.7U Expired - Lifetime CN204754881U (en) | 2015-06-12 | 2015-06-12 | Double -barrelled gas well flow string parallels |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN204754881U (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105464615A (en) * | 2015-12-31 | 2016-04-06 | 东营市福利德石油科技开发有限责任公司 | Parallel double-pipe packer for deepwater oil well |
| CN108729884A (en) * | 2017-04-20 | 2018-11-02 | 中国石油天然气股份有限公司 | Oil extraction device and application thereof |
| CN110242260A (en) * | 2019-05-17 | 2019-09-17 | 张强 | The application method of the layering gas recovery device of the double-deck tubing string |
| CN110644933A (en) * | 2019-10-25 | 2020-01-03 | 左入林 | Sucker rod and casing with oil pipe traction device |
-
2015
- 2015-06-12 CN CN201520404517.7U patent/CN204754881U/en not_active Expired - Lifetime
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105464615A (en) * | 2015-12-31 | 2016-04-06 | 东营市福利德石油科技开发有限责任公司 | Parallel double-pipe packer for deepwater oil well |
| CN105464615B (en) * | 2015-12-31 | 2019-01-11 | 东营市福利德石油科技开发有限责任公司 | Deepwater wells parallel double tube packer |
| CN108729884A (en) * | 2017-04-20 | 2018-11-02 | 中国石油天然气股份有限公司 | Oil extraction device and application thereof |
| CN110242260A (en) * | 2019-05-17 | 2019-09-17 | 张强 | The application method of the layering gas recovery device of the double-deck tubing string |
| CN110242260B (en) * | 2019-05-17 | 2021-04-20 | 南通新华诚科研仪器有限公司 | Application method of layered gas production device of double-layer pipe column |
| CN110644933A (en) * | 2019-10-25 | 2020-01-03 | 左入林 | Sucker rod and casing with oil pipe traction device |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102953711B (en) | Device and method for horizontal gas well to drain liquid and produce gas | |
| CN204754881U (en) | Double -barrelled gas well flow string parallels | |
| CN108266173B (en) | Method for segmented reconstruction of well completion | |
| CN204703876U (en) | Bridge type concentric separate injection pipe column | |
| CN204646186U (en) | One can setting type underground check valve | |
| CN202338292U (en) | Injection-production pipe string of exhaustion type oil-gas reservoir underground gas storage | |
| CN103912257B (en) | A kind of dragging multiple fracturing device with pressure | |
| CN104879098B (en) | A kind of concentric double pipe gas well liquid loading tubing string | |
| CN104963634B (en) | Method for tripping sucker rod | |
| CN203452734U (en) | Integrated production and wax removing and prevention pipe column for high-pressure gas well | |
| CN104989325A (en) | Method for producing gas by using production pipe column of parallel double-pipe gas well | |
| CN104879097A (en) | Gas well production string provided with double parallel pipes | |
| CN202659194U (en) | Novel well wall restoring device with combined sleeve and corrugated pipe | |
| CN104989319A (en) | Cementing method based on continuous cementing mode in petroleum exploration | |
| CN206600155U (en) | A kind of Continuous Circulation Drilling System | |
| CN201865632U (en) | Wax removing and preventing device for oil well | |
| CN202215193U (en) | Water expansion self-sealing packer | |
| CN205117297U (en) | Concentric double -barrelled gas well flow string | |
| CN220118098U (en) | A concentric multi-channel coiled tubing liquid drainage and gas production device | |
| CN203476263U (en) | Coiled tubing speed tubular column hanger | |
| CN201416429Y (en) | Sand blasting choke with sliding sleeve | |
| CN201857941U (en) | Anti-leakage and bottom water coning delay integrated string of horizontal well | |
| CN205297464U (en) | Gas injection well head device | |
| CN201137465Y (en) | Low yield well pumping unit | |
| CN203394451U (en) | Leakage-sealing water-plugging oil production pipe column for thickened oil horizontal well |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CP03 | Change of name, title or address | ||
| CP03 | Change of name, title or address |
Address after: 100010 Chaoyangmen North Street, Dongcheng District, Dongcheng District, Beijing Co-patentee after: CNOOC (China) Limited,Zhanjiang Branch Patentee after: CHINA NATIONAL OFFSHORE OIL Corp. Address before: 100010 China oil tower, 25 Chaoyangmen North Street, Dongcheng District, Beijing Co-patentee before: CNOOC (China) Limited,Zhanjiang Branch Patentee before: CHINA NATIONAL OFFSHORE OIL Corp. |
|
| CX01 | Expiry of patent term | ||
| CX01 | Expiry of patent term |
Granted publication date: 20151111 |