CN203822281U - Under-pressure dragging type separate-layer fracturing device - Google Patents

Under-pressure dragging type separate-layer fracturing device Download PDF

Info

Publication number
CN203822281U
CN203822281U CN201420210932.4U CN201420210932U CN203822281U CN 203822281 U CN203822281 U CN 203822281U CN 201420210932 U CN201420210932 U CN 201420210932U CN 203822281 U CN203822281 U CN 203822281U
Authority
CN
China
Prior art keywords
pressure
tubing
collar
blowout prevention
prevention box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201420210932.4U
Other languages
Chinese (zh)
Inventor
王林
张世林
黄德辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CNPC Bohai Drilling Engineering Co Ltd
Original Assignee
CNPC Bohai Drilling Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CNPC Bohai Drilling Engineering Co Ltd filed Critical CNPC Bohai Drilling Engineering Co Ltd
Priority to CN201420210932.4U priority Critical patent/CN203822281U/en
Application granted granted Critical
Publication of CN203822281U publication Critical patent/CN203822281U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model discloses an under-pressure dragging type separate-layer fracturing device, which comprises ground equipment and a downhole tool string. The downhole tool string comprises a conical stopper, a packer, a hydraulic spray gun, a collar-type tubing, a wear-and-corrosion-resistant check valve and a collar-free tubing, wherein the conical stopper, the packer, the hydraulic spray gun, the collar-type tubing, the wear-and-corrosion-resistant check valve and the collar-free tubing are sequentially connected together. The ground equipment comprises a wellhead cross joint, a dual-flashboard blowout preventer, a blowout stuffing box and an anti-jacking air slips. The upper end of the collar-free tubing is connected with a lifting pipe nipple. The lifting pipe nipple is suspended by means of an elevator and the large-hook hanging ring of a workover rig. The hanging ring is capable of moving up and down. The collar-free tubing is dragged to slide within the blowout stuffing box. The lifting pipe nipple is connected successively with a high-pressure elbow and a high-pressure hose line. The high-pressure hose line is connected with a ground high-pressure steel pipe line of a fracturing multi-unit 1. The steel pipe line is provided with a high-pressure tee. The high-pressure tee is provided with a plug valve for the pressure release of pipelines. The wellhead cross joint is connected with a fracturing multi-unit 2. Due to the combination of the dual-flashboard blowout preventer, the blowout stuffing box and the collar-free tubing, a tubing string is directly lifted upwards at a wellhead under pressure by means of a conventional workover rig, and the sand-sticking risk of the tubing string can be reduced maximally. Meanwhile, the layered fracturing efficiency and the cost performance are improved greatly.

Description

A kind of multiple fracturing device that drags with pressure
Technical field
The utility model relates to a kind of fracturing device of oil-gas field development application, especially a kind of multiple fracturing device that drags with pressure that improves pressure break efficiency, reduces operating cost.
Background technology
Hydraulic sand blasting packer layered fracturing technique is widely applied in hyposmosis and unconventional oil gas field at present.Tail band packer abrasive perforating separate stratum fracfturing technology adopts coiled tubing and conventional workover rig to drag two kinds of modes.Coiled tubing tail band packer abrasive perforating multiple fracturing device can be realized the tubing string that drags with pressure, there is the interval velocity of changing fast, the advantage of short construction period, but have that construction cost is high, a shortcoming such as the accurate location difficulty of downhole tool (cannot accurately locate for thin layer), oil pipe tension load are low, cannot rotate; Conventional oil pipe tail band packer abrasive perforating multiple fracturing device, have that cost is low, the unrestricted advantage of the pressure break number of plies, after but every lamination splits, need open flow discharge opeing, anti-flushing well and dismounting well head, exist open flow process easily to shake out and card instrument, frequent dismounting well head labour intensity are large, the shortcoming of long construction period.
Utility model content
Technical problem to be solved in the utility model is, a kind of combination that adopts double ram type preventer, blowout prevention box, nothing joint hoop oil pipe is provided, use conventional workover rig direct upper lifting pipe post in wellheadpressure situation, can reduce to greatest extent sand card tubing string risk, shorten construction period and reduce construction cost, significantly improve the multiple fracturing device that drags with pressure of separate stratum fracfturing efficiency and cost performance.
In order to solve the problems of the technologies described above, the technical solution adopted in the utility model is: a kind of multiple fracturing device that drags with pressure, comprise ground installation and underground tool string, underground tool string comprises successively the cone blocking, packer, the waterpower spray gun that connect, has collar oil line, erosion resistant ball-and-seat, integral joint tubing; Well head big four corresponding to pressure rank when ground installation comprises with pressure break, on well head big four, double ram type preventer is installed, on double ram type preventer, connect blowout prevention box, on blowout prevention box, connect anti-upper top air operated slips, pass successively well head big four, double ram type preventer, blowout prevention box and anti-upper top air operated slips without joint hoop oil pipe upper end, connecting lifting sub without joint hoop oil pipe upper end, lifting sub is hung by elevator and the large hook suspension ring of workover rig, suspension ring move up and down, and drag integral joint tubing and slide in blowout prevention box; On lifting sub, connect successively high-pressure-movable bend and high-pressure hose line, high-pressure hose line is connected with the ground high pressure steel pipeline of fracturing unit truck group one, installation high-voltage threeway on steel pipeline, on Highpressure Tee, dress is for the plug valve of pipeline pressure release, on plug valve, be connected with churning and fill with, well head four-way is connected with fracturing unit truck group two.
The total length of described integral joint tubing is greater than the distance that instrument need to move.
Described blowout prevention box, double ram type preventer, well head big four connect by flange and seal, and anti-upper top air operated slips connects by flange and is fixed on blowout prevention box top.
The integral joint tubing of described lifting sub and bottom is by screwed connection, and lifting sub is connected by oil with high-pressure hose line with high-pressure-movable bend, the high-pressure-movable bend on top the ninth of the ten Heavenly Stems.
Described double ram type preventer and the sealing load of blowout prevention box are not less than 70MPa, and anti-interior pressure of high-pressure hose line is not less than 70MPa.
The beneficial effects of the utility model are: fracturing device of the present utility model has been abandoned with traditional fracture well head of hanging on production tree and tubing hanger combines, can realize conventional workover rig drag fracturing tubing string with pressure, after pressing crack construction, utilize ball-and-seat sealing oil pipe, blowout prevention box and without joint hoop oil pipe Seal Oil cover annular space, the in the situation that of wellheadpressure and positive well-flushing, directly with carrying fracturing string on the large load of workover rig, realize the function of with pressure pipe, significantly reduce cost of equipment, avoid open flow after pressure break, well-flushing, the operation of dismounting well head, shorten construction period, reduce the risk that formation sand production blocks tubing string, having reduced unlimited well head plays borehole fluid in Tubing During Running and overflows the pollution to environment.
Brief description of the drawings
Fig. 1 is the structural representation that drags multiple fracturing device with pressure of the present utility model.
In figure: 1, cone blocking; 2, packer; 3, waterpower spray gun; 4, there is collar oil line; 5, erosion resistant ball-and-seat; 6, integral joint tubing; 7, well head big four; 8, double ram type preventer; 9, blowout prevention box; 10, anti-upper top air operated slips; 11, elevator; 12, lifting sub; 13, suspension ring; 14, high-pressure-movable bend; 15, high-pressure hose line; 16, Highpressure Tee; 17, fracturing unit truck group one; 18, fracturing unit truck group two; 19, plug valve; 20, open flow tank; 21, the first fractured layer.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail:
As shown in Figure 1, the multiple fracturing device that drags with pressure of the present utility model, comprise ground installation and underground tool string, underground tool string comprises successively the cone blocking 1, packer 2, the waterpower spray gun 3 that connect, has collar oil line 4, erosion resistant ball-and-seat 5, integral joint tubing 6; Well head big four 7 corresponding to pressure rank when ground installation comprises with pressure break, double ram type preventer 8 is installed on well head big four 7, on double ram type preventer 8, connect blowout prevention box 9, on blowout prevention box 9, connect anti-upper top air operated slips 10, pass successively well head big four 7, double ram type preventer 8, blowout prevention box 9 and anti-upper top air operated slips 10 without joint hoop oil pipe 6 upper ends, connecting lifting sub 12 without joint hoop oil pipe 6 upper ends, lifting sub 12 is hung by elevator 11 and the large hook suspension ring 13 of workover rig, suspension ring move up and down, and drag integral joint tubing 6 in the interior slip of blowout prevention box 9; On lifting sub 12, connect successively high-pressure-movable bend 14 and high-pressure hose line 15, high-pressure hose line 15 is connected with the ground high pressure steel pipeline of fracturing unit truck group 1, installation high-voltage threeway 16 on steel pipeline, on Highpressure Tee 16, dress is for the plug valve 19 of pipeline pressure release, on plug valve 19, be connected with churning and fill with 20, well head four-way 7 is connected with fracturing unit truck group 2 18.
The total length of described integral joint tubing 6 is greater than the distance that instrument need to move.
Described blowout prevention box 9, double ram type preventer 8, well head big four 7 connect by flange and seal, and anti-upper top air operated slips 10 connects by flange and is fixed on blowout prevention box 9 tops.
Described lifting sub 12 is with the integral joint tubing 6 of bottom by screwed connection, and lifting sub 12 is connected by oil with high-pressure hose line 15 with high-pressure-movable bend 14, the high-pressure-movable bend 14 on top the ninth of the ten Heavenly Stems.
Described double ram type preventer 8 and the sealing load of blowout prevention box 9 are not less than 70MPa, and anti-interior pressure of high-pressure hose line 15 is not less than 70MPa.
The multiple fracturing device that drags with pressure of the present utility model is installed in accordance with the following steps and uses:
Step 1, as shown in the figure, equipment is installed; First, while changing with pressure break, well head big four 7 corresponding to pressure rank installed ram preventer 8 on well head big four 7;
Secondly, by cone blocking 1, packer 2, waterpower spray gun 3, have joint hoop oil pipe 4, erosion resistant ball-and-seat 5, without joint hoop oil pipe 6 successively by screwed connection, they have formed underground tool string, by underground tool string G.I.H, allow spray gun aim at fractured layer, binding round oil pipe 6 tops by screwed connection lifting sub 12 without joint, the joint hoop on lifting sub 12 tops is made on elevator 11, lifting sub 12 passes from blowout prevention box 9 centers, blowout prevention box 9 is connected and fixed by flange with ram preventer 8, and lifting sub 12 is hung by the suspension ring 13 of elevator 11 and the large hook of workover rig.
Then, lifting sub 12 connects high-pressure-movable bend 14 and high-pressure hose line 15 by union variable buckle, high-pressure hose line 15 is connected with Highpressure Tee 16 one end, the other two ends of Highpressure Tee 16 are connected with fracturing unit truck group one 17 ground high pressure steel pipelines and plug valve 19 respectively, plug valve 19 also can replace with flap type, be mainly used in pipeline pressure release, well head big four 7 is connected with another group fracturing unit truck group 2 18.
Step 2, first floor pressing crack construction; By on put and put the first set packer 2 of lifting sub 12, method inspection packer 2 sealings that adopt pit shaft pressure measurement to fall, confirm packer 2 set normal after, that closes ram preventer 8 partly seals flashboard, compresses blowout prevention box 9, pressure break first floor 21, carry out pressure break according to first floor construction sequence, high-pressure fluid is opened the erosion resistant ball-and-seat 5 in oil pipe, and fluid carries out perforation by oil pipe and waterpower spray gun 3 to the first fractured layer 21, after perforation, carry out pressure break by oil jacket annular space;
Step 3, band presses the instrument of carrying; After pressure break finishes, open flashboard open flow device 8, oil pipe small displacement limit pumping liquid, the direct upper lifting pipe post of workover rig deblocking packer 2 for lateral dominance, allows downhole tool move to behind perforated interval top, and oil pipe stops infusion;
Step 4, pressure release in oil pipe; Open 19 pressure releases of ground plug valve, now the erosion resistant ball-and-seat 5 in oil pipe is closed automatically, the high-pressure fluid on erosion resistant ball-and-seat 5 tops enters open flow tank 20 by surface line, pressure leak process is until confirm that oil pipe internal pressure is to finish at 1 o'clock, high-pressure-movable bend 14 and the high-pressure hose line 15 on dismounting lifting sub 12 tops;
Step 5, Drag tool with pressure; Use the workover rig integral joint tubing 6 that trips out Len req with pressure, waterpower spray gun 3 is aimed at behind lower one deck position of pressing, reconnecting and promoting short circuit 12, high-pressure-movable bend 14 and high-pressure hose line 15 without joint hoop oil pipe 6 tops;
Step 6, succeeding layer pressure break; After in first floor pressing crack construction and oil pipe, pressure release completes, on waterpower spray gun 3, to carry to next fractured layer, repeating step 2, to the process of step 5, carries out pressure break to fractured interval below, until the whole pressure breaks of interval are complete;
This tool string generally continuously pressure break more than 10 layers, in the time that the order according to is from bottom to top constructed to each fractured interval, often complete after the pressing crack construction of an interval, need to judge downhole tool state.If instrument normally, is proceeded drag fracturing construction with pressure; If waterpower spray gun 3 pressure are on the low side or packer 2 lost efficacy, should upper lifting pipe post to fractured layer safety top position, after open flow, backwash kill-job, pull out of hole and change downhole tool.
Wherein, the injection pressing crack construction of construction interval, the specific operation process of step 2 is technical methods conventional in this area, is not describing in detail at this.
The method is aimed at pressure break interval of interest by removing without joint hoop oil pipe 6 by tool string; Utilize erosion resistant ball-and-seat 5 automatically to open and close under hydraulic action; Packer 2 inside have changement to realize to put put set and on put forward the function of deblocking; Blowout prevention box 9 and double ram type preventer 8 double seal oil sets annular spaces, ensureing in fracturing process not can seepage, has replaced the little four-way of conventional pressure break, has reduced the time of dismounting well head; Blowout prevention box 9 Seal Oil covers annular spaces, with pressure dragging without joint hoop oil pipe 6 with tool string to next pressure break interval of interest, reduces open flow, washes the kill-job time, the average single hop 5-8 hour that saves time.
The parts that the present embodiment does not describe in detail and structure belong to well-known components and common structure or the common method of the industry, here not in narration one by one.
The utility model can be applicable in Oil/gas Well multilevel hierarchy staged fracturing acidizing treatment, on realizing under wellheadpressure condition, carry fracturing string, be applicable to operation and the exploitation in the fields such as oil, natural gas, coal bed gas, tight gas and shale gas, can significantly reduce operating cost, improve pressure break efficiency, have a good application prospect.
In sum, content of the present utility model is not limited in the above-described embodiment, knowledgeable people in same area can propose easily other embodiment within technological guidance's thought of the present utility model, but within this embodiment is included in scope of the present utility model.

Claims (5)

1. the multiple fracturing device that drags with pressure, comprise ground installation and underground tool string, it is characterized in that, underground tool string comprises successively the cone blocking (1), packer (2), the waterpower spray gun (3) that connect, has collar oil line (4), erosion resistant ball-and-seat (5), integral joint tubing (6), well head big four (7) corresponding to pressure rank when ground installation comprises with pressure break, at the upper double ram type preventer (8) of installing of well head big four (7), at the upper blowout prevention box (9) that connects of double ram type preventer (8), upper connection of blowout prevention box (9) prevented upper top air operated slips (10), pass successively well head big four (7) without joint hoop oil pipe (6) upper end, double ram type preventer (8), blowout prevention box (9) and anti-upper top air operated slips (10), connecting lifting sub (12) without joint hoop oil pipe (6) upper end, lifting sub (12) is hung by elevator (11) and the large hook suspension ring of workover rig (13), suspension ring move up and down, drag integral joint tubing (6) slides in blowout prevention box (9), on lifting sub (12), connect successively high-pressure-movable bend (14) and high-pressure hose line (15), high-pressure hose line (15) is connected with the ground high pressure steel pipeline of fracturing unit truck group one (17), installation high-voltage threeway (16) on steel pipeline, the upper dress of Highpressure Tee (16) is for the plug valve (19) of pipeline pressure release, on plug valve (19), be connected with churning and fill with (20), well head four-way (7) is connected with fracturing unit truck group two (18).
2. the multiple fracturing device that drags with pressure according to claim 1, is characterized in that, the total length of described integral joint tubing (6) is greater than the distance that instrument need to move.
3. the multiple fracturing device that drags with pressure according to claim 1, it is characterized in that, described blowout prevention box (9), double ram type preventer (8), well head big four (7) connect by flange and seal, and anti-upper top air operated slips (10) connects by flange and is fixed on blowout prevention box (9) top.
4. the multiple fracturing device that drags with pressure according to claim 1, it is characterized in that, described lifting sub (12) is with the integral joint tubing (6) of bottom by screwed connection, and lifting sub (12) is connected by oil with high-pressure hose line (15) with high-pressure-movable bend (14), the high-pressure-movable bend (14) on top the ninth of the ten Heavenly Stems.
5. the multiple fracturing device that drags with pressure according to claim 1, it is characterized in that, described double ram type preventer (8) and the sealing load of blowout prevention box (9) are not less than 70MPa, and anti-interior pressure of high-pressure hose line (15) is not less than 70MPa.
CN201420210932.4U 2014-04-28 2014-04-28 Under-pressure dragging type separate-layer fracturing device Withdrawn - After Issue CN203822281U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420210932.4U CN203822281U (en) 2014-04-28 2014-04-28 Under-pressure dragging type separate-layer fracturing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420210932.4U CN203822281U (en) 2014-04-28 2014-04-28 Under-pressure dragging type separate-layer fracturing device

Publications (1)

Publication Number Publication Date
CN203822281U true CN203822281U (en) 2014-09-10

Family

ID=51477794

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420210932.4U Withdrawn - After Issue CN203822281U (en) 2014-04-28 2014-04-28 Under-pressure dragging type separate-layer fracturing device

Country Status (1)

Country Link
CN (1) CN203822281U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103912257A (en) * 2014-04-28 2014-07-09 中国石油集团渤海钻探工程有限公司 Pressure dragging layering fracturing device
CN106968660A (en) * 2017-06-06 2017-07-21 华美孚泰油气增产技术服务有限责任公司 A kind of new pressure break high pressure line connection combination and corresponding high pressure delivery system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103912257A (en) * 2014-04-28 2014-07-09 中国石油集团渤海钻探工程有限公司 Pressure dragging layering fracturing device
CN103912257B (en) * 2014-04-28 2016-04-06 中国石油集团渤海钻探工程有限公司 A kind of dragging multiple fracturing device with pressure
CN106968660A (en) * 2017-06-06 2017-07-21 华美孚泰油气增产技术服务有限责任公司 A kind of new pressure break high pressure line connection combination and corresponding high pressure delivery system

Similar Documents

Publication Publication Date Title
CN103912257B (en) A kind of dragging multiple fracturing device with pressure
CN104695927B (en) A kind of coiled tubing and production tube compound tube string pressure break and completion integral method
CN103573230B (en) A kind of selectivity production practice and its equipment
CN104153753B (en) Horizontal well volume fracturing tubular column and method based on conventional oil tube pressure dragging
CN102777156A (en) Fracturing method for multi-interval oil and gas wells
CN104533356B (en) The method and oil production by layer method of a kind of two-layer automatic control oil production by layer
CN105804680B (en) A kind of oil gas field workover operation device with pressure and method
CN202596684U (en) Testing process pipe column for casing pipe well completion horizontal well multistage subsection production and water detection
CN103306643A (en) Drainage gas recovery device and method
CN204703876U (en) A kind of bridge-type concentric separated-injection tubing string
CN110005374A (en) A kind of coal bed gas well one-trip string multilayer partial pressure reforming technology
CN103470239A (en) Pressurized-dragging continuous fracturing process
CN104196492B (en) A kind of dragging down-hole plugging valve with pressure
CN104963634B (en) A kind of actuating oil-pumping unit method
RU2594235C2 (en) Method of simultaneous separate operation of multi layer deposit and device for realizing said method
CN202215223U (en) Technology for limit-free staged fracturing down-hole string of horizontal open well
CN203822281U (en) Under-pressure dragging type separate-layer fracturing device
CN205605156U (en) Workover device is pressed in oil gas field area
CN202500541U (en) Tubular column of gas well plumb shaft multi-level layering fracturing technology
CN204082115U (en) Based on the horizontal well volume fracturing tubing string of conventional oil pipe dragging with pressure
CN106014370A (en) Oil-pipe under-pressure dragging fracturing device and technology
CN104196512B (en) Oil well horizontal well oil jacket is the same as the double envelope single deck tape-recorder volume fracturing tubing strings of note formula and fracturing process
CN204386577U (en) The protective jacket in sliding sleeve fracturing hole and sliding sleeve
CN103470233B (en) A kind of heavy crude reservoir natural gas huff and puff oil recovery process system and oil production method
CN205297515U (en) Coiled tubing drags hydraulic jet fracturing device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20140910

Effective date of abandoning: 20160406

C25 Abandonment of patent right or utility model to avoid double patenting