CN204082115U - Based on the horizontal well volume fracturing tubing string of conventional oil pipe dragging with pressure - Google Patents

Based on the horizontal well volume fracturing tubing string of conventional oil pipe dragging with pressure Download PDF

Info

Publication number
CN204082115U
CN204082115U CN201420482761.0U CN201420482761U CN204082115U CN 204082115 U CN204082115 U CN 204082115U CN 201420482761 U CN201420482761 U CN 201420482761U CN 204082115 U CN204082115 U CN 204082115U
Authority
CN
China
Prior art keywords
pressure
tubing string
oil pipe
volume fracturing
horizontal well
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420482761.0U
Other languages
Chinese (zh)
Inventor
孙虎
王祖文
隆世明
苏敏文
邓小强
邓继学
李尊团
宁治军
张文
许建伟
王建树
李景彬
安永江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changqing Downhole Operation Co of CNPC Chuanqing Drilling Engineering Co Ltd
Original Assignee
Changqing Downhole Operation Co of CNPC Chuanqing Drilling Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changqing Downhole Operation Co of CNPC Chuanqing Drilling Engineering Co Ltd filed Critical Changqing Downhole Operation Co of CNPC Chuanqing Drilling Engineering Co Ltd
Priority to CN201420482761.0U priority Critical patent/CN204082115U/en
Application granted granted Critical
Publication of CN204082115U publication Critical patent/CN204082115U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model belongs to super-low permeability reservoir renovation technique field, for oil well horizontal well volume fracturing technique, be specifically related to a kind of horizontal well volume fracturing plumber skill post based on the dragging with pressure of conventional oil pipe, adopt conventional tubing transmission, packer packing is every construction layer, hydraulic jet perforation is carried out by hydraulic sand blasting, tie surface annular preventer combination fracturing tree belt pressure drags tubing string and realizes oil, gas well horizontal well contiguous segmentation volume fracturing is constructed, solve in existing volume fracturing construction technological process, need just can carry out the operation of dragging tubing string by open flow release strata pressure, extend the engineering time, increase the problem of construction cost, shorten the engineering time, improve efficiency of construction, reduce construction cost.

Description

Based on the horizontal well volume fracturing tubing string of conventional oil pipe dragging with pressure
Technical field
The utility model belongs to super-low permeability reservoir renovation technique field, for oil well horizontal well volume fracturing technique, is specifically related to a kind of horizontal well volume fracturing plumber skill post based on the dragging with pressure of conventional oil pipe.
Background technology
Along with the further exploitation in oil field, horizontal well volume fracturing process as a kind of efficient reforming mode using the major alterations mode as extra-low-permeability reservoir.Volume fracturing technology has the feature of large liquid measure, huge discharge, large sand amount, does not reach design displacement requirements by infusion in oil pipe, needs to inject with oil jacket annular space in oil pipe simultaneously.At present, the construction of some oilfield horizontal well volume fracturings is a large amount of to be adopted " packer packing is every construction layer; hydraulic jet perforation, oil jacket are with note; drag tubing string and realize from bottom to top successively volume fracturing construction ", but adopt the method execute man-hour requirement by open flow release strata pressure just can carry out the operation of dragging tubing string, extend the engineering time, increase construction cost.
Utility model content
The purpose of this utility model overcomes in existing volume fracturing construction technological process, needs just can carry out the operation of dragging tubing string by open flow release strata pressure, extends the engineering time, increase the problem of construction cost.
For this reason, the utility model provides a kind of horizontal well volume fracturing tubing string based on the dragging with pressure of conventional oil pipe, comprise oil pipe, the horizontal segment of oil pipe is connected with in turn can closing type hydrajet tool, pressure reduction controlled circulation valve, packer and righting-oriented device, and described hydrajet tool, pressure reduction controlled circulation valve, connected mode between packer and righting-oriented device are screwed connection.
Described hydrajet tool is that mechanical type can close waterpower spray gun.
Described packer is mechanical compression type packer.
Described pressure reduction controlled circulation valve comprises top connection, spool and lower contact, and the head of lower contact is sleeved on the afterbody of top connection and is fixed by stopping screw;
It is inner that spool is positioned at top connection and lower contact, and spool and top connection, be provided with O RunddichtringO between lower contact;
The sidewall of top connection and the sidewall cross-under of spool have same shear pin, and the bottom near shear pin on the sidewall of top connection offers through hole.
Described pressure reduction controlled circulation valve is normally close valve.
The beneficial effects of the utility model: this horizontal well volume fracturing plumber skill post based on the dragging with pressure of conventional oil pipe of the present utility model and fracturing process, adopt conventional tubing transmission, packer packing is every construction layer, hydraulic jet perforation is carried out by hydraulic sand blasting, tie surface annular preventer combination fracturing tree belt pressure drags tubing string and realizes oil, the construction of gas well horizontal well contiguous segmentation volume fracturing, shortens the engineering time, improves efficiency of construction, reduces construction cost.
Below with reference to accompanying drawing, the utility model is described in further details.
Accompanying drawing explanation
Fig. 1 is tubular column structure schematic diagram of the present utility model.
Fig. 2 is pressure reduction controlled circulation valve arrangement figure.
Description of reference numerals: 1, fracture well head; 2, annular preventer; 3, well head big four; 4, hydrajet tool; 5, pressure reduction controlled circulation valve; 6, packer; 7, righting-oriented device; 8, oil pipe; 9, oil jacket annular space; 10, top connection; 11, spool; 12, lower contact; 13, stopping screw; 14, shear pin; 15, through hole.
Detailed description of the invention
In order to overcome in existing volume fracturing construction technological process, just need carry out the operation of dragging tubing string by open flow release strata pressure, extend the engineering time, increase the problem of construction cost.Present embodiments provide a kind of horizontal well volume fracturing tubing string based on the dragging with pressure of conventional oil pipe, as shown in Figure 1, comprise oil pipe 8, the horizontal segment of oil pipe 8 is connected with in turn can closing type hydrajet tool 4, pressure reduction controlled circulation valve 5, packer 6 and righting-oriented device 7, described hydrajet tool 4, pressure reduction controlled circulation valve 5, connected mode between packer 6 and righting-oriented device 7 are screwed connection, hydrajet tool 4 can close waterpower spray gun for mechanical type, and packer 6 is mechanical compression type packer.
Waterpower spray gun can be closed, mechanical compression type packer is applied in oil field hydraulic jet perforation very extensive on, here its structure be not particularly limited to and illustrate, the requirement that routine can close waterpower spray gun, mechanical compression type packer can meet this tool string.
The tubular column structure of this structure, jointly will drag with fracture well head 1 when pressing crack construction, and use under the cooperation of annular preventer 2, realize dragging with pressure, avoid open flow to discharge strata pressure and just can carry out the operation of dragging tubing string, save the time, reduce construction cost.
Pressure reduction controlled circulation valve 5 is normally close valve, as shown in Figure 2, comprises top connection 10, spool 11 and lower contact 12, and the head of lower contact 12 is sleeved on the afterbody of top connection 10 and is fixed by stopping screw 13; It is inner that spool 11 is positioned at top connection 10 and lower contact 12, and spool 11 and top connection 10, be provided with O RunddichtringO between lower contact 12; The sidewall of top connection 10 and the sidewall cross-under of spool 11 have same shear pin 14, and the bottom near shear pin 14 on the sidewall of top connection 10 offers through hole 15.
For pressure reduction controlled circulation valve 5, be mainly used in packer 6 in work progress to lose efficacy, to such an extent as to spray gun uses when normally cannot open abrasive perforating, be normally off time conventional, when tubing string internal pressure is higher than o exterior pressure, with reference to Fig. 2, internal high pressure produces downward hydraulic action to spool 11, this hydraulic action cuts off shear pin 14, spool 11 moves down, liquid now inside and outside tubing string can be linked up by the through hole 15 above top connection 10, and then can realize the inside and outside circulation of tubing string, and safety pulls out of hole and changes drilling tool.
Utilize the fracturing process of the above-mentioned horizontal well volume fracturing tubing string based on the dragging with pressure of conventional oil pipe, comprise the steps,
1) bore under fastening means string:
Fracture well head 1 installs well head big four 3, annular preventer 2 from bottom to top successively;
Fastening means string successively, is from bottom to top: righting-oriented device 7+ packer 6+ pressure reduction controlled circulation valve 5+ can close hydrajet tool 4;
After boring under tool string, the hanger of well head lower flange is connected with oil pipe.
2) set: transfer to design attitude until tool string, by put-on and delegated tubing string, mechanical compression type packer selected here by packer 6, the slips anchoring of mechanical compression type packer is on internal surface of sleeve pipe, apply the packing element of certain the pressure of the drill compression packer 6, set packer 6, packer 6 tubing string while setting is subject to axial compressive force, hydrajet tool 4(selects mechanical type can close waterpower spray gun here) compress in the effect of this axial compressive force, open nozzle fluid hole, the inside and outside nozzle by hydrajet tool of tubing string is communicated with;
3) perforation: infusion load fluid in oil pipe 8, load fluid stream is formed at the nozzle of spray gun and takes sand jet at a high speed, penetrates out sleeve pipe, cementing concrete ring and stratum.During hydraulic jet perforation, the chock pressure difference produced when liquid stream flows through nozzle is less than the opening pressure of pressure reduction controlled circulation valve 5, now pressure differential cycles valve 5 fluid closed condition;
4) pressure break: after perforation terminates, infusion liquid in oil pipe 8, forces stratum crack initiation, after the crack initiation of stratum, injects fracturing fluid carry out pressing crack construction in oil pipe 8 with oil jacket annular space 9 huge discharge;
5) deblocking packer with pressure: after pressing crack construction, close annular preventer 2, fracture well head 1 and all gates of well head big four 3, lay down the connecting bolt between fracture well head 1 and annular preventer 2, tubing string is carried together with on fracture well head 1, deblocking packer 6, closes hydrajet tool 4; Now as follows with the well control state of oil jacket annular space in oil pipe: annular preventer 2 Seal Oil cover annular space 9, and oil jacket annular space 9 movable sealing can be realized.Derrick traveling system is carried together with on tubing string in well, now due to fracture well head 1 connected pipes 8, fluid course in oil pipe 8 is by the gate combined closing of fracture well head 2, liquid stream now in tubing string can not flow out, when fracture well head 1 is together with when tubing string in well is carried, the tubing string axial compressive force that packer 6 applies when setting disappears, spray gun again cuts out under the effect of reset itself spring simultaneously, close oil, cover liquid stream interface channel, it is inner that the liquid now in oil jacket annular space 9 can not enter oil pipe 8.When above carrying to certain altitude (being greater than the deblocking height of packer 6), packer 6 deblocking, transfers the flange face of well head to annular preventer 2, now can open the gate of fracture well head 1, if lost returns liquid in oil pipe, illustrated that down-hole mechanical can be closed spray gun and be closed.Now can carry out unloading well head, tubing string operation is moved in dragging with pressure.
Due to conventional oil pipe rising, lower brill time tubing string have the action of transferring, machinery can the unlatching compressive force of closing type spray gun much larger than the frictional force of mechanical compression type packer and casing wall, when dynamic tubing string, waterpower spray gun can not be opened.
6) dragging tubing string with pressure: do not have well control risk at the moment with oil jacket annular space 9 in oil pipe 8, now can carry out dragging tubing string with pressure operation, adjustment tubing string is to next design and construction position;
7) again set: after tubing string adjustment, well mouth oil pipe 8 is connected all closing gates of fracture well head 1(fracture well head 1 again), by put-on and delegated tubing string set packer 6, packer 6 machinery while setting can be opened by closing type spray gun, connect the connecting bolt of fracture well head and annular preventer, open annular preventer 2;
8) repeat perforation, pressure break: repeat step 3), 4), 5), 6), 7) until all construction location all pressure break complete.Testing seal about packer failure, pulls out of hole and changes tool string.
After in above-mentioned step 7), packer 6 has set again, infusion liquid in oil pipe 8, completed by measurement fluid pressure and envelope operation is tested to packer 6, if testing seal about packer did not lose efficacy, then continue next step construction operation, if testing seal about packer lost efficacy, then carried out construction operation again after needing trip-out to change tool string.
In tool string, be connected with pressure reduction controlled circulation valve 5, when mechanical compression type packer slip mechanism lost efficacy, namely tubing string can not grappling time, now tubing string does not have the strong point as fulcrum to compress tubing string, and then machinery can cannot be opened by closing type spray gun, tubing string is inside and outside carries out open flow or circulation kill-job in oil pipe without interface channel, and now lift pipe string exists risk.Now suppress high pressure in oil pipe, starting differential pressure controlled circulation valve 5, carries out open flow in circulation kill-job or tubing string, pulls out of hole and changes drilling tool.
This fracturing string of the present utility model and fracturing process, adopt conventional tubing transmission, packer packing is every construction layer, hydraulic jet perforation is carried out by hydraulic sand blasting, tie surface annular preventer combination fracturing tree belt pressure drags tubing string and realizes oil, the construction of gas well horizontal well contiguous segmentation volume fracturing, shortens the engineering time, improves efficiency of construction, reduces construction cost.
More than exemplifying is only illustrate of the present utility model, does not form the restriction to protection domain of the present utility model, everyly all belongs within protection domain of the present utility model with the same or analogous design of the utility model.

Claims (5)

1. based on the horizontal well volume fracturing tubing string of conventional oil pipe dragging with pressure, comprise oil pipe (8), it is characterized in that: being connected with in turn on the horizontal segment of oil pipe (8) can closing type hydrajet tool (4), pressure reduction controlled circulation valve (5), packer (6) and righting-oriented device (7), described hydrajet tool (4), pressure reduction controlled circulation valve (5), connected mode between packer (6) and righting-oriented device (7) are screwed connection.
2. as claimed in claim 1 based on the horizontal well volume fracturing tubing string of conventional oil pipe dragging with pressure, it is characterized in that: described hydrajet tool (4) can close waterpower spray gun for mechanical type.
3., as claimed in claim 1 based on the horizontal well volume fracturing tubing string of conventional oil pipe dragging with pressure, it is characterized in that: described packer (6) is mechanical compression type packer.
4. as claimed in claim 1 based on the horizontal well volume fracturing tubing string of conventional oil pipe dragging with pressure, it is characterized in that: described pressure reduction controlled circulation valve (5) comprises top connection (10), spool (11) and lower contact (12), the head of lower contact (12) is sleeved on the afterbody of top connection (10) and is fixed by stopping screw (13);
Spool (11) is positioned at top connection (10) and lower contact (12) is inner, and spool (11) and top connection (10), lower contact are provided with O RunddichtringO between (12);
The sidewall of top connection (10) and the sidewall cross-under of spool (11) have same shear pin (14), and the bottom near shear pin (14) on the sidewall of top connection (10) offers through hole (15).
5., as claimed in claim 4 based on the horizontal well volume fracturing tubing string of conventional oil pipe dragging with pressure, it is characterized in that: described pressure reduction controlled circulation valve (5) is normally close valve.
CN201420482761.0U 2014-08-26 2014-08-26 Based on the horizontal well volume fracturing tubing string of conventional oil pipe dragging with pressure Active CN204082115U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420482761.0U CN204082115U (en) 2014-08-26 2014-08-26 Based on the horizontal well volume fracturing tubing string of conventional oil pipe dragging with pressure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420482761.0U CN204082115U (en) 2014-08-26 2014-08-26 Based on the horizontal well volume fracturing tubing string of conventional oil pipe dragging with pressure

Publications (1)

Publication Number Publication Date
CN204082115U true CN204082115U (en) 2015-01-07

Family

ID=52174846

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420482761.0U Active CN204082115U (en) 2014-08-26 2014-08-26 Based on the horizontal well volume fracturing tubing string of conventional oil pipe dragging with pressure

Country Status (1)

Country Link
CN (1) CN204082115U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104153753A (en) * 2014-08-26 2014-11-19 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 Horizontal well volume fracturing tubular column and method based on conventional oil tube pressure dragging
CN109751018A (en) * 2017-11-01 2019-05-14 中国石油化工股份有限公司 A kind of construction method for normal pressure shale gas volume fracturing
CN111395964A (en) * 2020-03-27 2020-07-10 中国石油大学(北京) Horizontal section cave-making spray gun, tubular column and cave-making method for coal bed gas horizontal well

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104153753A (en) * 2014-08-26 2014-11-19 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 Horizontal well volume fracturing tubular column and method based on conventional oil tube pressure dragging
CN104153753B (en) * 2014-08-26 2017-04-19 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 Horizontal well volume fracturing tubular column and method based on conventional oil tube pressure dragging
CN109751018A (en) * 2017-11-01 2019-05-14 中国石油化工股份有限公司 A kind of construction method for normal pressure shale gas volume fracturing
CN111395964A (en) * 2020-03-27 2020-07-10 中国石油大学(北京) Horizontal section cave-making spray gun, tubular column and cave-making method for coal bed gas horizontal well
CN111395964B (en) * 2020-03-27 2021-03-23 中国石油大学(北京) Horizontal section cave-making spray gun, tubular column and cave-making method for coal bed gas horizontal well

Similar Documents

Publication Publication Date Title
CN104153753B (en) Horizontal well volume fracturing tubular column and method based on conventional oil tube pressure dragging
CN104695927B (en) A kind of coiled tubing and production tube compound tube string pressure break and completion integral method
CN103470242B (en) A kind of oilfield horizontal well volume fracturing method
CN101864921A (en) Well completion and oil production string of horizontal well and well completion and oil production processes thereof
CN101775977B (en) Dual-tube injection well safety production string
CN109736737B (en) Method for snubbing tripping of reservoir gas drilling well
CN104196492B (en) A kind of dragging down-hole plugging valve with pressure
CN204703876U (en) A kind of bridge-type concentric separated-injection tubing string
CN103912257B (en) A kind of dragging multiple fracturing device with pressure
CN204082115U (en) Based on the horizontal well volume fracturing tubing string of conventional oil pipe dragging with pressure
CN205400702U (en) Hard strata shallow layer geothermal well fracturing unit
CN204827256U (en) Seal up and adopt down screen pipe and fill sand control integration operating tool string
CN106014370A (en) Oil-pipe under-pressure dragging fracturing device and technology
CN203685139U (en) Integrated pipe column for perforation, fracture and oil extraction for directional well on the sea
CN203939477U (en) A kind of formation testing and completion practice integrated pipe column
CN105443101A (en) Compression type double-sealing and single-clamping subsection fracturing process pipe column and fracturing method thereof
CN205349316U (en) Two single deck tape -recorder staged fracturing technology tubular columns that seal of compression
CN101839117B (en) Annulus safety valve
CN204041042U (en) A kind of coiled tubing drag fracturing tubing string
CN204386577U (en) The protective jacket in sliding sleeve fracturing hole and sliding sleeve
CN110617057A (en) Full-pipe type underground testing pipe column and testing method thereof
CN206917631U (en) Can bore can drag for the anti-pollution packer of horizontal well
CN105298443A (en) Oil pipe float valve and blowout prevention, gas lift and fracture combined operation method for underbalance well completion oil pipe descending
GB2588029A (en) Annular controlled safety valve system and method
CN205297515U (en) Coiled tubing drags hydraulic jet fracturing device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant