CN206205454U - A kind of construction concrete pit - Google Patents

A kind of construction concrete pit Download PDF

Info

Publication number
CN206205454U
CN206205454U CN201621264917.3U CN201621264917U CN206205454U CN 206205454 U CN206205454 U CN 206205454U CN 201621264917 U CN201621264917 U CN 201621264917U CN 206205454 U CN206205454 U CN 206205454U
Authority
CN
China
Prior art keywords
concrete pit
concrete
supporting plate
pit bottom
motor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621264917.3U
Other languages
Chinese (zh)
Inventor
程磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201621264917.3U priority Critical patent/CN206205454U/en
Application granted granted Critical
Publication of CN206205454U publication Critical patent/CN206205454U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model is related to a kind of construction apparatus,In particular it is a kind of construction concrete pit,Concrete slowly can be not only placed on the position specified,And when ending is built,When not needing many concrete,Part concrete in concrete pit can be placed on specified location,Save material,Gear coordinates with motor I,Connecting pole is on block,Deflecting post is on concrete side II,Rope is between connecting pole and axle I,Concrete pit bottom surface one end is inside concrete pit,Projection on block is engaged with the projection on concrete pit bottom surface,The concrete pit bottom surface other end is outside concrete pit,Concrete pit bottom surface lower end is provided with groove,Support column upper end and the groove fit of concrete pit bottom surface lower end,Support column is in the upper end of supporting plate II,Concrete pit bottom surface lower end is fluted,Gear and the groove fit of concrete pit bottom surface lower end,Supporting plate II is in the lower end of concrete pit side II,Concrete pit side I is provided with link.

Description

A kind of construction concrete pit
Technical field
The utility model is related to a kind of construction apparatus, is in particular a kind of construction concrete pit.
Background technology
During construction, substantial amounts of concrete is generally required, large batch of concrete can only be transported by tower crane Construction location is delivered to, and concrete needs a container for holding, and is exactly concrete pit, in concrete pit general at present, Mostly it is the position that concrete is directly placed on needs from bottom, so not only results in materials from spattering, wastes material, Er Qie When building ending, many concrete are not often needed, and conventional concrete pit can not individually put part concrete Put in the position for needing, remaining concrete is wasted mostly, so devising this concrete pit.
The content of the invention
The utility model, not only can be slow mainly solving the technical problems that provide a kind of construction concrete pit Concrete is placed on the position specified, and when ending is built, it is not necessary to during many concrete, can mix Part concrete in solidifying soil box is placed on specified location, saves material.
In order to solve the above technical problems, the utility model is related to a kind of construction apparatus, in particular it is that one kind is built Build construction concrete pit, including motor I, connecting pole, block, concrete pit side I, concrete pit side II, deflecting post, Rope, motor II, supporting plate I, concrete pit bottom surface, support column, supporting plate II, axle I, gear and axle II, not only can be slow Concrete is placed on the position specified, and when ending is built, it is not necessary to during many concrete, can be by coagulation Part concrete in soil box is placed on specified location, saves material.
Gear is engaged by axle II with motor I, and connecting pole is arranged on block, and deflecting post is arranged on concrete side II On, one end of rope is arranged on connecting pole, and the other end of rope is arranged on axle I, and rope is engaged with deflecting post, and motor II sets Put in the upper end of supporting plate I, motor II is engaged with axle I, and supporting plate I is arranged on concrete pit side I, concrete pit side I It is an entirety with concrete pit side II, block side is provided with projection, and concrete pit ground side is provided with projection, concrete pit One end of bottom surface is arranged on inside concrete pit, and the projection of block side matches with the projection of concrete pit bottom surface side Close, the other end of concrete pit bottom surface is arranged on outside concrete pit, and concrete pit bottom surface lower end is provided with groove, support column upper end With the groove fit of concrete pit bottom surface lower end, support column is arranged on the upper end of supporting plate II, and motor I is arranged in supporting plate II End, concrete pit bottom surface lower end is provided with gear recesses, and gear is engaged with the gear recesses of concrete pit bottom surface lower end, supporting plate II is arranged on the lower end of concrete pit side II, and the upper end of concrete pit side I is provided with link.
As the further optimization of the technical program, the motor described in a kind of construction concrete pit of the utility model Ith, concrete pit side I, concrete pit side II, deflecting post, rope, concrete pit bottom surface, support column, supporting plate II and gear are equal It is provided with 2.
As the further optimization of the technical program, the connection described in a kind of construction concrete pit of the utility model Post is provided with 4.
As the further optimization of the technical program, the gear described in a kind of construction concrete pit of the utility model Block, concrete pit side I, concrete pit side II and concrete pit bottom surface inwall are smooth.
A kind of the utility model construction concrete pit has the beneficial effect that:
A kind of construction concrete pit of the utility model, concrete slowly can be not only placed on the position specified Put, and when ending is built, it is not necessary to during many concrete, the part concrete in concrete pit can be placed In specified location, material is saved.
Brief description of the drawings
The utility model is described in more detail with specific implementation method below in conjunction with the accompanying drawings.
Fig. 1 is a kind of main structure diagram of construction concrete pit of the utility model.
Fig. 2 is a kind of right side structure schematic view of construction concrete pit of the utility model.
Fig. 3 is a kind of overlooking the structure diagram of construction concrete pit of the utility model.
Motor I 1 in figure;Connecting pole 2;Block 3;Concrete pit side I 4;Concrete pit side II 5;Deflecting post 6;Rope 7; Motor II 8;Supporting plate I 9;Concrete pit bottom surface 10;Support column 11;Supporting plate II 12;Axle I 13;Gear 14;Axle II 15.
Specific embodiment
Specific embodiment one:
Present embodiment is illustrated with reference to Fig. 1,2 and 3, the utility model is related to a kind of construction apparatus, more specifically Say it is a kind of construction concrete pit, including motor I 1, connecting pole 2, block 3, concrete pit side I 4, concrete pit Side II 5, deflecting post 6, rope 7, motor II 8, supporting plate I 9, concrete pit bottom surface 10, support column 11, supporting plate II 12, axle I 13rd, gear 14 and axle II 15, concrete slowly can be not only placed on the position specified, and when building finishes up Wait, it is not necessary to during many concrete, the part concrete in concrete pit can be placed on specified location, save material.
Gear 14 is engaged by axle II 15 with motor I 1, and connecting pole 2 is welded on block 3, and deflecting post 6 is welded on coagulation On native side II 5, one end of rope 7 is tied up on connecting pole 2, and the other end of rope 7 is tied up on axle I 13, and restricts 7 by deflecting post 6 Change the direction of motion, motor II 8 is fixed on the upper end of supporting plate I 9, and motor II 8 is engaged with axle I 13, and supporting plate I 9 is welded on mixed On solidifying soil box side I 4, concrete pit side I 4 and concrete pit side II 5 are an entirety, and the side of block 3 is provided with projection, are mixed The solidifying side of soil box ground 10 is provided with projection, and one end of concrete pit bottom surface 10 is arranged on inside concrete pit, and the side of block 3 Projection be engaged with the projection of the side of concrete pit bottom surface 10, prevent transport concrete during concrete pit bottom surface 10 Depart from operating position, the other end of concrete pit bottom surface 10 is arranged on outside concrete pit, and the lower end of concrete pit bottom surface 10 is provided with The groove fit of groove, the upper end of support column 11 and the lower end of concrete pit bottom surface 10, support column 11 is welded on the upper end of supporting plate II 12, Motor I 1 is fixed on the upper end of supporting plate II 12, and the lower end of concrete pit bottom surface 10 is provided with gear recesses, gear 14 and concrete pit bottom The gear recesses of the lower end of face 10 are engaged, and enable gear 14 to drive concrete pit bottom surface 10 to move when rotating, supporting plate II 12 are welded on the lower end of concrete pit side II 5, and the upper end of concrete pit side I 4 is provided with link, the hook for being connected to tower crane On.
Specific embodiment two:
Present embodiment is illustrated with reference to Fig. 1,2 and 3, present embodiment is described further to implementation method one, institute Motor I 1, concrete pit side I 4, concrete pit side II 5, deflecting post 6, the rope 7, concrete pit bottom surface 10, support column stated 11st, supporting plate II 12 and gear 14 are equipped with 2.
Specific embodiment three:
Present embodiment is illustrated with reference to Fig. 1,2 and 3, present embodiment is described further to implementation method one, institute The connecting pole 2 stated is provided with 4.
Specific embodiment four:
Present embodiment is illustrated with reference to Fig. 1,2 and 3, present embodiment is described further to implementation method one, institute Block 3, concrete pit side I 4, concrete pit side II 5 and the inwall of concrete pit bottom surface 10 stated are smooth.
Operation principle of the present utility model is:When below to concrete is placed in concrete pit, supporting plate II 12 is supported On ground, when being transported to specified location, when needing to pour out part concrete, concrete pit is placed on ground by tower crane, left The band moving gear 14 of motor I 1 on side or right side, gear 14 is coordinated by the gear recesses with the lower end of concrete pit bottom surface 10, band The dynamic bottom surface of concrete pit 10 moves leftwards and rightwards, and concrete is lived in I 4 grades of concrete pit side, concrete pit bottom surface 10 is slowly extracted out, Concrete slowly flows out along the inclined-plane of the upper end of block 3 as the gap between concrete pit bottom surface 10 and block 3 increases, while The concrete that following workman will flow out is dialled, and when needing to pour out whole concrete, concrete pit is lifted one by tower crane Fixed height, first allows motor II 8 to put down block 3, and inner concrete slowly flows out along the inclined-plane on block 3, when there is no mixed During solidifying soil outflow, motor I 8 drives concrete pit bottom surface 10 to move, and is inner concrete outflow.
Certainly, described above is not limitation of the utility model, and the utility model is also not limited to the example above, this skill Change, remodeling, addition or replacement that the those of ordinary skill in art field is made in essential scope of the present utility model, also belong to In protection domain of the present utility model.

Claims (4)

1. a kind of construction concrete pit, including motor I (1), connecting pole (2), block (3), concrete pit side I (4), Concrete pit side II (5), deflecting post (6), rope (7), motor II (8), supporting plate I (9), concrete pit bottom surface (10), support Post (11), supporting plate II (12), axle I (13), gear (14) and axle II (15), it is characterised in that:Gear (14) is by axle II (15) it is engaged with motor I (1), connecting pole (2) is arranged on block (3), deflecting post (6) is arranged on concrete side II (5) On, one end of rope (7) is arranged on connecting pole (2), and the other end of rope (7) is arranged on axle I (13), and restrict (7) and deflecting Post (6) is engaged, and motor II (8) is arranged on the upper end of supporting plate I (9), and motor II (8) is engaged with axle I (13), supporting plate I (9) It is arranged on concrete pit side I (4), concrete pit side I (4) and concrete pit side II (5) are an entirety, block (3) side is provided with projection, and concrete pit bottom surface (10) side is provided with projection, and the one end of concrete pit bottom surface (10) is arranged on coagulation Inside soil box, and the projection of block (3) side is engaged with the projection of concrete pit bottom surface (10) side, concrete pit bottom surface (10) the other end is arranged on outside concrete pit, and concrete pit bottom surface (10) lower end is provided with groove, support column (11) upper end with The groove fit of concrete pit bottom surface (10) lower end, support column (11) is arranged on the upper end of supporting plate II (12), and motor I (1) is set In the upper end of supporting plate II (12), concrete pit bottom surface (10) lower end is provided with gear recesses, gear (14) and concrete pit bottom surface (10) gear recesses of lower end are engaged, and supporting plate II (12) is arranged on the lower end of concrete pit side II (5), concrete pit side I (4) upper end is provided with link.
2. a kind of construction concrete pit according to claim 1, it is characterised in that:It is described motor I (1), mixed Solidifying soil box side I (4), concrete pit side II (5), deflecting post (6), rope (7), concrete pit bottom surface (10), support column (11), Supporting plate II (12) and gear (14) are equipped with 2.
3. a kind of construction concrete pit according to claim 1, it is characterised in that:Described connecting pole (2) sets There are 4.
4. a kind of construction concrete pit according to claim 1, it is characterised in that:Described block (3), coagulation Soil box side I (4), concrete pit side II (5) and concrete pit bottom surface (10) inwall are smooth.
CN201621264917.3U 2016-11-24 2016-11-24 A kind of construction concrete pit Expired - Fee Related CN206205454U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621264917.3U CN206205454U (en) 2016-11-24 2016-11-24 A kind of construction concrete pit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621264917.3U CN206205454U (en) 2016-11-24 2016-11-24 A kind of construction concrete pit

Publications (1)

Publication Number Publication Date
CN206205454U true CN206205454U (en) 2017-05-31

Family

ID=58746885

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621264917.3U Expired - Fee Related CN206205454U (en) 2016-11-24 2016-11-24 A kind of construction concrete pit

Country Status (1)

Country Link
CN (1) CN206205454U (en)

Similar Documents

Publication Publication Date Title
CN205630960U (en) Small concrete component production water line
CN105507593A (en) Multifunctional fast concrete pouring device
CN206205454U (en) A kind of construction concrete pit
CN205561549U (en) Improve device of sinter bed gas permeability
CN104339452A (en) Novel separation-resisting dry-mixed mortar material storage tank
CN205476501U (en) Device is pour fast to multi -functional concrete
CN203795865U (en) Lifting tumbling barrel for super-high concrete casting
US9162852B2 (en) Method for controlling a concrete mix casting equipment dismountably attached to a crane and a concrete mix casting equipment dismountably attached to a crane
CN215926781U (en) Subway station construction engineering concrete placement equipment
CN203270595U (en) Independent foundation construction inner formwork device with cup rabbet smaller than 600mm*600mm
CN205414336U (en) Sand box strutting arrangement
CN201214898Y (en) Low beam template reinforcement machine
CN208122325U (en) A kind of assembled architecture Liftable type material distributing machine
CN204112742U (en) A kind of Electronic control concrete ash bucket
CN208529385U (en) For making the concrete dosing system of cement tile idiosome
CN203638604U (en) Solid fermented feed blanking transportation mechanism
CN107190738A (en) A kind of underwater concreting stake machine
CN203062955U (en) Concrete mixing station
CN209261225U (en) A kind of tool for pouring concrete into steel column
CN205036086U (en) A hopper for concreting
CN105712248A (en) Hand lifting mechanism
CN208413757U (en) A kind of carrier-and-stacker with rotation function
CN202704625U (en) Paper-preloading device of glazing machine
CN205740137U (en) Bucket elevator
CN204588135U (en) A kind of bucket wheel machine electric throttling device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170531

Termination date: 20171124