CN206195245U - A auxiliary assembly that hangs when being used for electric power to overhaul and establishes earth connection - Google Patents
A auxiliary assembly that hangs when being used for electric power to overhaul and establishes earth connection Download PDFInfo
- Publication number
- CN206195245U CN206195245U CN201621261635.8U CN201621261635U CN206195245U CN 206195245 U CN206195245 U CN 206195245U CN 201621261635 U CN201621261635 U CN 201621261635U CN 206195245 U CN206195245 U CN 206195245U
- Authority
- CN
- China
- Prior art keywords
- action bars
- phase
- electric power
- ground wire
- jack
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000009471 action Effects 0.000 claims abstract description 91
- 230000003028 elevating effect Effects 0.000 claims description 12
- 230000007246 mechanism Effects 0.000 claims description 11
- 230000008901 benefit Effects 0.000 abstract description 2
- 102000004190 Enzymes Human genes 0.000 abstract 8
- 108090000790 Enzymes Proteins 0.000 abstract 8
- 239000004020 conductor Substances 0.000 abstract 2
- 230000000694 effects Effects 0.000 description 8
- 238000000034 method Methods 0.000 description 3
- 230000008569 process Effects 0.000 description 2
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses an auxiliary assembly that hangs when being used for electric power to overhaul and establishes earth connection, hanging to establish including the earth connection and using lever assembly, lever assembly includes phase 1 enzyme action bars, phase 2 enzyme action bars, third phase action bars, and phase 1 enzyme action bars, phase 2 enzyme action bars, third phase action bars converge with the cable conductor respectively each other, still including being used for the loading the fixed platform of phase 1 enzyme action bars, phase 2 enzyme action bars, third phase action bars, the last lifter that is equipped with of fixed platform, the cable conductor of phase 1 enzyme action bars, phase 2 enzyme action bars, third phase action bars joins into the three -phase unification each other to be held, be equipped with on the lifter and be used for the carry the couple of three -phase unification end. The utility model discloses the advantage lies in reducing the cost of labor of hanging when establishing the earth connection, and the security is good.
Description
【Technical field】
The utility model is related to be hung during for electric power overhaul the auxiliary equipment of ground wire, belongs to field of electrical equipment.
【Background technology】
It is that its operating process is to use cable phase by three through commonly used work post during electric power overhaul works that ground wire hangs
The out of phase earth operating lever for connecting is hung detected on circuit to be detected respectively, and ground wire is hung under normal landform
Difficulty less, but once run into the height for hanging place more than the mutual pool side of cable length when, hang difficult just bright
It is aobvious to increase.Difficulty is essentially consisted in:The hanging of ground wire needs the split-phase to carry out, operator when carrying out the first phase ground wire and hanging, separately
Outer two-phase is vacantly to place or be placed on ground.So, when ground wire hangs the excessive height in place, operating personnel then need
Upper and lower staircase is operated repeatedly to undertake the weight of whole secondary termination.The weight of whole secondary termination is not only grasped including ground wire
Make the weight of bar, also the weight including cable, influenceed by hanging the factors such as height, narrow space in addition, librarian use
Easily fall in staircase operating process and easily touch wire.
Problem above brings sizable unsafe factor to hanging for ground wire.Therefore, tradition is in such ground wire
Hang during generally require other staff's help and grip remaining two action bars so that one hangs the people of need of work two
Or three people coordinate can just complete, inefficiency, cost of labor is high.
【Utility model content】
Technical problem to be solved in the utility model is to overcome the deficiencies in the prior art and provide a kind of for electric power
The auxiliary equipment of ground wire is hung during maintenance, reduction hangs cost of labor during ground wire.
Above-mentioned technical problem is solved, the utility model is adopted the following technical scheme that:
It is a kind of for electric power overhaul when hang the auxiliary equipment of ground wire, including the operation rod that ground wire hangs,
Operation rod includes the first phase action bars, the second phase action bars, third phase action bars, and the first phase action bars, second mutually operate
Bar, third phase action bars are mutually converged with cable respectively, also including for loading the first phase action bars, second mutually operating
The fixed platform of bar, third phase action bars, the fixed platform is provided with elevating lever, the first phase action bars, the second phase action bars,
The cable of third phase action bars mutually merges into three-phase combination one end, and the elevating lever is provided with for three-phase combination one described in carry
The hook at end.
The auxiliary equipment for hanging ground wire in the utility model, first this auxiliary are set includes that loading described first mutually grasps
Make bar, the second phase action bars, the fixed platform of third phase action bars, operating personnel, can be by first when carrying out hanging work
First fixation is put on the stationary platform for phase action bars, the second phase action bars, third phase action bars, does not result in disorder, three operations
Mistake will not be changed between bar, is avoided that repetition hangs the problem of same root action bars.
In addition, in the utility model, the fixed platform is provided with elevating lever, the first phase action bars, the second phase action bars,
The cable of third phase action bars mutually merges into three-phase combination one end, and the elevating lever is provided with for three-phase combination one described in carry
The hook at end, when hanging height and being higher, operating personnel can raise the height of elevating lever, so that three-phase combination one end
Height is also corresponding to be raised, such as when operating personnel need to hang the first phase action bars, the height of three-phase combination one end is raised, and is had
Help diminution hang a little with three unification the distance between ends, it is ensured that the cable between the first phase action bars and three-phase combination one end
Do not stressed in relaxed state, therefore when hanging, operating personnel need not undertake the weight and cable of other two action bars
Weight, it is more laborsaving, convenient to operate, and ensure that security, without it is extra increase with personnel side hang personnel grip it is remaining
Two action bars, reduce cost of labor.
Preferably, the fixed platform includes base, be fixed with upper mounted plate on base, upper mounted plate be provided with for
Insert the jack of the operation rod.
Preferably, fixed plate is fixed on the base by hollow column, position and the sky of the jack
The cavity position correspondence of heart column.
Preferably, the jack include for insert the first phase action bars the first jack, insert second and mutually grasp
, the 3rd jack for inserting third phase action bars, the hollow column includes being correspondingly arranged at the first jack the second jack for making bar
First column of lower section, the second column being correspondingly arranged at below the second jack, the 3rd be correspondingly arranged at below the 3rd jack
Column.
Preferably, at least provided with one for fixing the fast of the operation rod temporarily on the wall of fixed plate side
Tear mechanism open.
Preferably, the Quick-disassembling mechanism includes two panels elastic clip, two panels elastic clip is formed for fixing action bars
The clamping cavity of component, the clamping cavity is provided with opening, and the elastic clip is provided with roller at opening.
Preferably, being provided with bottom plate between fixed plate and base, it also is provided with the bottom plate described
Quick-disassembling mechanism.
Preferably, fixed plate and/or bottom plate are arc.
Preferably, the fixed platform lower section is provided with support feet and universal wheel.
Preferably, fixed plate is provided with push rod handrail.
These features of the present utility model and advantage will be detailed in following specific embodiment, accompanying drawing exposure.
【Brief description of the drawings】
The utility model is described further below in conjunction with the accompanying drawings:
Fig. 1 is the structural representation of fixed platform in the utility model;
Fig. 2 is the structural representation of fixed platform in the utility model;
Fig. 3 is the structural representation after fixed platform installation operation bar assembly in the utility model;
Fig. 4 is schematic diagram when operating personnel operate in the utility model.
【Specific embodiment】
The technical scheme of the utility model embodiment is explained with reference to the accompanying drawing of the utility model embodiment and
Illustrate, but following embodiments are only preferred embodiment of the present utility model, and it is not all.Based on the embodiment in implementation method,
Those skilled in the art obtain other embodiment on the premise of creative work is not made, and belong to of the present utility model
Protection domain.
Referring to figs. 1 to 4, the present embodiment be it is a kind of for electric power overhaul when hang the auxiliary equipment of ground wire, including ground connection
The operation rod that line hangs, operation rod includes the first phase action bars 11, the second phase action bars 12, third phase action bars
13, the first phase action bars 11, the second phase action bars 12, third phase action bars 13 mutually converge to form path with cable respectively,
When hanging, the first phase action bars 11, the second phase action bars 12, third phase action bars 13 individually hang circuit to be detected
On, when wherein one action bars hangs, two action bars need not hang in addition, when line levels to be detected are not high, in addition
Two action bars can be directly placed on the ground, but when circuit to be detected is too high, two action bars then need to be carried in addition
To vacant state, born a heavy burden so as to increase operating personnel, nor safety, once hanging cable is touched, easy hair
Raw electric shock accidents, thus it is traditional hang work, be required for being equipped with other people helping and grip other action bars.
In the present embodiment, fixed platform, the first phase action bars 11, the second phase action bars 12, third phase behaviour are additionally arranged
Making bar 13 can be loaded into fixed platform in advance, and operating personnel, can be by the first phase action bars 11, when carrying out hanging work
Two-phase action bars 12, third phase action bars 13 first fixation puts on the stationary platform, do not result in it is in disorder, between three action bars not
Mistake can be changed, is avoided that repetition hangs the problem of same root action bars.
The fixed platform is provided with elevating lever 2, the first phase action bars 11, the second phase action bars 12, third phase action bars
13 cable mutually merges into three-phase combination one end 101, and the elevating lever 2 is provided with for three-phase combination one end 101 described in carry
Hook 21.Elevating lever 2 in the present embodiment includes outer tube 201 and the inner tube 202 being located in outer tube, on the side wall of outer tube 201
It is provided with the lock-screw 203 for locking inner tube 202.
Hook 21 in the present embodiment is a notched annulus actually, and annulus is fixed on the top of elevating lever 2, specifically
For be integrally fixed at the top of inner tube 202, notched this design of annulus is more preferable to the limit effect of cable.
When using, when hanging height and being higher, operating personnel can raise the height of elevating lever 2, so that three-phase
The height for unifying end 101 is also accordingly raised, such as when operating personnel need to hang the first phase action bars 11, by three-phase combination one end
101 height is raised, and contributes to diminution to hang a little the distance between with three-phase combination one end 101, it is ensured that the first phase action bars 11 and
Cable between three-phase combination one end 101 does not stress in relaxed state, therefore when hanging, operating personnel need not undertake other
The weight of two action bars and the weight of cable, it is more laborsaving, convenient to operate, and ensure that security, matches somebody with somebody without extra increasing
Personnel side hangs personnel and grips remaining two action bars, reduces cost of labor.
Specific structure:The fixed platform includes base 3, and upper mounted plate 4 is fixed with base 3, and upper mounted plate 4 is arc
Shape plate, upper mounted plate 4 is provided with the jack 41 for inserting the operation rod, and the mode for inserting is taken more convenient.Insert
Hole 41 specifically includes:For inserting the first jack 411 of the first phase action bars 11, inserting the second of the second phase action bars 12
Jack 412, the 3rd jack 413 for inserting third phase action bars 13.The bar of cylinder, therefore this implementation are due to general operation bar
The first jack 411, the second jack 412, the 3rd jack 413 are circular hole in example.
Fixed plate 4 is fixed on the base 3 by hollow column 5, and the position of the jack 41 is vertical with hollow
The cavity position correspondence of post 5, specifically, the hollow column 5 includes that being correspondingly arranged at the first of the lower section of the first jack 411 stands
Post 51, the second column 52 being correspondingly arranged at below the second jack 412, the 3rd be correspondingly arranged at below the 3rd jack 413 stand
Post 53.Hollow column 5 in the present embodiment plays two effects, first, being for being fixed upper mounted plate 4 on the base 3, being risen
To an effect being connected, second, structure of the hollow column 5 using its boring so that action bars is inserted from jack 41
After entering, the inside for being contained in hollow column 5 can be stablized, prevent action bars from shaking.Two are completed simultaneously with a hollow column 5
Individual effect, simple structure, small volume, cost is relatively low.
Because the length of action bars is more long, sometimes operating personnel by action bars from hollow column 5 it is whole extract out when compared with
For cumbersome, in order to further simplify operation, it is used at least provided with one in the present embodiment, on the side wall of fixed plate 4 interim
The Quick-disassembling mechanism of the fixation operation rod, the Quick-disassembling mechanism in the present embodiment has three, is uniformly located at the side of upper mounted plate 4
On wall.
Quick-disassembling mechanism in the present embodiment includes two panels elastic clip 42, and the one end of elastic clip 42 is fixed on upper mounted plate 4
Side wall on, two panels elastic clip 42 forms the clamping cavity 43 for fixing operation rod, and the clamping cavity 43 is provided with out
Mouthful, the elastic clip 42 is provided with roller 44 at opening, and during fixed action bars, action bars is snapped in from opening, using roller
Rolling effect, action bars can easily snap onto clamping cavity 43 in, certainly, take out when, it is also possible to it is light from opening
Take out, it is very convenient, entirely extracted out from hollow column 5 without by action bars.
In order to allow Quick-disassembling mechanism more stably to fix action bars, lower fixation is provided between fixed plate 4 and base 3
Plate 6, also is provided with Quick-disassembling mechanism on the Quick-disassembling mechanism, and bottom plate 6 also relative set three on the bottom plate 6
It is individual.Bottom plate 6 is also arc in the present embodiment, is consistent with the shape of upper mounted plate 4, in appearance more globality.
In the present embodiment, in order to more easily move whole fixed platform, the fixed platform lower section is provided with support feet 71
With universal wheel 72, support feet 71 and universal wheel 72 are located at not homonymy in the present embodiment, and the support effect of support feet 71 is good, is unlikely to
At will slide, the removable effect of universal wheel 72 is good, when user needs to move, it is only necessary to which base 3 is inclined into tilting, just can profit
Moved with universal wheel 72, and when that need not move, contacted with ground using support feet 71, preferably, the present embodiment
In universal wheel 72 using locking effect universal wheel 72, this universal wheel 72 relatively conventional on the market, do not made by structure
Illustrate, in addition, moving for convenience, fixed plate 4 is provided with push rod handrail 45, facilitates operating personnel to promote more.
The above, specific embodiment only of the present utility model, but protection domain of the present utility model do not limit to
In this, it is familiar with the those skilled in the art and should be understood that the utility model including but not limited to accompanying drawing and above specific embodiment party
Content described in formula.Any modification without departing from function and structure principle of the present utility model is intended to be included in claims
Scope in.
Claims (10)
1. it is a kind of for electric power overhaul when hang the auxiliary equipment of ground wire, including the operation rod that ground wire hangs, behaviour
Making bar assembly includes the first phase action bars, the second phase action bars, third phase action bars, and the first phase action bars, second are mutually grasped
Make bar, third phase action bars mutually to be converged with cable respectively, it is characterised in that also including mutually being operated for loading described first
Bar, the second phase action bars, the fixed platform of third phase action bars, the fixed platform are provided with elevating lever, the first phase action bars,
Second phase action bars, the cable of third phase action bars mutually merge into three-phase combination one end, and the elevating lever is provided with for hanging
Carry the hook of described three-phase combination one end.
2. it is used to be hung during electric power overhaul the auxiliary equipment of ground wire as claimed in claim 1, it is characterised in that the fixation is put down
Platform includes base, and upper mounted plate is fixed with base, and upper mounted plate is provided with the jack for inserting the operation rod.
3. it is used to be hung during electric power overhaul the auxiliary equipment of ground wire as claimed in claim 2, it is characterised in that fixed
Plate is fixed on the base by hollow column, and the position of the jack is corresponding with the cavity position of hollow column.
4. it is used to be hung during electric power overhaul the auxiliary equipment of ground wire as claimed in claim 3, it is characterised in that the jack bag
Include for the first jack for inserting the first phase action bars, the second jack for inserting the second phase action bars, insert third phase behaviour
Make the 3rd jack of bar, the hollow column includes being correspondingly arranged at the first column below the first jack, is correspondingly arranged at the
The second column below two jacks, the 3rd column being correspondingly arranged at below the 3rd jack.
5. it is used to be hung during electric power overhaul the auxiliary equipment of ground wire as claimed in claim 2, it is characterised in that fixed
At least provided with a Quick-disassembling mechanism for being used to fix the operation rod temporarily on the wall of plate side.
6. it is used to be hung during electric power overhaul the auxiliary equipment of ground wire as claimed in claim 5, it is characterised in that the Quick Release machine
Structure includes two panels elastic clip, and two panels elastic clip forms the clamping cavity for fixing operation rod, and the clamping cavity sets
There is opening, the elastic clip is provided with roller at opening.
7. it is used to be hung during electric power overhaul the auxiliary equipment of ground wire as claimed in claim 6, it is characterised in that fixed
Bottom plate is provided between plate and base, the Quick-disassembling mechanism also is provided with the bottom plate.
8. it is used to be hung during electric power overhaul the auxiliary equipment of ground wire as claimed in claim 7, it is characterised in that fixed
Plate and/or bottom plate are arc.
9. it is used to be hung during electric power overhaul the auxiliary equipment of ground wire as described in one of claim 1 to 8, it is characterised in that institute
State fixed platform lower section and be provided with support feet and universal wheel.
10. it is used to be hung during electric power overhaul the auxiliary equipment of ground wire as described in one of claim 2 to 8, it is characterised in that institute
State upper mounted plate and be provided with push rod handrail.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621261635.8U CN206195245U (en) | 2016-11-21 | 2016-11-21 | A auxiliary assembly that hangs when being used for electric power to overhaul and establishes earth connection |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621261635.8U CN206195245U (en) | 2016-11-21 | 2016-11-21 | A auxiliary assembly that hangs when being used for electric power to overhaul and establishes earth connection |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206195245U true CN206195245U (en) | 2017-05-24 |
Family
ID=58724349
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621261635.8U Active CN206195245U (en) | 2016-11-21 | 2016-11-21 | A auxiliary assembly that hangs when being used for electric power to overhaul and establishes earth connection |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206195245U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106654991A (en) * | 2016-11-21 | 2017-05-10 | 国网浙江省电力公司湖州供电公司 | Auxiliary equipment for hanging ground wire during power maintenance |
CN113964614A (en) * | 2021-11-29 | 2022-01-21 | 广东电网有限责任公司 | Auxiliary mounting tool for grounding wire |
-
2016
- 2016-11-21 CN CN201621261635.8U patent/CN206195245U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106654991A (en) * | 2016-11-21 | 2017-05-10 | 国网浙江省电力公司湖州供电公司 | Auxiliary equipment for hanging ground wire during power maintenance |
CN106654991B (en) * | 2016-11-21 | 2018-11-30 | 国网浙江省电力公司湖州供电公司 | It is a kind of for hanging the ancillary equipment of ground line when electric power overhaul |
CN113964614A (en) * | 2021-11-29 | 2022-01-21 | 广东电网有限责任公司 | Auxiliary mounting tool for grounding wire |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206545475U (en) | A kind of Portable multifunctional insulating ladder | |
CN206195245U (en) | A auxiliary assembly that hangs when being used for electric power to overhaul and establishes earth connection | |
CN106654991B (en) | It is a kind of for hanging the ancillary equipment of ground line when electric power overhaul | |
CN105401873A (en) | Insulating elevator | |
CN204186286U (en) | A kind of electric power overhaul ladder | |
CN107263416A (en) | A kind of portable power power tool case with built-in cat ladder | |
CN103447579B (en) | A kind of combined system and construction method that integrates setting-out, boring, fastening screw | |
CN210577411U (en) | Cable erecting device for building electromechanical installation | |
CN206014314U (en) | A kind of small-sized lowering or hoisting gear | |
CN205178281U (en) | Box -type substation's wiring stable structure | |
CN210866964U (en) | Transformer overhauls protection frame | |
CN204528908U (en) | Portable conducting wire roller fixed mount | |
CN214299167U (en) | Electric power safety construction operation platform | |
CN211215055U (en) | Safety belt hanger special for overhauling lightning arrester of transformer substation | |
CN205610070U (en) | Novel multi -functional electric power maintenance bench | |
CN103950872A (en) | Upright tube hoisting multifunctional tool of substation altitude plant | |
CN212669157U (en) | Telescopic bracket for overhauling substation equipment | |
CN211004327U (en) | Portable pole wire lifter | |
CN205977073U (en) | Portable telescopic combination power maintenance ladder | |
CN207375669U (en) | The electronic lifting bracket of cable tunnel inner column formula cable | |
CN207700824U (en) | A kind of body of rod draws high device | |
CN218320647U (en) | Auxiliary maintenance platform for elevator maintenance | |
CN219840342U (en) | Movable lifting scaffold | |
CN105604473A (en) | Power grid emergency repairing ladder | |
CN205008624U (en) | Electric portable drill support |