CN106654991B - It is a kind of for hanging the ancillary equipment of ground line when electric power overhaul - Google Patents

It is a kind of for hanging the ancillary equipment of ground line when electric power overhaul Download PDF

Info

Publication number
CN106654991B
CN106654991B CN201611040845.9A CN201611040845A CN106654991B CN 106654991 B CN106654991 B CN 106654991B CN 201611040845 A CN201611040845 A CN 201611040845A CN 106654991 B CN106654991 B CN 106654991B
Authority
CN
China
Prior art keywords
operating stick
phase
phase operating
ground line
electric power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611040845.9A
Other languages
Chinese (zh)
Other versions
CN106654991A (en
Inventor
王骁
何锋
谷剑峰
张翔鸿
沈亮
刘俊
刘鹏
郑城
沈丽雯
贾钘楠
朱赢健
蒋钟
刘勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Huzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Anji Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Huzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Anji Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Huzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd, Anji Power Supply Co of State Grid Zhejiang Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201611040845.9A priority Critical patent/CN106654991B/en
Publication of CN106654991A publication Critical patent/CN106654991A/en
Application granted granted Critical
Publication of CN106654991B publication Critical patent/CN106654991B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The invention discloses a kind of for hanging the ancillary equipment of ground line when electric power overhaul, it hangs including ground line with operation rod, operation rod includes the first phase operating stick, second phase operating stick, third phase operating stick, first phase operating stick, second phase operating stick, third phase operating stick is mutually converged with cable respectively, it further include for loading the first phase operating stick, second phase operating stick, the fixed platform of third phase operating stick, the fixed platform is equipped with elevating lever, first phase operating stick, second phase operating stick, the cable of third phase operating stick mutually merges into three-phase combination one end, the elevating lever is equipped with the hook for three-phase combination one end described in carry.The invention has the advantages that reducing cost of labor when hanging ground line, safety is good.

Description

It is a kind of for hanging the ancillary equipment of ground line when electric power overhaul
【Technical field】
The present invention relates to the ancillary equipments for hanging ground line when electric power overhaul, belong to field of electrical equipment.
【Background technique】
It is commonly used work post in electric power overhaul work that ground line, which is hung, and operating process is by three with cable phase The out of phase earth operating lever to connect hangs detected on route to be detected respectively, and ground line is hung under normal landform Difficulty is little, but when encountering length of the height for hanging place more than cable mutual pool side, hangs difficult just bright It is aobvious to increase.Difficulty essentially consists in:Hanging for ground line needs split-phase to carry out, and operator is when the first phase ground wire of progress is hung, separately Outer two-phase is vacantly to place or be placed on ground.In this way, operator then needs when ground line hangs the excessive height in place Undertaking the weight of whole secondary termination, staircase is operated up and down repeatedly.The weight of whole pair termination not only includes ground line behaviour Make the weight of bar, also includes the weight of cable, influenced in addition by hanging the factors such as height, narrow space, personnel's use Easily fall in staircase operating process and easily touches conducting wire.
Problem above gives hanging for ground line to bring sizable insecurity factor.Therefore, tradition is in such ground wire Hang during generally require other staff and help to hold remaining two operating sticks so that one hangs two people of need of work Or three people cooperation can just complete, working efficiency it is low, high labor cost.
【Summary of the invention】
It is provided technical problem to be solved by the present invention lies in overcome the deficiencies in the prior art a kind of for electric power overhaul When hang the ancillary equipment of ground line, reduce cost of labor when hanging ground line.
Above-mentioned technical problem is solved, the present invention adopts the following technical scheme that:
It is a kind of for hanging the ancillary equipment of ground line when electric power overhaul, including being grounded the operation rod that hangs, Operation rod includes the first phase operating stick, the second phase operating stick, third phase operating stick, the first phase operating stick, the operation of the second phase Bar, third phase operating stick are mutually converged with cable respectively, further include for loading the first phase operating stick, the operation of the second phase The fixed platform of bar, third phase operating stick, the fixed platform be equipped with elevating lever, the first phase operating stick, the second phase operating stick, The cable of third phase operating stick mutually merges into three-phase combination one end, and the elevating lever is equipped with for three-phase combination one described in carry The hook at end.
The setting of the ancillary equipment for hanging ground line in the present invention, first this auxiliary includes loading the first phase operation Bar, the second phase operating stick, the fixed platform of third phase operating stick, operator, can be by the first phases when carrying out hanging work First fixation is put on the stationary platform for operating stick, the second phase operating stick, third phase operating stick, not will cause in disorder, three operating sticks Between will not change mistake, be avoided that the problem of repetition hangs same root operating stick.
In addition, the fixed platform is equipped with elevating lever, the first phase operating stick, the second phase operating stick, third in the present invention The cable of phase operating stick mutually merges into three-phase combination one end, and the elevating lever is equipped with for three-phase combination one end described in carry Hook, when hanging highly higher, operator can be increased the height of elevating lever, so that the height of three-phase combination one end Also corresponding to increase, for example when operator needs to hang the first phase operating stick, the height of three-phase combination one end is increased, is facilitated The cable that diminution hangs a little the distance between with three unification ends, between the first phase operating stick of guarantee and three-phase combination one end is in Relaxed state does not stress, therefore when hanging, operator does not need to undertake the weight of other two operating sticks and the weight of cable Amount, operates more labor-saving, conveniently, and ensure that safety, hangs personnel without additionally increasing with personnel side and holds remaining two Operating stick reduces cost of labor.
Preferably, the fixed platform includes pedestal, upper mounted plate is fixed on pedestal, upper mounted plate is equipped with and is used for Insert the jack of the operation rod.
Preferably, fixed plate is fixed on the base by hollow column, the position of the jack and sky The cavity position of heart column is corresponding.
Preferably, the jack includes for inserting the first jack of the first phase operating stick, inserting the second phase behaviour Make the second jack of bar, insert the third jack of third phase operating stick, the hollow column includes being correspondingly arranged at the first jack First column of lower section, the second column being correspondingly arranged at below the second jack, the third being correspondingly arranged at below third jack Column.
Preferably, at least provided with one for being fixed temporarily the fast of the operation rod on fixed plate side wall Tear mechanism open.
Preferably, the Quick-disassembling mechanism includes two panels elastic clip, two panels elastic clip, which is formed, is used for fixed operation bar The clamping cavity of component, the clamping cavity are equipped with opening, and the elastic clip is provided in the opening with idler wheel.
Preferably, being equipped with bottom plate between fixed plate and pedestal, it also is provided on the bottom plate described Quick-disassembling mechanism.
Preferably, fixed plate and/or bottom plate are arc panel.
Preferably, being equipped with support leg and universal wheel below the fixed platform.
Preferably, fixed plate is equipped with push rod handrail.
These features and advantages of the invention will the detailed exposure in following specific embodiment, attached drawing.
【Detailed description of the invention】
Following further describes the present invention with reference to the drawings:
Fig. 1 is the structural schematic diagram of fixed platform in the present invention;
Fig. 2 is the structural schematic diagram of fixed platform in the present invention;
Fig. 3 is the structural schematic diagram that fixed platform installs after operation rod in the present invention;
Schematic diagram when Fig. 4 is operator's operation in the present invention.
【Specific embodiment】
The technical solution of the embodiment of the present invention is explained and illustrated below with reference to the attached drawing of the embodiment of the present invention, but under It states embodiment to be merely a preferred embodiment of the present invention, and not all.Based on the implementation example in the implementation mode, those skilled in the art Obtained other embodiments without making creative work, belong to protection scope of the present invention.
Referring to figs. 1 to 4, the present embodiment is a kind of for hanging the ancillary equipment of ground line, including ground connection when electric power overhaul The operation rod that line is hung, operation rod include the first phase operating stick 11, the second phase operating stick 12, third phase operating stick 13, the first phase operating stick 11, the second phase operating stick 12, third phase operating stick 13 are mutually converged to form access with cable respectively, When hanging, the first phase operating stick 11, the second phase operating stick 12, third phase operating stick 13 individually hang route to be detected On, when wherein an operating stick is hung, in addition two operating sticks do not need to hang, when line levels to be detected are not high, in addition Two operating sticks can be directly placed on the ground, but when route to be detected is excessively high, in addition two operating sticks then need to be carried It to vacant state, bears a heavy burden to increase operator, nor safety is easy hair once touching hanging cable Raw electric shock accidents, thus it is traditional hang work, require to be equipped with other people to help and hold other operating stick.
In the present embodiment, it is additionally arranged fixed platform, the first phase operating stick 11, the second phase operating stick 12, third phase behaviour Making bar 13 can be loaded into fixed platform in advance, and operator, can be by the first phase operating stick 11, when carrying out hanging work Two-phase operating stick 12, third phase operating stick 13 first fixation puts on the stationary platform, not will cause it is in disorder, between three operating sticks not Mistake can be changed, is avoided that the problem of repetition hangs same root operating stick.
The fixed platform is equipped with elevating lever 2, the first phase operating stick 11, the second phase operating stick 12, third phase operating stick 13 cable mutually merges into three-phase combination one end 101, and the elevating lever 2 is equipped with for three-phase combination one end 101 described in carry Hook 21.Elevating lever 2 in the present embodiment includes outer tube 201 and the inner tube 202 that is located in outer tube, on the side wall of outer tube 201 Equipped with the lock-screw 203 for locking inner tube 202.
Hook 21 in the present embodiment is a notched annulus actually, and annulus is fixed on the top of elevating lever 2, specifically For be the top for being fixed on inner tube 202, this design of notched annulus is more preferable to the limit effect of cable.
In use, operator can increase the height of elevating lever 2, so that three-phase when hanging highly higher The height at unification end 101 also accordingly increases, such as when operator needs to hang the first phase operating stick 11, by three-phase combination one end 101 height increases, and helps to reduce hanging a little the distance between with three-phase combination one end 101, guarantee the first phase operating stick 11 and Cable between three-phase combination one end 101 does not stress in relaxed state, therefore when hanging, operator does not need to undertake other The weight of two operating sticks and the weight of cable, operate more labor-saving, conveniently, and ensure that safety, match without additionally increasing Personnel side hangs personnel and holds remaining two operating sticks, reduces cost of labor.
Specific structure:The fixed platform includes pedestal 3, and upper mounted plate 4 is fixed on pedestal 3, and upper mounted plate 4 is arc Shape plate, upper mounted plate 4 are equipped with the jack 41 for inserting the operation rod, and the mode inserted is taken more convenient.It inserts Hole 41 specifically includes:For inserting the first jack 411 of the first phase operating stick 11, inserting the second of the second phase operating stick 12 Jack 412, the third jack 413 for inserting third phase operating stick 13.Since general operation bar is cylindrical bar, therefore this implementation The first jack 411, the second jack 412, third jack 413 are circular hole in example.
Fixed plate 4 is fixed on the pedestal 3 by hollow column 5, and the position of the jack 41 is stood with hollow The cavity position of column 5 is corresponding, specifically, the hollow column 5 includes being correspondingly arranged at the first of 411 lower section of the first jack to stand Column 51, the second column 52 for being correspondingly arranged at 412 lower section of the second jack, the third being correspondingly arranged at below third jack 413 are vertical Column 53.Hollow column 5 in the present embodiment plays the role of two, first, being risen for fixing on the base 3 upper mounted plate 4 The effect being connected and fixed to one, second, structure of the hollow column 5 using its boring, so that operating stick is inserted from jack 41 After entering, the inside for being accommodated in hollow column 5 can be stablized, prevent operating stick from shaking.Two are completed at the same time with a hollow column 5 A effect, structure is simple, small in size, and cost is relatively low.
Since the length of operating stick is longer, when sometimes operator entirely extracts operating stick out out of hollow column 5 compared with It to be cumbersome, is operated to be further simplified, in the present embodiment, at least provided with one for interim on fixed 4 side wall of plate The Quick-disassembling mechanism of the operation rod is fixed, there are three the Quick-disassembling mechanisms in the present embodiment, is uniformly located at the side of upper mounted plate 4 On wall.
Quick-disassembling mechanism in the present embodiment includes two panels elastic clip 42, and 42 one end of elastic clip is fixed on upper mounted plate 4 Side wall on, two panels elastic clip 42 formed be used for fixed operation bar assembly clamping cavity 43, the clamping cavity 43 be equipped with open Mouthful, the elastic clip 42 is provided in the opening with idler wheel 44, and when fixed operation bar, operating stick is caught in from opening, utilizes idler wheel Rolling effect, operating stick can easily snap onto clamping cavity 43 in, certainly, take out when, can also be light from opening It takes out, it is very convenient, without operating stick is entirely extracted out from hollow column 5.
In order to allow Quick-disassembling mechanism can more stably fixed operation bar, lower fixation is equipped between fixed plate 4 and pedestal 3 Plate 6 also is provided with the Quick-disassembling mechanism on the bottom plate 6, and the Quick-disassembling mechanism on bottom plate 6 is also accordingly arranged three It is a.Bottom plate 6 is also arc panel in the present embodiment, is consistent with 4 shape of upper mounted plate, in appearance more globality.
In the present embodiment, in order to more easily move entire fixed platform, support leg 71 is equipped with below the fixed platform With universal wheel 72, support leg 71 and universal wheel 72 are located at not ipsilateral in the present embodiment, and the support effect of support leg 71 is good, is unlikely to At will sliding, the removable effect of universal wheel 72 is good, when user needs mobile, it is only necessary to and pedestal 3 is tilted and is tilted, it can benefit It is moved with universal wheel 72, and when not needing be mobile, using support leg 71 and ground face contact, preferably, the present embodiment In universal wheel 72 using locking effect universal wheel 72, this universal wheel 72 is relatively conventional in the market, and structure was not made Illustrate, in addition, mobile for convenience, fixed plate 4 is equipped with push rod handrail 45 more, and operator is facilitated to push.
The above description is merely a specific embodiment, but scope of protection of the present invention is not limited thereto, is familiar with The those skilled in the art should be understood that the present invention includes but is not limited to attached drawing and interior described in specific embodiment above Hold.Any modification without departing from function and structure principle of the invention is intended to be included in the range of claims.

Claims (9)

1. it is a kind of for hanging the ancillary equipment of ground line when electric power overhaul, including being grounded the operation rod hung, behaviour Making bar assembly includes the first phase operating stick, the second phase operating stick, third phase operating stick, the first phase operating stick, the second phase behaviour Make bar, third phase operating stick is mutually converged with cable respectively, which is characterized in that further include for loading the first phase operation Bar, the second phase operating stick, the fixed platform of third phase operating stick, the fixed platform be equipped with elevating lever, the first phase operating stick, Second phase operating stick, third phase operating stick cable mutually merge into three-phase combination one end, the elevating lever is equipped with for hanging The hook for carrying described three-phase combination one end is linked up with as a notched annulus, and support leg and ten thousand are equipped with below the fixed platform To wheel.
2. being used to hang the ancillary equipment of ground line as described in claim 1 when electric power overhaul, which is characterized in that the fixation is flat Platform includes pedestal, and upper mounted plate is fixed on pedestal, and upper mounted plate is equipped with the jack for inserting the operation rod.
3. being used to hang the ancillary equipment of ground line as claimed in claim 2 when electric power overhaul, which is characterized in that fixed Plate is fixed on the base by hollow column, and the position of the jack and the cavity position of hollow column are corresponding.
4. being used to hang the ancillary equipment of ground line as claimed in claim 3 when electric power overhaul, which is characterized in that the jack packet It includes the first jack for inserting the first phase operating stick, the second jack for inserting the second phase operating stick, insert third phase behaviour Make the third jack of bar, the hollow column includes being correspondingly arranged at the first column below the first jack, being correspondingly arranged at The second column below two jacks, the third column being correspondingly arranged at below third jack.
5. being used to hang the ancillary equipment of ground line as claimed in claim 2 when electric power overhaul, which is characterized in that fixed At least provided with one for being fixed temporarily the Quick-disassembling mechanism of the operation rod on plate side wall.
6. being used to hang the ancillary equipment of ground line as claimed in claim 5 when electric power overhaul, which is characterized in that the Quick Release machine Structure includes two panels elastic clip, and two panels elastic clip forms the clamping cavity for being used for fixed operation bar assembly, which sets There is opening, the elastic clip is provided in the opening with idler wheel.
7. being used to hang the ancillary equipment of ground line as claimed in claim 6 when electric power overhaul, which is characterized in that fixed It is equipped with bottom plate between plate and pedestal, also is provided with the Quick-disassembling mechanism on the bottom plate.
8. being used to hang the ancillary equipment of ground line as claimed in claim 7 when electric power overhaul, which is characterized in that fixed Plate and/or bottom plate are arc panel.
9. being used to hang the ancillary equipment of ground line as described in one of claim 2 to 8 when electric power overhaul, which is characterized in that institute Upper mounted plate is stated equipped with push rod handrail.
CN201611040845.9A 2016-11-21 2016-11-21 It is a kind of for hanging the ancillary equipment of ground line when electric power overhaul Active CN106654991B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611040845.9A CN106654991B (en) 2016-11-21 2016-11-21 It is a kind of for hanging the ancillary equipment of ground line when electric power overhaul

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611040845.9A CN106654991B (en) 2016-11-21 2016-11-21 It is a kind of for hanging the ancillary equipment of ground line when electric power overhaul

Publications (2)

Publication Number Publication Date
CN106654991A CN106654991A (en) 2017-05-10
CN106654991B true CN106654991B (en) 2018-11-30

Family

ID=58811436

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611040845.9A Active CN106654991B (en) 2016-11-21 2016-11-21 It is a kind of for hanging the ancillary equipment of ground line when electric power overhaul

Country Status (1)

Country Link
CN (1) CN106654991B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107919594B (en) * 2017-07-14 2019-08-06 国网浙江省电力公司湖州供电公司 Circulating type is grounded Pilot Operational Equipment
CN110814490A (en) * 2019-10-19 2020-02-21 秦河新材股份有限公司 Butt welding device for cold-rolled steel bar
CN112909596B (en) * 2021-01-28 2022-10-18 国网河南省电力公司信阳供电公司 Clamp-on flexible cable lap joint

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102315530A (en) * 2011-07-12 2012-01-11 镇江市科捷电器有限公司 Ground wire hitching apparatus
CN202333176U (en) * 2011-11-16 2012-07-11 枣强县电力局 Double-row grounding wire hanging bracket
CN103107428A (en) * 2013-02-27 2013-05-15 绥化电业局 10 kv overhead line targeted installation grounding device and overhead line targeted connection method
CN103474905A (en) * 2013-09-24 2013-12-25 国家电网公司 Auxiliary grounding wire laying device
CN104037582A (en) * 2014-06-19 2014-09-10 国网四川省电力公司成都市新都供电分公司 Labor-saving adjustable ground wire hook mounting mechanism
CN204407843U (en) * 2015-02-05 2015-06-17 国家电网公司 Earth connection draw off gear
CN206195245U (en) * 2016-11-21 2017-05-24 国网浙江省电力公司湖州供电公司 A auxiliary assembly that hangs when being used for electric power to overhaul and establishes earth connection

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102315530A (en) * 2011-07-12 2012-01-11 镇江市科捷电器有限公司 Ground wire hitching apparatus
CN202333176U (en) * 2011-11-16 2012-07-11 枣强县电力局 Double-row grounding wire hanging bracket
CN103107428A (en) * 2013-02-27 2013-05-15 绥化电业局 10 kv overhead line targeted installation grounding device and overhead line targeted connection method
CN103474905A (en) * 2013-09-24 2013-12-25 国家电网公司 Auxiliary grounding wire laying device
CN104037582A (en) * 2014-06-19 2014-09-10 国网四川省电力公司成都市新都供电分公司 Labor-saving adjustable ground wire hook mounting mechanism
CN204407843U (en) * 2015-02-05 2015-06-17 国家电网公司 Earth connection draw off gear
CN206195245U (en) * 2016-11-21 2017-05-24 国网浙江省电力公司湖州供电公司 A auxiliary assembly that hangs when being used for electric power to overhaul and establishes earth connection

Also Published As

Publication number Publication date
CN106654991A (en) 2017-05-10

Similar Documents

Publication Publication Date Title
CN106654991B (en) It is a kind of for hanging the ancillary equipment of ground line when electric power overhaul
CN206545475U (en) A kind of Portable multifunctional insulating ladder
US20140218936A1 (en) Transportable lighting device
CN206195245U (en) A auxiliary assembly that hangs when being used for electric power to overhaul and establishes earth connection
CN105401873A (en) Insulating elevator
CN210926904U (en) Cable head manufacturing and fixing device
CN208883305U (en) Graphite crucible hoisting fixture
CN206801090U (en) A kind of building support
CN211502111U (en) Underframe fixing structure for compressor installation
CN210866964U (en) Transformer overhauls protection frame
CN201125558Y (en) Adjustable flag pole
CN204528908U (en) Portable conducting wire roller fixed mount
CN203748795U (en) Umbrella convenient to dry
CN106744438A (en) Telescoping cable trench cover drawing device
CN220133878U (en) Double ladder convenient to store
CN203271557U (en) Portable hanging ladder
CN206203762U (en) Telescoping cable trench cover drawing device
CN208308358U (en) A kind of aluminum alloy lift
CN216664157U (en) Supporting construction for geotechnical engineering
CN204809743U (en) Novel somersault coaster
CN215760846U (en) Novel shed roof structure convenient to expand and contract
CN209083042U (en) A kind of Multifunction pipe-type horizontal support device
CN214204645U (en) Multi-circuit line tower live-line work limiting device
CN211038490U (en) Climbing frame for electric power construction
CN106285069A (en) A kind of Novel stage

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant