CN106654991B - It is a kind of for hanging the ancillary equipment of ground line when electric power overhaul - Google Patents
It is a kind of for hanging the ancillary equipment of ground line when electric power overhaul Download PDFInfo
- Publication number
- CN106654991B CN106654991B CN201611040845.9A CN201611040845A CN106654991B CN 106654991 B CN106654991 B CN 106654991B CN 201611040845 A CN201611040845 A CN 201611040845A CN 106654991 B CN106654991 B CN 106654991B
- Authority
- CN
- China
- Prior art keywords
- operating stick
- phase
- phase operating
- ground line
- electric power
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000003028 elevating effect Effects 0.000 claims abstract description 14
- 230000007246 mechanism Effects 0.000 claims description 11
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims description 11
- 230000008901 benefit Effects 0.000 abstract description 3
- 230000000694 effects Effects 0.000 description 7
- 238000010586 diagram Methods 0.000 description 4
- 230000001965 increasing effect Effects 0.000 description 4
- 238000000034 method Methods 0.000 description 3
- 230000008569 process Effects 0.000 description 2
- 230000008859 change Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 239000000284 extract Substances 0.000 description 1
- 230000003447 ipsilateral effect Effects 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G1/00—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
- H02G1/02—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
Landscapes
- Laying Of Electric Cables Or Lines Outside (AREA)
Abstract
The invention discloses a kind of for hanging the ancillary equipment of ground line when electric power overhaul, it hangs including ground line with operation rod, operation rod includes the first phase operating stick, second phase operating stick, third phase operating stick, first phase operating stick, second phase operating stick, third phase operating stick is mutually converged with cable respectively, it further include for loading the first phase operating stick, second phase operating stick, the fixed platform of third phase operating stick, the fixed platform is equipped with elevating lever, first phase operating stick, second phase operating stick, the cable of third phase operating stick mutually merges into three-phase combination one end, the elevating lever is equipped with the hook for three-phase combination one end described in carry.The invention has the advantages that reducing cost of labor when hanging ground line, safety is good.
Description
【Technical field】
The present invention relates to the ancillary equipments for hanging ground line when electric power overhaul, belong to field of electrical equipment.
【Background technique】
It is commonly used work post in electric power overhaul work that ground line, which is hung, and operating process is by three with cable phase
The out of phase earth operating lever to connect hangs detected on route to be detected respectively, and ground line is hung under normal landform
Difficulty is little, but when encountering length of the height for hanging place more than cable mutual pool side, hangs difficult just bright
It is aobvious to increase.Difficulty essentially consists in:Hanging for ground line needs split-phase to carry out, and operator is when the first phase ground wire of progress is hung, separately
Outer two-phase is vacantly to place or be placed on ground.In this way, operator then needs when ground line hangs the excessive height in place
Undertaking the weight of whole secondary termination, staircase is operated up and down repeatedly.The weight of whole pair termination not only includes ground line behaviour
Make the weight of bar, also includes the weight of cable, influenced in addition by hanging the factors such as height, narrow space, personnel's use
Easily fall in staircase operating process and easily touches conducting wire.
Problem above gives hanging for ground line to bring sizable insecurity factor.Therefore, tradition is in such ground wire
Hang during generally require other staff and help to hold remaining two operating sticks so that one hangs two people of need of work
Or three people cooperation can just complete, working efficiency it is low, high labor cost.
【Summary of the invention】
It is provided technical problem to be solved by the present invention lies in overcome the deficiencies in the prior art a kind of for electric power overhaul
When hang the ancillary equipment of ground line, reduce cost of labor when hanging ground line.
Above-mentioned technical problem is solved, the present invention adopts the following technical scheme that:
It is a kind of for hanging the ancillary equipment of ground line when electric power overhaul, including being grounded the operation rod that hangs,
Operation rod includes the first phase operating stick, the second phase operating stick, third phase operating stick, the first phase operating stick, the operation of the second phase
Bar, third phase operating stick are mutually converged with cable respectively, further include for loading the first phase operating stick, the operation of the second phase
The fixed platform of bar, third phase operating stick, the fixed platform be equipped with elevating lever, the first phase operating stick, the second phase operating stick,
The cable of third phase operating stick mutually merges into three-phase combination one end, and the elevating lever is equipped with for three-phase combination one described in carry
The hook at end.
The setting of the ancillary equipment for hanging ground line in the present invention, first this auxiliary includes loading the first phase operation
Bar, the second phase operating stick, the fixed platform of third phase operating stick, operator, can be by the first phases when carrying out hanging work
First fixation is put on the stationary platform for operating stick, the second phase operating stick, third phase operating stick, not will cause in disorder, three operating sticks
Between will not change mistake, be avoided that the problem of repetition hangs same root operating stick.
In addition, the fixed platform is equipped with elevating lever, the first phase operating stick, the second phase operating stick, third in the present invention
The cable of phase operating stick mutually merges into three-phase combination one end, and the elevating lever is equipped with for three-phase combination one end described in carry
Hook, when hanging highly higher, operator can be increased the height of elevating lever, so that the height of three-phase combination one end
Also corresponding to increase, for example when operator needs to hang the first phase operating stick, the height of three-phase combination one end is increased, is facilitated
The cable that diminution hangs a little the distance between with three unification ends, between the first phase operating stick of guarantee and three-phase combination one end is in
Relaxed state does not stress, therefore when hanging, operator does not need to undertake the weight of other two operating sticks and the weight of cable
Amount, operates more labor-saving, conveniently, and ensure that safety, hangs personnel without additionally increasing with personnel side and holds remaining two
Operating stick reduces cost of labor.
Preferably, the fixed platform includes pedestal, upper mounted plate is fixed on pedestal, upper mounted plate is equipped with and is used for
Insert the jack of the operation rod.
Preferably, fixed plate is fixed on the base by hollow column, the position of the jack and sky
The cavity position of heart column is corresponding.
Preferably, the jack includes for inserting the first jack of the first phase operating stick, inserting the second phase behaviour
Make the second jack of bar, insert the third jack of third phase operating stick, the hollow column includes being correspondingly arranged at the first jack
First column of lower section, the second column being correspondingly arranged at below the second jack, the third being correspondingly arranged at below third jack
Column.
Preferably, at least provided with one for being fixed temporarily the fast of the operation rod on fixed plate side wall
Tear mechanism open.
Preferably, the Quick-disassembling mechanism includes two panels elastic clip, two panels elastic clip, which is formed, is used for fixed operation bar
The clamping cavity of component, the clamping cavity are equipped with opening, and the elastic clip is provided in the opening with idler wheel.
Preferably, being equipped with bottom plate between fixed plate and pedestal, it also is provided on the bottom plate described
Quick-disassembling mechanism.
Preferably, fixed plate and/or bottom plate are arc panel.
Preferably, being equipped with support leg and universal wheel below the fixed platform.
Preferably, fixed plate is equipped with push rod handrail.
These features and advantages of the invention will the detailed exposure in following specific embodiment, attached drawing.
【Detailed description of the invention】
Following further describes the present invention with reference to the drawings:
Fig. 1 is the structural schematic diagram of fixed platform in the present invention;
Fig. 2 is the structural schematic diagram of fixed platform in the present invention;
Fig. 3 is the structural schematic diagram that fixed platform installs after operation rod in the present invention;
Schematic diagram when Fig. 4 is operator's operation in the present invention.
【Specific embodiment】
The technical solution of the embodiment of the present invention is explained and illustrated below with reference to the attached drawing of the embodiment of the present invention, but under
It states embodiment to be merely a preferred embodiment of the present invention, and not all.Based on the implementation example in the implementation mode, those skilled in the art
Obtained other embodiments without making creative work, belong to protection scope of the present invention.
Referring to figs. 1 to 4, the present embodiment is a kind of for hanging the ancillary equipment of ground line, including ground connection when electric power overhaul
The operation rod that line is hung, operation rod include the first phase operating stick 11, the second phase operating stick 12, third phase operating stick
13, the first phase operating stick 11, the second phase operating stick 12, third phase operating stick 13 are mutually converged to form access with cable respectively,
When hanging, the first phase operating stick 11, the second phase operating stick 12, third phase operating stick 13 individually hang route to be detected
On, when wherein an operating stick is hung, in addition two operating sticks do not need to hang, when line levels to be detected are not high, in addition
Two operating sticks can be directly placed on the ground, but when route to be detected is excessively high, in addition two operating sticks then need to be carried
It to vacant state, bears a heavy burden to increase operator, nor safety is easy hair once touching hanging cable
Raw electric shock accidents, thus it is traditional hang work, require to be equipped with other people to help and hold other operating stick.
In the present embodiment, it is additionally arranged fixed platform, the first phase operating stick 11, the second phase operating stick 12, third phase behaviour
Making bar 13 can be loaded into fixed platform in advance, and operator, can be by the first phase operating stick 11, when carrying out hanging work
Two-phase operating stick 12, third phase operating stick 13 first fixation puts on the stationary platform, not will cause it is in disorder, between three operating sticks not
Mistake can be changed, is avoided that the problem of repetition hangs same root operating stick.
The fixed platform is equipped with elevating lever 2, the first phase operating stick 11, the second phase operating stick 12, third phase operating stick
13 cable mutually merges into three-phase combination one end 101, and the elevating lever 2 is equipped with for three-phase combination one end 101 described in carry
Hook 21.Elevating lever 2 in the present embodiment includes outer tube 201 and the inner tube 202 that is located in outer tube, on the side wall of outer tube 201
Equipped with the lock-screw 203 for locking inner tube 202.
Hook 21 in the present embodiment is a notched annulus actually, and annulus is fixed on the top of elevating lever 2, specifically
For be the top for being fixed on inner tube 202, this design of notched annulus is more preferable to the limit effect of cable.
In use, operator can increase the height of elevating lever 2, so that three-phase when hanging highly higher
The height at unification end 101 also accordingly increases, such as when operator needs to hang the first phase operating stick 11, by three-phase combination one end
101 height increases, and helps to reduce hanging a little the distance between with three-phase combination one end 101, guarantee the first phase operating stick 11 and
Cable between three-phase combination one end 101 does not stress in relaxed state, therefore when hanging, operator does not need to undertake other
The weight of two operating sticks and the weight of cable, operate more labor-saving, conveniently, and ensure that safety, match without additionally increasing
Personnel side hangs personnel and holds remaining two operating sticks, reduces cost of labor.
Specific structure:The fixed platform includes pedestal 3, and upper mounted plate 4 is fixed on pedestal 3, and upper mounted plate 4 is arc
Shape plate, upper mounted plate 4 are equipped with the jack 41 for inserting the operation rod, and the mode inserted is taken more convenient.It inserts
Hole 41 specifically includes:For inserting the first jack 411 of the first phase operating stick 11, inserting the second of the second phase operating stick 12
Jack 412, the third jack 413 for inserting third phase operating stick 13.Since general operation bar is cylindrical bar, therefore this implementation
The first jack 411, the second jack 412, third jack 413 are circular hole in example.
Fixed plate 4 is fixed on the pedestal 3 by hollow column 5, and the position of the jack 41 is stood with hollow
The cavity position of column 5 is corresponding, specifically, the hollow column 5 includes being correspondingly arranged at the first of 411 lower section of the first jack to stand
Column 51, the second column 52 for being correspondingly arranged at 412 lower section of the second jack, the third being correspondingly arranged at below third jack 413 are vertical
Column 53.Hollow column 5 in the present embodiment plays the role of two, first, being risen for fixing on the base 3 upper mounted plate 4
The effect being connected and fixed to one, second, structure of the hollow column 5 using its boring, so that operating stick is inserted from jack 41
After entering, the inside for being accommodated in hollow column 5 can be stablized, prevent operating stick from shaking.Two are completed at the same time with a hollow column 5
A effect, structure is simple, small in size, and cost is relatively low.
Since the length of operating stick is longer, when sometimes operator entirely extracts operating stick out out of hollow column 5 compared with
It to be cumbersome, is operated to be further simplified, in the present embodiment, at least provided with one for interim on fixed 4 side wall of plate
The Quick-disassembling mechanism of the operation rod is fixed, there are three the Quick-disassembling mechanisms in the present embodiment, is uniformly located at the side of upper mounted plate 4
On wall.
Quick-disassembling mechanism in the present embodiment includes two panels elastic clip 42, and 42 one end of elastic clip is fixed on upper mounted plate 4
Side wall on, two panels elastic clip 42 formed be used for fixed operation bar assembly clamping cavity 43, the clamping cavity 43 be equipped with open
Mouthful, the elastic clip 42 is provided in the opening with idler wheel 44, and when fixed operation bar, operating stick is caught in from opening, utilizes idler wheel
Rolling effect, operating stick can easily snap onto clamping cavity 43 in, certainly, take out when, can also be light from opening
It takes out, it is very convenient, without operating stick is entirely extracted out from hollow column 5.
In order to allow Quick-disassembling mechanism can more stably fixed operation bar, lower fixation is equipped between fixed plate 4 and pedestal 3
Plate 6 also is provided with the Quick-disassembling mechanism on the bottom plate 6, and the Quick-disassembling mechanism on bottom plate 6 is also accordingly arranged three
It is a.Bottom plate 6 is also arc panel in the present embodiment, is consistent with 4 shape of upper mounted plate, in appearance more globality.
In the present embodiment, in order to more easily move entire fixed platform, support leg 71 is equipped with below the fixed platform
With universal wheel 72, support leg 71 and universal wheel 72 are located at not ipsilateral in the present embodiment, and the support effect of support leg 71 is good, is unlikely to
At will sliding, the removable effect of universal wheel 72 is good, when user needs mobile, it is only necessary to and pedestal 3 is tilted and is tilted, it can benefit
It is moved with universal wheel 72, and when not needing be mobile, using support leg 71 and ground face contact, preferably, the present embodiment
In universal wheel 72 using locking effect universal wheel 72, this universal wheel 72 is relatively conventional in the market, and structure was not made
Illustrate, in addition, mobile for convenience, fixed plate 4 is equipped with push rod handrail 45 more, and operator is facilitated to push.
The above description is merely a specific embodiment, but scope of protection of the present invention is not limited thereto, is familiar with
The those skilled in the art should be understood that the present invention includes but is not limited to attached drawing and interior described in specific embodiment above
Hold.Any modification without departing from function and structure principle of the invention is intended to be included in the range of claims.
Claims (9)
1. it is a kind of for hanging the ancillary equipment of ground line when electric power overhaul, including being grounded the operation rod hung, behaviour
Making bar assembly includes the first phase operating stick, the second phase operating stick, third phase operating stick, the first phase operating stick, the second phase behaviour
Make bar, third phase operating stick is mutually converged with cable respectively, which is characterized in that further include for loading the first phase operation
Bar, the second phase operating stick, the fixed platform of third phase operating stick, the fixed platform be equipped with elevating lever, the first phase operating stick,
Second phase operating stick, third phase operating stick cable mutually merge into three-phase combination one end, the elevating lever is equipped with for hanging
The hook for carrying described three-phase combination one end is linked up with as a notched annulus, and support leg and ten thousand are equipped with below the fixed platform
To wheel.
2. being used to hang the ancillary equipment of ground line as described in claim 1 when electric power overhaul, which is characterized in that the fixation is flat
Platform includes pedestal, and upper mounted plate is fixed on pedestal, and upper mounted plate is equipped with the jack for inserting the operation rod.
3. being used to hang the ancillary equipment of ground line as claimed in claim 2 when electric power overhaul, which is characterized in that fixed
Plate is fixed on the base by hollow column, and the position of the jack and the cavity position of hollow column are corresponding.
4. being used to hang the ancillary equipment of ground line as claimed in claim 3 when electric power overhaul, which is characterized in that the jack packet
It includes the first jack for inserting the first phase operating stick, the second jack for inserting the second phase operating stick, insert third phase behaviour
Make the third jack of bar, the hollow column includes being correspondingly arranged at the first column below the first jack, being correspondingly arranged at
The second column below two jacks, the third column being correspondingly arranged at below third jack.
5. being used to hang the ancillary equipment of ground line as claimed in claim 2 when electric power overhaul, which is characterized in that fixed
At least provided with one for being fixed temporarily the Quick-disassembling mechanism of the operation rod on plate side wall.
6. being used to hang the ancillary equipment of ground line as claimed in claim 5 when electric power overhaul, which is characterized in that the Quick Release machine
Structure includes two panels elastic clip, and two panels elastic clip forms the clamping cavity for being used for fixed operation bar assembly, which sets
There is opening, the elastic clip is provided in the opening with idler wheel.
7. being used to hang the ancillary equipment of ground line as claimed in claim 6 when electric power overhaul, which is characterized in that fixed
It is equipped with bottom plate between plate and pedestal, also is provided with the Quick-disassembling mechanism on the bottom plate.
8. being used to hang the ancillary equipment of ground line as claimed in claim 7 when electric power overhaul, which is characterized in that fixed
Plate and/or bottom plate are arc panel.
9. being used to hang the ancillary equipment of ground line as described in one of claim 2 to 8 when electric power overhaul, which is characterized in that institute
Upper mounted plate is stated equipped with push rod handrail.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611040845.9A CN106654991B (en) | 2016-11-21 | 2016-11-21 | It is a kind of for hanging the ancillary equipment of ground line when electric power overhaul |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611040845.9A CN106654991B (en) | 2016-11-21 | 2016-11-21 | It is a kind of for hanging the ancillary equipment of ground line when electric power overhaul |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106654991A CN106654991A (en) | 2017-05-10 |
CN106654991B true CN106654991B (en) | 2018-11-30 |
Family
ID=58811436
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611040845.9A Active CN106654991B (en) | 2016-11-21 | 2016-11-21 | It is a kind of for hanging the ancillary equipment of ground line when electric power overhaul |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106654991B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107919594B (en) * | 2017-07-14 | 2019-08-06 | 国网浙江省电力公司湖州供电公司 | Circulating type is grounded Pilot Operational Equipment |
CN110814490A (en) * | 2019-10-19 | 2020-02-21 | 秦河新材股份有限公司 | Butt welding device for cold-rolled steel bar |
CN112909596B (en) * | 2021-01-28 | 2022-10-18 | 国网河南省电力公司信阳供电公司 | Clamp-on flexible cable lap joint |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102315530A (en) * | 2011-07-12 | 2012-01-11 | 镇江市科捷电器有限公司 | Ground wire hitching apparatus |
CN202333176U (en) * | 2011-11-16 | 2012-07-11 | 枣强县电力局 | Double-row grounding wire hanging bracket |
CN103107428A (en) * | 2013-02-27 | 2013-05-15 | 绥化电业局 | 10 kv overhead line targeted installation grounding device and overhead line targeted connection method |
CN103474905A (en) * | 2013-09-24 | 2013-12-25 | 国家电网公司 | Auxiliary grounding wire laying device |
CN104037582A (en) * | 2014-06-19 | 2014-09-10 | 国网四川省电力公司成都市新都供电分公司 | Labor-saving adjustable ground wire hook mounting mechanism |
CN204407843U (en) * | 2015-02-05 | 2015-06-17 | 国家电网公司 | Earth connection draw off gear |
CN206195245U (en) * | 2016-11-21 | 2017-05-24 | 国网浙江省电力公司湖州供电公司 | A auxiliary assembly that hangs when being used for electric power to overhaul and establishes earth connection |
-
2016
- 2016-11-21 CN CN201611040845.9A patent/CN106654991B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102315530A (en) * | 2011-07-12 | 2012-01-11 | 镇江市科捷电器有限公司 | Ground wire hitching apparatus |
CN202333176U (en) * | 2011-11-16 | 2012-07-11 | 枣强县电力局 | Double-row grounding wire hanging bracket |
CN103107428A (en) * | 2013-02-27 | 2013-05-15 | 绥化电业局 | 10 kv overhead line targeted installation grounding device and overhead line targeted connection method |
CN103474905A (en) * | 2013-09-24 | 2013-12-25 | 国家电网公司 | Auxiliary grounding wire laying device |
CN104037582A (en) * | 2014-06-19 | 2014-09-10 | 国网四川省电力公司成都市新都供电分公司 | Labor-saving adjustable ground wire hook mounting mechanism |
CN204407843U (en) * | 2015-02-05 | 2015-06-17 | 国家电网公司 | Earth connection draw off gear |
CN206195245U (en) * | 2016-11-21 | 2017-05-24 | 国网浙江省电力公司湖州供电公司 | A auxiliary assembly that hangs when being used for electric power to overhaul and establishes earth connection |
Also Published As
Publication number | Publication date |
---|---|
CN106654991A (en) | 2017-05-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106654991B (en) | It is a kind of for hanging the ancillary equipment of ground line when electric power overhaul | |
CN206545475U (en) | A kind of Portable multifunctional insulating ladder | |
US20140218936A1 (en) | Transportable lighting device | |
CN206195245U (en) | A auxiliary assembly that hangs when being used for electric power to overhaul and establishes earth connection | |
CN105401873A (en) | Insulating elevator | |
CN210926904U (en) | Cable head manufacturing and fixing device | |
CN208883305U (en) | Graphite crucible hoisting fixture | |
CN206801090U (en) | A kind of building support | |
CN211502111U (en) | Underframe fixing structure for compressor installation | |
CN210866964U (en) | Transformer overhauls protection frame | |
CN201125558Y (en) | Adjustable flag pole | |
CN204528908U (en) | Portable conducting wire roller fixed mount | |
CN203748795U (en) | Umbrella convenient to dry | |
CN106744438A (en) | Telescoping cable trench cover drawing device | |
CN220133878U (en) | Double ladder convenient to store | |
CN203271557U (en) | Portable hanging ladder | |
CN206203762U (en) | Telescoping cable trench cover drawing device | |
CN208308358U (en) | A kind of aluminum alloy lift | |
CN216664157U (en) | Supporting construction for geotechnical engineering | |
CN204809743U (en) | Novel somersault coaster | |
CN215760846U (en) | Novel shed roof structure convenient to expand and contract | |
CN209083042U (en) | A kind of Multifunction pipe-type horizontal support device | |
CN214204645U (en) | Multi-circuit line tower live-line work limiting device | |
CN211038490U (en) | Climbing frame for electric power construction | |
CN106285069A (en) | A kind of Novel stage |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |