CN211038490U - Climbing frame for electric power construction - Google Patents

Climbing frame for electric power construction Download PDF

Info

Publication number
CN211038490U
CN211038490U CN201921349035.0U CN201921349035U CN211038490U CN 211038490 U CN211038490 U CN 211038490U CN 201921349035 U CN201921349035 U CN 201921349035U CN 211038490 U CN211038490 U CN 211038490U
Authority
CN
China
Prior art keywords
climbing frame
electric power
climbing
power construction
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921349035.0U
Other languages
Chinese (zh)
Inventor
梁岳连
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Xineng Electric Co ltd
Original Assignee
Guangxi Xineng Electric Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Xineng Electric Co ltd filed Critical Guangxi Xineng Electric Co ltd
Priority to CN201921349035.0U priority Critical patent/CN211038490U/en
Application granted granted Critical
Publication of CN211038490U publication Critical patent/CN211038490U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Ladders (AREA)

Abstract

The utility model discloses an electric power construction is with climbing frame, including base and climbing frame body, the side symmetry welding of base top surface has two pivot ears, and all weld on the front and back both ends of base top surface has first spout piece, the inside horizontal sliding of first spout piece has first slider, and the vertical welding of one end of first spout piece has the screw hole ear on the base top surface, horizontal installation has the screw rod in the screw hole ear, and the one end rotation of screw rod is fixed in one side of first slider, the base has fixed ear near a side end face horizontal welding of pivot ear, and install the staple in the fixed ear, climbing frame body includes first climbing frame and second climbing frame. The utility model discloses can highly carry out nimble use according to the use, conveniently reduce the height that its used when carrying the transportation simultaneously, conveniently carry, and then be favorable to improving the flexibility of using and the convenience of carrying.

Description

Climbing frame for electric power construction
Technical Field
The utility model relates to an electric power construction auxiliary assembly technical field especially relates to an electric power construction is with climbing frame.
Background
In the construction is maintained to current electric power, in order to overhaul and maintain the circuit or the electric elements of eminence, constructor need generally climb to the eminence with the help of the climbing frame and maintain and overhaul, current electric power construction is with climbing frame simple structure and high fixed, can not in time be according to user's concrete use height, adjust, simultaneously when using because the high fixation is in the comparatively narrow and small construction site in some spaces, traditional climbing frame is difficult to get into, it is inconvenient to carry the transportation.
Therefore, a climbing frame for electric power construction is needed, which can be flexibly used according to the use height, is convenient to carry and transport, and is convenient to reduce the use height, thereby being beneficial to improving the use flexibility and carrying convenience.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an electric power construction is with climbing frame, aim at improving current electric power construction is with climbing frame simple structure and high fixed, can not in time adjust according to user's concrete height of using, simultaneously when using because the high fixation is in the comparatively narrow and small construction place in some spaces, traditional climbing frame is difficult to get into, carries the inconvenient problem of transportation.
The utility model discloses a realize like this: a climbing frame for electric power construction comprises a base and a climbing frame body, wherein two rotating shaft lugs are symmetrically welded on one side of the top surface of the base, first sliding groove blocks are welded at the front end and the rear end of the top surface of the base, a first sliding block is horizontally and slidably mounted inside the first sliding groove blocks, a screw hole lug is vertically welded at one end of the first sliding groove block on the top surface of the base, a screw rod is horizontally mounted in the screw hole lug, one end of the screw rod is rotationally fixed on one side of the first sliding block, a fixing lug is horizontally welded on the end surface of one side, close to the rotating shaft lugs, of the base, and a fixing nail is mounted in the fixing lug; the climbing frame body comprises a first climbing frame and a second climbing frame, the first climbing frame and the second climbing frame comprise side plates and pedals, the side plates are arranged oppositely, and a plurality of pedals are vertically fixed between the side plates.
Furthermore, the bottom end of the side plate of the first climbing frame is provided with a rotating shaft matched with the rotating shaft lug, one side of the side plate of the first climbing frame is provided with a second sliding groove block, the outer side end face of the side plate of the first climbing frame is rotatably fixed with a connecting rod, and the other end of the connecting rod is rotatably connected onto the first sliding block.
And then through first climbing frame bottom through pivot and the epaxial ear of rotation swivelling joint of base, and then conveniently adjust the angle of first climbing frame, the convenient sliding connection second of second spout piece on the first climbing frame is climbed the frame simultaneously to the last rotation of the curb plate of first climbing frame is fixed with the connecting rod, is used for promoting first climbing frame to revolute the rotatory angle regulation of axle ear.
Furthermore, a second sliding block is installed on the end face of one side of the second climbing frame, and the second sliding block is in sliding fit with the second sliding groove block.
And then install second slider and second spout piece sliding fit on the side end face through second climbing frame, convenient slip is tensile or accomodate, changes the length of climbing frame body, when convenient according to using altitude mixture control, reduces occupation space and conveniently carries.
Furthermore, jacks are formed in the top ends of the front end face and the rear end face of the second sliding groove block.
And then be convenient for peg graft the fixed second climbing frame in the position of first climbing frame through the jack, improve the security of climbing and the flexibility of receiving and releasing.
Further, the front end face and the rear end face of the second sliding block are uniformly provided with rollers along the vertical direction, and L-shaped limiting plates are fixedly welded on the front face and the rear face of the second sliding block.
And then evenly install the gyro wheel along vertical direction on the terminal surface around through the second slider, conveniently reduce the coefficient of friction between second slider and the second spout piece, reduce the resistance that receive and releases that uses to all fixed welding has L shape limiting plate on the front and back of second slider, L shape limiting plate be convenient for with the jack cooperation on the second spout piece peg graft the position of spacing second slider in the second spout piece.
Furthermore, limiting holes are vertically and uniformly formed in the limiting plate, and inserting rods are inserted in the limiting holes.
And then it has inserted the fixed first climbing frame of inserted bar grafting and second climbing frame to go up spacing hole grafting in the spacing board on the second slider, improves the stability of climbing.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model discloses electric power construction is with climbing frame simple structure and high fixed, can not in time be according to user's specific use height, adjust, simultaneously when using because the high fastening is in the comparatively narrow and small construction site in some spaces, traditional climbing frame is difficult to get into, carry the inconvenient problem of transportation, through when using climbing frame when power maintenance, at first fix the staple of bottom plate one side on the bottom surface, then through manual rotation screw rod, promote first slider horizontal slip in first spout piece, thereby drive the connecting rod on the first climbing frame and remove, the convenient climbing frame body adjustment climbing angle of placing the level, the convenience that improves maintenance climbing and the flexibility of angle modulation, adjust the completion back, constructor climbs on first climbing frame and manually mentions the second climbing frame with first climbing frame sliding connection, then it has inserted bar grafting fixed first climbing frame and second to have pegged graft in the spacing hole in the second slider upper limit board The frame, then with the top and the construction face contact of second climbing frame, begin the construction, through receiving and releasing folding second climbing frame and first climbing frame in proper order after the construction finishes, reduce to occupy the convenient removal of empty foundation and carry, can highly carry out nimble use according to the use, conveniently reduce the height that its used simultaneously when carrying the transportation, conveniently carry, and then be favorable to improving the flexibility of using and the convenience of carrying.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings that are required to be used in the embodiments will be briefly described below, it should be understood that the following drawings only illustrate some embodiments of the present invention, and therefore should not be considered as limiting the scope, and for those skilled in the art, other related drawings can be obtained according to the drawings without inventive efforts.
Fig. 1 is a schematic view of the expanded structure of the present invention;
fig. 2 is a schematic view of the overall structure of the present invention;
fig. 3 is a schematic structural diagram of a base in an embodiment of the present invention;
fig. 4 is a schematic structural view of a first climbing stand according to an embodiment of the present invention;
fig. 5 is a schematic structural view of a second climbing stand according to an embodiment of the present invention.
In the figure: 1. a base; 11. a rotating shaft ear; 12. a first runner block; 13. a first slider; 14. a screw hole ear; 15. a screw; 16. fixing the ear; 17. fixing nails; 2. a climbing frame body; 21. a first climbing frame; 211. a rotating shaft; 212. a connecting rod; 22. a second climbing frame; 23. a side plate; 24. a pedal; 25. a second runner block; 251. a jack; 26. a second slider; 261. a roller; 262. a limiting plate; 263. and a limiting hole.
Detailed Description
To make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the drawings of the embodiments of the present invention are combined to clearly and completely describe the technical solutions of the embodiments of the present invention, and obviously, the described embodiments are some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention. Thus, the following detailed description of the embodiments of the present invention, presented in the accompanying drawings, is not intended to limit the scope of the invention, as claimed, but is merely representative of selected embodiments of the invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1, 2, 3, 4 and 5, a climbing frame for electric power construction includes a base 1 and a climbing frame body 2, two rotating shaft lugs 11 are symmetrically welded on one side of the top surface of the base 1, first sliding groove blocks 12 are welded on the front end and the rear end of the top surface of the base 1, a first sliding block 13 is horizontally and slidably installed inside the first sliding groove blocks 12, a screw hole lug 14 is vertically welded on one end of the first sliding groove block 12 on the top surface of the base 1, a screw rod 15 is horizontally installed in the screw hole lug 14, one end of the screw rod 15 is rotatably fixed on one side of the first sliding block 13, a fixing lug 16 is horizontally welded on the end surface of one side of the base 1 close to the rotating shaft lug 11, and a fixing nail 17 is installed in the fixing lug 16; the climbing frame body 2 comprises a first climbing frame 21 and a second climbing frame 22, the first climbing frame 21 and the second climbing frame 22 comprise side plates 23 and pedals 24, the side plates 23 are arranged oppositely, and a plurality of pedals 24 are vertically fixed between the side plates 23.
When the climbing frame is used in power maintenance, firstly, the fixing nail 17 on one side of the bottom plate 1 is fixed on the bottom surface, then the screw 15 is manually rotated to push the first slide block 13 to horizontally slide in the first slide groove block 12, so as to drive the connecting rod 212 on the first climbing frame 21 to move, so that the climbing angle of the horizontally placed climbing frame body 2 is conveniently adjusted, the convenience of maintenance climbing and the flexibility of angle adjustment are improved, after the adjustment is finished, a constructor climbs the first climbing frame 21 to manually lift up the second climbing frame 22 in sliding connection with the first climbing frame 21, then the first climbing frame 21 and the second climbing frame 22 are fixedly inserted and connected through the insertion rod inserted in the limiting hole 263 in the limiting plate 262 on the second slide block 26, then the top end of the second climbing frame 22 is contacted with a construction surface, construction is started, and after the construction is finished, the second climbing frame 22 and the first climbing frame 21 are sequentially folded and unfolded, the reduction occupies that the space base is convenient to remove and is carried, can highly carry out nimble use according to the use, conveniently reduces the height that its used simultaneously when carrying the transportation, conveniently carries, and then is favorable to improving the flexibility of using and the convenience of carrying.
Referring to fig. 4, the bottom ends of the side plates 23 of the first climbing frame 21 are respectively provided with a rotating shaft 211 matched with the rotating shaft lug 11, one side of the side plate 23 of the first climbing frame 21 is provided with a second sliding groove block 25, the outer side end surface of the side plate 23 of the first climbing frame 21 is rotatably fixed with a connecting rod 212, and the other end of the connecting rod 212 is rotatably connected to the first sliding block 13.
And then the bottom end of the first climbing frame 21 is rotatably connected with the rotating shaft lug 11 on the base 1 through the rotating shaft 211, so that the angle of the first climbing frame 21 can be conveniently adjusted, meanwhile, the second sliding groove block 25 on the first climbing frame 21 is conveniently and slidably connected with the second climbing frame 22, and a connecting rod 212 is rotatably fixed on the upper part of the side plate 23 of the first climbing frame 21 and used for pushing the first climbing frame 21 to rotate around the rotating shaft lug 11 to adjust the angle.
Referring to fig. 5, a second sliding block 26 is mounted on one side end surface of the second climbing frame 22, and the second sliding block 26 is in sliding fit with the second sliding groove block 25.
And then install second slider 26 and second spout piece 25 sliding fit on a side end face through second climbing frame 22, convenient slip is tensile or accomodate, changes the length of climbing frame body 2, when convenient according to using altitude mixture control, reduces occupation space and conveniently carries.
Referring to fig. 4, the top ends of the front and rear end surfaces of the second sliding groove block 25 are respectively provided with a socket 251.
Furthermore, the position of the second climbing frame 22 on the first climbing frame 21 is convenient to be inserted and fixed through the insertion hole 251, so that the climbing safety and the folding and unfolding flexibility are improved.
Referring to fig. 5, rollers 261 are uniformly installed on the front and rear end surfaces of the second slider 26 along the vertical direction, and L-shaped limiting plates 262 are fixedly welded on the front and rear surfaces of the second slider 26.
And then evenly install gyro wheel 261 along vertical direction on the terminal surface around through second slider 26, conveniently reduce the coefficient of friction between second slider 26 and the second spout piece 25, reduce the resistance that receive and releases that uses to all fixed welding has L shape limiting plate 262 on the front and back of second slider 26, L shape limiting plate 262 is convenient for with the position of jack 251 cooperation grafting spacing second slider 26 in second spout piece 25 on the second spout piece 25.
Referring to fig. 1, the limiting plate 262 is vertically and uniformly provided with a limiting hole 263, and an inserting rod is inserted into the limiting hole 263.
And furthermore, the first climbing frame 21 and the second climbing frame 22 are fixedly connected with the limiting holes 263 in the limiting plates 262 on the second sliding block 26 in an inserting mode through inserted rods, and the climbing stability is improved.
The working principle is as follows: when the climbing frame is used in power maintenance, firstly, the fixing nail 17 on one side of the bottom plate 1 is fixed on the bottom surface, then the screw 15 is manually rotated to push the first sliding block 13 to horizontally slide in the first sliding groove block 12, so that the connecting rod 212 on the first climbing frame 21 is driven to move, the climbing angle of the horizontally placed climbing frame body 2 is conveniently adjusted, after the adjustment is completed, a constructor climbs the first climbing frame 21 and manually lifts the second climbing frame 22 in sliding connection with the first climbing frame 21 upwards, then the inserting rod is inserted and connected in the limiting hole 263 in the limiting plate 262 on the second sliding block 26 to fix the first climbing frame 21 and the second climbing frame 22, then the top end of the second climbing frame 22 is contacted with a construction surface, and construction is started after the completion.
The device obtained through the design can basically meet the requirements of flexible use according to the use height, convenient carrying and transportation, reduction of the use height, and convenience in carrying and transportation, and is favorable for improving the use flexibility and carrying convenience.
The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention, and various modifications and changes may be made by those skilled in the art. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. The utility model provides an electric power construction is with climbing frame, includes base (1) and climbing frame body (2), its characterized in that: two rotating shaft lugs (11) are symmetrically welded on one side of the top surface of the base (1), first sliding groove blocks (12) are welded at the front end and the rear end of the top surface of the base (1), a first sliding block (13) is horizontally and slidably installed inside the first sliding groove blocks (12), a threaded hole lug (14) is vertically welded at one end of each first sliding groove block (12) on the top surface of the base (1), a screw rod (15) is horizontally installed in each threaded hole lug (14), one end of each screw rod (15) is rotatably fixed on one side of each first sliding block (13), a fixing lug (16) is horizontally welded on the end surface, close to the rotating shaft lug (11), of one side of the base (1), and a fixing nail (17) is installed in each fixing lug (16); climbing frame body (2) include first climbing frame (21) and second climbing frame (22), and first climbing frame (21) and second climbing frame (22) all include curb plate (23) and footboard (24), curb plate (23) set up relatively, and vertically be fixed with a plurality of footboard (24) between curb plate (23).
2. The climbing frame for electric power construction according to claim 1, wherein a rotating shaft (211) matched with the rotating shaft lug (11) is installed at the bottom end of each side plate (23) of the first climbing frame (21), a second sliding groove block (25) is installed on one side of each side plate (23) of the first climbing frame (21), a connecting rod (212) is rotationally fixed on the end face of the outer side of each side plate (23) of the first climbing frame (21), and the other end of each connecting rod (212) is rotationally connected to the first sliding block (13).
3. The climbing frame for electric power construction according to claim 2, wherein a second slide block (26) is attached to one side end surface of the second climbing frame (22), and the second slide block (26) is slidably fitted to the second runner block (25).
4. The climbing frame for electric power construction according to claim 3, wherein the second runner block (25) has insertion holes (251) formed at the top ends of the front and rear end surfaces thereof.
5. The climbing column for electric power construction according to claim 4, wherein rollers (261) are uniformly installed on the front and rear end surfaces of the second sliding block (26) in the vertical direction, and L-shaped limiting plates (262) are fixedly welded on the front and rear surfaces of the second sliding block (26).
6. The climbing frame for electric power construction according to claim 5, wherein the limiting plate (262) is vertically and uniformly provided with limiting holes (263), and the inserting rods are inserted into the limiting holes (263).
CN201921349035.0U 2019-08-20 2019-08-20 Climbing frame for electric power construction Active CN211038490U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921349035.0U CN211038490U (en) 2019-08-20 2019-08-20 Climbing frame for electric power construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921349035.0U CN211038490U (en) 2019-08-20 2019-08-20 Climbing frame for electric power construction

Publications (1)

Publication Number Publication Date
CN211038490U true CN211038490U (en) 2020-07-17

Family

ID=71563961

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921349035.0U Active CN211038490U (en) 2019-08-20 2019-08-20 Climbing frame for electric power construction

Country Status (1)

Country Link
CN (1) CN211038490U (en)

Similar Documents

Publication Publication Date Title
CN206545475U (en) A kind of Portable multifunctional insulating ladder
CN211038490U (en) Climbing frame for electric power construction
CN202054584U (en) Leveling supporting foot of aerial work platform
CN212406031U (en) Foldable self-walking construction support
CN210712584U (en) Movable supporting bracket for road and bridge construction
CN113235892A (en) High telescopic scaffold frame for construction of security
CN215212198U (en) A portable scaffold frame for building engineering
CN214273475U (en) Electric power construction is with lift cat ladder
CN209284508U (en) A kind of architecture Multifunctional drawing desk
CN215485833U (en) Portable ladder for building construction
CN110809105A (en) Portable personnel video information collection system
CN111693799A (en) Portable electric power detection device that electric power construction used
CN217680348U (en) Support frame with protective structure for building construction
CN212715832U (en) Portable operation platform
CN215520747U (en) Power steel pipe tower with auxiliary ladder
CN214697648U (en) Civil engineering is with increasing frame
CN214292975U (en) Operating platform for building engineering technical development
CN220203341U (en) Construction bench that stability performance is good
CN219158895U (en) Foldable safety ladder
CN217439936U (en) Engineering ladder for power transformation maintenance
CN214365835U (en) Portable ladder
CN220868049U (en) Foldable and portable railing
CN216276794U (en) Mobile climbing equipment for house construction engineering construction
CN218261859U (en) Lifting platform
CN210315957U (en) Highly safe energy-saving multifunctional movable board room

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant