CN206190655U - Jacking auxiliary device of vertical equipment - Google Patents

Jacking auxiliary device of vertical equipment Download PDF

Info

Publication number
CN206190655U
CN206190655U CN201621159878.0U CN201621159878U CN206190655U CN 206190655 U CN206190655 U CN 206190655U CN 201621159878 U CN201621159878 U CN 201621159878U CN 206190655 U CN206190655 U CN 206190655U
Authority
CN
China
Prior art keywords
jacking
clamp structure
equipment
supporting construction
connecting portion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621159878.0U
Other languages
Chinese (zh)
Inventor
黄正斌
朱金孝
郝长山
王刚
赵坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ji'nan Fenghui Technology Co Ltd
SEPCO1 Electric Power Construction Co Ltd
Original Assignee
Ji'nan Fenghui Technology Co Ltd
SEPCO1 Electric Power Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ji'nan Fenghui Technology Co Ltd, SEPCO1 Electric Power Construction Co Ltd filed Critical Ji'nan Fenghui Technology Co Ltd
Priority to CN201621159878.0U priority Critical patent/CN206190655U/en
Application granted granted Critical
Publication of CN206190655U publication Critical patent/CN206190655U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a jacking auxiliary device of vertical equipment, including a clamping structure, the 2nd clamping structure, locking structure and jacking bearing structure, wherein, jacking bearing structure's working face is the plane, provides the jacking face with the jacking structure contact, a clamping structure and the 2nd clamping structure install in one side of jacking bearing structure, and a clamping structure and the 2nd clamping structure's working face is the evagination structure, and both install relatively, constitute the space that holds the equipment landing leg, locking structure installs between a clamping structure and the 2nd clamping structure, and is fixed with a clamping structure and the 2nd clamping structure's relative position. Make jacking bearing structure fix on the equipment landing leg. Conveniently fix jacking bearing structure on the landing leg of equipment through a clamping structure and the 2nd clamping structure, at jacking bearing structure's lower extreme installation jacking device, the jacking device is the application of force simultaneously, can be with equipment jacking to the position department that sets for smoothly.

Description

A kind of jacking servicing unit of vertical equipment
Technical field
The utility model is specifically related to a kind of jacking servicing unit of vertical equipment.
Background technology
It is vertical that the precision processing of large nuclear-power and fired power generating unit and specialty chemical relevant device are usually that volume is big, weight is big Case jar structure, for example:Mixed bed, poplar bed etc..Prior art is typically to arrange suspension centre above equipment on-station position that equipment is arrived at just Behind the position of position, equipment is aided in using chain block etc. in place.
When large equipment in place being installed using conventional method, because this kind equipment feature is often " top-heavy ", and one As belong to line with rubber, lining plastic or stainless steel equipment, the kind equipment do not allow weld supporting construction.And this kind equipment is installed at the scene When, often due to design is limited with regard to bit space, after causing this kind equipment into factory building or arriving at installation site, without suitable Installation of the suspension centre to complete equipment work in place.In this case it is necessary to using the welded steel beam above on-station position, hang The means such as disk or floor with opening complete the arrangement work of suspension centre.In hoisting process, equipment is also easy to shake, due to setting Standby and volume is big from great, and rocking for equipment can produce certain potential safety hazard to the people of surrounding and object.So, use During these methods, hazards increase, safety coefficient reduction, meanwhile, larger, consuming is destroyed to completed civil engineering operation finished product It is artificial many.
Utility model content
For technical problem present in prior art, a purpose of the present utility model is to provide a kind of vertical equipment Jacking servicing unit, the positioning apparatus can realize the integral jacking of large equipment, from bottom to top jacking, it is to avoid in limited sky Interior use Large-scale Hoisting equipment.
Second purpose of the present utility model is to provide a kind of jack-up construction method of vertical equipment.It is auxiliary using above-mentioned jacking Help device to be constructed, the accuracy that equipment is installed in place is ensure that in limited space.
In order to solve the above technical problems, the technical solution of the utility model is:
A kind of jacking servicing unit of vertical equipment, including the first clamp structure, the second clamp structure, locking mechanism and top Supporting construction is risen, wherein,
The working face of jacking supporting construction is plane, there is provided the jacking face contacted with climbing structure;
First clamp structure and the second clamp structure are arranged on the side of jacking supporting construction, the first clamp structure and second The working face of clamp structure is outer male structure, and both are mounted opposite, and constitutes the space of receiving equipment supporting leg;
Locking mechanism is arranged between the first clamp structure and the second clamp structure, and the first clamp structure and second are clamped The relative position of structure is fixed, and jacking supporting construction is fixed on equipment supporting leg.
Multiple jacking supporting constructions are fixed on the different supporting legs of equipment, in the lower section of the working face of jacking supporting construction The climbing structures such as jack are placed, climbing structure work can be related by equipment supporting leg jack-up by jacking supporting construction jack-up, And then by equipment jacking to setting position, equipment is installed ready.
Due to leaving larger space between the supporting leg of equipment, the utility model makes full use of this segment space, supporting leg it Between lay jack-up system, jacking is carried out to equipment, it is to avoid using the use of Large-scale Hoisting equipment, complete what equipment was installed in place Meanwhile, realize the accuracy of equipment jacking.In order to ensure the balance of equipment jacking, positioning apparatus can symmetrically be installed In the lower section of equipment, make each position jacking simultaneously of equipment, people and thing of the unstable lifting of equipment to surrounding can be avoided Body produces potential safety hazard.
Preferably, first clamp structure and the second clamp structure are anchor ears, and both working faces are the arc of evagination Shape.
Because supporting leg is usually cylindrical structural, the arcuate structure of evagination can improve the contact area and supporting leg between, In the case that the coefficient of friction of the chucking power and supporting leg surface of the first clamp structure and the applying of the second clamp structure is certain, clamping knot The stiction formed between structure and supporting leg is larger, it is ensured that the safe jacking of equipment.
It is further preferred that the jacking supporting construction is platy structure, the first clamp structure and the second clamp structure cut with scissors It is connected on the side of jacking supporting construction.
First clamp structure and the second clamp structure are hinged on the side of jacking supporting construction, the convenient clamping of regulation first knot Openings of sizes between structure and the second clamp structure, it is convenient that jacking supporting construction is fixed on the supporting leg of equipment.
Preferably, first clamp structure and the second clamp structure include connecting portion, work department and supporting part, work The working face in portion is the arc of evagination, and connecting portion and supporting part set the lock respectively positioned at the two ends of work department on connecting portion Locking structure, is fixedly connected between supporting part and the jacking supporting construction.
It is further preferred that the jacking supporting construction is platy structure, on the supporting part that the platy structure is fixed.
It is further preferred that the connecting portion is laminated structure, the locking mechanism is bolt.
The jacking installation method carried out using the positioning apparatus of above-mentioned vertical equipment, is comprised the following steps:
1) opening between the first clamp structure and the second clamp structure is tuned up, the supporting leg of vertical equipment is put into the first folder Hold in the space between structure and the second clamp structure, turn the opening between the first clamp structure and the second clamp structure down, make The supporting leg of equipment is brought into close contact with the working face of the first clamp structure and the second clamp structure, and locks first by locking mechanism Opening between clamp structure and the second clamp structure, now, jacking supporting construction is located at the side of the supporting leg of equipment, jacking branch The lower surface of support structure is set with horizontal direction parallel;
2) the like, the positioning apparatus are all installed on all supporting legs of equipment, locking mechanism is by regulation first The folder of opening between clamp structure and the second clamp structure, the first clamp structure of regulation and the second clamp structure to equipment supporting leg Holding force so that during equipment jacking, gravity of the upward frictional force more than equipment itself suffered by equipment supporting leg;
3) lower surface of jack, jack and jacking supporting construction is respectively mounted in the lower end of all of jacking supporting construction Contact, starts jack, applies upward active force to jacking supporting construction, by equipment jack-up.
Advantageous Effects of the present utility model are:
The utility model can easily be fixed jacking supporting construction by the first clamp structure and the second clamp structure On the supporting leg of equipment, jacking apparatus, such as jack are installed in the lower end of jacking supporting construction, jacking apparatus exert a force simultaneously, Can by equipment smoothly jacking to setting position at.
Due to leaving larger space between the supporting leg of equipment, the volume of jacking supporting construction is not too large, greatlys save Space needed for Lifting Equipment.
The shape of the working face of the evagination of the first clamp structure and the second clamp structure can be according to the shape of the supporting leg of equipment Shape is adjusted, with extensive promotional value.
The positioning apparatus are respectively mounted at all supporting legs of vertical case tank equipment, all of jacking supporting construction constitutes one Individual jacking plane, the jacking plane is located at the leg location of vertical case tank equipment, and is substantially completely covered vertical case tank and set The standby plane for being covered, i.e., the center of gravity of vertical case tank equipment does not deviate by the jacking plane of jacking supporting construction composition, it is ensured that The stability of jacking;The jacking plane that jacking supporting construction is constituted is located at the lower section of vertical case tank, from bottom to top Lifting Equipment, nothing Large-scale hanging device need to be set in the top of equipment, it is adaptable to the jacking assembling of the equipment in small space;In jacking support The jacking simultaneously of multiple positions of the jacking plane that structure is constituted, can be by controlling the amount of feeding of jack, it is ensured that same flat The error in face is no more than 3mm, compared to the lifting of Large-scale Hoisting equipment, substantially increases the precision that the jacking of vertical case tank is installed Degree.
Brief description of the drawings
Fig. 1 is mounting structure schematic diagram of the present utility model;
Fig. 2 is structural representation of the present utility model;
Fig. 3 is main view figure structure schematic representation of the present utility model.
Wherein, 1, clamping screw, 2, jacking supporting construction, the 3, first clamp structure, the 4, second clamp structure, 5, jacking it is auxiliary Help device.
Specific embodiment
With reference to specific embodiment, the utility model is described in further detail.
Embodiment 1
As shown in Figures 2 and 3, a kind of jacking servicing unit of vertical equipment, including the first clamp structure 3, second is clamped Structure 4, locking mechanism and jacking supporting construction 2, wherein,
The working face of jacking supporting construction 2 is plane, there is provided the jacking face contacted with climbing structure;
First clamp structure 3 and the second clamp structure 4 are arranged on the side of jacking supporting construction 2, the He of the first clamp structure 3 The working face of the second clamp structure 4 is outer male structure, and both are mounted opposite, and constitutes the space of receiving equipment supporting leg;
Locking mechanism is arranged between the first clamp structure 3 and the second clamp structure 4, by the first clamp structure 3 and second The relative position of clamp structure 4 is fixed, and jacking supporting construction 2 is fixed on equipment supporting leg.
As shown in figure 1, multiple above-mentioned jacking servicing units 5 are fixed on the different supporting legs of equipment, as much as possible, setting Above-mentioned jacking servicing unit 5 is respectively mounted on standby all supporting legs, jack is placed in the lower section of the working face of jacking supporting construction 2 Deng climbing structure, climbing structure work can be related by equipment supporting leg jack-up by the jack-up of jacking supporting construction 2, and then by equipment Equipment is installed ready by jacking to setting position.Jacking servicing unit 5 is respectively mounted on all of supporting leg, jack is simultaneously same Step work, can be by the smoothly jacking of jacking servicing unit 5.
First clamp structure 3 and the second clamp structure 4 are anchor ears, and both working faces are the arc of evagination, the structure It is suitable for the equipment supporting leg of cylinder.Jacking supporting construction 2 is platy structure, and the first clamp structure 3 and the second clamp structure 4 cut with scissors It is connected on the side of jacking supporting construction.First clamp structure 3 and the second clamp structure 4 can in certain angular range phase Rotated for jacking supporting construction 2, the opening angle between the first clamp structure 3 of regulation and the second clamp structure 4.It is easy to set Standby supporting leg is linked between the first clamp structure 3 and the second clamp structure 4.Locking mechanism is clamping screw 1, can be by the first folder The opening for holding the clamp structure 4 of structure 3 and second is locked.
Embodiment 2
As another embodiment, the first clamp structure 3 and the second clamp structure 4 include connecting portion, work department and Supporting part, the working face of work department is the arc (can also be adjusted according to the concrete shape of supporting leg) of evagination, connecting portion and Supporting part positioned at the two ends of work department, sets the locking mechanism, supporting part and the jacking supporting construction respectively on connecting portion Between be fixedly connected.The jacking supporting construction 2 is platy structure, on the supporting part that the platy structure is fixed.
The connecting portion is laminated structure, and laminated structure is provided with hole, and the locking mechanism is clamping screw 1, Clamping screw 1 passes through hole, and with nut screw connection, by both position relationships of adjustment, the first clamp structure of regulation 3 and second is clamped Openings of sizes between structure 4.
Locking mechanism can also be other structures, such as:The open end of the first clamp structure 3 is hinged with engaging button, the The open end of two clamp structures 4 is provided with projection, and the engaging button is fastened on when in projection, just can be by the first clamp structure 3 Opening with the second clamp structure 4 is fixed.
Now, the opening angle between the first clamp structure 3 and the second clamp structure 4 is not easy regulation, it is necessary to apply outer Power, the opening angle between the first clamp structure 3 and the second clamp structure 4 is tuned up, and positioning apparatus 5 are fastened on the branch of equipment On leg.
Quantity according to equipment supporting leg arranges jacking servicing unit, when equipment is transported to Equipment Foundations top by slideway Afterwards, by adjusting the jack below jacking supporting construction 2 by equipment jack-up, it is noted that jack operation is synchronous, in jack-up mistake Cheng Zhong, places scale control jack stroke, it is ensured that jack synchronization of jacking up, same plane error is no more than in very heavy top side face 3mm.Delivery slideway after equipment jack-up below extraction equipment.Synchronous landing jack, until equipment is in place in base position.
Although above-mentioned be described with reference to accompanying drawing to specific embodiment of the present utility model, not to utility model The limitation of protection domain, one of ordinary skill in the art should be understood that on the basis of the technical solution of the utility model, this area Various modifications or deform still in protection domain of the present utility model that technical staff makes by need not paying creative work It is interior.

Claims (7)

1. the jacking servicing unit of a kind of vertical equipment, it is characterised in that:Including the first clamp structure, the second clamp structure, lock Locking structure and jacking supporting construction, wherein,
The working face of jacking supporting construction is plane, there is provided the jacking face contacted with climbing structure;
First clamp structure and the second clamp structure are arranged on the side of jacking supporting construction, the first clamp structure and the second clamping The working face of structure is outer male structure, and both are mounted opposite, and constitutes the space of receiving equipment supporting leg;
Locking mechanism is arranged between the first clamp structure and the second clamp structure, by the first clamp structure and the second clamp structure Relative position fix, jacking supporting construction is fixed on equipment supporting leg.
2. jacking servicing unit according to claim 1, it is characterised in that:First clamp structure and the second clamping knot Structure is anchor ear, and both working faces are the arc of evagination.
3. jacking servicing unit according to claim 2, it is characterised in that:The jacking supporting construction is platy structure, First clamp structure and the second clamp structure are hinged on the side of jacking supporting construction.
4. jacking servicing unit according to claim 1, it is characterised in that:First clamp structure and the second clamping knot Structure includes connecting portion, work department and supporting part, and the working face of work department is the arc of evagination, connecting portion and supporting part difference position The locking mechanism is set in the two ends of work department, on connecting portion, is fixedly connected between supporting part and the jacking supporting construction.
5. jacking servicing unit according to claim 4, it is characterised in that:The jacking supporting construction is platy structure, On the supporting part that the platy structure is fixed.
6. jacking servicing unit according to claim 4, it is characterised in that:The connecting portion is laminated structure, the lock Locking structure is bolt, and connecting hole is provided with connecting portion, and bolt passes through connecting hole, is installed with nut screw connection.
7. jacking servicing unit according to claim 4, it is characterised in that:The connecting portion is laminated structure, connecting portion On be provided with screwed hole, locking mechanism is clamping screw, and clamping screw coordinates with screwed hole to be installed.
CN201621159878.0U 2016-11-01 2016-11-01 Jacking auxiliary device of vertical equipment Active CN206190655U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621159878.0U CN206190655U (en) 2016-11-01 2016-11-01 Jacking auxiliary device of vertical equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621159878.0U CN206190655U (en) 2016-11-01 2016-11-01 Jacking auxiliary device of vertical equipment

Publications (1)

Publication Number Publication Date
CN206190655U true CN206190655U (en) 2017-05-24

Family

ID=58732011

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621159878.0U Active CN206190655U (en) 2016-11-01 2016-11-01 Jacking auxiliary device of vertical equipment

Country Status (1)

Country Link
CN (1) CN206190655U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106438605A (en) * 2016-11-01 2017-02-22 山东电力建设第工程公司 Jacking assisting device of vertical equipment and jacking construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106438605A (en) * 2016-11-01 2017-02-22 山东电力建设第工程公司 Jacking assisting device of vertical equipment and jacking construction method
CN106438605B (en) * 2016-11-01 2019-03-12 山东电力建设第一工程公司 A kind of the jacking auxiliary device and jack-up construction method of vertical equipment

Similar Documents

Publication Publication Date Title
CN203625921U (en) Precision control device for pre-embedded mounting of foundation bolts
CN205777600U (en) Batter post installs auxiliary support apparatus
CN206190655U (en) Jacking auxiliary device of vertical equipment
CN205312921U (en) Transformer on -load switch suspended core instrument
CN106438605B (en) A kind of the jacking auxiliary device and jack-up construction method of vertical equipment
CN201334770Y (en) Wall-attached supporting seat
CN205955171U (en) Fall to ground scaffold collet device
CN210288117U (en) Angle-adjustable support jacking
CN105502174A (en) Transformer on-load tap-changer (OLTC) suspended core tool
CN211473458U (en) Installation of steel-pipe column transfers machine of hanging down
CN204418440U (en) Adjusting part bottom the plug-in wall of a kind of PC
CN210049110U (en) Pier adjusting device and pier adjusting system
CN201319484Y (en) Portable cable workbench
CN203891023U (en) Pile driving platform device
CN206000167U (en) Adjustable Alminum Project slab form support meanss
CN206512611U (en) A kind of empty rail bridge pier of suspension type, which is installed, uses ground frock
CN217811167U (en) Fixed support bracket capable of adjusting elevation of embedded support leg of tower crane
CN207293959U (en) Special lifting platform is installed in the lifting of assembly concrete building element
CN204549127U (en) Glass handling erecting device
CN204552144U (en) A kind of building support
CN204826704U (en) A horizontal lifeline system for steel construction factory building
CN217811053U (en) Lattice column positioning fixture
CN109534180A (en) Steel structure hoisting device in a kind of reusable adjustable room
CN205474858U (en) Bridge bent cap or binder formwork support adjusting device
CN218754694U (en) Adjustable fixing device for front beam of hanging basket support

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant