CN206189907U - Bathroom room - Google Patents

Bathroom room Download PDF

Info

Publication number
CN206189907U
CN206189907U CN201621092464.0U CN201621092464U CN206189907U CN 206189907 U CN206189907 U CN 206189907U CN 201621092464 U CN201621092464 U CN 201621092464U CN 206189907 U CN206189907 U CN 206189907U
Authority
CN
China
Prior art keywords
wall
bathing room
floor drain
base plate
room according
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621092464.0U
Other languages
Chinese (zh)
Inventor
俞大有
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Mingsheng Drawin Technology Investment Co Ltd
Original Assignee
China Mingsheng Drawin Technology Investment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Mingsheng Drawin Technology Investment Co Ltd filed Critical China Mingsheng Drawin Technology Investment Co Ltd
Priority to CN201621092464.0U priority Critical patent/CN206189907U/en
Application granted granted Critical
Publication of CN206189907U publication Critical patent/CN206189907U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Floor Finish (AREA)

Abstract

The utility model provides a bathroom room, including bottom plate and wallboard, the bottom plate includes bottom surface and side, bottom surface and side are mainly by concrete or the disposable whole machine -shaping of fibre concrete, the bottom surface is provided with the floor drain installing port, floor drain installing port department is provided with the floor drain adapter, the wall decoration board on the wall body is fixed including the installation to the wallboard, thus, support the concrete piece of fixed bed for adding slotted steel mesh piece, support the fixed bed setting between wall body and panel. Like this, bathroom room's bottom plate can seamlessly be pour, can play rigid water -proofing's effect, can produce the prefabrication in the mill, and water -proof effects is good, and intensity is high, and the wallboard site operation is efficient.

Description

A kind of bathing room
Technical field
The utility model belongs to building field, specially a kind of bathing room.
Background technology
The base plate of traditional bathing room is constructed using concrete cast-in-situ, and waterproofing process is mainly by brush water-repellent paint, paving Protective layer reaches the effect of impervious waterproof.In order to the waterproof effect that has reached it is general firstly the need of ensure the ground of bathing room compared with For steady, but if necessary to change the floor tile of bathing room, after original floor tile chisel is gone, must first will with cement mortar Floor leveling, then does water-proofing treatment, complex process again.In addition, in order to prevent water percolation of wall, also to be done about on general metope 30 centimetres of water-repellent paints high, the metope in case ponding is spread and sunk in.It follows that existing bathing room waterproof slab workload is larger, apply Work efficiency rate is low, construction cost hardly results in control.And the metope of traditional bathing room decorates way using patch block, it is mainly logical Cross following steps completion, snap the line, labeling on schedule, select brick, row's brick, leaching brick (Imitation Rock Porcelain Tiles or high-grade brick do not allow immersion), edge patch logical Seam, jointing or the wiping seam effect attractive in appearance to reach wall decoration.It follows that existing wall tile decoration way efficiency of construction Low, construction cost hardly results in control.
The content of the invention
The technical problems to be solved in the utility model is:There is provided a kind of bathing room, the base plate of the bathing room can be with factory Production is prefabricated, and good water-proof effect, intensity is high, wallboard site operation efficiency high.
What solution of the present utility model was realized in:A kind of bathing room, including base plate and wallboard, wherein, it is described Base plate includes bottom surface and side, and the bottom surface and side are main by the disposable overall machine-shaping of concrete or fiber concrete, The bottom surface is provided with floor drain installing port, and floor drain adapter is provided with the floor drain installing port, and the floor drain adapter includes At least one import and at least one outlet, are connected between the inlet and outlet by reducing transfer tube, the reducing switching Pipe is provided with the T-shaped flank of annulus on the outer wall at import;The wallboard includes the wall dress being fixed on wall Plaque, the wall decorating veneer includes panel and support fixed bed, and the support fixed bed is the coagulation for being added with channel-section steel mesh sheet Soil block, the support fixed bed is arranged between wall and panel.So, the base plate of bathing room uses concrete or fiber coagulation The machine-shaping of native disposable entirety, can be in integrally basin type, and whole base plate is seamless to be poured, and can play a part of rigid waterproofing, And the techniques such as installation stainless steel water-proof strip side are saved, and not only good water-proof effect, and efficiency of construction is high.Particularly, according to super The ultra-high performance concrete of high performance concrete (Ultra-High PerformanceConcrete) or mixing of steel fiber adds Work manufactures the base plate of bathing room, and the high intensity of ultra-high performance concrete, high tenacity, the superelevation of low porosity can be made full use of strong High-durability, improves cracking strength and the fatigue life of bathing room base plate, strengthens the durability and rigidity of bathing room base plate.Separately Outward, the bottom surface and side overall processing are molded, and can use and instead beat casting craft so that the use face position of the base plate of bathing room In the lower section of mould, so that it is guaranteed that using face smoother, flatness is good, saves levelling construction, directly can be with paving PVC ground The decorative layers such as plate, ceramic tile, so as to further improve efficiency of construction.Further, as needed can be on the base plate of bathing room Built-in fitting hole is set or built-in fitting is set, be easy to production line balance, can simultaneously carry out the manufacture of bottom surface and side engineering, enter One step reduces subsequent machining technology, improves efficiency of construction.Floor drain adapter, and reducing transfer tube are provided with floor drain installing port The T-shaped flank of annulus is provided with the outer wall at import, so, the T-shaped flank of annulus can well be embedded in bathroom Be merged with concrete in base plate, for later stage floor drain installation sealing play a good role, can improve floor drain with The linking sealing effectiveness of floor drain adapter.Also, connected by reducing transfer tube between the inlet and outlet, not only can be square Just the installation of floor drain, and be also convenient for floor drain outlet with leaking drainage pipe dock;In addition, if set to outlet from import It is the reducing transfer tube for tapering into that is open, then high flow rate pass can be formed in floor drain adapter so that spot is not easy Deposited in floor drain adapter and blocked.And, inlet and outlet being connected by reducing transfer tube, by the import of floor drain and can go out Mouth is arranged on different directions, and then the curved bottom for not being set directly at floor drain of floor drain water storage can be solved into traditional floor drain Installation dimension is excessive, the problem too high to the thickness of slab requirement of base plate, improves the installation effectiveness of floor drain.In addition, including panel and Support fixed bed, the support fixed bed is the concrete block for being added with channel-section steel mesh sheet, and the support fixed bed is arranged on wall And panel between.So, by setting support fixed bed between wall and panel, first channel-section steel is welded with steel mesh piece, then Casting concrete or the concrete mixed with haydite, form concrete block, then panel is affixed into formation wall dress on concrete block Plaque.Until be connected for wall decorating veneer and matrix wall or lightgage steel joist wall by the connectors such as scene bolt, suspension member.It is described The processing of wall decorating veneer can use pipelining, such that it is able to greatly reduce the workload of site operation, it is to avoid scene Wet trade, improves efficiency of construction, facilitates in-site installation.
Another technical scheme of the present utility model is that the bottom surface is provided with dry area and wet area on above-mentioned basis, The dry area and wet area are separated by projection, the projection overall machine-shaping disposable with bottom surface.So, area and wet area are done by convex Block separates, projection overall machine-shaping disposable with bottom surface, not only projection and bottom surface good forming effect, good appearance, Er Qiejia Work is easily manufactured, and efficiency of construction is high.
Another technical scheme of the present utility model is that the floor drain adapter includes an import on above-mentioned basis And one outlet, connected by 90 ° of reducing transfer tubes between the inlet and outlet.So, lead between the inlet and outlet 90 ° of reducing transfer tube connections are crossed, the drainpipe horizontally set of floor drain can be wanted so as to reduce floor drain and install to base plate thickness of slab Ask, the thickness of base plate can be effectively reduced, save cost, meanwhile, floor drain installs the height reduction for needing so that bathing room Use space increase, using more comfortable.
Another technical scheme of the present utility model is on above-mentioned basis, weathering to be additionally provided with the bottom surface Degree, the gradient is relatively low at the floor drain installing port.So, the sanitary wastewater of bathing room bottom surface smoothly can be caused into floor drain to install Floor drain adapter at mouthful simultaneously drains into drainage equipment module, so as to keep the drying of bathing room bottom surface.
Another technical scheme of the present utility model is that on above-mentioned basis, the junction of the bottom surface and side is set There is arc angling.So, the junction of bottom surface and side is provided with arc angling, the company of bottom surface and side can not only be reduced Meet place and the cracking risk of right-angle side is set, and be conducive to secondary decoration construction, without corner or spot as yet untouched by a clean-up campaign when using.
Another technical scheme of the present utility model is that the upper end of the side is provided with waterproof knot on above-mentioned basis Structure, the waterproof construction is sealing surface, groove or flanging.So, the upper end in side is provided with waterproof construction, bathing room Wallboard just directly can vertically be stuck in the base plate top of bathing room, then be sealed by breaking fluid sealant, simple structure, installation side Just, good water-proof effect.
Another technical scheme of the present utility model is that the side is made up of the anti-bank of staged on above-mentioned basis, The anti-bank of staged at least includes top half and the latter half.So, side is made up of the anti-bank of staged, can be formed many Level waterproof construction, improves the water resistance of base plate.
Another technical scheme of the present utility model is the top half size 50mm high, width on above-mentioned basis 40mm, the latter half size 50mm high, width 75mm.So, even if the surface water is as deep as to 50mm, also 50mm in bathing room Anti- water depth, equivalent to double waterproof measure, improve the water resistance of bathing room base plate.
Another technical scheme of the present utility model is that the bottom of the bottom surface is provided with ribs on above-mentioned basis Bar.So, the bottom of bottom surface is provided with supporting rib, the height of bottom surface can be increased, reduce processing materials.Further, The supporting rib can be fixed on the bottom of bottom surface with bottom surface one moulding by casting or by back-hand craft.
Another technical scheme of the present utility model be it is above-mentioned basis on, be provided with the base plate of the bathing room to Few two suspension centres, the suspension centre is that pre-buried hanging is followed closely or suspension ring.So, by default suspension centre, bathing room base plate can be facilitated Or movement, lifting and the transport of bathing room.Preferably, four suspension centres are respectively provided with four angles of bathing room base plate.
The channel-section steel mesh sheet is that the skeleton that is formed by connecting by channel-section steel and steel mesh piece are welded to form.So, connected into by channel-section steel Skeleton simultaneously welds steel mesh piece formation channel-section steel mesh sheet, with stronger resistance to compression, tension and impact resistance, so as to improve wall body decoration The resistance to compression of plate, tension and shock resistance.
Another technical scheme of the present utility model is that the junction of the channel-section steel is provided with reinforcement on above-mentioned basis Muscle or reinforcing plate.So, the junction of channel-section steel is provided with reinforcement or reinforcing plate, it is possible to reduce the deformation of channel-section steel, increases lattice The intensity of screen, so as to increase the intensity of wall decorating veneer.
Another technical scheme of the present utility model is that on above-mentioned basis, the concrete block is haydite concrete block Or foaming haydite concrete block.So, using haydite concrete block or foaming haydite concrete block, it is not only lightweight, and Impervious good, fire resistance is good, is adapted to be used in bathing room or kitchen.
Another technical scheme of the present utility model is that the wall decorating veneer is pacified by connector on above-mentioned basis Dress is fixed on wall.So, wall decorating veneer can be connected with matrix wall or lightgage steel joist wall by connector, is applied Work is convenient.
Another technical scheme of the present utility model is on above-mentioned basis, to be set between the wall decorating veneer and wall It is equipped with clearance layer.So, clearance layer is set between wall decorating veneer and wall, and wall decorating veneer is applied to bathing room or kitchen It is that, even if water or vapor are immersed in wall decorating veneer by panel, also can down be drained by clearance layer, therefore clearance layer Certain waterproof action can be played.It is also possible to enter the arrangement of row line and pipeline by clearance layer, facilitate the installation of electrical equipment Or safeguard.
Another technical scheme of the present utility model is that on above-mentioned basis, the connector is L-shaped, T-shaped or product Font.So, connector is the various shapes structures such as L-shaped, T-shaped or isosceles triangle, can be wanted with various different mounting structures Ask, be easy to the installation of wall decorating veneer.
Another technical scheme of the present utility model is that described connector one end is by being welded and fixed on above-mentioned basis On the channel-section steel of wall decorating veneer, the other end is fixed with wall.So, connector one end can be fixed by welding in advance On the channel-section steel of wall decorating veneer, until scene is again with fixtures such as bolts by the other end of connector and matrix wall or lightgage steel joist Wall is connected.Site operation workload is reduced, efficiency of construction is improved.
Brief description of the drawings
Fig. 1 is the sectional view of the base plate for representing the bathing room involved by a kind of implementation method of this technology;
Fig. 2 is the sectional view of the production mould of the base plate for representing the bathing room involved by a kind of implementation method of this technology;
Fig. 3 is the structure chart of the base plate for representing the bathing room involved by a kind of implementation method of this technology;
Fig. 4 is the partial section of the base plate for representing the bathing room involved by this technology another embodiment;
Fig. 5 is the floor drain discharge structure figure for representing the bathing room involved by a kind of implementation method of this technology;
Fig. 6 is the local structural graph for representing the bathing room involved by a kind of implementation method of this technology;
Fig. 7 is the installation diagram of the wall decorating veneer for representing the bathing room involved by a kind of implementation method of this technology;
Fig. 8 is the structure chart of the wall decorating veneer for representing the bathing room involved by a kind of implementation method of this technology;
Fig. 9 and Figure 10 are the local peace of the wall decorating veneer for representing the bathing room involved by this technology another embodiment Assembling structure figure;
Figure 11 is the structure chart for representing the bathing room involved by a kind of implementation method of this technology;
Figure 12 is to represent the partial enlarged drawing in Figure 11 at A.
In figure:
The waterproof construction of 10 production mould, 11 bottom surface, 12 side 13
The projection of 14 arc angling, 15 dry area, 16 wet area 17
The import of 18 floor drain installing port, 19 supporting rib, 50 floor drain 51
The 52 outlet T-shaped flanks of annulus of 53 reducing transfer tube 54
The top half of 55 ground leaking drainage pipe, 121 the latter half 122
The wall of 22 panel, 23 clearance layer 100
The 25 support connectors of fixed bed 26
Specific embodiment
The utility model is described in detail below in conjunction with the accompanying drawings, the description of this part be only it is exemplary and explanatory, There should not be any restriction effect to protection domain of the present utility model.Additionally, those skilled in the art's retouching according to presents State, respective combination can be carried out to the feature in embodiment in presents and in different embodiments.
The utility model embodiment is as follows, refers to shown in Fig. 1 to 12, a kind of bathing room, including base plate and wallboard, its In, the base plate includes bottom surface 11 and side 12, the bottom surface 11 and side 12 it is main by concrete or fiber concrete once Property overall processing shaping, the bottom surface 11 is provided with floor drain installing port 18, and floor drain switching is provided with the floor drain installing port 18 Device, the floor drain adapter includes at least one import 51 and at least one outlet 52, wherein, the import 51 and outlet 52 it Between connected by reducing transfer tube 53, the reducing transfer tube 53 is provided with the T-shaped side of annulus on the outer wall at the import 51 The wing 54;The wallboard includes the wall decorating veneer being fixed on wall 100, and the wall decorating veneer includes panel 22 With support fixed bed 25, the support fixed bed 25 is the concrete block for being added with channel-section steel mesh sheet, and the support fixed bed 25 sets Put between wall 100 and panel 22.So, bathroom base plate is disposably integrally processed into using concrete or fiber concrete Type, can be in integrally basin type, and whole base plate is seamless to be poured, and can play a part of rigid waterproofing, and it is anti-to save installation stainless steel The techniques such as water bar side, not only good water-proof effect, and also efficiency of construction is high.Particularly, according to ultra-high performance concrete (Ultra- High Performance Concrete) or the ultra-high performance concrete of mixing of steel fiber fabricate the base plate of bathing room, High intensity, high tenacity, the strong high-durability of the superelevation of low porosity of ultra-high performance concrete can be made full use of, bathroom bottom is improved The cracking strength of plate and fatigue life, strengthen the durability and rigidity of bathroom base plate.In addition, the bottom surface 11 and side 12 are overall Machine-shaping, as shown in Fig. 2 bathroom base plate can be used instead beats casting craft so that the use face of bathroom base plate is located at production The lower section of mould 10, so that it is guaranteed that using face smoother, flatness is good, saves levelling construction, directly can be with paving PVC ground The decorative layers such as plate, ceramic tile, so as to further improve efficiency of construction.Further, can be set on bathroom base plate as needed Built-in fitting hole sets built-in fitting, is easy to production line balance, can simultaneously carry out the manufacture of bottom surface and side engineering, further Subsequent machining technology is reduced, efficiency of construction is improved.As shown in Figure 4 and Figure 5, the bottom surface 11 is provided with floor drain installing port 18, institute State and floor drain adapter is provided with floor drain installing port 18, the floor drain adapter goes out including at least one import 51 and at least one Mouth 52, wherein, being connected by reducing transfer tube 53 between the import 51 and outlet 52, the reducing transfer tube 53 is near import The T-shaped flank 54 of annulus is provided with outer wall at 51.So, the T-shaped flank 54 of the annulus can well be embedded in bathroom bottom Be merged with concrete in plate, for later stage floor drain 50 installation sealing play a good role, can improve floor drain with The linking sealing effectiveness of floor drain adapter.Also, 53 are connected by reducing transfer tube between the import 51 and outlet 52, not only The installation of floor drain can be facilitated, and be also convenient for floor drain outlet with leaking drainage pipe 55 dock;In addition, if from import to going out Mouth is provided that the reducing transfer tube that opening tapers into, then high flow rate pass can be formed in floor drain adapter so that dirty Stain is not easy to deposit blocking in floor drain adapter.And, import 51 and outlet 52 are connected by reducing transfer tube 53, can be by The inlet and outlet of floor drain is arranged on different directions, and then can be by the curved bottom for not being set directly at floor drain 50 of floor drain water storage Portion, solves that traditional floor drain installation dimension is excessive, the problem too high to the thickness of slab requirement of base plate, improves the installation effect of floor drain Rate.In addition, the wall decorating veneer includes panel 22 and support fixed bed 25, the support fixed bed 25 is to be added with channel-section steel net The concrete block of piece, the support fixed bed 25 is arranged between wall 100 and panel 22.So, by wall 100 and face Support fixed bed 25 is set between plate 22, during construction, first channel-section steel is welded with steel mesh piece, then casting concrete or mixed with haydite Concrete, form concrete block, then panel 22 is affixed to wall decorating veneer is formed on concrete block.Until scene spiral shell Be connected for wall decorating veneer and matrix wall or lightgage steel joist wall by the connectors such as bolt, suspension member 26, the wall decorating veneer plus Work can use pipelining, such that it is able to greatly reduce the workload of site operation, it is to avoid situ wet operation, improve construction Efficiency, facilitates in-site installation.
On the basis of above-described embodiment, in another embodiment of the utility model, as shown in Figure 3 and Figure 4, the bottom surface can To be provided with dry area 15 and wet area 16, the dry area 15 and wet area 16 are separated by projection 17, and the projection 17 can be with bottom surface one Secondary property overall processing shaping.So, do area 15 and wet area 16 is separated by projection 17, projection 17 is disposably integrally processed into bottom surface Type, not only projection 17 and bottom surface good forming effect, good appearance, and convenient processing and manufacture, efficiency of construction is high.
On the basis of above-described embodiment, in another embodiment of the utility model, as shown in figure 5, the floor drain adapter Including an import 51 and one outlet 52, connected by 90 ° of reducing transfer tubes 53 between the import 51 and outlet 52.This Sample, the import 51 and outlet 52 between connected by 90 ° of reducing transfer tubes 53, can by the horizontally set of ground leaking drainage pipe 55, So as to reduce requirement of the floor drain installation to base plate thickness of slab, the thickness of base plate can be effectively reduced, save cost, meanwhile, ground The height reduction for needing is installed in leakage so that the use space of bathing room increases, using more comfortable.
On the basis of above-described embodiment, in another embodiment of the utility model, as described in Figure 4, also set on the bottom surface Drainage grade (not illustrating in figure) is equipped with, the gradient is relatively low at the floor drain installing port 18.So, can smoothly by bathing room bottom During the sanitary wastewater in face causes the floor drain adapter at floor drain installing port 18 and drains into drainage equipment module, so as to keep bathing room The drying of bottom surface.
On the basis of above-described embodiment, in another embodiment of the utility model, as shown in figure 1, the bottom surface 11 and side The junction in face 12 can be provided with arc angling 14.So, the junction of bottom surface 11 and side 12 is provided with arc angling 14, the junction that can not only reduce bottom surface 11 and side 12 sets the cracking risk of right-angle side, and is conducive to secondary decoration Construction, without corner or spot as yet untouched by a clean-up campaign when using.
On the basis of above-described embodiment, in another embodiment of the utility model, as shown in figures 1 to 6, the side 12 Upper end be provided with waterproof construction 13, the waterproof construction 13 can be sealing surface, groove or flanging.So, in side 12 Upper end be provided with waterproof construction 13, the wallboard of bathing room just directly can vertically be stuck in the base plate top of bathing room, then pass through Break fluid sealant to be sealed, simple structure is easy for installation, good water-proof effect.
On the basis of above-described embodiment, in another embodiment of the utility model, as shown in fig. 6, the side 12 is by rank The anti-bank composition of ladder type, the anti-bank of staged at least includes top half 122 and the latter half 121.So, side is by staged Anti- bank composition, can form multi-level waterproof construction 13, improve the water resistance of bathroom base plate.Preferably, the first half 122 sizes are divided to be 50mm high, width 40mm, the size of the latter half 121 is 50mm high, width 75mm.So, even if in bathing room As deep as to 50mm, the anti-water depth of also 50mm, equivalent to double waterproof measure, improves the water proofing property of bathroom base plate to the surface water Energy.
On the basis of above-described embodiment, in another embodiment of the utility model, as shown in figure 5, the bottom of the bottom surface 11 Portion is also provided with supporting rib 19.So, the bottom in bottom surface 11 is provided with supporting rib 19, can increase bottom surface 11 Highly, processing materials are reduced.Further, the supporting rib 19 can be with the one moulding by casting of bottom surface 11 or by anti-manual labour Skill is fixed on the bottom of bottom surface 11.
On the basis of above-described embodiment, in another embodiment of the utility model, it is provided with least on the bathroom base plate Two suspension centres, the suspension centre is that pre-buried hanging is followed closely or suspension ring (not indicated in figure).So, by default suspension centre, can be conveniently Movement, lifting and the transport of the base plate or bathing room of bathing room.Preferably, set respectively on four angles of bathing room base plate Put four suspension centres.
On the basis of above-described embodiment, in another embodiment of the utility model, the panel 22 can be by the anti-side of beating Method is fixed on support fixed bed 25.So, panel 22 is fixed on support fixed bed 25 by anti-printing method, during construction, First panel 22 can be positioned with locator card, and be laid on platform mould, in the back side standing groove steel mesh piece of panel 22, then poured Concrete or the concrete mixed with haydite, form wall decorating veneer.Such that it is able to using pipelining, batch production, improve Production efficiency.
On the basis of above-described embodiment, in another embodiment of the utility model, the channel-section steel mesh sheet can be by channel-section steel The skeleton and steel mesh piece being formed by connecting are welded to form.So, skeleton is connected into by channel-section steel and welds steel mesh piece and form channel-section steel mesh sheet, With stronger resistance to compression, tension and impact resistance, so as to improve resistance to compression, tension and the shock resistance of wall decorating veneer.
On the basis of above-described embodiment, in another embodiment of the utility model, the junction of the channel-section steel can be set There are reinforcement or reinforcing plate (not identified in figure).So, the junction of channel-section steel is provided with reinforcement or reinforcing plate, it is possible to reduce The deformation of channel-section steel, increases the intensity of flase floor, so as to increase the intensity of wall decorating veneer.
On the basis of above-described embodiment, in another embodiment of the utility model, the concrete block can use haydite Concrete block or foaming haydite concrete block.So, using haydite concrete block or foaming haydite concrete block, its not only weight Gently, and impervious good, fire resistance is good, it is adapted to be used in bathing room or kitchen.
It is described as shown in Fig. 7, Fig. 9 and Figure 10 in another embodiment of the utility model on the basis of above-described embodiment Wall decorating veneer is fixed on wall 100 by connector 26.So, can be by connector by wall decorating veneer and base Body wall or lightgage steel joist wall are connected, easy construction.
On the basis of above-described embodiment, in another embodiment of the utility model, as shown in fig. 7, the wall decorating veneer Clearance layer 23 is provided between wall 100.So, clearance layer 23, wall body decoration are set between wall decorating veneer and wall Plate is applied to bathing room or kitchen, even if water or vapor are immersed in wall decorating veneer by panel 22, also can by Gap layer 23 is down drained, therefore clearance layer 23 can play certain waterproof action, it is also possible to passing through clearance layer 23 enters line Road and the arrangement of pipeline, facilitate the installation or maintenance of electrical equipment.
On the basis of above-described embodiment, in another embodiment of the utility model, the connector 26 is L-shaped, T-shaped Or isosceles triangle.So, connector 26 is the various shapes structures such as L-shaped, T-shaped or isosceles triangle, can be with various different installation knots Structure requirement, is easy to the installation of wall decorating veneer.
It is described as shown in Fig. 7, Fig. 9 and Figure 10 in another embodiment of the utility model on the basis of above-described embodiment The one end of connector 26 is fixed by welding on the channel-section steel of wall decorating veneer, and the other end is fixed with wall 100.So, can be pre- First the one end of connector 26 is fixed by welding on the channel-section steel of wall decorating veneer, until scene again will be even with fixtures such as bolts The other end of fitting 26 is connected with matrix wall or lightgage steel joist wall.Site operation workload is reduced, efficiency of construction is improved.
The above is only preferred embodiment of the present utility model, it is noted that for the common skill of the art For art personnel, on the premise of the utility model principle is not departed from, some improvements and modifications can also be made, these improve and Retouching also should be regarded as protection domain of the present utility model.

Claims (10)

1. a kind of bathing room, including base plate and wallboard, it is characterised in that the base plate include bottom surface and side, the bottom surface and Side is main by the disposable overall machine-shaping of concrete or fiber concrete, and the bottom surface is provided with floor drain installing port, described Floor drain adapter is provided with floor drain installing port, the floor drain adapter includes at least one import and at least one outlet, institute State and connected by reducing transfer tube between inlet and outlet, the reducing transfer tube is provided with annulus on the outer wall at import T-shaped flank;The wallboard includes the wall decorating veneer being fixed on wall, and the wall decorating veneer includes panel and branch Support fixed bed, the support fixed bed is the concrete block for being added with channel-section steel mesh sheet, the support fixed bed be arranged on wall and Between panel.
2. bathing room according to claim 1, it is characterised in that the bottom surface is provided with dry area and wet area, the dry area Separated by projection with wet area, the projection overall machine-shaping disposable with bottom surface.
3. bathing room according to claim 1, it is characterised in that the floor drain adapter includes an import and goes out Mouthful, connected by 90 ° of reducing transfer tubes between the inlet and outlet.
4. bathing room according to claim 3, it is characterised in that drainage grade is additionally provided with the bottom surface, describedly The gradient is relatively low at leakage installing port.
5. bathing room according to claim 1, it is characterised in that the junction of the bottom surface and side is provided with arc and falls Angle.
6. bathing room according to claim 1, it is characterised in that the upper end of the side is provided with waterproof construction, described Waterproof construction is sealing surface, groove or flanging.
7. bathing room according to claim 1, it is characterised in that the side is made up of the anti-bank of staged, the ladder The anti-bank of formula at least includes top half and the latter half;Or, the top half size 50mm high, width 40mm, the lower half Portion size 50mm high, width 75mm.
8. bathing room according to any one of claim 1 to 7, it is characterised in that set on the base plate of the bathing room There are at least two suspension centres, the suspension centre is that pre-buried hanging is followed closely or suspension ring.
9. bathing room according to any one of claim 1 to 7, it is characterised in that the channel-section steel mesh sheet is to be connected by channel-section steel The skeleton and steel mesh piece for connecing are welded to form;The junction of the channel-section steel is provided with reinforcement or reinforcing plate;The concrete Block is haydite concrete block or foaming haydite concrete block.
10. bathing room according to any one of claim 1 to 7, it is characterised in that the wall decorating veneer is by connection Part is fixed on wall;The connector is L-shaped, T-shaped or isosceles triangle;Described connector one end is by being welded and fixed On the channel-section steel of wall decorating veneer, the other end is fixed with wall.
CN201621092464.0U 2016-09-29 2016-09-29 Bathroom room Active CN206189907U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621092464.0U CN206189907U (en) 2016-09-29 2016-09-29 Bathroom room

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621092464.0U CN206189907U (en) 2016-09-29 2016-09-29 Bathroom room

Publications (1)

Publication Number Publication Date
CN206189907U true CN206189907U (en) 2017-05-24

Family

ID=58731322

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621092464.0U Active CN206189907U (en) 2016-09-29 2016-09-29 Bathroom room

Country Status (1)

Country Link
CN (1) CN206189907U (en)

Similar Documents

Publication Publication Date Title
CN206503169U (en) A kind of integral basement tower crane and raft plate seam construction
CN106088260A (en) A kind of Homofloor drainage system of novel building toilet
CN208501802U (en) A kind of bathroom caisson internal drainage construction
CN206189912U (en) Bathroom bottom plate
CN206189906U (en) Bathroom room
CN206189916U (en) Bathroom room
CN206189908U (en) Bathroom room
CN208777468U (en) A kind of kitchen and bath's water-proofing anticracking structure
CN207499071U (en) toilet
CN206189907U (en) Bathroom room
CN206189909U (en) Bathroom room
CN206189914U (en) Bathroom room
CN206189911U (en) Bathroom room
CN206616888U (en) A kind of bathing room
CN206530084U (en) A kind of bathroom bottom plate
CN206530009U (en) A kind of bathroom bottom plate
CN206385828U (en) A kind of bathing room
CN209585309U (en) Subsided rest room waterproof construction
CN206329067U (en) A kind of bathing room
CN208415810U (en) A kind of caisson type accomodation ground assembling mounting structure
CN106320749A (en) Bathroom
CN106013566A (en) Assembled type bathroom floor slab and construction method
CN206554180U (en) A kind of integrated water-proof chassis of toilet pipeline
CN205857311U (en) A kind of Homofloor drainage system of novel building toilet
CN206189905U (en) Bathroom room

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: China Civil Architecture Friends Technology (Jiaozhou) Co., Ltd.

Assignor: CHINA MINGSHENG DRAWIN TECHNOLOGY INVESTMENT CO., LTD.

Contract record no.: 2018430000023

Denomination of utility model: Bathroom

Granted publication date: 20170524

License type: Common License

Record date: 20190102