CN206189416U - Side slope adds muscle structure - Google Patents

Side slope adds muscle structure Download PDF

Info

Publication number
CN206189416U
CN206189416U CN201621085290.5U CN201621085290U CN206189416U CN 206189416 U CN206189416 U CN 206189416U CN 201621085290 U CN201621085290 U CN 201621085290U CN 206189416 U CN206189416 U CN 206189416U
Authority
CN
China
Prior art keywords
reinforcing layer
side slope
slope
height
spacing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621085290.5U
Other languages
Chinese (zh)
Inventor
杨明瑞
杨泽伟
宋飞
马立秋
杨建华
刘永
冀程哲
刘国勇
江坤
黄�隆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Electric Power Construction Supervision Co Ltd
Guizhou electric power design institute
Changan University
Original Assignee
Guizhou Electric Power Construction Supervision Co Ltd
Guizhou electric power design institute
Changan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Electric Power Construction Supervision Co Ltd, Guizhou electric power design institute, Changan University filed Critical Guizhou Electric Power Construction Supervision Co Ltd
Priority to CN201621085290.5U priority Critical patent/CN206189416U/en
Application granted granted Critical
Publication of CN206189416U publication Critical patent/CN206189416U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The utility model discloses a side slope adds muscle structure, include along height of side slope direction level in proper order and lay a plurality of reinforcing layer in the side slope, each reinforcing layer edgewise the slope the slope in proper order backward the dislocation lay, reinforcing layer include the muscle material with lay the soil body in the muscle material, each reinforcing layer adopts the laying mode of different intervals in the side slope in the altitude range of difference, wherein the interval between each reinforcing layer between 16~12 at height of side slope will be less than the interval between each reinforcing layer in other altitude ranges of side slope. Through position and the interval that rationally sets up reinforcing layer, can effectively put forward high slope's stability, reduce domatic horizontal displacement, can save construction cost and cycle simultaneously.

Description

A kind of side slope reinforced structure
Technical field
The utility model is related to slope project protection technology field, it is more particularly to a kind of can the side slope reinforced of side slope Reinforced structure.
Background technology
With the implementation of China's national strategy plan, the sustainable development of the development of the national economy, communal facility, infrastructure and The engineering constructions such as means of transportation are surging forward, and the project scale such as energy development constantly expands, water conservancy construction, highway engineering, railway Substantial amounts of slope project can be all run into engineering, airport engineering, port engineering, surface mining, defence engineering and urban construction Problem, associated Problems of Slope Stability also becomes increasingly conspicuous.Reinforcement method is used as a kind of method quilt for reinforcing tall earth fill Be widely used in engineering practice, how reasonable Arrangement reinforced bands position and length, be engineering circles problem demanding prompt solution.
Chinese utility model patent CN203129156U discloses a kind of steep reinforced slope structure high, and it uses reinforced slope Slopes, although solve the Problems of Slope Stability existing for traditional bricklaying barricade, but do not consider in side slope reinforcement position and The influence of spacing side slope performance, is still equally spaced mode using traditional, so as to cause the waste of reinforcement material, increases Construction cost and cycle.
Utility model content
The purpose of this utility model is to solve existing side slope using the above mentioned problem existing for equidistant reinforcement mode, is carried A kind of position and spacing by rationally setting reinforcing layer is supplied, the stability of side slope can have been effectively improved, reduced side slope surface water The side slope reinforced structure that prosposition is moved.
In order to solve the above technical problems, the utility model uses following technical scheme:
A kind of side slope reinforced structure, including the multiple reinforcing layers in side slope are laid on along slope height direction successively level, Each reinforcing layer misplaces and lays backward successively along the gradient of side slope, and the reinforcing layer includes muscle material and the soil body being laid in muscle material, In side slope each reinforcing layer at various height in the range of using different spacing paving mode, wherein slope height 1/6~ Spacing between 1/2 between each reinforcing layer is less than the spacing between each reinforcing layer in side slope other altitude ranges.
Between the 1/6~1/2 of slope height, the spacing between each reinforcing layer is 20~40cm;Side slope other highly In the range of, the spacing between each reinforcing layer is 50~60cm.
Between the 1/6~1/2 of slope height, the spacing between each reinforcing layer is 30cm;In other altitude ranges of side slope Interior, the spacing between each reinforcing layer is 60cm.
Reinforcing layer is equipped with the 1/3 of slope height and 1/2.
Muscle material in the reinforcing layer uses geo-grid sheet or geotextile.
The reinforcing layer laid at slope height 1/3 and 1/2, its muscle material moulds geo-grid sheet using steel.
The utility model takes the different height in side slope rationally to set according to the difference of different slopes height institutes bearing capacity The density of reinforcing layer in side slope, so in the case of layer number of bar identical, can effectively strengthen the bearing capacity and stabilization of side slope Property;Using this reinforcing layer set-up mode on the premise of slope stability is ensured, the cost of reinforcement material can be effectively saved, saved About corresponding construction period;Meanwhile, reinforcing layer is set and in reinforcing layer using high intensity using the key position in side slope The modes such as muscle material, can further strengthen the stability of side slope, reduce domatic horizontal displacement.
Brief description of the drawings
Fig. 1 is the utility model structural representation, and wherein H is slope height.
Fig. 2 be in the case of layer number of bar identical, using in equidistant reinforcement and the utility model in different height model Enclose using different spacing reinforcement modes, the impact analysis schematic diagram of side slope horizontal displacement, H is slope height;
Wherein:Operating mode a be slope height 0, spaced set reinforcement respectively at H/8, H/4,3H/8, H/2,5H/8 Layer,
Operating mode b is the difference spaced set reinforcing layer at H/8, H/4,3H/8, H/2,5H/8,3H/4 of slope height,
Operating mode c is the difference spaced set reinforcing layer at H/4,3H/8, H/2,5H/8,3H/4,7H/8 of slope height,
Operating mode d be slope height 0, spaced set reinforcing layer respectively at H/6, H/3, H/2,2H/3,5H/6,
Operating mode e is to set to add using different spacing modes at H/6, H/4, H/3,5H/12, H/2,2H/3 of slope height Muscle layer;Wherein between the 1/6~1/2 of slope height, the spacing between each reinforcing layer is H/12, in other models of slope height In enclosing, the spacing between each reinforcing layer is H/6.
Fig. 3 is position and the side slope surface horizontal displacement relation schematic diagram of reinforcing layer in side slope.Wherein:H is slope height, A is height of the reinforcing layer away from side slope bottom.
Fig. 4 is position and the Side Slope Safety Coefficient relation schematic diagram of reinforcing layer in side slope.Wherein H is slope height, and a is to add Height of the muscle layer away from side slope bottom.
In figure:1st, side slope, 2, reinforcing layer.
Specific embodiment
The utility model is further described below in conjunction with the accompanying drawings.
As shown in figure 1, a kind of side slope reinforced structure, including be laid in side slope 1 along slope height direction successively level Multiple reinforcing layers 2, each reinforcing layer 2 misplaces and lays backward successively along the gradient of side slope, and each reinforcing layer 2 is relative to reinforcement below Layer is shifted to install backward along gradient direction, so as to side slope surface keeping parallelism, the reinforcing layer 2 includes muscle material and being laid on muscle The soil body in material, in side slope 1 each reinforcing layer 2 at various height in the range of using different spacing paving mode, wherein on side Spacing between the 1/6~1/2 of slope height between each reinforcing layer is less than in side slope other altitude ranges between each reinforcing layer 2 Spacing.
In concrete engineering construction, between the 1/6~1/2 of slope height, the spacing between each reinforcing layer can be according to reality Border condition of construction uses the spacing of 20~40cm;And in side slope other altitude ranges, the spacing between each reinforcing layer can basis Practice of construction situation uses the spacing of 50~60cm.Generally, preferably use between the 1/6~1/2 of slope height, Spacing between each reinforcing layer is set to 30cm;In side slope other altitude ranges, the spacing between each reinforcing layer is set to 60cm。
By to the contrast between the reinforcing layer and spaced set reinforcing layer that different height scope sets different spacing Analysis, such as Fig. 2, it can be deduced that:Encrypted in the range of the 1/6~1/2 of slope height and reinforcing layer is set, can effectively reduced and add The horizontal displacement of muscle side slope, compared to the equidistant laying reinforcing layer mode employed in existing engineering construction, can optimize and add The configuration of muscle material, improves the overall performance of reinforced slope.
Additionally by analytical calculation, such as Fig. 3 and 4, it can be seen that when setting reinforcing layer at the 1/3 of slope height, side slope The horizontal displacement of slopes is minimum, safety coefficient highest;When reinforcing layer is set at the 1/2 of slope height, the level of side slope slopes Displacement is smaller, and safety coefficient is higher.That is, to strengthen the stability of side slope in work progress, should be in slope height Reinforcing layer is laid at 1/3 and 1/2, while the muscle material of this reinforcing layer at two can be using the steel plastic geogrid of high intensity, to enter one The stability of the reinforcement side slope of step.
The muscle material of reinforcing layer 2 can use geo-grid sheet or geotextile in the side slope 1.
The difference of the power carried according to different slopes height, takes and adds in the different height of side slope rationally sets side slope The density of muscle layer, so in the case of layer number of bar identical, can effectively strengthen the bearing capacity and stability of side slope;Using this Reinforcing layer set-up mode is planted on the premise of slope stability is ensured, the cost of reinforcement material can be effectively saved, saves corresponding Construction period;Meanwhile, reinforcing layer is set using the key position in side slope and uses muscle material of high intensity etc. square in reinforcing layer Formula, can further strengthen the stability of side slope, reduce domatic horizontal displacement.
Specification and drawings of the present utility model are considered as illustrative and not restrictive, are disclosed in the utility model Technical scheme on the basis of, those skilled in the art is according to disclosed technology contents, it is not necessary to which performing creative labour is just Some can be made to some of them technical characteristic to replace and deform, these are replaced and deform in protection scope of the present invention It is interior.

Claims (6)

1. a kind of side slope reinforced structure, including the multiple reinforcing layers in side slope are laid on along slope height direction successively level, respectively Reinforcing layer misplaces and lays backward successively along the gradient of side slope, and the reinforcing layer includes muscle material and the soil body being laid in muscle material, its It is characterised by:In side slope each reinforcing layer at various height in the range of using different spacing paving mode, wherein high in side slope Spacing between the 1/6~1/2 of degree between each reinforcing layer is less than the spacing between each reinforcing layer in side slope other altitude ranges.
2. side slope reinforced structure according to claim 1, it is characterised in that:Between the 1/6~1/2 of slope height, respectively Spacing between reinforcing layer is 20~40cm;In side slope other altitude ranges, the spacing between each reinforcing layer is 50~60cm.
3. side slope reinforced structure according to claim 2, it is characterised in that:Between the 1/6~1/2 of slope height, respectively Spacing between reinforcing layer is 30cm;In side slope other altitude ranges, the spacing between each reinforcing layer is 60cm.
4. side slope reinforced structure according to any one of claim 1 to 3, it is characterised in that:In 1/3 He of slope height Reinforcing layer is equipped with 1/2.
5. side slope reinforced structure according to any one of claim 1 to 3, it is characterised in that:Muscle in the reinforcing layer Material uses geo-grid sheet or geotextile.
6. side slope reinforced structure according to claim 4, it is characterised in that:That is laid at slope height 1/3 and 1/2 adds Muscle layer, its muscle material moulds geo-grid sheet using steel.
CN201621085290.5U 2016-09-27 2016-09-27 Side slope adds muscle structure Active CN206189416U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621085290.5U CN206189416U (en) 2016-09-27 2016-09-27 Side slope adds muscle structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621085290.5U CN206189416U (en) 2016-09-27 2016-09-27 Side slope adds muscle structure

Publications (1)

Publication Number Publication Date
CN206189416U true CN206189416U (en) 2017-05-24

Family

ID=58731244

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621085290.5U Active CN206189416U (en) 2016-09-27 2016-09-27 Side slope adds muscle structure

Country Status (1)

Country Link
CN (1) CN206189416U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109577349A (en) * 2018-11-22 2019-04-05 临沂大学 Reinforcement means of the Earthworking reinforced bar to open-pit mine blast side slope

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109577349A (en) * 2018-11-22 2019-04-05 临沂大学 Reinforcement means of the Earthworking reinforced bar to open-pit mine blast side slope

Similar Documents

Publication Publication Date Title
CN103669398B (en) A kind of monoblock type cutting retaining wall
CN201952698U (en) Roadbed structure reinforced by geotextile discrete material piles
CN103410156B (en) Support space enclosing structure and application process thereof before a kind of recyclable vertical type steel pipe
CN103952986B (en) A kind of off-load formula rigid culvert structure
CN202117068U (en) Micropile plate-type composite foundation
CN202969393U (en) Ribbing load reduction structure of road high hill culvert
CN203174619U (en) Reverse raft concrete terrace
CN101666083A (en) Soft soil foundation treatment reinforcement method and device thereof
CN203346750U (en) Long-short pile raft structure roadbed of deep spongy soil region
CN103046543A (en) Antiskid pile with hollow outer isosceles trapezoid cross section and in unequal interval arrangement
CN202000357U (en) Novel tailing filling fabricform damming device
CN203161244U (en) Existing subway underground excavation running tunnel protection structure
CN103410158A (en) Recoverable vertical type portal self-stabilizing enveloping structure and application method thereof
CN106337434B (en) A kind of reinforced earth retaining wall and its construction method
CN104594297B (en) A kind of double face slab rock-fill dams and construction method thereof
CN102312443B (en) Bearing platform structure with variable cross section and variable rigidity for special-shaped compound cross-section pile and construction method thereof
CN104652181A (en) Light supporting structure for existing railway station roadbed on filling roadbed
CN206189416U (en) Side slope adds muscle structure
CN106836034B (en) High-fill cover plate culvert flexible load shedding system and construction method
CN203855956U (en) Cast-in-place pile structure with sleeve
CN202492856U (en) Reinforced concrete pile type buttress retaining wall
CN209260466U (en) A kind of high-fill roadbed structure
CN107524144B (en) A kind of hardened system and reinforcement means for soft soil foundation before tunnel excavation
CN201801880U (en) Variable cross-section variable-stiffness bearing platform structure of special-shaped combined cross-section pile
CN204401606U (en) The prefabricated expansion pile cover of a kind of plain concrete pile

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant