CN206174943U - 煤层/页岩层/致密层水平井分段压裂实验装置 - Google Patents

煤层/页岩层/致密层水平井分段压裂实验装置 Download PDF

Info

Publication number
CN206174943U
CN206174943U CN201621233958.6U CN201621233958U CN206174943U CN 206174943 U CN206174943 U CN 206174943U CN 201621233958 U CN201621233958 U CN 201621233958U CN 206174943 U CN206174943 U CN 206174943U
Authority
CN
China
Prior art keywords
coal seam
pit shaft
steel pipe
outer barrel
urceolus
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621233958.6U
Other languages
English (en)
Inventor
胡随
谭晋崇
张丽芳
武文超
李薇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Shale Gas Co Ltd
Original Assignee
Shanxi Shale Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Shale Gas Co Ltd filed Critical Shanxi Shale Gas Co Ltd
Priority to CN201621233958.6U priority Critical patent/CN206174943U/zh
Application granted granted Critical
Publication of CN206174943U publication Critical patent/CN206174943U/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)

Abstract

本实用新型公开了一种煤层/页岩层/致密层水平井分段压裂实验装置,包括水平放置的外筒(5),所述外筒(5)内设置经过高压压实的砂岩/页岩/煤层混层体(2),所述外筒(5)两端封闭,所述外筒(5)外围安装圆板型电加热板(6)后置于岩心夹持器(4)中;所述砂岩/页岩/煤层混层体(2)内钻孔后放置钢管井筒(9),所述钢管井筒(9)上开设射孔(8),所述钢管井筒(9)内安装桥塞(3);所述钢管井筒(9)穿出外筒(5),并连接高压水泵(1);所述外筒(5)外放置有CT扫描监测设备(7)。本装置可以在大规模的井下压裂前,进行实验室分段式模拟压裂过程,对各段参数对裂缝的形态的影响进行敏感性分析,得出最优的压裂方案。

Description

煤层/页岩层/致密层水平井分段压裂实验装置
技术领域
本实用新型涉及地下开采工艺实验室试验装置领域,具体为一种煤层/页岩层/致密层水平井分段压裂实验装置,用来模拟确定地下压裂工艺参数。
背景技术
山西省独特的海陆过渡相地层对传统的压裂技术提出了新的问题,在海相的页岩气地层中,页岩气压裂技术较为成熟,但是夹杂着煤层、页岩层、砂岩层的海陆过渡相的岩层中,进行压裂,对压裂的缝隙的特征以及压裂的工艺都需要详细的实验室模拟。
发明内容
本实用新型的目的是提供一种煤层/页岩层/致密层水平井分段压裂实验装置,用于解决生产实践前进行充分的压裂实验,保证井下作业的安全有效。
本实用新型是采用如下技术方案实现的:
一种煤层/页岩层/致密层水平井分段压裂实验装置,包括水平放置的外筒,所述外筒内设置经过高压压实的砂岩/页岩/煤层混层体,所述外筒两端封闭,所述外筒外围安装圆板型电加热板后置于岩心夹持器中;所述砂岩/页岩/煤层混层体内钻孔后放置钢管井筒,所述钢管井筒上开设射孔,所述钢管井筒内安装桥塞;所述钢管井筒穿出外筒,并连接高压水泵;所述外筒外放置有CT扫描监测设备。
按照试验要求,选用不同的煤、砂岩、页岩放入水平放置的圆筒形实验装置(外筒),加入高压充分压实后构成砂岩/页岩/煤层混层体,根据需要钻出需要的孔径,中间放入已根据需要射孔完毕的钢管井筒。该钢管井筒穿出外筒。在外筒周围加入圆板型电加热板,外接电源,用于温度控制。然后将圆筒形实验装置的最外圈加入岩心夹持器,方便控制围压。最后,对整个外筒装置用钢板封闭,留出钢管井筒口,从钢管井筒口接入高压水泵,对实验装置进行增压。实验装置周围加入CT扫描监控设备,检测砂岩/页岩/煤层混层体的裂缝状态。
试验时,桥塞可以用于将钢管井筒密封分隔成两段,首先,桥塞位于前部,通入高压水后,由位于桥塞前部的射孔流出,观察煤层/页岩层/致密层体该位置段的裂缝状态。之后,分段逐步将桥塞在钢管井筒内向后移动,这样就可以分段注入高压水,分段观察煤层/页岩层/致密层体相应位置段的裂缝状态。
本实用新型的有益效果如下:
本装置可以在大规模的井下压裂前,进行实验室分段式模拟压裂过程,对各段参数围压、温度、介质状况、孔径、孔密、携砂液、沙子粒径等因素对裂缝的形态的影响进行敏感性分析,得出最优的压裂方案。
本实用新型设计合理,该装置能够模拟不同的地层条件下,不同的压力条件下以及不同的温度条件下,对海陆过渡相砂岩、煤、页岩气混层的压裂效果进行评估,得出最有利的压裂参数以及压裂工艺,具有较好的应用价值。
附图说明
图1表示煤层/页岩层/致密层水平井分段压裂实验装置的结构示意图。
图中:1-高压水泵,2-砂岩/页岩/煤层混层体,3-桥塞,4-岩心夹持器,5-外筒,6-圆板型电加热板,7-CT扫描监测设备,8-射孔,9-钢管井筒。
具体实施方式
下面结合附图对本实用新型的具体实施例进行详细说明。
一种煤层/页岩层/致密层水平井分段压裂实验装置,如图1所示,包括水平放置的外筒5,所述外筒5内设置经过高压压实的砂岩/页岩/煤层混层体2;制备时,选用不同的煤、砂岩、页岩放入外筒,加入高压充分压实后构成砂岩/页岩/煤层混层体。
如图1所示,所述砂岩/页岩/煤层混层体2的内钻孔(一般情况下,在混层体的轴线处钻孔)后放置钢管井筒9,所述钢管井筒9上开设射孔8。所述钢管井筒9从外筒5端面或者其外壁穿出外筒5。所述外筒5两端封闭,所述钢管井筒9穿出外筒5后连接高压水泵1。
如图1所示,所述钢管井筒9内安装桥塞3。桥塞的作用是,实现钢管井筒的分段式注水,以实现分段压裂检测。
如图1所示,所述外筒5外围安装圆板型电加热板6,连接电源后,用于温度控制。外筒5最外圈加装岩心夹持器4,用于控制围压。
如图1所示,所述外筒5外放置有CT扫描监测设备7,用于检测砂岩/页岩/煤层混层体的裂缝状态。
具体实施时,按照试验要求,选用不同的煤、砂岩、页岩放入一个外筒5中,加入高压充分压实后构成砂岩/页岩/煤层混层体2,根据需要钻出需要的孔径,中间放入已根据需要射孔完毕的钢管井筒9。在外筒5周围加入圆板型电加热板6,外接电源,用于温度控制。然后将圆筒形实验装置的最外圈加入岩心夹持器4,方便控制围压。钢管井筒9从外筒5端面或者其外壁穿出外筒5。最后,对整个外筒装置用钢板封闭,留出钢管井筒口,从钢管井筒口接入高压水泵1,对实验装置进行增压。实验装置周围加入CT扫描监控设备7,用于分段检测砂岩/页岩/煤层混层体的裂缝状态。试验时,通过逐步移动桥塞过程,实现分段注入高压水,分段观察煤层/页岩层/致密层体相应位置段的裂缝状态。
最后所应说明的是,以上实施例仅用以说明本实用新型的技术方案而非限制,尽管参照本实用新型实施例进行了详细说明,本领域的普通技术人员应当理解,对本实用新型的技术方案进行修改或者等同替换,都不脱离本实用新型的技术方案的精神和范围,其均应涵盖权利要求保护范围中。

Claims (1)

1.一种煤层/页岩层/致密层水平井分段压裂实验装置,其特征在于:包括水平放置的外筒(5),所述外筒(5)内设置经过高压压实的砂岩/页岩/煤层混层体(2),所述外筒(5)两端封闭,所述外筒(5)外围安装圆板型电加热板(6)后置于岩心夹持器(4)中;所述砂岩/页岩/煤层混层体(2)内钻孔后放置钢管井筒(9),所述钢管井筒(9)上开设射孔(8),所述钢管井筒(9)内安装桥塞(3);所述钢管井筒(9)穿出外筒(5),并连接高压水泵(1);所述外筒(5)外放置有CT扫描监测设备(7)。
CN201621233958.6U 2016-11-17 2016-11-17 煤层/页岩层/致密层水平井分段压裂实验装置 Expired - Fee Related CN206174943U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621233958.6U CN206174943U (zh) 2016-11-17 2016-11-17 煤层/页岩层/致密层水平井分段压裂实验装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621233958.6U CN206174943U (zh) 2016-11-17 2016-11-17 煤层/页岩层/致密层水平井分段压裂实验装置

Publications (1)

Publication Number Publication Date
CN206174943U true CN206174943U (zh) 2017-05-17

Family

ID=58687065

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621233958.6U Expired - Fee Related CN206174943U (zh) 2016-11-17 2016-11-17 煤层/页岩层/致密层水平井分段压裂实验装置

Country Status (1)

Country Link
CN (1) CN206174943U (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107387054A (zh) * 2017-09-14 2017-11-24 辽宁工程技术大学 一种页岩缝网压裂裂缝扩展的物理模拟方法
CN109142128A (zh) * 2018-07-26 2019-01-04 中国石油天然气股份有限公司 一种三元复合驱油井井下采出设备动态结垢模拟实验方法及装置
CN115614025A (zh) * 2022-10-21 2023-01-17 西南石油大学 一种裂缝穿越海陆过渡相岩性界面偏转角测量装置及方法

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107387054A (zh) * 2017-09-14 2017-11-24 辽宁工程技术大学 一种页岩缝网压裂裂缝扩展的物理模拟方法
CN107387054B (zh) * 2017-09-14 2019-08-27 辽宁工程技术大学 一种页岩缝网压裂裂缝扩展的物理模拟方法
CN109142128A (zh) * 2018-07-26 2019-01-04 中国石油天然气股份有限公司 一种三元复合驱油井井下采出设备动态结垢模拟实验方法及装置
CN109142128B (zh) * 2018-07-26 2021-04-27 中国石油天然气股份有限公司 一种三元复合驱油井井下采出设备动态结垢模拟实验方法及装置
CN115614025A (zh) * 2022-10-21 2023-01-17 西南石油大学 一种裂缝穿越海陆过渡相岩性界面偏转角测量装置及方法

Similar Documents

Publication Publication Date Title
WO2019205578A1 (zh) 一种构造煤原位煤层气水平井洞穴卸压开采模拟试验系统
WO2019205577A1 (zh) 一种构造煤原位煤层气水平井洞穴卸压开采模拟试验系统
CN101122552B (zh) 油层套管射孔抗挤毁模拟试验方法和模拟试验机
CN103712863B (zh) 基于突变理论研究压裂岩体损伤及裂缝扩展的装置及方法
CN204679347U (zh) 一种钻井液承压堵漏压裂试验装置
CN105041284B (zh) 油气井压裂工况井筒完整性评价的实验装置与方法
CN104237025A (zh) 一种封闭钻孔采动破坏模拟试验方法
CN206174943U (zh) 煤层/页岩层/致密层水平井分段压裂实验装置
CN105738221A (zh) 一种模拟射孔完井下水力压裂的实验装置及方法
CN105756599A (zh) 煤矿用两头气堵及中间水封穿层钻孔封孔装置及封孔方法
CN104632174A (zh) 煤层液态二氧化碳压裂装置及方法
CN104535727B (zh) 一种水力加砂压裂系统
CN110424892B (zh) 一种矿井近水平定向钻孔的突水治理方法
Song et al. Evaluation of coal seam hydraulic fracturing using the direct current method
CN107100612B (zh) 一种井下水力压裂影响区域考察方法
CN113236217A (zh) 一种利用大功率超声波对低渗透性煤层增透装置及增透方法
CN210269442U (zh) 一种三轴煤岩多场多相耦合压裂实验装置
CN111287731A (zh) 一种固井水泥环完整性评价装置及方法
CN102889077A (zh) 检测模拟实际工况水力喷射压裂孔内压力分布的实验装置
CN107269263A (zh) 一种蠕变地层定向井筒力学行为模拟实验装置与方法
CN103884597A (zh) 煤层水力压裂诱导围岩应力变化的模拟测量装置及方法
CN205477573U (zh) 一种模拟射孔完井下水力压裂的实验装置
CN206319870U (zh) 一种水平井分段压裂或同步压裂模拟实验系统
CN102200002A (zh) 上向孔分段高压封孔方法及装置
WO2023131359A1 (zh) 一种利用钻孔注胶测试顶底板岩层裂隙发育特征的方法

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170517

Termination date: 20181117