CN105041284B - 油气井压裂工况井筒完整性评价的实验装置与方法 - Google Patents

油气井压裂工况井筒完整性评价的实验装置与方法 Download PDF

Info

Publication number
CN105041284B
CN105041284B CN201510251392.3A CN201510251392A CN105041284B CN 105041284 B CN105041284 B CN 105041284B CN 201510251392 A CN201510251392 A CN 201510251392A CN 105041284 B CN105041284 B CN 105041284B
Authority
CN
China
Prior art keywords
rock mass
pressure
wellbore
operating mode
gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510251392.3A
Other languages
English (en)
Other versions
CN105041284A (zh
Inventor
高德利
尹飞
刘奎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Petroleum Beijing
Original Assignee
China University of Petroleum Beijing
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Petroleum Beijing filed Critical China University of Petroleum Beijing
Priority to CN201510251392.3A priority Critical patent/CN105041284B/zh
Publication of CN105041284A publication Critical patent/CN105041284A/zh
Application granted granted Critical
Publication of CN105041284B publication Critical patent/CN105041284B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

本发明提供了一种油气井压裂工况井筒完整性评价的实验装置,外压缸套外部连接有外压加载管线和高压泵,外压缸套内部布置了三向加载液压缸,三向加载液压缸与液压控制模块连接,三向加载液压缸中间放置有岩体与井筒物理模型,岩体与井筒物理模型由套管、水泥环、岩体及射孔孔眼组成,套管入口连接有内压加载管线和高压泵,套管入口还连接有高压气瓶和气体压缩机,套管外壁连接有应变传感器,水泥环内部连接有气压传感器和欧姆表。本发明还提供了利用上述装置评价井筒完整性的实验方法。本发明可以模拟油气井压裂及生产过程,评价压裂工况井筒完整性的结果可信度高,为油气井套管设计、固井和压裂参数优化提供了实验依据。

Description

油气井压裂工况井筒完整性评价的实验装置与方法
技术领域
本发明涉及一种油气井工程领域的实验装置与方法,可以评价油气井压裂工况井筒完整性。
背景技术
油气井压裂改造是开发非常规油气资源的一种有效途径,通过注入压裂液使油气藏产生裂缝,从而降低油气的流动阻力。压裂施工在改造油气藏的同时,也增大了井筒失效的风险。例如,对12口页岩气水平井进行压裂,其中8口井出现了套管变形。井筒完整性是安全、高效地开采油气资源的必要条件。压裂引起井筒完整性的失效机理十分复杂,目前尚无评价该工况下井筒完整性的有效方法。
发明内容
为了揭示油气井压裂工况井筒失效机理和探索井筒完整性控制措施,本发明提供了一种油气井压裂工况井筒完整性评价的实验装置与方法。该装置包括:岩体与井筒物理模型、外压缸套、外压加载管线、内压加载管线、高压泵、三向加载液压缸、液压控制模块、应变传感器、气压传感器、欧姆表和计算机。外压缸套外部连接有外压加载管线和高压泵,外压缸套内部布置了三向加载液压缸,三向加载液压缸与液压控制模块连接,三向加载液压缸中间放置有岩体与井筒物理模型,岩体与井筒物理模型由套管、水泥环、岩体及射孔孔眼组成,套管入口连接有内压加载管线和高压泵,套管入口还连接有高压气瓶和气体压缩机,套管外壁连接有应变传感器,水泥环内部连接有气压传感器和欧姆表。
本发明还提供了利用上述装置评价井筒完整性的实验方法。实验方法包括以下步骤:步骤一,在套管外壁上布置应变片,并连接应变传感器和计算机;步骤二,制作含有井眼和射孔孔眼的岩体;步骤三,在岩体的井眼中放置套管,在套管与井眼之间环空中注入水泥浆,套管、水泥环和岩体共同组成了岩体与井筒物理模型,水泥环连接气压传感器和欧姆表;步骤四,把岩体与井筒物理模型放置于三向加载液压缸之中,通过外压加载管线和高压泵对岩体施加孔隙压力,通过三向加载液压缸对岩体施加三向主地应力;步骤五,在压裂液中混合示踪剂,通过内压加载管线和高压泵向套管内部注入压裂液,对岩体进行水力压裂;步骤六,在压裂过程中,利用应变传感器和计算机测量套管应变,利用欧姆表考察水泥环内部窜流情况;步骤七,在压裂完成后,通过与高压气瓶连接的气体压缩机向套管内部注入气体,利用气压传感器和计算机监测生产时气体在水泥环中窜流压力;步骤八,击碎岩体与水泥环,观察岩体与水泥环内部示踪剂分布规律。
本发明可以模拟油气井压裂及生产过程,评价压裂工况井筒完整性的结果可信度高,为油气井套管设计、固井和压裂参数优化提供了实验依据。
附图说明
下面将结合附图和实施例对本发明作进一步说明。
附图1是油气井压裂工况井筒完整性评价的实验装置。
附图中:1.气体压缩机,2.高压气瓶,3.水箱,4.内压加载管线和高压泵,5.外压加载管线和高压泵,6.压力计,7.外压缸套,8.应变传感器,9.计算机,10.气压传感器,11.欧姆表,12.三向加载液压缸,13.射孔孔眼,14.套管,15.水泥环,16.岩体,17.液压控制模块。
具体实施方式
为了对本发明的技术特征和有益效果有更加清楚地理解,现参照说明书附图对本发明的技术方案进行以下详细说明。
本发明提供了一种油气井压裂工况井筒完整性评价的实验装置,如附图1所示。压裂工况井筒完整性评价的实验装置包括:气体压缩机(1)、高压气瓶(2)、水箱(3)、内压加载管线和高压泵(4)、外压加载管线和高压泵(5)、压力计(6)、外压缸套(7)、应变传感器(8)、计算机(9)、气压传感器(10)、欧姆表(11)、三向加载液压缸(12)、射孔孔眼(13)、套管(14)、水泥环(15)、岩体(16)和液压控制模块(17)。外压缸套(7)外部连接有外压加载管线和高压泵(5),外压缸套(7)内部布置了三向加载液压缸(12),三向加载液压缸(12)与液压控制模块(17)连接,三向加载液压缸(12)中间放置有岩体与井筒物理模型,岩体与井筒物理模型由套管(14)、水泥环(15)、岩体(16)及射孔孔眼(13)组成,套管(14)入口连接有内压加载管线和高压泵(4),套管(14)入口还连接有高压气瓶(2)和气体压缩机(1),套管(14)外壁连接有应变传感器(8),水泥环(15)内部连接有气压传感器(10)和欧姆表(11)。
利用上述装置评价井筒完整性的实验方法包括以下步骤:步骤一,在套管(14)外壁上布置应变片,并连接应变传感器(8)和计算机(9);步骤二,制作含有井眼和射孔孔眼(13)的岩体(16);步骤三,在岩体的井眼中放置套管(14),在套管(14)与井眼之间环空中注入水泥浆,套管(14)、水泥环(15)和岩体(16)共同组成了岩体与井筒物理模型,水泥环(15)连接气压传感器(10)和欧姆表(11);步骤四,把岩体与井筒物理模型放置于三向加载液压缸(12)之中,通过外压加载管线和高压泵(5)对岩体(16)施加孔隙压力,通过三向加载液压缸(12)对岩体施加三向主地应力;步骤五,在压裂液中混合示踪剂,通过内压加载管线和高压泵(4)向套管(14)内部注入压裂液,对岩体(16)进行水力压裂;步骤六,在压裂过程中,利用应变传感器(8)和计算机(9)测量套管(14)应变,利用欧姆表(11)考察水泥环(15)内部窜流情况;步骤七,在压裂完成后,通过与高压气瓶(2)连接的气体压缩机(1)向套管(14)内部注入气体,利用气压传感器(10)和计算机(9)监测生产时气体在水泥环(15)中窜流压力;步骤八,击碎岩体(16)与水泥环(15),观察岩体(16)与水泥环(15)内部示踪剂分布规律。

Claims (9)

1.油气井压裂工况井筒完整性评价的实验装置,其特征是:包括岩体与井筒物理模型、外压缸套、外压加载管线、内压加载管线、高压泵、三向加载液压缸、液压控制模块、应变传感器、气压传感器、欧姆表和计算机;外压缸套外部连接有外压加载管线和高压泵,外压缸套内部布置了三向加载液压缸,三向加载液压缸与液压控制模块连接,三向加载液压缸中间放置有岩体与井筒物理模型,套管入口连接有内压加载管线和高压泵及高压气瓶和气体压缩机,套管外壁连接有应变传感器,水泥环内部连接有气压传感器和欧姆表。
2.根据权利要求1所述的油气井压裂工况井筒完整性评价的实验装置,其特征是:岩体含有井眼和射孔孔眼,在井眼中放置套管,在套管与井眼之间环空中注入水泥浆,套管、水泥环和岩体共同组成了岩体与井筒物理模型。
3.油气井压裂工况井筒完整性评价的实验方法,其特征是:包括以下步骤:步骤一,在套管外壁上布置应变片,并连接应变传感器和计算机;步骤二,制作含有井眼和射孔孔眼的岩体;步骤三,在岩体的井眼中放置套管,在套管与井眼之间环空中注入水泥浆,水泥环连接气压传感器和欧姆表;步骤四,把岩体与井筒物理模型放置于三向加载液压缸之中,对岩体施加孔隙压力和三向主地应力;步骤五,在压裂液中混合示踪剂,通过内压加载管线和高压泵向套管内部注入压裂液,对岩体进行水力压裂;步骤六,在压裂过程中,测量套管应变,考察水泥环内部窜流情况;步骤七,在压裂完成后,通过与高压气瓶连接的气体压缩机向套管内部注入气体,监测生产时气体在水泥环中窜流压力;步骤八,击碎岩体与水泥环,观察岩体与水泥环内部示踪剂分布规律。
4.根据权利要求3所述的油气井压裂工况井筒完整性评价的实验方法,其特征是:通过外压加载管线和高压泵对岩体施加孔隙压力,通过三向加载液压缸对岩体施加三向主地应力。
5.根据权利要求3所述的油气井压裂工况井筒完整性评价的实验方法,其特征是:通过与高压气瓶连接的气体压缩机向套管内部注入气体来模拟采气过程。
6.根据权利要求3所述的油气井压裂工况井筒完整性评价的实验方法,其特征是:在套管外壁上布置应变片,并连接应变传感器和计算机,通过测量应变实时地评价套管完整性。
7.根据权利要求3所述的油气井压裂工况井筒完整性评价的实验方法,其特征是:根据水泥环和压裂液导电性差异,利用欧姆表测量水泥环内部液体窜流情况,评价压裂时水泥环完整性。
8.根据权利要求3所述的油气井压裂工况井筒完整性评价的实验方法,其特征是:利用气压传感器监测气体在水泥环中窜流压力,评价气井生产时水泥环完整性。
9.根据权利要求3所述的油气井压裂工况井筒完整性评价的实验方法,其特征是:在压裂液中混合示踪剂,实验后击碎岩体与水泥环,观察示踪剂分布规律,评价压裂后岩体与水泥环完整性。
CN201510251392.3A 2015-05-14 2015-05-14 油气井压裂工况井筒完整性评价的实验装置与方法 Expired - Fee Related CN105041284B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510251392.3A CN105041284B (zh) 2015-05-14 2015-05-14 油气井压裂工况井筒完整性评价的实验装置与方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510251392.3A CN105041284B (zh) 2015-05-14 2015-05-14 油气井压裂工况井筒完整性评价的实验装置与方法

Publications (2)

Publication Number Publication Date
CN105041284A CN105041284A (zh) 2015-11-11
CN105041284B true CN105041284B (zh) 2018-04-24

Family

ID=54448207

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510251392.3A Expired - Fee Related CN105041284B (zh) 2015-05-14 2015-05-14 油气井压裂工况井筒完整性评价的实验装置与方法

Country Status (1)

Country Link
CN (1) CN105041284B (zh)

Families Citing this family (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105672972B (zh) * 2016-01-14 2018-04-06 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 一种多级水力喷射压裂管柱性能评价方法
CN106483045B (zh) * 2016-10-14 2019-06-07 西南石油大学 用于测试水泥环射孔后层间封隔性能的试验装置及方法
CN106499385B (zh) * 2016-12-15 2017-09-29 中国石油大学(北京) 用于评价压裂环境下套管完整性的装置及方法
CN106703777A (zh) * 2017-01-10 2017-05-24 中国石油大学(北京) 一种压裂水平井筒完整性实验装置
CN107100617B (zh) * 2017-04-20 2018-04-24 中国石油大学(北京) 一种模拟致密储层水平井固井缺陷诱发套管变形的方法
CN106869843B (zh) * 2017-04-24 2020-03-17 中国石油大学(华东) 一种油水井物理法增产增注效果评价模拟实验方法
CN107269263A (zh) * 2017-08-16 2017-10-20 成都理工大学 一种蠕变地层定向井筒力学行为模拟实验装置与方法
CN110231436A (zh) * 2018-03-02 2019-09-13 中国石油天然气股份有限公司 套损检测方法
CN108931369A (zh) * 2018-08-23 2018-12-04 中国石油大学(北京) 一种循环带温带压的测试管柱井下模拟实验装置
CN111335874B (zh) * 2020-03-20 2021-08-13 中国石油大学(北京) 油气井固井水泥封隔能力检测装置及其检测方法
CN111287732B (zh) * 2020-04-01 2023-04-25 中国石油天然气集团有限公司 一种油气井水泥环密封性能检测评价装置及评价方法
CN112761605A (zh) * 2021-01-08 2021-05-07 成都理工大学 一种预防油气井固井界面密封失效的方法
CN114934769B (zh) * 2022-05-22 2023-04-07 东北石油大学 致密气藏压裂套管-水泥环一体化模拟装置及其评价方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103498662A (zh) * 2013-10-16 2014-01-08 东北石油大学 一种水泥环结构完整性力学实验装置
CN104153760A (zh) * 2014-07-22 2014-11-19 中国石油大学(华东) 油气井水泥环密封特性模拟测试装置与实验方法
CN204024635U (zh) * 2014-07-22 2014-12-17 中国石油大学(华东) 一种油气井水泥环密封特性模拟测试装置

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8726993B2 (en) * 2010-05-27 2014-05-20 Claude E Cooke, Jr. Method and apparatus for maintaining pressure in well cementing during curing
US8960013B2 (en) * 2012-03-01 2015-02-24 Halliburton Energy Services, Inc. Cement testing

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103498662A (zh) * 2013-10-16 2014-01-08 东北石油大学 一种水泥环结构完整性力学实验装置
CN104153760A (zh) * 2014-07-22 2014-11-19 中国石油大学(华东) 油气井水泥环密封特性模拟测试装置与实验方法
CN204024635U (zh) * 2014-07-22 2014-12-17 中国石油大学(华东) 一种油气井水泥环密封特性模拟测试装置

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
《高温高压高含硫气井井筒完整性评价技术研究与应用》;郭建华;《中国博士学位论文全文数据库 工程科技Ⅰ辑》;20140615;第65-71页 *

Also Published As

Publication number Publication date
CN105041284A (zh) 2015-11-11

Similar Documents

Publication Publication Date Title
CN105041284B (zh) 油气井压裂工况井筒完整性评价的实验装置与方法
Jiang et al. Experimental and numerical study on hydraulic fracture propagation in coalbed methane reservoir
CN103267722B (zh) 一种承压渗透注浆加固试验装置及方法
CN106499385B (zh) 用于评价压裂环境下套管完整性的装置及方法
CN104500031B (zh) 天然气水合物地层钻井模拟装置
CN103196762B (zh) 一种脉冲水力压裂改造页岩气储层的实验装置及方法
CN106522923A (zh) 油气井水泥环密封完整性测试装置及利用此装置进行评价的方法
CN107269263A (zh) 一种蠕变地层定向井筒力学行为模拟实验装置与方法
CN206233918U (zh) 油气井水泥环密封完整性测试装置
CN104153760A (zh) 油气井水泥环密封特性模拟测试装置与实验方法
CN104535727B (zh) 一种水力加砂压裂系统
CN206957685U (zh) 页岩气水力压裂液与地层配伍性的测试装置
CN210269442U (zh) 一种三轴煤岩多场多相耦合压裂实验装置
CN103884597A (zh) 煤层水力压裂诱导围岩应力变化的模拟测量装置及方法
CN111287731A (zh) 一种固井水泥环完整性评价装置及方法
US20230168164A1 (en) Device for testing strength and sealing performance of cement sheath after perforation and using method thereof
Geng et al. Development and application of triaxial seepage test system for gas-water two-phase in coal rock
CN212671758U (zh) 一种固井水泥环完整性评价装置
CN206174943U (zh) 煤层/页岩层/致密层水平井分段压裂实验装置
CN203798679U (zh) 一种煤层水力压裂诱导围岩应力变化的模拟测量装置
CN112443288B (zh) 一种评价固井水泥环二界面密封能力的实验装置
CN108196002B (zh) 一种压裂酸化用暂堵转向液性能评价装置及其测试方法
CN204301779U (zh) 一种室内深孔注浆多参数联合测试仪
CN114737925B (zh) 一种水压致裂煤岩体瓦斯渗流模拟装置及抽采量预测方法
Xi et al. Research on the establishment of gas channeling barrier for preventing SCP caused by cyclic loading-unloading in shale gas horizontal wells

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
CB03 Change of inventor or designer information

Inventor after: Gao Deli

Inventor after: Yin Fei

Inventor after: Liu Kui

Inventor before: Yin Fei

Inventor before: Gao Deli

Inventor before: Liu Kui

COR Change of bibliographic data
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180424

Termination date: 20190514

CF01 Termination of patent right due to non-payment of annual fee
DD01 Delivery of document by public notice

Addressee: Yin Fei

Document name: Notification of Termination of Patent Right

DD01 Delivery of document by public notice